This document is an Addendum to the Construction Bid for the Milakokia Lake SFCG BAS Improvements project located in Mackinac County, Michigan. The Addendum updates the Contract Documents by extending the Substantial Completion date from October 25, 2024 to November 14, 2024, and the Final Completion date from November 22, 2024 to May 15, 2025. The scope of work and associated timeline for the project have also been adjusted accordingly. The Addendum notes that Wade Trim, Inc. will provide construction staking and layout for the Contractor, and includes the sign-in sheet from the on-site pre-bid meeting.
The Milakokia Lake SFCG BAS Improvements project has a bid opening date of March 27, 2024. Bidders must acknowledge receipt of this Addendum in their bid submission. The project is being procured by the Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. No. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
3/18/2024
PROJECT NAME
Milakokia Lake SFCG BAS Improvements
FILE NUMBER
751/18062.ABG
PROFESSIONAL
Wade Trim, Inc.
PROJECT DIRECTOR
Alan Goschka
BID OPENING DATE:
3/27/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
General:
1. On-site prebid meeting sign-in sheet is attached.
Clarifications:
1. Wade Trim will provide construction staking and layout for the Contractor.
Changes:
1. Contract Documents
Page 2, Contract Time(s):
- REPLACE “Substantial Completion October 25, 2024" with “Substantial Completion
November 14, 2024” and “Final Completion November 22, 2024” with “Final Completion May 15, 2025”
Page 2, Project Scope of Work:
- REPLACE “November 22, 2024” with “May 15, 2025”
Page 20, Contract Time; Liquidated Damages:
- REPLACE “October 25, 2024” with “November 14, 2024”
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Wade Trim, Inc. DATE: 3/18/2023
APPROVED BY:
PROJECT DIRECTOR: DATE: Click to enter date http://www.michigan.gov/SIGMAVSS qridley Line qridley Line qridley Line qridley Line
GoschkaA Text Box
ABG
| DTMB-0414 (Construction Addendum) No. 1 (Rebid) |
| Meeting Attendence |
File details come from the government source that posted it. Updated .