(180000003036)Truck Mounted Auger Drill Unit Schedule A.docx

DOCX document 53 KB Posted

Attached to
Truck Mounted Auger Drill Unit
Solicitation number
RFP-591-180000003036-3
Issued by
Ingham County, Lansing City, Michigan

About this file

This is a Schedule A Statement of Work document from the Michigan Department of Transportation (MDOT) for bid number 180000003036 requesting one truck-mounted auger drill unit. The unit is needed for construction, scheduled maintenance, and emergency response on roads, bridges, and facilities. The equipment must be the latest model in current production and delivered fully assembled within 120 days after receipt of order. The contract includes requirements for two sets of operating and maintenance manuals, 8 hours of operator and mechanics training for 6-8 MDOT employees, and delivery to the MDOT OOAS Garage in Lansing, MI. A pre-award demonstration may be required within 10 days of recommendation for award, and a pre-delivery inspection at the vendor's facility is mandatory.

The pricing must include all costs including setup, training, shipping, and handling as a one-time purchase. The contract requires a three-year warranty covering all components, starting from the in-service date. Liquidated damages of 0.2% per day up to 30 days may be assessed for late delivery. The vendor must be available for technical support between 8:00 am to 6:00 pm EST Monday through Friday, and must provide details of their quality assurance program and any environmental certifications or hazardous materials information.

View the file

Other files

File Type Posted
(180000003036) Schdule B Pricing Page.docx DOCX document
(180000003036) Standard Contract Terms.docx DOCX document
Amendment 1 - Description.docx DOCX document
180000003036 Cover Page Proposal Instructions and Vendor Questions Worksheet SIGMA.docx DOCX document
(Amendment 1) C11-0001.18 Revised.xlsx XLSX spreadsheet
Question and Answer 180000003036.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidder must enter company name here. MDOT Spec. No. C11-0001.18 June 2018 Truck Mounted Auger Drill Unit

SCHEDULE A

Bid Number: 180000003036

STATE OF MICHIGAN

Truck Mounted Auger Drill Unit

SCHEDULE A

STATEMENT OF WORK

CONTRACT ACTIVITIES

This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

SCOPE

The Michigan Department of Transportation, Office of Operations Administrative Services, Fleet Division is requesting one (1) Truck Mounted Auger Drill Unit for construction, scheduled maintenance and response to emergency situations on roads, bridges and facilities.

Requirements
Responses:

The Contractor is to provide a Truck Mounted Auger Drill Unit, as listed within the attached specifications.

Attachment A, Specification # C11-0001.18

The Truck Mounted Auger Drill Unit must be the latest model in current production, satisfactory to meet the performance and design characteristics required in the specification.
Bidder Response
The Truck Mounted Auger Drill Unit shall be built in accordance with the U.S. Government, American National Standards (ANSI) and Federal and Michigan’s Occupational Safety and Health Administration (OSHA& MIOSHA) standards.
Bidder Response
The Truck Mounted Auger Drill Unit must be delivered fully assembled and equipped with manufacturer’s standard equipment necessary for operation.
Bidder Response

The Contractor is to submit manufacturer's product literature for the make and model offered with the bid.

The literature is to show supporting data for the performance and design specifications described within Attachment A, Specification # C11-0001.18 Bidder Response

If the listed specifications and requirements, within Attachment A are not available from the manufacturer, the Contractor will be expected to identify the appropriate substitution within their bid proposal.

Bidder Response

An alternate/deviated bid from the attached specifications must clearly describe all variances from the specifications and the proposal must include descriptive literature that contains complete specifications.
Bidder will indicate NO within the response of the Specification attachment and provide

available alternate/option and explanation.

1.Specifications

The Contractor will indicate if it is a licensed distributor or manufacturer.
Contractor licensed distributor or manufacturer.
Contractor to identify proposed Truck Mounted Auger Drill Unit. Bidder will include descriptive literature with bid submission.
Bidder Response:

Make Model

Bidder will complete the attached specification sheet – Attachment A, Specification # C11-0001.18

Listed brands is for identification purposes only and do not limit the Contractor to such brands.

Bidder response:

Is Attachment A completed and attached in SIGMA?

Contractor must respond to the following areas with either agreed or indicate an exception OR provide detail as requested Sections 1.2 through Sections 11

1.2 Quantity

Contractor will provide one (1) Truck Mounted Auger Drill Unit as specified within Attachment A, Specification # C11-0001.18
Bidder Response

1.3 Manuals

The Contractor will provide two (2) sets of the following manuals for the Truck Mounted Auger Drill Unit at time of delivery.

1. Operating

2. Parts and maintenance/service

Manuals can be provided in CD, flash drive or paper format.

Bidder Response

Failure to deliver manuals at time of delivery may be cause for payment to be delayed.

1.4 Warranties

The Contractor is to provide a three-year warranty covering all components listed within this RFP, or manufacturer`s warranty whichever is greater.

This warranty shall start on the in-service date, which is when MDOT first begins to use the unit.

Bidder Response:

The Contractor will explain its warranty period for all the components as specified within this RFP to include:

Reporting warranty issues and how it will handle material replacements.

Bidder Response

1.5 Recall Requirements and Procedures

The Contractor will notify MDOT and assist with any removal and replacement of defected parts at no additional cost.
Bidder Response

1.6 Quality Assurance Program

The Contractor will explain your Quality Assurance Program(s).
Bidder Response

1.7 Incentives

Explain any special incentives or services including, but not limited to, return policies, trade-in programs, quantity discounts, etc.

2. Service Levels

2.1 Delivery

Prior to the delivery the unit shall be serviced, tested and ready for operation.
Bidder Response

Delivery shall be 120 days ARO

Contractor to contact Scott Poyer, MDOT Fleet Specialist 48 hours prior to delivery.

Delivery will be accepted between the hours of 8:00 and 3:00 pm Monday through Thursday except public holidays.

Delivery will be shipped to:

MDOT OOAS Garage 2522 West Main Street Lansing MI 48917 Attention: Scott Poyer

2.2 Technical Support and Repairs

The Contractor will specify direct phone numbers or cell phone numbers for the State to make contact with the Contractor for technical support, repairs and maintenance. The Contractor must be available for calls and service during the hours of 8:00 am to 6:00 pm EST, Monday thru Friday.
Bidder Response:

Contractor to define process for repairs under warranty and non-warranty items.

Bidder response:

Warranty items:

Non Warranty items:

Location for repairs:

2.3 Training

For a group of 6-8 MDOT employees, the Contractor will provide, at a minimum, 8 hours of operator and mechanics training, Training is to include, but not limited to the following:

1.Daily and preventative maintenance.
2.Operator controls.
3.Startup and shutdown.
4.Hands-on-operation of the unit.
5.One (1) Safety & Training Video
Bidder to provide recommended training hours:

Scheduling of training will occur at a time and location determined by MDOT after unit has been accepted and is ready to be placed into service.

MDOT will contact the Contractor to schedule training.

Bidder Response:

Contractor is to demonstrate providing previous training on the make and model of Truck Mounted Auger Drill Unit submitted with bid response.

Contractor to respond with statement or attach copies of previous training material.

Contractor to indicate training fee.
Bidder Response: $

3. Staffing

3.1 Disclosure of Subcontractors

If the Contractor will use a supplier or sub-contractor to purchase the requested material, the Contractor must disclose and provide the following:
Bidder Response

The legal business name; address and telephone number of the sub-contractor or supplier

A description of subcontractor’s or supplier’s organization

The relationship of the subcontractor or supplier to the Contractor

Whether the Contractor has a previous working experience with the subcontractor or supplier. If yes, provide the details of that previous relationship

A complete description of the Contract Activities that will be performed or provided by the sub-contractor or supplier.

The subcontractor or supplier will attach a statement addressed to the Contractor verifying that the warranty will be transferable to MDOT; this statement is to include signatures from the supplier or subcontractor AND the manufacturer.

Of the total bid, the price of the subcontractor’s work.

3.2 Security

The contract activities require interaction with State personnel at State facilities and/or designated State trunk lines or highways.

Upon request by the State, the Contractor shall provide the results of all security background checks of employees.

The State may decide to also perform a security background check. If so, the Contractor will be required to provide to the State a list of all delivery people that will service State of Michigan facilities, including name, date of birth and social security number.

Bidder Response:

4. Pricing

4.1 Price Term

This is a one-time purchase
Bidder Response

Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, training and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).

Contractor to complete and submit pricing on Schedule B

5. Project Management

5.1 Meetings

A. PRE-AWARD MEETING

After the bidder is “Recommendation for Award”, the successful bidder may be required to provide a demonstration, at a location within the State of Michigan, within ten (10) days of such request by the State

(i) The purpose of this meeting will be for the recommended bidder to demonstrate proposed equipment features, attachments and accessories as called for within Schedule A and Attachment A, Specification # C11-0001.18.

(ii) MDOT reserves the right to withdraw the posted award recommendation if the bidder does not have sufficient personnel and the specified equipment to perform the requirements of the contact activities.

Bidder Response:

B.

Kick-Off Meeting

Within thirty (30) days of the purchase order date, MDOT may request a pre-construction meeting with the Contractor. Meeting is generally a phone conference.

Areas to be discussed will include:

1. Review terms and requirements of the order.

2. Contractor to provide estimated progress schedule and completion date.

Bidder Response:

C. Equipment Inspection The Contractor will be required to host a pre-delivery model inspection at the vendor`s facility. The inspection will be scheduled when the unit is substantially completed and before delivery.

The Contractor shall be required to pay the travel and subsistence costs for up to two (2) MDOT personnel from Lansing Michigan. The costs will be the same as the standard travel reimbursement rates for state of Michigan Employees.

Bidder Response:

Contractor to indicate cost to host Equipment Inspection
Bidder Response $_______

6. Ordering

6.1 Authorizing Document

The appropriate authorizing document for the Contract will be a purchase order.

7.Delivery

7.1Delivery Programs

The Contractor will state its delivery programs (e.g., standard delivery and quick-ship), including any limitations such as quantity.
Bidder Response
The Contractor will state transportation method (e.g., UPS, FedEx, Contractor fleet, or other third party carrier) it intends on utilizing in delivery of the Contract Activities.
Bidder Response

8.Acceptance

8.1 Acceptance and Inspection

The following criteria will be used to determine final acceptance of the Contract Actives.

1. The Truck Mounted Auger Drill Unit shall be fully assembled and completely equipped with all features necessary for its operation as listed within Attachment A, Specification # C11-0001.18

2. Manuals as specified within section 1.3 Bidder Response

8.2 Final Acceptance

As stated within attached Standard Contract Term, Section 16, Acceptance.

9. Invoice and Payment

9.1 Invoice Requirements

All invoices submited to the State must include: (a) date; (b) purchase order; (c) quantity; (d) description

Contractor will send invoice to:

Fleet Administration Michigan Department of Transportation 2522 West Main St.

Lansing, MI 48917 Attention: Scott Poyer

9.2 Payment Methods

The State will make payment for Contract Activities as stated within the attached Standard Contract Terms, Section 20, Terms of Payment

The State will only disburse payments under this Contract through Electronic Funds Transfer (EFT). Contractor must register with the State at http://www.michigan.gov/cpexpress to receive electronic fund transfer payments. If Contractor does not register, the State is not liable for failure to provide payment.

Bidder Response

10. Additional Requirements

10.1 Environmental and Energy Efficient Products

The Contractor must identify any energy efficient, bio-based, or otherwise environmental friendly products used in the products. Contractor must include any relevant third-party certification, including the verification of a United States department of agriculture certified bio based product label.
Bidder Response

10.2 Hazardous Chemical Identification

In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals, as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.

The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.

Bidder Response

10.3 Mercury Content

Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.
Bidder Response

10.4 Brominated Flame Retardants

The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs.
Bidder Response

11. Liquidated Damages

The delivery of vehicles/units must be consistent with the scheduling as established within the Purchase Order.

If any vehicles/units are not delivered within the delivery schedule specified, the delay will interfere with the proper implementation of the fleet management programs utilizing these vehicles/units, to the loss and damage of the State of Michigan.

Late or improper completion of the deliverables would be impracticable and extremely difficult to fix the actual damage sustained in the event of any such delays.

If there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of 2/10th of 1% per day up to 30 days, if Contractor fails to remedy the late or improper completion of the Work, the State may deduct liquidated damages from the final payment.

Bidder Response:

Version 1 Revised Date: 7/28/2017

File details come from the government source that posted it. Updated .