17264 Cheboygan Lock Facility IFB Drawings 12-1-23.pdf
PDF 3 MB Posted
- Attached to
- 751/17264. ABG; Cheboygan Lock Facility Repairs
- Solicitation number
- RFQ - 171 - 240000000124
- Issued by
- Cheboygan County, Chesaning Village, Michigan
About this file
This document is an Invitation for Bid (IFB) for the Cheboygan Lock Facility Improvement Project, issued by the Michigan Department of Technology, Management, and Budget (DTMB) on behalf of the Michigan Department of Natural Resources (MDNR). The project involves the repair and renovation of the Cheboygan Lock Facility located in Cheboygan, Michigan. Key components of the work include replacement of timber sills, miter gate rehabilitation, bypass conduit improvements, hydraulic operating system upgrades, concrete repairs, and various safety enhancements. Bids are due by 2:00 PM on December 1, 2023, and the contract is anticipated to be awarded shortly thereafter. The successful contractor will be responsible for completing the work within the project schedule constraints.
The IFB provides detailed specifications, drawings, and a rehabilitation schedule outlining the scope of work. Pricing is lump sum, and the project is funded by the MDNR. Bidders must comply with all applicable state and federal requirements, including those related to lead-based paint and cadmium content on existing painted surfaces. The contractor will be required to provide shop drawings, work plans, and other submittals for review prior to fabrication and construction.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\COVER SHEET.dwg - 5/4/2023
CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
MICHIGAN DEPARTMENT OF NATURAL RESOURCES
CHEBOYGAN, MI
DTMB FILE.:751/17264.ABG
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED
HEREIN, IS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE
PROPERTY OF GEI CONSULTANTS AND IS NOT TO BE USED, IN WHOLE
OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN
AUTHORIZATION OF GEI CONSULTANTS.
STATE MAP
(NOT TO SCALE)
SITE LOCATION MAP
(NOT TO SCALE)
PREPARED FOR:
MICHIGAN DEPARTMENT OF TECHNOLOGY,
MANAGEMENT, AND BUDGET
440 N. STATE ST
SAINT IGNACE, MICHIGAN 49781
(906) 643-6181
GEI PROJECT NO. 1904013
SITE
SOURCE:
GOOGLE EARTH IMAGE
ISSUE FOR BID
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Consultants
PREPARED BY:
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
DWG. NO.
SHEET NO.
G-01
SITE
PROJECT OWNER:
MICHIGAN DEPARTMENT OF NATURAL
RESOURCES
120 A STREET
CHEBOYGAN, MICHIGAN 49721
(231)627-9011
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S PENI NSUL AM AMOENA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
SHEET INDEX
SHEET NO. DRAWING NO. SHEET TITLE
1 G-01 COVER SHEET
2 G-02 GENERAL NOTES AND LEGEND
3 G-03 SITE ACCESS PLAN
4 C-01 EXISTING SITE PLAN
5 C-02 EXISTING LOCK FACILITY
6 C-03 LOCK REHABILITATION SCHEDULE
7 C-04 STOP LOG SLOT PREPARATION
8 C-05 CONCRETE REPAIR DETAILS
9 S-01 EXISTING MITER GATE ANCHORAGES
10 S-02 MITER GATE ANCHORAGE REPAIRS
11 C-06 MITER GATES
12 S-03 EXISTING MITER GATE STRUCTURAL DETAILS
13 S-04 PROPOSED MITER GATE STRUCTURAL DETAILS
14 C-07 TIMBER REPLACEMENT
15 C-08 DEMOLITION PLAN AND SECTIONS
16 C-09 PROPOSED BYPASS CONDUIT IMPROVEMENTS
17 C-10 LOCK HYDRAULIC OPERATING SYSTEM DEMOLITION PLAN
- ALTERNATE SCOPE #2
18 C-11 PROPOSED LOCK HYDRAULIC OPERATING SYSTEM -
ALTERNATE SCOPE #2
19 EWD-1 PROPOSED LOCK HYDRAULIC OPERATING SYSTEM -
ALTERNATE SCOPE #2
20 C-12 EXISTING LOCK SAFETY & DEMO
21 C-13 PROPOSED LOCK SAFETY UPGRADES
22 C-14 DOWNSTREAM MITER GATE SAFETY UPGRADES
23 S-05 PLATFORM FRAMING
24 S-06 PLATFORM FRAMING DETAILS
STEEL
STRUCTURAL
CONCRETE
APPROX = APPROXIMATE
CL = CENTERLINE
CLR = CLEAR
CNTR = CENTER
CONC = CONCRETE
DIA, Ø = DIAMETER
DIM = DIMENSION(S)
D/S = DOWNSTREAM
DWG, DWGS = DRAWING OR DRAWINGS
EA = EACH
EL., ELEV = ELEVATION
FT = FEET OR FOOT
GALV = GALVANIZED
GR = GRADE
HDG = HOT DIPPED GALVANIZED
HSS = HOLLOW STRUCTURAL STEEL
LOC = LIMITS OF CONSTRUCTION
MAX = MAXIMUM
MIN = MINIMUM
NO = NUMBER
NTS = NOT TO SCALE
O.C. = ON CENTER
PL = PLATE
RA = RADIUS
REINF = REINFORCEMENT
REQ'D = REQUIRED
SPEC = SPECIFICATION(S)
TC = TURBIDITY CURTAIN
TYP = TYPICAL
U.N.O. = UNLESS NOTED OTHERWISE
U/S = UPSTREAM
VERT = VERTICAL
VIF = VERIFY IN FIELD
ABBREVIATIONS:
HATCH LEGEND:
GENERAL LEGEND:
A S-01
A S-01
SECTION LOCATION. THE LETTER "A" REFERS TO THE SECTION
DESIGNATION. THE NUMBER "S-01" REFERS TO THE DRAWING NUMBER
WHERE THE SECTION IS SHOWN.
S-01
DETAIL LOCATION. THE NUMBER "1" REFERS TO THE DETAIL
DESIGNATION. THE NUMBER "S-01" REFERS TO THE DRAWING NUMBER
WHERE THE DETAIL IS SHOWN.
SCALE: N.T.S.
DETAIL - XXXX1
S-01
SCALE: N.T.S.
SECTION - XXXXA
S-01
DETAIL TITLE. THE NUMBER "1" REFERS TO THE DETAIL DESIGNATION.
THE NUMBER "S-01" REFERS TO THE DRAWING NUMBER WHERE THE
DETAIL IS CALLED OUT.
SECTION TITLE. THE LETTER "A" REFERS TO THE DETAIL
DESIGNATION. THE NUMBER "S-01" REFERS TO THE DRAWING
NUMBER WHERE THE DETAIL IS CALLED OUT.
EXISTING GROUND
SURFACE
VERTICAL DATUM:
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88)
NOTE: EXISTING DRAWINGS IN IGLD55. TO CONVERT BETWEEN DATUMS:
594.09 (IGLD55) + 0.95 FT = 595.04 (NAVD88)
HISTORICAL DRAWING SHEET INDEX
DATE DRAWING NO. SHEET TITLE
8/12/1927 H-140 HYDRAULIC PROPOSED CONCRETE LOCK
7/1988 1 PROPOSED REPLACEMENT OF LOCK GATES
7/1988 2 SITE PLAN
7/1988 3 LOCK GATES AREA PLAN
7/1988 4 QUOIN POSITIONING DETAILS
7/1988 5 CYLINDER AND QUOIN POCKET LINER DETAILS
7/1988 6 LOCK GATE DETAILS
7/1988 7 LOCK GATE SECTION DETAILS
7/1988 8 UPPER AND LOWER LOCK GATE CONNECTION
DETAILS
7/1988 9 SPRUE PLATES AND FRAMING DETAILS
7/1988 10 HEADRACE TIMBER PILING AND BUMPER
DETAILS
11/1988 E1 PLAN VIEW
12/1988 E2 SPUR GATE CONNECTION AND ANGLE FRAME
9/1988 1 CYLINDER POCKETS AND QUOIN SKIRTS
9/1988 2 QUOIN POCKETS, QUOIN SKIRTS AND PINTLE
SHOE
10/1988 3 UPPER GATE LOCKS
11/1988 4 LOWER GATES
11/1988 5 MISC. STEEL
11/1988 6 RAILINGS
1/11/1988 L-1 GATE CENTER DETAIL
HORIZONTAL DATUM:
NORTH AMERICAN DATUM 1983 (NAD83)
GENERAL NOTES AND LEGEND
GENERAL NOTES:
1. THESE NOTES SUPPLEMENT THE PROJECT SPECIFICATIONS. ANY DISCREPANCY FOUND AMONG THE DRAWINGS, SPECIFICATIONS, THESE NOTES, AND THE SITE CONDITIONS SHALL BE REPORTED TO
THE OWNER'S REPRESENTATIVE (GEI), WHO SHALL CORRECT SUCH DISCREPANCY IN WRITING.
ANY WORK DONE BY THE CONTRACTOR AFTER DISCOVERY OF SUCH DISREPANCY SHALL BE
DONE AT CONTRACTOR'S RISK. THE CONTRACTOR SHALL VERIFY AND COORDINATE THE
DIMENSIONS AMONG ALL DRAWINGS PRIOR TO PROCEEDING WITH ANY WORK OF FABRICATION.
2. CONSTRUCTION IS SUBJECT TO THE RULES AND REGULATIONS OF THE MICHIGAN DEPARTMENT OF THE ENVIRONMENT, GREAT LAKES, AND ENERGY (EGLE) AND THE UNITED STATES ARMY CORPS OF ENGINEERS (USACE). SUBSTANTIVE CHANGES TO THE APPROVED DRAWINGS AND SPECIFICATIONS
MAY REQUIRE EGLE AND/OR USACE APPROVAL.
3. PRIMARY SITE ACCESS TO THE PROJECT IS PROVIDED AS FOUND ON SHEET G-03.
4. THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN SHALL BE ASSUMED TO BE APPROXIMATE.
THE CONTRACTOR SHALL MAKE ANY NECESSARY INVESTIGATIONS AND COORDINATION WITH THE 811
MIS-DIG ONE CALL PRIOR TO COMMENCEMENT OF ANY WORK ACTIVITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING (SHOWN AND
NOT SHOWN ON THESE DRAWINGS) DURING CONSTRUCTION.
6. SHOP DRAWINGS FOR REINFORCING STEEL, AND STRUCTURAL STEEL SHALL BE SUBMITTED TO
THE OWNER'S REPRESENTATIVE (GEI) FOR REVIEW PRIOR TO FABRICATION. SUBMIT THREE
COPIES WITH CONTRACTOR'S REVIEW STAMP. OWNER'S REPRESENTATIVE (GEI) SHOP DRAWING
REVIEW IS FOR GENERAL CONFORMANCE ONLY OF THE DESIGN CONCEPT AND CONTRACT
DOCUMENTS. OWNER'S REPRESENTATIVE (GEI) COMMENTS SHALL NOT BE CONSTRUED AS
RELIEVING THE CONTRACTOR FROM COMPLIANCE WITH THE PROJECT PLANS AND
SPECIFICATIONS. THE CONTRACTOR REMAINS RESPONSIBLE FOR DETAILS AND ACCURACY, FOR
CONFORMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS AND FOR PERFORMING THE
WORK IN SAFE MANNER.
7. CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A SEQUENCE AND
SCHEDULE FOR COMPLETION OF THE WORK IN ACCORDANCE WITH APPLICABLE PROVISIONS OF
THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL SUBMIT THEIR WORK PLAN WHICH SHALL
INCLUDE THE PROPOSED SEQUENCE OF WORK.
8. THE LOCK WILL REMAIN OUT OF SERVICE DURING THE WORK, HOWEVER, ACCOMODATIONS SHALL BE MADE FOR OWNER AND/OR THE OWNER'S REPRESENTATIVE FOR INSPECTION, REVIEW, ETC. AT ANY
POINT DURING CONSTRUCTION WITHOUT DELAY.
9. THIS PROJECT INCLUDES REPLACEMENT IN KIND OF HISTORICAL MATERIALS, SOME OF WHICH WERE UNABLE TO BE INSPECTED OR MATERIAL TYPE CONFIRMED. CONTRACTOR SHALL PROVIDE SUBMITTALS FOR
ALL MATERIALS PROPOSED FOR PERMANENT USE AT THE SITE.
COORDINATION:
1. SCHEDULE, COORDINATE, AND PERFORM THE WORK TO MEET THE OVERALL PROJECT SCHEDULE
CONSTRAINTS.
2. COORDINATE WITH THE OWNER FOR DESIGNATION OF SPECIFIC WORK AREAS FOR RESTRICTED
ACCESS DURING PARTICULAR PERIODS OF THE WORK, AS WELL AS NEED FOR FENCING,
SIGNAGE, AND OTHER MEASURES NECESSARY TO PROTECT THE PUBLIC, COMPLETED WORK,
WORK IN PROGRESS, AND CONTRACTOR'S EQUIPMENT AND PROPERTY ON SITE.
3. MAINTAIN FULL AND COMPLETE ACCESS TO WORK TO OWNER, ENGINEER, AND REGULATORY
PERSONNEL.
PERMITTING AND ENVIRONMENTAL:
COMPLY WITH ALL REQUIREMENTS OF OWNER-OBTAINED PROJECT PERMITS. CONTRACTOR SHALL OBTAIN
ALL OTHER PERMITS NECESSARY FOR
CONSTRUCTION OF THE WORK.
VARIOUS PAINTED STEEL SURFACES ON SITE TESTED POSITIVE FOR LEAD BASED PAINT AND CADMIUM
CONTENT. REFERENCE THE LABORATORY TESTING REPORT FOR RESULTS AND LEAD/CADMIUM
CONCENTRATIONS.
STEWARDSHIP / ARTIFACT NOTE:
IF ANY ARTIFACTS ARE DISCOVERED DURING THE CONSTRUCTION PROCESS, ALL WORK IS TO
STOP AND THE OWNER'S REPRESENTATIVE / PROJECT MANAGER SHALL BE NOTIFIED.
ARTIFACTS OR ARCHEOLOGICAL MATERIALS ARE DEFINED AS : ABORIGINAL ANTIQUITIES AND
OTHER RECORDS ON ANTIQUITY, INCLUDING MOUNDS, MINES, EARTHWORKS, VILLAGE SITES,
CAMP SITES, BURIALS, HUMAN OR OTHER BONES, SHELLS, STONE IMPLEMENTS, BONE OR
COPPER IMPLEMENTS, POTTERY OR SHARD OF POTTER, OR OTHER OBJECTS RELATING TO
NATIVE AMERICAN OCCUPATION; AND MODERN ARTIFACTS, SUCH AS FORTS, RELICS, AND
OTHER ARTIFACTS RELATING TO THE HISTORIC, COLONIAL, TERRITORIAL AND EARLY
STATEHOOD PERIODS.
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\GENERAL NOTES AND LEGEND.dwg - 5/1/2023
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
ISSUE FOR BID
LINETYPE LEGEND:
ACCESS ROUTE
TURBIDITY CURTAIN
EXISTING GROUND
TOPO (MAJOR)
TOPO (MINOR)
PROPERTY LINE
USACE CHANNEL
LIMITS OF CONSTRUCTION
EXISTING FENCELINE
TC
LOC
X
G-02
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
LOC
LO
C
LOC
LOC
LO
C
LOC
LOC
LOC
LO
C
LOC
SITE ACCESS PLAN
- SITE ACCESS
PLANSITE PHOTOS - DOWNSTREAM ACCESS
(NOT TO SCALE)
SHEET NOTES:
1. UPSTREAM ACCESS TO THE LOCK CAN BE ACHIEVED THROUGH THE CHEBOYGAN LOCK DNR BOATING
ACCESS SITE.
2. DOWNSTREAM ACCESS CAN BE ACHIEVED VIA THE CHEBOYGAN MUNICIPAL MARINA. THERE EXISTS A PEDESTRIAN BRIDGE IMMEDIATELY SOUTH OF THE MARINA, LIMITING OVERHEAD CLEARANCE TO APPROXIMATELY 15 FT ABOVE THE WATER SURFACE. THIS LIMITATION SHOULD BE CONSIDERED DURING
ACCESS PLANNING.
3. THE DOWNSTREAM CHANNEL IS APPROXIMATELY 25' WIDE AT ITS MOST NARROW. THIS LIMITATION SHOULD
BE CONSIDERED WHEN PLANNING THE CONSTRUCTION DOWNSTREAM OF THE LOCK.
4. IF ACCESSING FROM THE EAST THROUGH GLT PROPERTY, THERE EXISTS A HOPPER THAT LIMITS OVERHEAD
CLEARANCE TO 9' 6". THIS LIMITATION SHOULD BE CONSIDERED DURING ACCESS PLANNING.
5. PROPERTY LINE INFORMATION GATHERED FROM CHEBOYGAN COUNTY ONLINE MAPPING SYSTEM
ACCESSED ON 11/9/2021.
6. THE MDNR WILL REMOVE THE SKID DOCK AT THE REQUEST OF THE CONTRACTOR AS NEEDED TO PROVIDE
ADDITIONAL SPACE FOR LAUNCHING BARGES AND EQUIPMENT.
7. THE ACCESS BRIDGE IMMEDIATELY UPSTREAM OF THE GLT POWERHOUSE HAS REPORTED LIMITED LOAD RESTRICTIONS AS FOLLOWS: SINGLE REAR AXLE LOAD NOT EXCEEDING 16 TONS, HOWEVER EXISTING PLANK LIMITS LOAD AT 1 1/2 TONS (REFERENCE HISTORICAL DRAWING - PROPOSED REPLACEMENT OF LOCK
GATES DRAWINGS, UDA 1988, SHT NO. 2).
PARKING LOT AND
BOAT LAUNCH
(SEE NOTE 1)
UPSTREAM ACCESS TO LOCK
DOWNSTREAM ACCESS TO LOCK
PEDESTRIAN BRIDGE
(SEE NOTE 2)
OVERPASS
CEC SUBSTATIONSEE PHOTOS FOR
DOWNSTREAM ACCESS
(SEE NOTE 3)
GREAT LAKES TISSUE (GLT) PROPERTY LINE
CEC PROPERTY LINE (SEE NOTE 5)
SCALE, FEET
120 240
MICHIGAN STATE
WATERWAYS
PROPERTY LINE
25'
UPSTREAM ACCESS TO LOCK
VIA GREAT LAKES TISSUE
CONSUMERS ENERGY (CEC) SUBSTATION
PROPERTY CONTACT: RON BOURGEOIS AT
517-740-8936
M-27
E.
L
IN
C
O
LN
A
VE
SOUTH ST.
HOPPER
(SEE NOTE 4)
CHEBOYGAN DAM
MAIN SPILLWAY
CONTRACTOR STAGING
AREA (CLOSED TO
PUBLIC)
REMOVABLE SKID
DOCK (SEE NOTE 6)
POWERHOUSE
ACCESS BRIDGE
(SEE NOTE 7)
OHLOHLOHL
GREAT LAKES
TISSUE POWER
PLANT (SEE NOTE 8)
PROJECT LOCATION:
PART OF THE W 1/2 OF THE SE 1/4 OF SECTION 31 IN T38N, R01W
CITY OF CHEBOYGAN
USACE NAVIGABLE CHANNEL
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\SITE ACCESS PLAN.dwg - 11/8/2023
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
ISSUE FOR BID
G-03
X
X X
E
F
E
580580
LOC
LOC
LO
C
LOC
LOC
LO
C
LOC
LOC
LOC
LO
C
LO
C
LOCLOC
LOC
LO
C
EXISTING SITE PLAN
C-01
GREAT LAKES TISSUE
COMPANY PLANT
40 80
SCALE:
1" = 40'
- OVERALL SITE
PLANAERIAL SITE PHOTOS
(NOT TO SCALE)NOTES:
1. EXISTING BASEMAP COMPILED FROM AERIAL IMAGERY OBTAINED FROM
GOOGLE EARTH (2008) OVERLAYED BY THE RESULTS OF A SITE SURVEY
CONDUCTED SEPTEMBER 23, 2019 BY GEI CONSULTANTS.
2. A TRIMBLE R6 GNSS SYSTEM GPS WAS USED FOR THE DATA COLLECTION
AND WAS SUPPLEMENTED WITH A SEAFLOOR HYDROLITE SINGLE BEAM ECHO
SOUNDER FOR THE BATHYMETRY MEASUREMENTS.
CHEBOYGAN RIVER
(EL. VARIES, 594.2' TO 590.2')
C-02CHEBOYGAN DAM
NOTE AERIAL IMAGERY WAS TAKEN DURING
2008 DAM MODIFICATION PROJECT.
CONSTRUCTION CONDITIONS SHOWN DO
NOT REFLECT CURRENT SITE CONDITIONS
DRAWBRIDGE
RESTRICTED CLEARANCE AT HOPPER LOCATION (~9' 6")
12"Ø CMP CULVERTLOCATION OF EXISTING
STEEL BULKHEADS
CEC PROPERTY LINE
GLT PROPERTY LINE
CEC SUBSTATION
GABION BASKETS
MICHIGAN STATE
WATERWAYS
PROPERTY LINE
CHEBOYGAN LOCK
CITY OF CHEBOYGAN
EXTENTS OF USACE
NAVIGABLE CHANNEL
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\EXISTING SITE PLAN.dwg - 11/21/2023
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
HIGH WATER
EL. 594.20'
LOW WATER
EL. 590.20' HIGH WATER
EL. 582.40'
LOW WATER
EL. 577.20'
10 20
SCALE:
1" = 10'
- LOCK FACILITY
PLAN
10 20
SCALE:
1" = 10'
- CENTERLINE PROFILE OF LOCK
PROFILE
10 20
SCALE:
1" = 10'
C
- LOCK SECTION
SECTION
10 20
SCALE:
1" = 10'
A
- LOCK SECTION
SECTION
10 20
SCALE:
1" = 10'
B
- LOCK SECTION
SECTION
E C-02
E C-02
D C-02
D C-02
C C-02
C C-02
B C-02
B C-02
A C-02
A C-02
10 20
SCALE:
1" = 10'
D
- LOCK SECTION
SECTION
10 20
SCALE:
1" = 10'
E
- LOCK SECTION
SECTION
APPROXIMATE
OBSERVED
OVERPOUR
APPROXIMATE
OBSERVED
OVERPOUR
CLAY AND GRAVEL
HARD PAN
44' WOOD SHEET PILING 25' STEEL SHEET PILING
LOCK MITER GATES
STOPLOG CENTER
SUPPORT COLUMN POCKET
LOCK WALL
STOPLOG
SLOTS
(TYP)
BYPASS CONDUIT ACCESS MANHOLE (TYP)
BYPASS CONDUIT INLET (TYP)
BYPASS CONDUIT (TYP)
RECESSED CONCRETE
FOR MITER GATE
STOPLOG SLOTS (TYP)
BYPASS CONDUIT INLET
(NOTE TRASH RACK SHOWN)
BYPASS CONDUIT BUTTERFLY VALVE
BYPASS CONDUIT
BYPASS CONDUIT OUTLET
STOPLOG SLOTS (TYP)MITER GATE ANCHORAGE POINT
STOPLOG SLOTS (TYP)
NOTES:
1. LOCK EXISTING CONDITIONS DRAWING DEVELOPED FROM HISTORICAL
DRAWING "HYDRAULIC PROPOSED CONCRETE LOCK" DRAWING NO. H-140
DATED 8-12-27. WHILE THE DRAWINGS APPEAR TO REPRESENT AS-BUILT
CONDITIONS BASED ON MEASUREMENTS OF SURFACE FEATURES, THE
SUBSURFACE STRUCTURE GEOMETRY IS UNABLE TO BE VERIFIED.
TIMBER CRIB FILLED
WITH CINDER CONCRETE
SEEPAGE CUTOFF WALL
ELEV. 584.90'
ELEV. 594.95'
ELEV. 594.95'
ELEV. 570.70'
ELEV. 585.90'
ELEV. 571.60' ELEV. 572.60'
ELEV. 570.10'
ELEV. 594.95'
ELEV. 572.20'
25'-0" 21'-6" 23'-0"
0'
-0
'-0
9' -0
'-0
52'-6" 32'-0"
52'-6"
21'-6"
11'-6" 18'-0"
20'-6" 20'-6"
41'-0"
22'-4" 22'-0"
'-1
4'
-6
4' -6
4'
-9
1'-6"
1'-6"
1'-9"
1'-9" 5'-0" 10'-10" 9'-0" 6'-10" 1'-8"
1'-6"
5' -9
'-0
18'-0"
9'-0" 9'-0"
TOP OF UPSTREAM
MITER GATE SILL WALL
D/S TIMBER SILL
12"X12"U/S TIMBER SILL 12"X12"
U/S TIMBER SILL
12"X12"
D/S TIMBER SILL
12"X12"
U/S TIMBER SILL
12"X12"
A C-04
B C-04
94'
EL. 572.4
EL. 573.0
S-01
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\EXISTING LOCK FACILITY.dwg - 8/2/2022
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
ISSUE FOR BID
EXISTING LOCK FACILITY
C-02 file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt
XXXXXX
XXX
X
XXXX
X
XXXXXXXXXXXXX
X X
CEMENT-BENTONITE GROUT
BENTONITE PELLETS
FILTER SAND PACK
PVC WELL SCREEN
2" Ø PVC PIEZOMETER
BOREHOLE
~1'
PROTECTIVE
CASING
CONCRETE
FLOOR
SURFACE
2'
AP
PX
. 1 8"
~1'
~1'
2'
LOCK REHABILITATION SCHEDULE
C-03
NOTES:
1. CLEAN AND REPAIR (AS NECESSARY) ALL STOPLOGS SLOTS PRIOR TO USE.
CONTRACTOR SHALL CLEAN AND REPAIR THE SLOTS TO SATISFY HIS OWN
SAFE WORKING AREA UPON DEWATERING THE LOCK.
2. INSPECT STOPLOGS PRIOR TO INSTALLATION. DOWNSTREAM STOPLOG WAS
UNABLE TO BE INSPECTED.
3. INSPECT UPSTREAM BEAM POCKET AND REMOVE SEDIMENT TO FACILITATE
STANCHION INSTALLATION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL STEEL FOR A
COMPLETE BRACING SYSTEM FOR BOTH PANELS.
5. CONTRACTOR SHALL INSTALL 6 OPEN STANDPIPE PIEZOMETERS IN ORDER TO
MONITOR UPLIFT PRESSURES BENEATH THE STRUCTURE PRIOR TO AND
DURING DEWATERED CONDITIONS.
SCALE:
0 5 10
1" = 5'
- LOCK REHABILITATION
PLAN
LOCK REHABILITATION SCHEDULE
NUMBER 1 2 3 4 5 6 7 8 9 10 11 12 13
COMPONENT UPSTREAM
STOPLOGS TIMBER SILLS MITER GATES
HYDRAULIC
OPERATING
SYSTEM
(ALTERNATE
SCOPE #2)
BYPASS CONDUIT
GATES
MITER GATE
ANCHORAGE
SYSTEM
UPSTREAM GATE
SILL WALL LEFT LOCK WALL RIGHT LOCK WALL
LOCK FLOOR
(ALTERNATE
SCOPE #1)
BOAT ANCHOR
SYSTEM DOWNSTREAM COFFERDAM LOCK SAFETY
IMPROVEMENTS
DESCRIPTION
22'- 4 38" x 11' - 6"
STEEL FRAMED
BULKHEAD
(APPROX. WT 6,260
LBS).
CONTRACTOR TO
PROVIDE A
CENTER SUPPORT
STANCHION AND
BEAM FOR
BRACING TOP OF
STANCHION.
TEMPORARILY
FASTEN BEAM TO
TOP OF LOCK
STRUCTURE.
SLOTS REQUIRE
CLEANING PRIOR
TO USE. DETAILED
ON SHEET C-04.
CONTRACTOR TO
REPLACE 12X12
TREATED TIMBER
SILLS AT EACH
MITER GATE.
DETAILED ON
SHEETS C-07.
CONTRACTOR TO
REMOVE MITER
GATES TO
FACILITATE
INSPECTION AND
REHABILITAION.
MITER GATE
REHABILITATION
DETAILED
FURTHER ON
SHEETS C-06.
HYDRAULIC
OPERATING
SYSTEM
REHABILITATION
DETAILED ON
SHEETS C-10 AND
C-11.
BYPASS CONDUITS
DETAILED ON
SHEET C-08 AND
C-09.
MITER GATE
ANCHORAGE
SYSTEM DETAILED
ON SHEET S-01
AND S-02.
CONCRETE WALL
REPAIRS DETAILED
ON SHEET C-05.
CONCRETE WALL
REPAIRS DETAILED
ON SHEET C-05.
CONCRETE WALL
REPAIRS DETAILED
ON SHEET C-05.
CONCRETE FLOOR
REPAIRS DETAILED
ON SHEET C-05.
CONTRACTOR TO
REPLACE
DISCONNECTED
BOAT ANCHOR
CABLES AS
DETAILED ON
SHEET C-13.
DOWNSTREAM STEEL FRAMED
BULKHEAD IS 22'- 4 38" x 10' - 6" (APPROX.
WT 5,510 LBS). BULKHEAD IS AVAILABLE
FOR CONTRACTOR USE; HOWEVER, IT
REQUIRES MID-SPAN SUPPORT
BRACING. ADDITIONALLY, THE
EXISTING BULKHEAD SLOTS CONTAIN
CONCRETE OVERPOUR TO BE
REMOVED, AND THE LOCK FLOOR SLOT
WILL ALSO REQUIRE CLEANING.
CONTRACTOR CAN UTILIZE OTHER
METHODS TO ACHIEVE THE
DOWNSTREAM COFFERDAM. THE
SELECTED COFFERDAM DESIGN IS THE
RESPONSIBILITY OF THE CONTRACTOR
AND SHALL BE STAMPED BY A
REGISTERED PROFESSIONAL
ENGINEER IN THE STATE OF MICHIGAN.
CONTRACTOR TO
CONSTRUCT NEW
STEEL FRAMED
PLATFORMS AND
WALKWAYS AT
DOWNSTREAM
MITER GATES AS
DETAILED ON
SHEETS C-13, C-14,
S-05, AND S-06.
EXISTING SAFETY
LADDER MISSING
BOLTS.
RE-ANCHOR
EXISTING LADDER
TO LOCK WALL.
QUANTITY 1 PANEL 2 EA 4 EA N/A 2 EA 2 EA 280 SFT 2850 SFT 2850 SFT 2640 SFT 20 EA 1 PANEL 1 EA
UPSTREAM
DOWNSTREAM
OPEN STANDPIPE PIEZOMETER (SEE NOTE 5)
SCALE: N.T.S.
- OPEN STANDPIPE PIEZOMETER
DETAIL
C-03
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\LOCK REHABILITATION SCHEDULE.dwg - 11/13/2023
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
STOP LOG SLOT PREPARATION
C-04
NOTES:
1. INSPECT AND CLEAN ALL STOPLOGS SLOTS AS NECESSARY PRIOR TO USE.
CONTRACTOR SHALL CLEAN AND PREPARE THE SLOTS TO ALLOW FOR AN
ADEQUATE SEALING SURFACE FOR DEWATERING THE LOCK.
2. INSPECT STOPLOGS PRIOR TO INSTALLATION. DOWNSTREAM STOPLOG WAS
UNABLE TO BE INSPECTED.
3. INSPECT UPSTREAM BEAM POCKET AND REMOVE SEDIMENT TO FACILITATE
STANCHION INSTALLATION.
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SUPPLY ALL NECESSARY
STEEL ELEMENTS FOR CONSTRUCTION AND IMPLEMENTATION OF THE CHOSEN
DEWATERING SYSTEM. EXISTING ELEMENTS SHALL BE INSPECTED AND ANALYZED
BY AN ENGINEER REGISTERED IN THE STATE OF MICHIGAN. ANY DIFFERENT
UPSTREAM AND DOWNSTREAM BULKHEAD SYSTEMS SHALL BE DESIGNED BY AN
ENGINEER REGISTERED IN THE STATE OF MICHIGAN, AND SUBMITTED TO THE
ENGINEER FOR REVIEW AND ACCEPTANCE PRIOR TO USE.
5. REMOVE CONCRETE CAREFULLY TO ENSURE OVER EXCAVATION IS AVOIDED. TAKE
CARE TO NOT OVER DEMOLISH CONCRETE. RETAIN A RELIABLE AND CONTINUOUS
SEALING SURFACE. CONTRACTOR TO REPAIR ANY DEMOLITION BEYOND SLOT
EXTENTS TO THE SATISFACTION OF THE ENGINEER.
6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY MEASURE AND
CONFIRM ALL PERTINENT DIMENSIONS.
7. THE TOP OF THE MIDDLE VERTICAL STANCHION WILL REQUIRE BRACING.
TEMPORARY SUPPORTS ANTICIPATED TO BE ADDED ON TOP OF THE CONCRETE
LOCK STRUCTURE.
SCALE:
0 1 2
1" = 1'
A
C-03 UPSTREAM STOPLOG
SLOT REMEDIATION
SECTION
SCALE:
0 4 8
1" = 4'
B
C-03 DOWNSTREAM STOPLOG
SLOT REMEDIATION
SECTION
12"X12" TIMBER SILL HELD
IN PLACE BY 4
MECHANICAL ANCHORS
EXISTING TIMBER CRIB
6"X6" STEEL-LINED
STOPLOG SLOT
REMOVE ALL DEBRIS
AND SEDIMENT FROM
STANCHION POCKET
REMOVE DEBRIS AND
CONCRETE OVER POUR
FROM BOTTOM CORNER OF
STOP LOG SLOTS
APPX. 1-2 CFT(SEE NOTE 5).
SEE DIVE REPORT FOR
FURTHER INFORMATION
EXISTING CONCRETE APRON
MITER GATE
1' -6
SEE NOTE 7
1'-0"
1/
8"
12"X14"
STEEL-LINED
STOPLOG SLOT
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\STOP LOG SLOT PREPARATION.dwg - 8/2/2022
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
~3" SHOTCRETE OVERLAY #1
ORIGINAL CONCRETE
XXXX
~3" SHOTCRETE OVERLAY #2
~2" SHOTCRETE OVERLAY #3
WELDED WIRE MESH REINFORCEMENT
#4 BAR, 12" OC, EW
#4 BAR, 12" OC, EW
(INTERIOR LAYER NOTED IN ONLY 1 OF 8 CORES)
REMOVE OVERLAYS AND REINFORCEMENT UNTIL REACHING
COMPETENT ORIGINAL CONCRETE, MIN. 8" DEPTH
ORIGINAL CONCRETE
STRUCTURAL
CONCRETE
#5 BAR @ 12" OC EW
#5 DOWELS STD HOOK @ 18"
OC, ALTERNATE HOOK
DIRECTION MIN 12" EMBED
WITH STRUCTURAL EPOXY
4" CLEAR COVER
BONDING
AGENT
ORIGINAL
CONCRETE SLAB
STRUCTURAL CONCRETE
#5 BAR @ 12" OC EW
#5 DOWELS STD HOOK @ 24"
OC, ALTERNATE HOOK
DIRECTION MIN 6" EMBED
3" CLEAR COVER
BONDING
AGENT
18"
6" +/- 0.5"
CONCRETE
REMOVALEXISTING WWM REINFORCEMENT
XXXXX
ORIGINAL
CONCRETE SLAB
REMOVE OVERLAYS AND REINFORCEMENT
UNTIL REACHING COMPETENT ORIGINAL
CONCRETE, MAX 8" DEPTH
ORIGINAL CONCRETE
STRUCTURAL
CONCRETE
#5 BAR @ 12" OC EW
#5 DOWELS STD HOOK @ 18"
OC, ALTERNATE HOOK
DIRECTION MIN 12" EMBED
WITH STRUCTURAL EPOXY
BONDING
AGENT
CHAMFER CORNER
OF CONCRETE WALLS
2"X45 DEG (TYP.)3" CLEAR (MIN)
4" CLEAR COVER
CONCRETE REPAIR DETAILS
C-05
10 20
SCALE:
1" = 10'
- TYPICAL EXISTING LOCK WALL
DETAIL
10 20
SCALE:
1" = 10'
- TYPICAL LOCK WALL REPAIR
DETAIL - PLAN VIEW
EXISTING CONCRETE CONDITION TABLE
CONCRETE LAYER APPROXIMATE DEPTH FROM
SURFACE OF CONCRETE CONDITION COMMENTARY
SHOTCRETE OVERLAY #1 0" - 3"
- ROUGH SCREEDED SURFACE, FINE CEMENTITIOUS
SHOTCRETE OVERLAY
- FAIR CONDITION
- OCCASIONAL SPALLING AND CRACKING OBSERVED
- WELDED WIRE MESH REINFORCEMENT ~2" FROM SURFACE
SHOTCRETE OVERLAY #2 3" - 6"
- VERY POOR CONDITION
- SOFT, CRUMBLING MATERIAL, SEVERAL SAND POCKET
LOCATIONS, MINIMAL TO NO STRENGTH CONSISTENCY- #4
REINFORCEMENT EACH WAY ~2 - 3" FROM SURFACE
SHOTCRETE OVERLAY #3 6" - 8"
- POOR TO FAIR CONDITION
- PRESENCE OF THIS OVERLAY VARIES BY LOCATION AS
OVERLAY#2 OCCASIONALLY REACHED ORIGINAL CONCRETE
AT 8"+ DEPTH
- #4 REINFORCEMENT EACH WAY ~10" FROM SURFACE
ORIGINAL CONCRETE 8"+
- REINFORCEMENT UNKNOWN
- FAIR TO GOOD CONDITION
- NO DETERIORATION OBSERVED
- DEPTH TO COMPETENT CONCRETE TYPICALLY OBSERVED
AT ~8", WITH MAXIMUM OF 12" DEPTH
NOTES:
1. DEPTHS ARE APPROXIMATE AND MAY VARY BY LOCATION. CONTRACTOR SHALL REMOVE CONCRETE UNTIL REACHING SOUND CONCRETE AS INDICATED BY HAMMER SOUNDINGS IN PRESENCE OF ENGINEER OR QUALIFIED INSPECTOR. SURFACE OF SOUND CONCRETE SHALL BE CLEANED AND ROUGHENED TO 1/4"
AMPLITUDE WITH NO MICRO CRACKS PRESENT.
2. CONDITION ASSESSMENTS BASED ON A COMPREHENSIVE VISUAL INSPECTION AND THE TESTING OF (8) CONCRETE CORES PERFORMED BY GEI IN SEPTEMBER 2019. CONCRETE CORE PHOTOS, LAB TESTING
REPORTS, ETC. AVAILABLE UPON REQUEST.
10 20
SCALE:
1" = 10'
- TYPICAL LOCK FLOOR REPAIR
DETAIL - ALTERNATE SCOPE #1
CONCRETE REPAIR LOCATION TABLE
FEATURE APPROXIMATE AREA OF
REPAIR REQUIRED (SFT)
DEPTH OF
REPAIR (IN)
APPROXIMATE VOLUME OF
REPAIR (CYD)
LEFT WALL 2,850 10 90
RIGHT WALL 2,850 10 90
UPSTREAM MITER
GATE SILL WALL 280 10 10
FLOOR (ALTERNATE
SCOPE #1) 2,640 6 50
NOTES:
1. CONTRACTOR SHALL MAINTAIN ALL EXISTING CONSTRUCTION JOINTS IN
CONCRETE THROUGH OVERLAYS. LOCATION OF EXISTING CONSTRUCTION
JOINTS UNKNOWN DUE TO PREVIOUS SHOTCRETE REPAIRS.
2. REPAIR DETAILS APPLY TO ALL EXPOSED CONCRETE SURFACES INSIDE OF
THE LOCK BETWEEN THE UPSTREAM AND DOWNSTREAM MITER GATES. THIS
INCLUDES THE FLOOR AND WALLS OF THE UPSTREAM SILL.
3. CONTRACTOR SHALL INSTALL 6 OPEN STANDPIPE PIEZOMETERS IN ORDER TO
MONITOR UPLIFT PRESSURES BENEATH THE STRUCTURE PRIOR TO AND
DURING DEWATERED CONDITIONS (SEE SHEET C-05).
10 20
SCALE:
1" = 10'
- TYPICAL EXISTING LOCK FLOOR
DETAIL
10 20
SCALE:
1" = 10'
A
C-05 TYPICAL LOCK WALL REPAIR
SECTION
TOP OF CONC
EL 594.95'
D U
E
TO
B
AT
TE
R
ED
D
ES
IG
N , L
O C
K W
AL
L
TH
IC
KN
ES
S
VA
R
IE
S W
IT
H
H
EI
G H
T W
AL
L
TH
IC
KN
ES
S
EQ
U
AL
T O
' M
IN
0.
5" C
O N
C R
ET
E
R
EM
O
VA
L
A C-05
10"
10"
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\CONCRETE REPAIR DETAILS.dwg - 11/13/2023
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
3"
X X
X X
X
X X
X X
EXISTING MITER GATE ANCHORAGES
S-01
21 2
SCALE, FEET
S-01 EXISTING DOWNSTREAM MITER
GATE QUOIN LINER AND SKIRT PLATE
DETAIL
1/2 1
SCALE, FEET
- MITER GATE QUOIN LINER
DETAIL
R6"
C GATE CLOSEDL
C PIVOTL
CONCRETE
LOCK WALL
3/4"
2"
90°
27.5°
VIF
R7" 14" I.D. LINER
8" MIN WALL THICKNESS
SLEEVE ANCHORS
L3x3x3
8 TAB WELDED TO PLATE
AND PIPE SECTIONS (TYP)
135°
3"
MIN
2"4"
VARIES
3"
2"
2"
4"
VARIES
135°
5"
MIN
3"MIN
8" BENT PL
WELD TO PIPE
(TYP)
EXISTING EXPANSION ANCHOR
(TYP)
CONCRETE
LOCK WALL
L3x3x3
8 TAB WELDED TO PLATE
AND PIPE SECTIONS (TYP)
7"
7 1/2"
2" (TYP)
2" (TYP)
R7"
SCALE:
0 5 10
1" = 5'
- EXISTING DOWNSTREAM LOCK
PLAN
EXISTING DOWNSTREAM MITER GATE ANCHORAGE
S-01
FLOW
NOTES:
1. REMOVE EXISTING CONCRETE AS NECESSARY TO REMOVE QUOIN LINER
AND ANCHORS. TYPICAL ALL GATES.
REMOVE CONCRETE. SEE NOTE 1.
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\EXISTING MITER GATE ANCHORAGES.dwg - 8/2/2022
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
6" MIN EMBED
STRUCTURAL CONCRETE
MITER GATE ANCHORAGE REPAIRS
S-02
10 20
SCALE:
1" = 10'
- DOWNSTREAM MITER GATE
ANCHORAGE REPAIR
PLAN
SCALE: N.T.S.
A
S-02 DOWNSTREAM MITER GATE
ANCHORAGE REPAIR
SECTION
REPLACE MECHANICAL ANCHORS
WITH 1" Ø CIP ANCHORS
STRUCTURAL CONCRETE
21 2
SCALE, FEET
- DOWNSTREAM MITER GATE
ANCHORAGE
DETAIL
DRILL 1 58" Ø
HOLES (TYP)
ANCHOR
C OF 1" Ø U-BOLTL
1/2 4" 1/2 4"
TOP OF CONCRETE
EL. 594.95 +/-
1/2 TYP.1/2"
4'
2 1/2", VIF
1 1/2", VIF
REMOVE AND REPLACE
ANGLE AND ANCHORS
REMOVE AND REPLACE
U-BOLTS AND NUTS
REMOVE AND REPLACE
U-BOLTS AND NUTS REMOVE AND REPLACE ANGLE
REMOVE AND REPLACE
QUOIN LINER, SKIRTS, AND
MECHANICAL ANCHORS
STRUCTURAL
CONCRETE
1/2
7"
7 1/2"
2 1/2"
1/2
2" (TYP)
2" (TYP)
1'-2"
VIF
REPLACE 1"Ø STEEL U-BOLTS WITH
THREADED ENDS TO MATCH EXISTING
ANCHORAGE LOCATION (TYP)
INSTALL 1" Ø HOOKED ANCHORS
EMBED 6" MIN.
21 2
SCALE, FEET
- DOWNSTREAM MITER GATE
ANCHORAGE
DETAIL
9"
2'
21 2
SCALE, FEET
- MITER GATE QUOIN LINER
DETAIL
14" I.D. PIPE LINER
8" MIN WALL THICKNESS
135°
3"
MIN
2"4"
VARIES
3"
2"
2"
4"
VARIES
135°
5"
MIN
3"MIN
8" BENT PL
WELD TO PIPE
(TYP)
3/4" HIT-HY-200-A EPOXIED ANCHORS
9" EMBEDMENT MIN. (TYP)
CONCRETE
LOCK WALL
L3x3x3
8 TAB WELDED TO PLATE
AND PIPE SECTIONS (TYP)
VIF
1'-2" (TYP)
ASTM A615 GRADE 60 DEFORMED #8 BAR
36" MIN EMBEDMENT DEPTH
1/2 5" 1/2 5"
3" C
LE
AR
C O
VE
R
FIRST ANCHOR SPACED 8" DOWN
FROM TOP OF CONCRETE
REMAINING ANCHORS SPACED 24"
O.C.
CONTROL POINT SEE
NOTE 1
NOTES:
1. CONTRACTOR SHALL SURVEY CONTROL POINT (CENTER
OF EACH QUOIN) PRIOR TO REMOVAL OF GATES.
EXISTING
CONCRETE
5/16 TYP.
5/16TYP.
A S-02
A S-02
\\geiconsulta b:\Working\DTMB\1904013 cheboygan lock facility - repair and reno\CAD\Design\Working\MITER GATE ANCHORAGE REPAIRS.dwg - 8/2/2022
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
ISSUE FOR BID
file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .