17264 Addendum 1.pdf
PDF 6 MB Posted
- Attached to
- 751/17264. ABG; Cheboygan Lock Facility Repairs
- Solicitation number
- RFQ - 171 - 240000000124
- Issued by
- Cheboygan County, Chesaning Village, Michigan
About this file
This document is an Addendum to a Request for Bids for the Cheboygan Lock Facility Improvement Project, DTMB File No. 751/17264.ABG, issued by the Michigan Department of Natural Resources. The addendum provides revisions and clarifications to the original bid documents, including updates to the drawings and specifications, responses to questions received from bidders, and additional geotechnical information. The project involves concrete rehabilitation of the lock walls and floor, replacement of the pintle assembly components, and potential refurbishment of the hydraulic operating system. The bid due date is Wednesday, January 24, 2024, at 2:00 p.m. Eastern Time. The addendum also provides information on the prebid meeting attendance and highlights the "Buy America" requirements applicable to the entire project. Pricing information is not included, but the document indicates that payment for the special removal, handling, and disposal of any encountered asbestos would be considered additional work.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
A1-2000-1
CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT DTMB FILE NO. 751/17264.ABG
ADDENDUM NO. 1
File No.: 751/17264.ABG
Department of Natural Resources
Project Name: Cheboygan Lock Facility Improvement Project
Subject: Request for Bids – Addendum 1
DATE: January 5, 2024
BID DATE: Wednesday, January 24, 2024, at 2:00 p.m. Eastern Time
TO: All Bidders
INTENT: This Addendum is issued to revise and clarify the intent of the project bid documents.
ATTACHMENTS: 1. Prebid Meeting Attendance Record
2. Question Responses
2. Revised Project Documents
All Bidders submitting a Bid on the above Contract shall carefully read this Addendum and give it consideration in the preparation of their Bid.
Contractor shall list all addenda on the Bid Form to ensure conformity in the bid.
Drawings, Specifications and/or Proposals are herein amended, expanded and/or modified, as hereinafter described, and become a part of the Contract Documents with same force and affect as if incorporated, therein, originally. Any contrary provisions contained, or referred to, in
Drawings and/or Specifications, shall remain applicable unless overridden by this Addendum.
Revised or contrary provisions herein shall not affect any other part of Contract Documents and any deletions, additions, substitutions and/or revisions mentioned, shall include all labor, materials, methods, modifications, etc. required for complete performance of the work.
The following are revisions to the Bidding and Contract Requirements:
GENERAL:
1. Prebid Meeting Attendance Record
2. Questions List
DRAWINGS & SPECIFICATIONS:
1. C-04: Clarified extents of concrete rehabilitation
2. C-05: Corrected errant note regarding concrete rehabilitation extents
3. S-04: Corrected errant pintle assembly component dimensions
PROJECT MANUAL:
1. N/A
ADDITIONAL KEY INFORMATION:
1. 2004 SSI Report of Geotechnical Investigation for Cheboygan Lock Evaluation
2. Historical Miscellaneous Geotechnical Exploration Drawings
Bidder shall acknowledge receipt of this Addendum at the bottom of the Bid Summary form to be submitted as part of the greater bid.
ATTACHMENT 2 TO ADDENDUM NO. 1
SUMMARY
This Attachment 2 to Addendum No. 1 provides all bidders with responses to questions received. The questions in the following table have been received and answered by the Engineer:
Cheboygan Lock Facility Improvement Project - Addendum #1 Question Responses
ITEM DOCUMENT SECTION QUESTION RESPONSE
Column1 Column12 Column13 Column2 Column3
0001 DRAWINGS SHEET S-04 Are the pintle components in Details 3 & 6 to be HDG?
No. The steel pintle shoe and sockets in Details 3 and 6 on Sheet S-04 are to be ASTM A36 carbon steel in accordance with Specification 05100 Part 2 Section 2.01.A.9. These components shall be painted in accordance with Specification 09900 except for designated contact surfaces, as noted in Specification 05100 Part 2 Section 2.06 .
0002 DRAWINGS SHEET S-04 Detail 4 indicates an inside diameter of 4” and an outside diameter of 3 3/8”. Please advise.
See revised drawing S-04. The following dimensions have been corrected:
- (3/S-04) Steel Pintle Shoe Cylinder: 2 5/8" [4"] O.D. Interference Fit (Press) - P7/h6
- (4/S-04) Bronze Pintle Cap: 3 3/8" [5"] O.D. Clearance Fit (Loose Running) - C11/h11
0003 DRAWINGS SHEET S-04 Can you supply CAD drawings for the pintle assembly?
CAD files may be provided to the successful bidder upon contract award. Files will not be provided during the bidding process.
0004 DRAWINGS SHEET S-04
Will Bronze C95400 be an acceptable alternate for the pintle socket & cap in the pintle assembly on S-04?
Yes, Bronze C95400 is an acceptable alternative to C93200 for the pintle socket and cap.
0005 DRAWINGS
SHEETS C-10,
C-11 & EWD-1
Clarify what the limits are of alternate 2 “Hydraulic Operating System Refurbishment”. Do any cylinders, hoses, etc, need to be replaced or refurbished if alternate A2 is not utilized?
Alternate 2 is all inclusive of the hydraulic and electrical improvements shown on Sheets C-10, C-11, and EWD-1. Note the replacement of the lock bypass fill valves (existing butterfly valves) with new vertical slide gates including the hydraulic cylinders and associated hoses, valves, etc. as shown on Sheets C-08 and C-09 will be included in the base scope of work and are not subject to exclusion per Alternate 2.
0006 DRAWINGS
SHEETS C-04
and C-05 Clarify the limits of both the lock wall and lock slab rehabilitation.
See revised drawings C-04 and C-05. The following C-05 Note 2 has been corrected:
- Repair details apply to all exposed concrete surfaces inside of the lock between the upstream and downstream miter gates [beginning twelve inches downstream of the upstream stanchion pocket and commencing twelve inches upstream of the downstream stoplog slot]. This includes the floor and walls of the upstream sill.
0007 SPECIFICATIONS 03050 What alternatives may be accepted for concrete crystalline waterproofing admixtures?
The following alternatives are acceptable:
- Admix C-500 NF, Xypex Chemical Company, Richmond, BC, Canada
[ - ADI-CON CW PLUS, W.R. Meadows, Inc., Hampshire, IL, United States]
[ - Vapor Lock 20/20, Specialty Products Group, Inc., Smithville, ON, Canada]
0008 PROJECT MANUAL APPENDIX III
Does “Buy America“ apply to the entire project? Does the hydraulic system replacement parts need to meet the Buy America requirement?
The Title IX - Build America, Buy America provisions apply to the entire project per Appendix
III of the Project Manual.
0009 PROJECT MANUAL APPENDIX II
Is the site known to contain asbestos? If asbestos is encountered will its special removal, handling & disposal be paid as additional work?
There has not been any evidence of asbestos observed onsite. However, in the event asbestos is encountered during the project, the special removal, handling, and disposal would be paid as additional work.
0010 SUPPLEMENTAL N/A Can the relevant geotechnical information for the lock be provided? See attached supplemental information documents.
Page 1 of 1 1/5/2024
END ATTACHMENT 2
STOP LOG SLOT PREPARATION
C-04
NOTES:
1. INSPECT AND CLEAN ALL STOPLOGS SLOTS AS NECESSARY PRIOR TO USE.
CONTRACTOR SHALL CLEAN AND PREPARE THE SLOTS TO ALLOW FOR AN
ADEQUATE SEALING SURFACE FOR DEWATERING THE LOCK.
2. INSPECT STOPLOGS PRIOR TO INSTALLATION. DOWNSTREAM STOPLOG WAS
UNABLE TO BE INSPECTED.
3. INSPECT UPSTREAM BEAM POCKET AND REMOVE SEDIMENT TO FACILITATE
STANCHION INSTALLATION.
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SUPPLY ALL NECESSARY
STEEL ELEMENTS FOR CONSTRUCTION AND IMPLEMENTATION OF THE CHOSEN
DEWATERING SYSTEM. EXISTING ELEMENTS SHALL BE INSPECTED AND ANALYZED
BY AN ENGINEER REGISTERED IN THE STATE OF MICHIGAN. ANY DIFFERENT
UPSTREAM AND DOWNSTREAM BULKHEAD SYSTEMS SHALL BE DESIGNED BY AN
ENGINEER REGISTERED IN THE STATE OF MICHIGAN, AND SUBMITTED TO THE
ENGINEER FOR REVIEW AND ACCEPTANCE PRIOR TO USE.
5. REMOVE CONCRETE CAREFULLY TO ENSURE OVER EXCAVATION IS AVOIDED. TAKE
CARE TO NOT OVER DEMOLISH CONCRETE. RETAIN A RELIABLE AND CONTINUOUS
SEALING SURFACE. CONTRACTOR TO REPAIR ANY DEMOLITION BEYOND SLOT
EXTENTS TO THE SATISFACTION OF THE ENGINEER.
6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY MEASURE AND
CONFIRM ALL PERTINENT DIMENSIONS.
7. THE TOP OF THE MIDDLE VERTICAL STANCHION WILL REQUIRE BRACING.
TEMPORARY SUPPORTS ANTICIPATED TO BE ADDED ON TOP OF THE CONCRETE
LOCK STRUCTURE.
SCALE:
0 1 2
1" = 1'
A
C-03 UPSTREAM STOPLOG
SLOT REMEDIATION
SECTION
SCALE:
0 4 8
1" = 4'
B
C-03 DOWNSTREAM STOPLOG
SLOT REMEDIATION
SECTION
12"X12" TIMBER SILL HELD
IN PLACE BY 4
MECHANICAL ANCHORS
EXISTING TIMBER CRIB
6"X6" STEEL-LINED
STOPLOG SLOT
EXISTING CONCRETE APRON
MITER GATE
1' -6
SEE NOTE 7
1'-0"
1/
8"
12"X14"
STEEL-LINED
STOPLOG SLOT
\\geiconsulta B:\Working\DTMB\1904013 Cheboygan Lock Facility - Repair and Reno\CAD\Design\Working\STOP LOG SLOT PREPARATION.dwg - 1/4/2024
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
B 1/5/2024 ADDENDUM NO. 1 SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
ISSUE FOR BID
B B
REMOVE ALL DEBRIS
AND SEDIMENT FROM
STANCHION POCKET
REMOVE DEBRIS AND
CONCRETE OVER POUR
FROM BOTTOM CORNER OF
STOP LOG SLOTS
APPX. 1-2 CFT(SEE NOTE 5).
SEE DIVE REPORT FOR
FURTHER INFORMATION
LI
M
IT
S
O F
C O
N C
R
ET
E R
EM
O
VA
L
LI
M
IT
S
O F
C O
N C
R
ET
E R
EM
O
VA
L
LI
M
IT
S
O F
C O
N C
R
ET
E R
EM
O
VA
L
LIM
ITS O
F C O
N C
R
ETE R
EM
O
VAL
LIM
ITS O
F C
O N
C R
ETE R
EM
O
VAL
LIM
ITS O
F C O
N C
R
ETE R
EM
O
VAL
12" MIN
12" MIN
~3" SHOTCRETE OVERLAY #1
ORIGINAL CONCRETE
XXXX
~3" SHOTCRETE OVERLAY #2
~2" SHOTCRETE OVERLAY #3
WELDED WIRE MESH REINFORCEMENT
#4 BAR, 12" OC, EW
#4 BAR, 12" OC, EW
(INTERIOR LAYER NOTED IN ONLY 1 OF 8 CORES)
REMOVE OVERLAYS AND REINFORCEMENT UNTIL REACHING
COMPETENT ORIGINAL CONCRETE, MIN. 8" DEPTH
ORIGINAL CONCRETE
STRUCTURAL
CONCRETE
#5 BAR @ 12" OC EW
#5 DOWELS STD HOOK @ 18"
OC, ALTERNATE HOOK
DIRECTION MIN 12" EMBED
WITH STRUCTURAL EPOXY
4" CLEAR COVER
BONDING
AGENT
ORIGINAL
CONCRETE SLAB
STRUCTURAL CONCRETE
#5 BAR @ 12" OC EW
#5 DOWELS STD HOOK @ 24"
OC, ALTERNATE HOOK
DIRECTION MIN 6" EMBED
3" CLEAR COVER
BONDING
AGENT
18"
6" +/- 0.5"
CONCRETE
REMOVALEXISTING WWM REINFORCEMENT
XXXXX
ORIGINAL
CONCRETE SLAB
REMOVE OVERLAYS AND REINFORCEMENT
UNTIL REACHING COMPETENT ORIGINAL
CONCRETE, MAX 8" DEPTH
ORIGINAL CONCRETE
STRUCTURAL
CONCRETE
#5 BAR @ 12" OC EW
#5 DOWELS STD HOOK @ 18"
OC, ALTERNATE HOOK
DIRECTION MIN 12" EMBED
WITH STRUCTURAL EPOXY
BONDING
AGENT
CHAMFER CORNER
OF CONCRETE WALLS
2"X45 DEG (TYP.)3" CLEAR (MIN)
4" CLEAR COVER
CONCRETE REPAIR DETAILS
C-05
10 20
SCALE:
1" = 10'
- TYPICAL EXISTING LOCK WALL
DETAIL
10 20
SCALE:
1" = 10'
- TYPICAL LOCK WALL REPAIR
DETAIL - PLAN VIEW
EXISTING CONCRETE CONDITION TABLE
CONCRETE LAYER APPROXIMATE DEPTH FROM
SURFACE OF CONCRETE CONDITION COMMENTARY
SHOTCRETE OVERLAY #1 0" - 3"
- ROUGH SCREEDED SURFACE, FINE CEMENTITIOUS
SHOTCRETE OVERLAY
- FAIR CONDITION
- OCCASIONAL SPALLING AND CRACKING OBSERVED
- WELDED WIRE MESH REINFORCEMENT ~2" FROM SURFACE
SHOTCRETE OVERLAY #2 3" - 6"
- VERY POOR CONDITION
- SOFT, CRUMBLING MATERIAL, SEVERAL SAND POCKET
LOCATIONS, MINIMAL TO NO STRENGTH CONSISTENCY- #4
REINFORCEMENT EACH WAY ~2 - 3" FROM SURFACE
SHOTCRETE OVERLAY #3 6" - 8"
- POOR TO FAIR CONDITION
- PRESENCE OF THIS OVERLAY VARIES BY LOCATION AS
OVERLAY#2 OCCASIONALLY REACHED ORIGINAL CONCRETE
AT 8"+ DEPTH
- #4 REINFORCEMENT EACH WAY ~10" FROM SURFACE
ORIGINAL CONCRETE 8"+
- REINFORCEMENT UNKNOWN
- FAIR TO GOOD CONDITION
- NO DETERIORATION OBSERVED
- DEPTH TO COMPETENT CONCRETE TYPICALLY OBSERVED
AT ~8", WITH MAXIMUM OF 12" DEPTH
NOTES:
1. DEPTHS ARE APPROXIMATE AND MAY VARY BY LOCATION. CONTRACTOR SHALL REMOVE CONCRETE UNTIL REACHING SOUND CONCRETE AS INDICATED BY HAMMER SOUNDINGS IN PRESENCE OF ENGINEER OR QUALIFIED INSPECTOR. SURFACE OF SOUND CONCRETE SHALL BE CLEANED AND ROUGHENED TO 1/4"
AMPLITUDE WITH NO MICRO CRACKS PRESENT.
2. CONDITION ASSESSMENTS BASED ON A COMPREHENSIVE VISUAL INSPECTION AND THE TESTING OF (8) CONCRETE CORES PERFORMED BY GEI IN SEPTEMBER 2019. CONCRETE CORE PHOTOS, LAB TESTING
REPORTS, ETC. AVAILABLE UPON REQUEST.
10 20
SCALE:
1" = 10'
- TYPICAL LOCK FLOOR REPAIR
DETAIL - ALTERNATE SCOPE #1
CONCRETE REPAIR LOCATION TABLE
FEATURE APPROXIMATE AREA OF
REPAIR REQUIRED (SFT)
DEPTH OF
REPAIR (IN)
APPROXIMATE VOLUME OF
REPAIR (CYD)
LEFT WALL 2,850 10 90
RIGHT WALL 2,850 10 90
UPSTREAM MITER
GATE SILL WALL 280 10 10
FLOOR (ALTERNATE
SCOPE #1) 2,640 6 50
NOTES:
1. CONTRACTOR SHALL MAINTAIN ALL EXISTING CONSTRUCTION JOINTS IN
CONCRETE THROUGH OVERLAYS. LOCATION OF EXISTING CONSTRUCTION
JOINTS UNKNOWN DUE TO PREVIOUS SHOTCRETE REPAIRS.
2. REPAIR DETAILS APPLY TO ALL EXPOSED CONCRETE SURFACES INSIDE OF THE
LOCK BEGINNING TWELVE INCHES DOWNSTREAM OF THE UPSTREAM STANCHION
POCKET AND COMMENCING TWELVE INCHES UPSTREAM OF THE DOWNSTREAM
STOPLOG SLOT. THIS INCLUDES THE FLOOR AND WALLS OF THE UPSTREAM SILL.
3. CONTRACTOR SHALL INSTALL 6 OPEN STANDPIPE PIEZOMETERS IN ORDER TO
MONITOR UPLIFT PRESSURES BENEATH THE STRUCTURE PRIOR TO AND DURING
DEWATERED CONDITIONS (SEE SHEET C-05).
10 20
SCALE:
1" = 10'
- TYPICAL EXISTING LOCK FLOOR
DETAIL
10 20
SCALE:
1" = 10'
A
C-05 TYPICAL LOCK WALL REPAIR
SECTION
TOP OF CONC
EL 594.95'
D U
E
TO
B
AT
TE
R
ED
D
ES
IG
N , L
O C
K W
AL
L
TH
IC
KN
ES
S
VA
R
IE
S W
IT
H
H
EI
G H
T W
AL
L
TH
IC
KN
ES
S
EQ
U
AL
T O
' M
IN
0.
5" C
O N
C R
ET
E
R
EM
O
VA
L
A C-05
10"
10"
\\geiconsulta B:\Working\DTMB\1904013 Cheboygan Lock Facility - Repair and Reno\CAD\Design\Working\CONCRETE REPAIR DETAILS.dwg - 11/13/2023
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
B 1/5/2024 ADDENDUM NO. 1 SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
ISSUE FOR BIDB
PROPOSED MITER GATE STRUCTURAL DETAILS
S-04
21 2
SCALE, FEET
- STEEL PINTLE
SHOE
DETAIL
21 2
SCALE, FEET
- BRONZE PINTLE SOCKET
DETAIL
21 2
SCALE, FEET
- BRONZE
PINTLE CAP
DETAIL
21 2
SCALE, FEET
- STEEL PINTLE SOCKET
DETAIL
INSTALL 1"Ø THREADED ANCHORS 12"
DEPTH MIN. AT QUADRANTS OF SHOE
UTILIZE HILTI HY-200R EPOXY (TYP)
R2"
R4"
1'-2"
3" 1/ 2"
1"
R5 1/2"
C OF PIVOTL
SHEET NOTES:
1. CONTRACTOR SHALL FIELD VERIFY LOCATION OF EXISTING PINTLE SHOE
PLATE AND PIVOT POINT. SURVEY LOCATION AS NECESSARY TO FACILITATE
REPLACEMENT OF SHOE IN THE SAME POSITION AS PIVOT POINT LOCATION IS
CRITICAL TO SUCCESSFUL GATE OPERATION.
2. CONTRACTOR TO REPLACE ALL WEARABLE COMPONENTS OF PINTLE
ASSEMBLY INCLUDING STEEL PINTLE SHOE, BRONZE CAP, BRONZE SOCKET,
AND STEEL SOCKET.
1/2
1/2
2" 2 1/2"
1/2"
1/2" 4" I.D.
INTERFERENCE FIT
(PRESS) - H7/p6
1/2"
CHAMFER 3
16" X 45°
BRONZE CAP FITS OVER 4" DIA. O.D.
STEEL CYLINDER OF PINTLE SHOE
Ø5"
CHAMFER 34" X 45°
BRONZE SOCKET FITS OVER 5" DIA.
O.D. BRONZE CAP. PRESS FIT INTO
STEEL PINTLE SOCKET
5 1/8" I.D. CLEARANCE FIT
(LOOSE RUNNING) - H11/c11
3/4"
2 1/4" 1 1/2"
Ø9 1 /2"
Ø8"
Ø5 1/8"Ø4"
8"Ø SPACER PLATES
13.36" O.D. 3 34" HEIGHT PIPE,
0.312 MIN. WALL THICKNESS
SIZED FOR SNUG FIT INSIDE
14" OD 0.312" QUOIN PIPE
Ø1'-2" 5/16 TYP5/16
8" THICK SPACER PLATES
SIZED AS REQUIRED
CENTER OF PINTLE SHOE AND
SOCKET CENTER OF ROTATION
11/16"
CENTER OF 14" O.D. PIPE AND
13.36" O.D. PIPE SECTION FOR
FABRICATED SOCKET
5/16
5/16
21 2
SCALE, FEET
- PINTLE ASSEMBLY ANCHOR REPAIR
DETAIL
LOCK FLOOR
PINTLE SHOEPINTLE CAP
BRONZE PINTLE
SOCKETSTEEL PINTLE
SOCKET
MITER GATE
QUOIN SHAFT
1" Ø x 1'-0" THREADED ANCHORS
WITH HILTI HIT-HY-200-A ADHESIVE
ANCHORS SHALL BE TRIMMED TO
ALLOW SUFFICIENT CLEARANCE
FOR GATE QUOIN SHAFT
ROTATE SHOE 45 DEG AS
NEEDED TO AVOID GROUTED
ANCHOR HOLES
3/4"
3 3/4"
1/2"
8" I.D.
INTERFERENCE FIT
(PRESS) -H7/p6
1'-2"
UTILIZE JAM NUTS TO
ENSURE CLEARANCE
4" O.D.
INTERFERENCE FIT
(PRESS) - P7/h6
5" O.D. CLEARANCE FIT
(LOOSE RUNNING) - C11/h11
8" I.D. CLEARANCE FIT
(LOOSE RUNNING) - H11/c11
1/2 1
SCALE, FEET
- PINTLE ASSEMBLY
DETAIL
GATE QUOIN SHAFT
STEEL PINTLE SOCKET
BRONZE PINTLE SOCKET
BRONZE PINTLE CAP
STEEL PINTLE SHOE
\\geiconsulta B:\Working\DTMB\1904013 Cheboygan Lock Facility - Repair and Reno\CAD\Design\Working\PROPOSED MITER GATE STRUCTURAL DETAILS.dwg - 8/2/2022
MICHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT AND
BUDGET
GEI Project 1904013
If this scale bar does not measure 1" then drawing is not original scale.
Attention: CHEBOYGAN LOCK FACILITY IMPROVEMENT PROJECT
CHEBOYGAN, MI
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
0 1"
NO. DATE ISSUE/REVISION APP
A 12/1/2023 ISSUE FOR BID SAE
B 1/5/2024 ADDENDUM NO. 1 SAE
Designed:
Checked:
Drawn:
JEP
KAR
JEP
Approved By: SAE
SHEET NO.
DWG. NO.
OF 24
ISSUE FOR BID
B
B