1704732 QOM ARSR Specifications Combined Portfolio Repr Bldg King Mountain TX 2025 July 9.pdf

PDF 7 MB Posted

Attached to
King Mountain, TX - Building Repair Project
Solicitation number
6973GH-25-R-00183
Issued by

About this file

This document is an Adobe PDF portfolio splash screen recommending users open the file in Acrobat X or Adobe Reader X. The page displays the Adobe PDF logo, provides instructions for optimal viewing, and includes a button to download Adobe Reader. No substantive contract, solicitation, or procurement information is present in this image.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1

SECTION 01 31 00

PROJECT MANAGEMENT AND COORDINATION

PART 1 GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on

Project including, but not limited to, the following:

1. Coordination.

2. Submittals

3. Administrative and supervisory personnel.

4. Project meetings.

5. Requests for Interpretation (RFIs).

1.2 DEFINITIONS

A. RFI: Request from Contractor seeking interpretation or clarification of the Contract Documents.

1.3 COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for FAA and separate contractors if coordination of their Work is required.

C. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2

Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. All salvaged materials shall be placed in a designated area for review by the RE/COR prior to disposal.

1.4 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date, time and location of each meeting. Notify the FAA Contracting Officer (CO), RE/COR, Project Engineer, and subcontractors of dates, times and location of the meeting.

B. Pre-construction Conference: A pre-construction conference will be held before starting construction. Location and time designated by FAA. The meeting will review responsibilities and personnel assignments.

1. Attendees: Contracting Officer, Project Engineer, RE/COR, FAA SSCM and other authorized representatives of the FAA, Contractor and his superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Sign in sheet

b. Tentative overall construction schedule.

c. Designation of key personnel and their duties.

d. Procedures for processing field decisions and Change Orders.

e. Procedures for RFIs.

f. Submittal procedures. (Submittal Log & Numbering)

g. Preparation of Record Documents. (Maintain Red Line drawings for immediate review)

h. Use of the premises and existing facility.

i. Work restrictions.

j. Owner's occupancy requirements.

k. Responsibility for temporary facilities and controls.

l. Parking availability and location.

m. Equipment deliveries and priorities.

n. Security.

o. Progress cleaning.

p. Working hours.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 3

q. Safety Management System (SMS)

r. Lay down area for Contractor temporary office facilities, any trailers and staging area. (utilize open space on site as directed by RE/COR)

s. Notice to Proceed Letter (NTP) by Contracting Officer.

t. Final clean up and punch list.

u. Letter designating RE/COR by Contracting Officer

v. Schedule of Values.

w. Review Form 3900-18, FAA Pre-Construction and Maintenance Project Safety and Health Checklist. Form 3900-18 at end of Section 013100.

3. Minutes: Record and distribute meeting minutes.

C. Progress Meetings:

Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to the approved Contractor's Construction Schedule.

Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Status of submittals.

2) Deliveries.

3) Access.

4) Site utilization.

5) Work hours.

6) Hazards and risks including any proposed utility outages or cutovers

7) Progress cleaning.

8) Quality and work standards.

9) Status of correction of deficient items.

10) Field observations.

11) RFIs.

12) Status of proposal requests.

13) Pending changes.

14) Status of Change Orders. (Maintain change order log with status)

15) Pending claims and disputes.

1.5 REQUESTS FOR INTERPRETATION (RFIs)

A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, prepare and submit all RFI’s in the form specified.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 4

1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

A. Hard-Copy RFIs: Form at end of this Section.

1. Identify each page of attachments with the RFI number and sequential page number.

B. FAA's Action: The CO will review each RFI, determine action required, and return it. Allow five

(5) working days for the CO's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for coordination information already indicated in the Contract Documents.

d. Requests for adjustments in the Contract Time or the Contract Sum.

e. Requests for interpretation of the engineering's actions on submittals.

f. Incomplete RFIs or RFIs with numerous errors.

2. CO's action may include a request for additional information.

C. On receipt of the CO's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify the CO within three (3) working days if Contractor disagrees with response.

D. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log at each updated meeting.

--End of Section--

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

CONSTRUCTION PROJECT DOCUMENTATION 01 32 00 - 1

SECTION 01 32 00

CONSTRUCTION PROJECT DOCUMENTATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Submittals Schedule.

2. Preliminary Construction Schedule.

3. Contractor's Construction Schedule.

B. Related Sections include the following:

1. Division 01 Section "Project Management and Coordination" for submitting and distributing meeting and conference minutes.

2. Division 01 Section "Submittal Procedures" for submitting schedules and reports.

1.3 SUBMITTALS

A. Submittals Schedule: Submit three (3) copies of schedule. Arrange the following information in a tabular format:

3. Scheduled date for first submittal.

4. Specification Section number and title.

5. Submittal category (action or informational).

6. Name of subcontractor.

7. Description of the Work covered.

8. Scheduled date for the Contracting Office (CO)'s final release or approval.

C. Preliminary Construction Schedule: Submit three (3) copies.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

CONSTRUCTION PROJECT DOCUMENTATION 01 32 00 - 2

1. Approval of cost-loaded preliminary construction schedule will not constitute approval of Schedule of Values for cost-loaded activities.

D. Contractor's Construction Schedule: Submit one (1) copy of schedule in electronic format for the Project Engineer and RE/COR and submit three (3) hard copies of initial schedule, large enough to show entire schedule for entire construction period. Prepare construction schedule utilizing Microsoft Project indicating the Critical Path and any long lead items.

Update schedule and resubmit with each and every pay application request as a minimum.

1.2 COORDINATION

A. Coordinate requirements in this Article with Part 2 "Submittals Schedule" Article. If a submittal review sequence policy governs, revise this Article to comply with requirements.

See Evaluations for discussion on submittal review sequence policies.

B. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.

C. Coordinate Contractor's Construction Schedule with the schedule of values, list of subcontracts, submittals schedule, progress reports, payment requests, and all other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from parties involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.1 SUBMITTALS SCHEDULE

A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates.

1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule.

2. If a Preliminary Construction Schedule is not required, delete subparagraph below or revise to require initial submittal within 14 days of date established for commencement of the Work.

3. Initial Submittal: Submit concurrently with preliminary bar-chart schedule. Include submittals required at Notice to Proceed. List those required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

CONSTRUCTION PROJECT DOCUMENTATION 01 32 00 - 3

4. Revise subparagraph below if schedule must be continuously updated to reflect current status and changes in timing for submittals.

5. Final Submittal: Submit concurrently with the first complete submittal of Contractor's Construction Schedule.

2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Manual referenced in first paragraph below contains basic recommendations for CPM procedures and methods.

B. Procedures: Comply with procedures contained in AGC’s "Construction Planning & Scheduling."

C. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final Completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order from the Contracting Officer.

D. Activities: Treat each separate area as a separate numbered activity for each principal element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than 3 days, unless specifically allowed by the CO.

2. Submittal Review Time: Include review and resubmittal times indicated in Section 013300 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule.

3. Substantial Completion: Indicate completion in advance of date established for Substantial Completion and allow time for engineering's administrative procedures necessary for certification of Substantial Completion.

E. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Products Ordered in Advance: Include a separate activity for each product. Include delivery date indicated in Section 01 10 00 “Summary of Work." Delivery dates indicated stipulate the earliest possible delivery date.

3. Work Restrictions: Show the effect of the following items on the schedule:

a. Limitations of continued occupancies.

b. Uninterruptible services.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

CONSTRUCTION PROJECT DOCUMENTATION 01 32 00 - 4

c. Use of premises restrictions.

d. Seasonal variations.

e. Weather (requiring a stop work e.g. severe weather)

F. Milestones: Include major milestones indicated in the Contract Documents schedule, including, but not limited to, the Notice to Proceed, Phases begin and end dates, Substantial Completion, and Final Completion.

2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)

A. Gantt-chart schedule in this Article is adequate for many projects. Delete this Article if Project size and complexity justify CPM construction schedule. Time in first paragraph below usually needs extending for multiple contracts.

B. Gantt-Chart Schedule: Within 5 calendar days of contract award, the contractor shall submit a comprehensive, fully developed, horizontal Gantt-chart-type, Contractor's Construction Schedule. A Notice to Proceed will not be issued until the schedule is approved.

PART 3 EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: At weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule at the regularly scheduled progress meeting. (Proposed vs. Actual)

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate Actual Completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to the CO, RE/COR, Project Engineer, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 01 32 00

SUBMITTAL PROCEDURES 01 33 00 - 1

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

SECTION 01 33 00

SUBMITTAL PROCEDURES

1.01 SUBMITTALS

A. Catalog cut sheets, brochures, shop drawings and/or samples shall be clearly marked/indicated by the Contractor and submitted to the Project Engineer for the items on the schedule, drawings and other sections of the specifications.

B. All salient features of materials required to be submitted shall be easily found in the submittal package for each item and not require research on the part of the Government to determine compliance with Contract requirements.

C. Related items such as mechanical/electrical components shall be submitted at one time for coordination purposes.

D. Color coordinated items such as paint, vinyl composition tile, and so forth shall be submitted at one time to facilitate color comparison/selection by the RE/COR. Different categories of submittal items are not to be grouped on the same form.

E. All related submittals have to be submitted all together in one package. Submit the following items for approval after contract award.

1. Paint manufacturer’s technical data sheet including instructions for its applications and use of the interior/exterior primer and interior/exterior paint.

2. Construction schedule/sequence of work. The schedule shall be arranged in a chronical order.

3. Letter of certification to certify that only lead-free paint is to be/was used.

4. Name and number of persons on site shall be submitted to the RE/COR before the starting date.

F. All items shall be approved by the Project Engineer prior to purchase, delivery or installation.

G. All items shall be submitted electronically in pdf format not more than twenty (20) calendar days after Contractor's notification that they can proceed with construction. Samples of all items requiring color selection shall be submitted along with the electronic submittal. Operations and Maintenance (O&M) manuals shall be submitted for approval by the RE/COR, prior to final inspection.

H. Not less than ten (10) business days shall be allowed for review of submittals by the

Government.

I. Submittals will be returned to the Contractor unless otherwise specified. A sample of all items requiring color selection will be retained by the Contracting Officer’s Representative for reference.

J. Refer to Section 01 63 00 - Substitutions and Product Options.

1.02 OPERATION AND MAINTENANCE MANUALS

The Contractor shall furnish three (3) copies, one (1) hard copy and two (2) CD ROM, of all operation and maintenance (O&M) manuals. O&M manuals shall contain complete instructions for the operation, inspection, testing and maintenance of the system, and shall include complete parts breakdown diagrams.

SUBMITTAL PROCEDURES 01 33 00 - 2

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

Manuals shall also contain complete wiring schematics and diagrams. Manuals shall be in booklet form with binder and shall be arranged in logical sections for easy reference.

1.03 MATERIAL SAFETY DATA SHEET (MSDS)/SAFETY DATA SHEET (SDS) SUBMITTALS

1. All submittals for products shall include the MSDS/SDS when an MSDS/SDS is required by law for that product.

2. MSDS/SDS’s shall also be submitted on FAA “Approval-Disapproval form of Contract Materials” for all products to be used during the course of the project, not otherwise requiring a submittal, but which may be of a toxic, hazardous, flammable or otherwise dangerous nature.

3. Approval by the RE/COR is required before bringing the materials on site. All hazardous waste shall be disposed of per all local, state and federal regulations.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

--END OF SECTION—

SUBMITTAL PROCEDURES 01 33 00 - 3

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

APPROVAL OR DISAPPROVAL OF CONTRACTOR'S FEDERAL AVIATION ADMINISTRATION 10101

HILLWOOD PARKWAY, FORT WORTH, TX

Ph:817-222-4571

MATERIALS OR SHOP DRAWINGS

1. TO:

Phone:

Mobile:

Web:

2. DATE:

3. QUOTE NO. 4. CONTRACTOR'S TRANS. NO.

Sheet 1 of 1

5. DATE CONTRACTOR'S TRANSMITTAL RECEIVED

6. PROJECT NAME

7. PRODUCT DATA

8. TRANSMITTAL REFERENCE TO CONTRACT DRAWINGS and/or SHOP DRAWINGS

9. TRANSMITTAL REFERENCE TO CONTRACT SPECIFICATION AND PARAGRAPH NUMBER and/or CHANGE ORDER NUMBER

10. FACTS:

A

ITEM

NO.

B.

TYPE

C.

NAME OF SUPPLIER

D.

TYPE OF MATERIAL OR EQUIPMENT

E. APPROVAL F.

NOT

APPROVED

AS

SUBMITTE

D

NOTE

D

TO

MFG

G. REMARKS

H. STIPULATIONS

Data marked "Approved as Noted" is satisfactory , contingent upon contractor acceptance of corrections and/or notations, and if accepted does not require re-submittal.

Data marked "Approved as to Mfgr. Only" will be acceptable, provided re-submittal is made with revised selections, according to specifications. Data marked "Not Approved" does not meet job requirements, and contractor must re-submit on proper bases. Approval of Data does not obviate Contractor Responsibility for correct take-off or installation clearance.

Carbon Copies Transmitted To:

Sincerely, JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

QUALITY REQUIREMENTS 014000 - 1

SECTION 01 40 00

QUALITY REQUIREMENTS

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspection services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and quality-control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality-assurance and quality-control services required by authorities having jurisdiction are not limited by provisions of this Section.

A. Experienced: When used with an entity or individual, "experienced" unless otherwise further described means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

B. Field Quality-Control Tests and Inspections: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

C. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, assembly, and similar operations.

1. Use of trade-specific terminology in referring to a Work result does not require that certain construction activities specified apply exclusively to specific trade(s).

D. Preconstruction Testing: Tests and inspections performed specifically for Project before products and materials are incorporated into the Work, to verify performance or compliance with specified criteria. Unless otherwise indicated, copies of reports of tests or inspections performed for other than the Project do not meet this definition.

E. Product Tests: Tests and inspections that are performed by a nationally recognized testing laboratory (NRTL) in accordance with 29 CFR 1910.7, by a testing agency accredited in accordance with NIST's National Voluntary Laboratory Accreditation Program (NVLAP), or by a

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

QUALITY REQUIREMENTS 014000 - 2

testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

F. Source Quality-Control Tests and Inspections: Tests and inspections that are performed at the source; for example, plant, mill, factory, or shop.

G. Testing Agency: An entity engaged to perform specific tests, inspections, or both. The term "testing laboratory" has the same meaning as the term "testing agency."

H. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

I. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Contractor's quality-control services do not include contract administration activities performed by FAA RE/COR (Resident Engineer/Contracting Officer’s Representative.

1.3 DELEGATED DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Project Engineer via the Contracting Officer.

B. Delegated Design Services Statement: Submit a statement, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional, indicating that the products and systems are in compliance with performance and design criteria indicated. Include list of codes, loads, and other factors used in performing these services.

1.4 CONFLICTING REQUIREMENTS

A. Conflicting Standards and Other Requirements: If compliance with two or more standards or requirements is specified and the standards or requirements establish different or conflicting requirements for minimum quantities or quality levels, inform the RE/COR regarding the conflict and obtain clarification prior to proceeding with the Work. Refer conflicting requirements that are different, but apparently equal, to the Project Engineer via the Contracting Officer for clarification before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified is the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

QUALITY REQUIREMENTS 014000 - 3

To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Project Engineer via the Contracting Officer for a decision before proceeding.

1.5 INFORMATIONAL SUBMITTALS

A. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

B. Permits, Licenses, and Certificates: For local SSCM's record, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents established for compliance with standards and regulations bearing on performance of the Work.

1.6 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, telephone number, and email address of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspection.

11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and reinspecting.

B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following:

1. Statement that products at Project site comply with requirements.

2. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

3. Results of operational and other tests and a statement of whether observed performance complies with requirements.

4. Other required items indicated in individual Specification Sections.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

QUALITY REQUIREMENTS 014000 - 4

C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections. Include the following:

1. Statement that equipment complies with requirements.

2. Results of operational and other tests and a statement of whether observed performance complies with requirements.

3. Other required items indicated in individual Specification Sections.

1.7 QUALITY ASSURANCE

A. Qualifications paragraphs in this article establish the minimum qualification levels required;

individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. As applicable, procure products from manufacturers able to meet qualification requirements, warranty requirements, and technical or factory-authorized service representative requirements.

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Installer Qualifications: A firm or individual experienced in installing, erecting, applying, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

E. Specialists: Certain Specification Sections require that specific construction activities be performed by entities who are recognized experts in those operations. Specialists will satisfy qualification requirements indicated and engage in the activities indicated.

1. Requirements of authorities having jurisdiction supersede requirements for specialists.

F. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

G. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect, demonstrate, repair, and perform service on installations of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

QUALITY REQUIREMENTS 014000 - 5

1.8 QUALITY CONTROL

A. Contractor Responsibilities: Tests and inspections are Contractor's responsibility. Perform additional quality-control activities, whether specified or not, to verify and document that the Work complies with requirements.

1. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspection will be performed.

2. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

3. Testing and inspection requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

4. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

B. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

C. Testing Agency Responsibilities: Cooperate with RE/COR and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify RE/COR and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the locations from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected Work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

6. Do not perform duties of Contractor.

D. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Section 013300 "Submittal Procedures."

E. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work, and submittal of written reports.

F. Contractor's Associated Requirements and Services: Cooperate with agencies and representatives performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

QUALITY REQUIREMENTS 014000 - 6

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspection. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Preliminary design mix proposed for use for material mixes that require control by testing agency.

6. Security and protection for samples and for testing and inspection equipment at Project site.

G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspection.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

1.9 SPECIAL TESTS AND INSPECTIONS

PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG

A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following:

1. Date test or inspection was conducted.

2. Description of the Work tested or inspected.

3. Date test or inspection results were transmitted to Architect.

4. Identification of testing agency or special inspector conducting test or inspection.

B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for RE/COR reference during normal working hours.

1. Submit log at Project closeout as part of Project Record Documents.

3.2 REPAIR AND PROTECTION

A. General: On completion of testing, inspection, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

QUALITY REQUIREMENTS 014000 - 7

invisible as possible. Comply with the Contract Document requirements for cutting and patching in Section 01 73 00 "Execution."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

--END OF SECTION--

QUALITY CONTROL 01 45 00 - 1

JCN 1704732, QOM ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

SECTION 01 45 00

QUALITY CONTROL

1.01 WORKMANSHIP

All materials and equipment shall be installed in a manner accepted by standard trade practice.

Workmen skilled in the type of work required shall accomplish the installation.

1.02 TRAFFIC SAFETY

Special efforts shall be made not to interfere with traffic flow or create safety hazards to traffic.

1.03 ENVIRONMENTAL MANAGEMENT SYSTEM

Environmental Management System (EMS) is an ISO 14,001 tool used to identify and mitigate threats to our environment. Ultimate goal is to protect our environment (work environment and the natural environment) while accomplishing our mission. All Contractors working on FAA projects are expected to acknowledge their role in EMS while completing their mission. Threats associated with construction sites include, but are not limited to: hazardous materials, spills, equipment leaks, air-born dust, soil erosion, track- out, and lack of recycling. This will be communicated and documented initially for each project with monthly updates provided to the FAA Contracting Officer’s Representative.

1.04 DEBRIS DISPOSAL

A. Debris shall be removed from the project site promptly, and as feasible, all equipment and materials shall be removed or secured at the end of each day. The Contractor is responsible for the daily cleanup of all construction areas and construction debris that has escaped from the construction site.

B. The Contractor shall exercise caution in not disturbing adjacent facilities, finishes, materials, grounds and other items not a part of this project. The Contractor shall clean daily all areas outside the project area of dirt, dust, and debris generated by this contract.

C. The Contractor shall use designated haul routes for both delivery and removals. Haul routes are noted on the drawings.

D. All debris generated by the contract shall be properly disposed of by the Contractor off the project site. Removal of debris and other material shall be handled, transported, stored, and disposed of by the Contractor and his sub-contractors in accordance with all applicable federal, state or local laws, ordinances, regulations, court orders or other types of rules or rulings having the effect of laws. These restrictions shall apply both on and off FAA facilities.

E. The Contractor shall submit with the regular progress reports a Government supplied Contractor Construction and Demolition Debris Report. This form lists the amount of materials disposed at a landfill, recycled or otherwise reused. This submittal is required before progress payments can be made and also applies to any debris by sub-contractors.

F. The Contractor shall take all precautions to prevent spillage of materials from Contractor vehicles on FAA facility pavements. The Contractor shall provide adequate labor and equipment to keep paved areas free of debris, and to contain loose materials at all times.

G. RECYCLING MATERIALS

QUALITY CONTROL 01 45 00 - 2

JCN 1704732, QOM ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

1. All removed ceiling tile shall be recycled and the Contractor shall provide written certification that the ceiling was not placed in a landfill. Contractor certification shall indicate how the material was recycled and provide the address where it was delivered.

1.05 CULTURAL RESOURCE MANAGEMENT

For the protection of cultural, historic and prehistoric resources, the Contractor shall submit a signed certification that the selected land borrow area is free of all materials of this type. This includes anything of an archeological nature as well as any Native American sites to include tribal burial grounds.

1.06 TEMPORARY EROSION CONTROL MEASURES: Not Used

1.07 GROUNDS MAINTENANCE: Not Used

1.08 WARRANTY REQUIREMENTS

The Contractor shall provide a standard Warranty of Construction for all work associated with this contract in accordance with FAR Clause 52.246-21 and any other additional warranties outlined within this Statement of Work/Specifications.

1.09 FINAL INSPECTION AND ACCEPTANCE OF WORK

As construction nears completion, the Contracting Officer’s Representative and the Contractor's Quality Control representative and Superintendent shall thoroughly inspect the work and generate a deficiency (punch) list. When this list has been cleared, the Contractor shall request a preliminary inspection through the Contracting Officer; then the Contracting Officer’s Representative will schedule the preliminary inspection using Government specialists of the systems installed under the Contract. When all deficiencies are corrected, the Contractor shall request a final inspection through the Contracting Officer, to be conducted by the Contracting Officer and Contracting Officer’s Representative. For phased work, this process may be repeated for each phase.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

DUST CONTROL 01 56 00 - 1

SECTION 01 56 00

DUST CONTROL

The work covered by this section consists of furnishing all labor, materials and equipment and performing all work required for the control and prevention of fugitive dust during and as the result of construction operations under this contract. Except for those measures set forth in other Technical Provisions of these specifications. For the purpose of this specification, fugitive dust entails the generation of solid particles by the forces of wind or machinery acting upon exposed materials. Provisions of this specification shall prevent fugitive dust from adversely affecting human health or welfare; unfavorably altering ecological balances of importance to human life; affecting other species of importance to man; or degrading the utility of the environment for aesthetic and recreational purposes. Dust Control is a requirement in the EPA and state pollutant discharge elimination system or permit for discharging storm water during construction.

Contain dust around all ARSR electronic equipment with PVC sheets suspended from the ceilings. Do not cover the equipment as that would cause the electronic equipment to overheat.

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referenced in the text by basic designation only.

FEDERAL AVIATION ADMINISTRATION (FAA)

FAA ORDER 3900.19C National Policy (latest version): Occupational Safety and Health Policy

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Dust Control; G.

Products and Procedures; G

Prior to commencement of the work, submit in writing a proposal to the Contracting Officer for implementing the provisions of this section for fugitive dust control. Address the plans, and the products to be used, to prevent and control fugitive dust through specific mitigative and preventative measures. The effectiveness of the dust control program shall be periodically checked and reviewed. Revisions to the dust control plan shall be submitted to the Contracting Officer as changes are necessary during the duration of this contract.

Material Safety Data Sheet; G.

Material Safety Data Sheets include those for soil stabilization products.

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

DUST CONTROL 01 56 00 - 2

Sandblasting; G.

SD-02 Shop Drawings

Recordkeeping;.

Maintain and furnish records in accordance with PART 1 paragraph 1.7

RECORDKEEPING.

1.4 IMPLEMENTATION MEETING

Prior to commencement of the work the Contractor shall meet with representatives of the Contracting

Officer. In the Preconstruction Meeting will be an appropriate time to address dust control implementation.

Develop a mutual understanding relative to compliance with these provisions and administration of the

Contractor dust control measures.

1.5 APPLICABLE REGULATIONS

In order to prevent and to provide control of pollution arising from the construction activities of the

Contractor and his subcontractors in the performance of this contract, all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement. And all applicable provisions of the FAA ORDER 3900.19C as well as the specific requirements stated in this section and elsewhere in the contract specifications. Compliance with the provisions of this section by subcontractors will be the responsibility of the Contractor.

1.6 NOTIFICATION OF NON-COMPLIANCE

The Contracting Officer will notify the Contractor in writing of any observed non-compliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately take corrective action.

Such notice, when delivered to the Contractor or his authorized representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor unless it was later determined that the Contractor was in compliance.

1.7 RECORDKEEPING

The Contractor shall, at a minimum, maintain records indicating dust control measures taken. Information provided shall be sufficient to answer any questions regarding control methods utilized, products used, application rates, inspections performed. Additional information to be recorded, but not limited to reporting, includes treated area, operator, date and time of treatment, meteorological conditions and inspection and monitoring reports. Records shall be submitted every 30 days to the Contracting Officer.

PART 2 PRODUCTS

2.1 PRODUCTS AND PROCEDURES

Products and procedures used in controlling particulates and dust shall be in accordance with the

Contractor's Environmental Protection Plan and the dust control plan required by this Section. Material

JCN 1704732 QOM ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, King Mountain TX

DUST CONTROL 01 56 00 - 3

Safety Data Sheets for soil binders for use in dust control shall be approved prior to application. Soil binders containing carcinogenic substances (e.g. acrylamides) are prohibited.

3.1 DUST CONTROL

Control techniques for fugitive dust sources shall involve watering. For arid regions and dusty work areas, dust control shall include water application with soil binders that is environmentally sustainable and non-toxic. The methods utilized shall be cost effective, water conservation, and appropriate for the size and scope of the fugitive dust source. Methods and controls shall not have an adverse effects on plant and animal life, ecosystem, and facility air intakes, or contaminate the treated material.

Repeat methods at such intervals as to keep all parts of the disturbed area(s) treated at all times. Have sufficient competent equipment on the job to accomplish control techniques. Products shall provide a method to reduce dust-related environmental concerns and aid in complying with applicable regulations.

Products shall not in any form produce any adverse environmental effects through their use and shall provide an effective, clean, safe control of airborne dust and protection against soil erosion.

3.1.1 Preventative Techniques

The reduction of source extent, the incorporation of process modifications, or adjusted work practices, which reduce the amount of dust-generation, are preventative techniques for the control of fugitive dust emissions. These techniques include the elimination of mud and dirt carry-out onto paved roads at construction sites.

3.1.2 Mitigative Techniques

Mitigative measures entail the periodic removal of dust-producing material. Examples of mitigative control measures include clean-up of spillage on paved or unpaved travel surfaces and clean-up of material spillage at…