This technical proposal requirements memorandum from the 86th Airlift Wing of the United States Air Forces in Europe requests that bidders on the QUUG 17-1000 RPR Potable Water Lines project hold certain certificates from the Ministry of Economy and Finance of Spain and perform at least 60% of the total work with their own resources.
The federal contract opportunity notice seeks proposals to repair fourteen leaks and replace over 1,000 feet of potable water lines at Morón Air Base in Spain. Bidders would demolish and remove existing pipes, install new high density polyethylene pipes ranging from 50mm to 250mm in diameter, replace valves, fire hydrants, and other accessories. Additional work includes repairs to pavement, vegetation, and performing leak detection on the new and existing water systems supplying six zones on the base. An optional line item provides estimated costs for demolishing underground obstructions and installing additional pipes and valves.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GFM Status.pdf | ||
| 17-1000 Especificaciones sp.pdf | ||
| Solicitation - FA557521B0001.pdf | ||
| 17-1000 Form for Cost Estimate.xls | XLS spreadsheet | |
| 17-1000 Specifications en.pdf | ||
| 17-1000 Drawings.pdf | ||
| 17-1000 AF66 Submittals.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
86TH AIRLIFT WING (USAFE)
22 Jan 21
MEMORANDUM FOR 496 ABS/PK
FROM: 496 ABS/CENDM
SUBJECT: Technical Proposal Requirements for Project QUUG 17-1000, RPR Potable Water
Lines, Area 1
1. Request that the bidders and/or their subcontractors hold an updated Certificate of
Classification issued by the "Registro de Contratistas de Obras del Estado" of the "Ministerio de Economía y Hacienda", covering the following groups, subgroups, and categories. The certificate holder must execute the activities related to the certificate.
Group Subgroup Category
E (Hydraulic) 1 (Water Mains and Sewer)
C (annual amount from 120,000.00 to 360,000.00 Euros)
2. Request that the main Contractor performs on the site, and with its own organization, work equivalent to at least 60 percent of the total amount of work to be performed under the contract.
JOSE M.ZUMÁRRAGA
Mechanical engineer
| 2021-01-21T12:12:46+0100 | |
| ZUMARRAGA-CARMONA.JOSE.MARIA.1392442568 |
File details come from the government source that posted it. Updated .