17-1000 Form for Cost Estimate.xls

XLS spreadsheet 110 KB Posted

Attached to
QUUG 17-1000 RPR POTABLE WATER LINES, Morón AB Spain AREA 1
Solicitation number
FA5575-21-B-0001
Issued by

About this file

This document contains a cost estimate form and related federal contract opportunity for potable water infrastructure repairs at Morón Air Base in Spain. The cost estimate form provides unit pricing for materials, labor, and other direct costs for replacing and repairing underground water pipes, valves, hydrants, and related infrastructure across six zones and fourteen leak locations on base. The replacement work will use high density polyethylene pipes and fittings to demolish aged and damaged PVC components. Additional work includes road crossings, repairs to affected elements, GPS and leak surveys, and as-built drawings. An additive item is included to account for potential underground obstructions discovered during excavation. The related federal contract opportunity is solicitation number FA5575-21-B-0001 for the QUUG 17-1000 RPR project. The Department of the Air Force United States Air Forces in Europe - Air Forces Africa is the contracting agency. The work will repair the potable water distribution system and address ongoing leaks.

View the file

Other files

File Type Posted
GFM Status.pdf PDF
17-1000 Especificaciones sp.pdf PDF
Solicitation - FA557521B0001.pdf PDF
17-1000 Specifications en.pdf PDF
17-1000 Drawings.pdf PDF
17-1000 Technical Proposal Requirements.pdf PDF
17-1000 AF66 Submittals.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic pkg KTR

*
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR POTABLE WATER LINES, AREA 1 (BASIC PACKAGE)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 17-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ZONE A
ZONA A
1Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
2Water meter and accessories 80 mm
Contador de agua y accesorios 80 mmEa
3Gate Valve 2" and accessories
Válvulas de compuerta 2" y accesoriosEa
4Gate Valve 8" and accessories
Válvulas de compuerta 8" y accesoriosEa
5Gate Valve 10" and accessories
Válvulas de compuerta 10" y accesoriosEa
6Polyethylene Pipe PE100 DN40 and connection accessories
Tubería polietileno PE100 DN40 y accesorios de conexiónLm
7Polyethylene Pipe PE100 DN63 and connection accessories
Tubería polietileno PE100 DN63 y accesorios de conexiónLm
8Polyethylene Pipe PE100 DN110 and connection accessories
Tubería polietileno PE100 DN110 accesorios de conexiónLm
9Polyethylene Pipe PE100 DN180 and connection accessories
Tubería polietileno PE100 DN180 y accesorios de conexiónLm
10Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
11Polyethylene Pipe PE100 DN250 and connection accessories
Tubería polietileno PE100 DN250 y accesorios de conexiónLm
12Galvanized steel pipe 4" and connection accessories
Tubería acero galvanizado 4" y accesorios de conexiónLm
13Road crossing (drilled) RC-1
Cruce de carretera (con topo) RC-1Lm
14Road crossing (drilled) RC-2
Cruce de carretera (con topo) RC-2Lm
15Road crossing (drilled) RC-3
Cruce de carretera (con topo) RC-3Lm
16Road crossing (drilled) RC-4
Cruce de carretera (con topo) RC-4Lm
17Road crossing (drilled) RC-5
Cruce de carretera (con topo) RC-5Lm
18Road crossing (drilled) RC-6
Cruce de carretera (con topo) RC-6Lm
19Road crossing (drilled) RC-7
Cruce de carretera (con topo) RC-7Lm
20Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJOB
21Bollards installation
Instalación de bolardosEa
22GPS Survey
Survey GPSJOB
23Water Leak Survey
Survey fugas de aguaJOB
TOTAL ZONE A
TOTAL ZONA A
ZONE B
ZONA B
24Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
25Air relief valve, T, Pipe and accessories
Ventosa T, tubería y accesoriosEa
26Demolish existing barrel type hydrant and accessories
Demolición de hidrante vertical existente y accesoriosEa
27Valve and accessories for barrel type hydrant (GFM)
Válvula y accesorios para hidrante vertical (GFM)Ea
28Barrel type hydrant, T, pipe and accessories
Hidrante vertical, T, tubería y accesoriosEa
29Water meter and accessories 25 mm
Contador de agua y accesorios 25 mmEa
30Gate Valve 1 1/4" and accessories
Válvulas de compuerta 1 1/4" y accesoriosEa
31Gate Valve 1 1/2" and accessories
Válvulas de compuerta 1 1/2" y accesoriosEa
32Gate Valve 8" and accessories
Válvulas de compuerta 8" y accesoriosEa
33Gate Valve 10" and accessories
Válvulas de compuerta 10" y accesoriosEa
34Gate Valve 12" and accessories
Válvulas de compuerta 12" y accesoriosEa
35Install backflow preventer and accessories (RPPD) 1 1/2"
Instalar desconector y accesorios 1 1/2"Ea
36Polyethylene Pipe PE100 DN40 and connection accessories
Tubería polietileno PE100 DN40 y accesorios de conexiónLm
37Polyethylene Pipe PE100 DN50 and connection accessories
Tubería polietileno PE100 DN50 y accesorios de conexiónLm
38Polyethylene Pipe PE100 DN180 and connection accessories
Tubería polietileno PE100 DN180 y accesorios de conexiónLm
39Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
40Polyethylene Pipe PE100 DN250 and connection accessories
Tubería polietileno PE100 DN250 y accesorios de conexiónLm
41Polyethylene Pipe PE100 DN315 and connection accessories
Tubería polietileno PE100 DN315 y accesorios de conexiónLm
42Galvanized steel pipe 1 1/2" and connection accessories
Tubería acero galvanizado 1 1/2" y accesorios de conexiónLm
43Pipes and valves for chlorine system
Tuberías y válvulas para sistema de cloroJOB
44Manhole and cover
Arqueta y tapaEa
45Road crossing (drilled) RC-8
Cruce de carretera (con topo) RC-8Lm
46Road crossing (drilled) RC-9
Cruce de carretera (con topo) RC-9Lm
47Road crossing (drilled) RC-10
Cruce de carretera (con topo) RC-10Lm
48Road crossing (drilled) RC-11
Cruce de carretera (con topo) RC-11Lm
49Road crossing (drilled) RC-12
Cruce de carretera (con topo) RC-12Lm
50Road crossing (drilled) RC-13
Cruce de carretera (con topo) RC-13Lm
51Road crossing (drilled) RC-14
Cruce de carretera (con topo) RC-14Lm
52Road crossing (drilled) RC-15
Cruce de carretera (con topo) RC-15Lm
53Road crossing (drilled) RC-16
Cruce de carretera (con topo) RC-16Lm
54Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJOB
55Bollards installation
Instalación de bolardosEa
56GPS Survey
Survey GPSJOB
57Water Leak Survey
Survey fugas de aguaJOB
TOTAL ZONE B
TOTAL ZONA B
ZONE C
ZONA C
58Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
59Water meter and accessories 40 mm
Contador de agua y accesorios 40 mmEa
60Gate Valve 2" and accessories
Válvulas de compuerta 2" y accesoriosEa
61Gate Valve 4" and accessories
Válvulas de compuerta 4" y accesoriosEa
62Gate Valve 8" and accessories
Válvulas de compuerta 8" y accesoriosEa
63Polyethylene Pipe PE100 DN63 and connection accessories
Tubería polietileno PE100 DN63 y accesorios de conexiónLm
64Polyethylene Pipe PE100 DN110 and connection accessories
Tubería polietileno PE100 DN110 accesorios de conexiónLm
65Polyethylene Pipe PE100 DN180 and connection accessories
Tubería polietileno PE100 DN180 y accesorios de conexiónLm
66Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
67Galvanized steel pipe 2" and connection accessories
Tubería acero galvanizado 2" y accesorios de conexiónLm
68Road crossing (drilled) RC-17
Cruce de carretera (con topo) RC-17Lm
69Road crossing (drilled) RC-18
Cruce de carretera (con topo) RC-18Lm
70Road crossing (drilled) RC-19
Cruce de carretera (con topo) RC-19Lm
71Road crossing (drilled) RC-20
Cruce de carretera (con topo) RC-20Lm
72Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJOB
73Bollards installation
Instalación de bolardosEa
74GPS Survey
Survey GPSJOB
75Water Leak Survey
Survey fugas de aguaJOB
TOTAL ZONE C
TOTAL ZONA C
ZONE D
ZONA D
76Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
77Water meter and accessories 40 mm
Contador de agua y accesorios 40 mmEa
78Install backflow preventer and accessories (RPPD) 2"
Instalar desconector y accesorios 2"Ea
79Gate Valve 2" and accessories
Válvulas de compuerta 2" y accesoriosEa
80Gate Valve 8" and accessories
Válvulas de compuerta 8" y accesoriosEa
81Polyethylene Pipe PE100 DN50 and connection accessories
Tubería polietileno PE100 DN50 y accesorios de conexiónLm
82Polyethylene Pipe PE100 DN63 and connection accessories
Tubería polietileno PE100 DN63 y accesorios de conexiónLm
83Polyethylene Pipe PE100 DN180 and connection accessories
Tubería polietileno PE100 DN180 y accesorios de conexiónLm
84Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
85Galvanized steel pipe 2" and connection accessories
Tubería acero galvanizado 2" y accesorios de conexiónLm
86Road crossing (drilled) RC-21
Cruce de carretera (con topo) RC-21Lm
87Road crossing (drilled) RC-22
Cruce de carretera (con topo) RC-22Lm
88Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJOB
89Bollards installation
Instalación de bolardosEa
90GPS Survey
Survey GPSJOB
91Water Leak Survey
Survey fugas de aguaJOB
TOTAL ZONE D
TOTAL ZONA D
ZONE E
ZONA E
92Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
93Gate Valve 8" and accessories
Válvulas de compuerta 8" y accesoriosEa
94Gate Valve 10" and accessories
Válvulas de compuerta 10" y accesoriosEa
95Polyethylene Pipe PE100 DN180 and connection accessories
Tubería polietileno PE100 DN180 y accesorios de conexiónLm
96Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
97Polyethylene Pipe PE100 DN250 and connection accessories
Tubería polietileno PE100 DN250 y accesorios de conexiónLm
98Road crossing (drilled) RC-23
Cruce de carretera (con topo) RC-23Lm
98Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJOB
99GPS Survey
Survey GPSJOB
100Water Leak Survey
Survey fugas de aguaJOB
TOTAL ZONE E
TOTAL ZONA E
ZONE F
ZONA F
101Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
102Gate Valve 8" and accessories
Válvulas de compuerta 8" y accesoriosEa
103Polyethylene Pipe PE100 DN180 and connection accessories
Tubería polietileno PE100 DN180 y accesorios de conexiónLm
104Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
105Road crossing (drilled) RC-23
Cruce de carretera (con topo) RC-23Lm
106Repair elements affected by the execution of the project
Reparar elementos afectados por la ejecución del proyectoJOB
107GPS Survey
Survey GPSJOB
108Water Leak Survey
Survey fugas de aguaJOB
TOTAL ZONE F
TOTAL ZONA F
LEAK #1
FUGA #1
109Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
110Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
111Miscelaneous
VariosJOB
TOTAL LEAK #1
TOTAL FUGA #1
LEAK #2
FUGA #2
112Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
113Demolish existing barrel type hydrant and accessories
Demolición de hidrante vertical existente y accesoriosEa
114Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
115T, pipe and accessories
T, tubería y accesoriosEa
116Valve and valve box for barrel type hydrant (GFM)
Válvula y caja de válvulas para hidrante vertical (GFM)Ea
117Barrel type hydrant, T, pipe and accessories
Hidrante vertical, T, tubería y accesoriosEa
117Remove and reinstall 4 1/2" connection
Desmontar y reinstalar conexión de 4 1/2"Ea
118Miscelaneous
VariosJOB
TOTAL LEAK #2
TOTAL FUGA #2
LEAK #3
FUGA #3
119Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
120Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
121Miscelaneous
VariosJOB
TOTAL LEAK #3
TOTAL FUGA #3
LEAK #4
FUGA #4
122Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
123Demolish existing barrel type hydrant and accessories
Demolición de hidrante vertical existente y accesoriosEa
124Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
125T, pipe and accessories
T, tubería y accesoriosEa
126Valve and valve box for barrel type hydrant (GFM)
Válvula y caja de válvulas para hidrante vertical (GFM)Ea
127Barrel type hydrant, T, pipe and accessories
Hidrante vertical, T, tubería y accesoriosEa
127Remove and reinstall 4 1/2" connection
Desmontar y reinstalar conexión de 4 1/2"Ea
128Miscelaneous
VariosJOB
TOTAL LEAK #4
TOTAL FUGA #4
LEAK #5
FUGA #5
129Demolish existing underground pipe, manhole and accessories
Demolición tubería enterrada existente, arqueta y accesoriosEa
130Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
131T, pipe, valve and accessories
T, tubería, válvula y accesoriosEa
132Water meter and accessories 150 mm
Contador de agua y accesorios 150 mmEa
133Galvanized steel pipe 8" and connection accessories
Tubería acero galvanizado 8" y accesorios de conexiónLm
134Miscelaneous
VariosJOB
TOTAL LEAK #5
TOTAL FUGA #5
LEAK #6
FUGA #6
135Demo underground pipe, backflow prev, meter and accessories
Demolición tubería enterrada, desconector, contador y accesoriosEa
136Polyethylene Pipe PE100 DN160 and connection accessories
Tubería polietileno PE100 DN160 y accesorios de conexiónLm
137Backflow preventer 6", valves and accessories
Desconector 6", válvulas y accesoriosEa
138Water meter and accessories 100 mm
Contador de agua y accesorios 100 mmEa
139Galvanized steel pipe 6" and connection accessories
Tubería acero galvanizado 6" y accesorios de conexiónLm
140Miscelaneous
VariosJOB
TOTAL LEAK #6
TOTAL FUGA #6
LEAK #7
FUGA #7
141Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
142Polyethylene Pipe PE100 DN50 and connection accessories
Tubería polietileno PE100 DN50 y accesorios de conexiónLm
143Miscelaneous
VariosJOB
TOTAL LEAK #7
TOTAL FUGA #7
LEAK #8
FUGA #8
144Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
145Polyethylene Pipe PE100 DN250 and connection accessories
Tubería polietileno PE100 DN250 y accesorios de conexiónLm
146Miscelaneous
VariosJOB
TOTAL LEAK #8
TOTAL FUGA #8
LEAK #9
FUGA #9
147Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
148Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
149Reinstall air relief valve. New T, Pipe and accessories
Reinstalación ventosa. Nueva T, tubería y accesoriosEa
149Miscelaneous
VariosJOB
TOTAL LEAK #9
TOTAL FUGA #9
LEAK #10
FUGA #10
150Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
151Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
152Reinstall air relief valve. New T, Pipe and accessories
Reinstalación ventosa. Nueva T, tubería y accesoriosEa
152Miscelaneous
VariosJOB
TOTAL LEAK #10
TOTAL FUGA #10
LEAK #11
FUGA #11
153Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
154Demolish existing barrel type hydrant and accessories
Demolición de hidrante vertical existente y accesoriosEa
155Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
156T, pipe and accessories
T, tubería y accesoriosEa
157Valve and valve box for barrel type hydrant (GFM)
Válvula y caja de válvulas para hidrante vertical (GFM)Ea
158Barrel type hydrant, T, pipe and accessories
Hidrante vertical, T, tubería y accesoriosEa
158Remove and reinstall 4 1/2" connection
Desmontar y reinstalar conexión de 4 1/2"Ea
159Miscelaneous
VariosJOB
TOTAL LEAK #11
TOTAL FUGA #11
LEAK #12
FUGA #12
160Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
161Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
162T, pipe, valve and accessories
T, tubería, válvula y accesoriosEa
163Miscelaneous
VariosJOB
TOTAL LEAK #12
TOTAL FUGA #12
LEAK #13
FUGA #13
164Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
165Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
166Miscelaneous
VariosJOB
TOTAL LEAK #13
TOTAL FUGA #13
LEAK #14
FUGA #14
167Demolish existing underground pipe and accessories
Demolición de tubería enterrada existente y accesoriosLm
168Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
169T, pipe and accessories for flush type fire hydrant
T, tubería y accesorios para hidrante enrasadoEa
170Miscelaneous
VariosJOB
TOTAL LEAK #14
TOTAL FUGA #14
TOTAL ZONE A
TOTAL ZONA A
TOTAL ZONE B
TOTAL ZONA B
TOTAL ZONE C
TOTAL ZONA C
TOTAL ZONE D
TOTAL ZONA D
TOTAL ZONE E
TOTAL ZONA E
TOTAL ZONE F
TOTAL ZONA F
TOTAL LEAK #1
TOTAL FUGA #1
TOTAL LEAK #2
TOTAL FUGA #2
TOTAL LEAK #3
TOTAL FUGA #3
TOTAL LEAK #4
TOTAL FUGA #4
TOTAL LEAK #5
TOTAL FUGA #5
TOTAL LEAK #6
TOTAL FUGA #6
TOTAL LEAK #7
TOTAL FUGA #7
TOTAL LEAK #8
TOTAL FUGA #8
TOTAL LEAK #9
TOTAL FUGA #9
TOTAL LEAK #10
TOTAL FUGA #10
TOTAL LEAK #11
TOTAL FUGA #11
TOTAL LEAK #12
TOTAL FUGA #12
TOTAL LEAK #13
TOTAL FUGA #13
TOTAL LEAK #14
TOTAL FUGA #14
TOTAL
TOTAL
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD%
SUBTOTAL
PROFIT%
TOTAL PROJECT EUROS (BASIC PACKAGE)
DATE:FIRM NAME:
TITLE:BY:
These costs and overhead and profit percentages will be applied in any possible future modifications

&R&"Times New Roman,Regular"Page &P of &N

Additive Item KTR

*
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR POTABLE WATER LINES, AREA 1 (ADDITIVE ITEM)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 17-1000MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ADDITIVE ITEM
PARTIDA ADICIONAL
1Demolish underground concrete block
Demoler bloque de hormigón enterradoEa
2Polyethylene Pipe PE100 DN200 and connection accessories
Tubería polietileno PE100 DN200 y accesorios de conexiónLm
3Gate Valve 8" and accessories
Válvulas de compuerta 8" y accesoriosEa
4Barrel type hydrant, T, pipe, valve, valve box and accessories
Hidrante, T, tubería, válvula, caja de válvulas y accesoriosEa
5Road crossing 10m/Ea (drilled) RC
Cruce de carretera 10m/Ea (con topo) RCEa
TOTAL ADDITIVE ITEM
TOTAL PARTIDA ADICIONAL
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD%
SUBTOTAL
PROFIT%
TOTAL PROJECT EUROS (ADDITIVE ITEM)
DATE:FIRM NAME:
TITLE:BY:
These costs and overhead and profit percentages will be applied in any possible future modifications

&R&"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .