17-1000 AF66 Submittals.xlsx
XLSX spreadsheet 37 KB Posted
- Solicitation number
- FA5575-21-B-0001
About this file
This document contains a schedule of material submittals for a federal contract to repair potable water lines at Morón Air Base in Spain. The contract requires the contractor to submit plans, schedules, and samples of materials for approval by specified due dates. Key submittals include a construction schedule due 7 days after the notice to proceed, a work plan and water outage schedule due 7 days after the notice to proceed, and safety, quality control, and warranty plans due 15 days after the notice to proceed. The contractor must also submit samples of all coating and piping materials for approval prior to installation. Upon completion, the contractor must deliver as-built drawings and conduct a leak detection survey of the new and existing water system within the specified areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GFM Status.pdf | ||
| 17-1000 Especificaciones sp.pdf | ||
| Solicitation - FA557521B0001.pdf | ||
| 17-1000 Form for Cost Estimate.xls | XLS spreadsheet | |
| 17-1000 Specifications en.pdf | ||
| 17-1000 Drawings.pdf | ||
| 17-1000 Technical Proposal Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 17-1000 | PROJECT TITLE |
RPR POTABLE WATER LINES, AREA 1
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | ||||||
| 1 | Construction Schedule | 1 | NTP+7 | |||
| 2 | Work Plan | 1 | NTP+7 | |||
| 3 | Water Outage Schedule | 1 | NTP+7 | |||
| SECTION 01 11 01 | ||||||
| 4 | Progress Schedule | 1 | NTP+10 | |||
| 5 | Mobility Plan | 1 | NTP+15 | |||
| 6 | Quality Control Plan | 1 | NTP+15 | |||
| 7 | Waste & construction debris management | 1 | Final Inspection | |||
| 8 | As-Built drawings | 1 | FI+15 | |||
| 9 | Spatial Data | 1 | FI+15 | |||
| 10 | Key Personnel | 1 | NTP+15 | |||
| 11 | Safety Program | 1 | NTP+15 | |||
| 12 | Warranty letter | 1 | Acceptance+15 | |||
| SECTION 09 90 00 | ||||||
| 13 | Each type of coating and/or product furnished | 4 | ||||
| SECTION 22 00 00 | ||||||
| 14 | High-density polyethylene piping PE 100 | 4 | ||||
| 15 | Accessories for polyethylene pipe connections | 4 | ||||
| 16 | DIN 2440 galvanized steel pipe | 4 | ||||
| 17 | Barrel type fire hydrant | 4 | ||||
| 18 | Quick connection for hydrant | 4 | ||||
| 19 | Gate valve | 4 | ||||
| 20 | Valve box | 4 | ||||
| 21 | Flanmged Tee | 4 | ||||
| 22 | Gibault Joint | 4 | ||||
| 23 | Universal flange adapter and coupling | 4 | ||||
| 24 | Backflow Preventer (RPPD) | 4 | ||||
| 25 | Water flow meter | 4 | ||||
| 26 | Air Relief Valve | 4 | ||||
| 27 | Leak Detection Survey Company | 4 | ||||
| 28 | Leak Detection Report | 4 | Prior to FI |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 17-1000 | TÍTULO DE PROYECTO: | |||
| REPARAR LINEAS DE AGUA POTABLE, AREA 1 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||
| 1 | Programa de obra | 1 | NTP+7 | ||||
| 2 | Plan de obra | 1 | NTP+7 | ||||
| 3 | Plan de cortes de suministro de agua | 1 | NTP+7 | ||||
| SECCIÓN 01 11 01 | |||||||
| 4 | Programa de ejecución | 1 | NTP+10 | ||||
| 5 | Plan de movilización | 1 | NTP+15 | ||||
| 6 | Plan de control de calidad | 1 | NTP+15 | ||||
| 7 | Gestión de residuos y escombros | 1 | Inspección final | ||||
| 8 | Planos As-Builts | 1 | IF+15 | ||||
| 9 | Datos espaciales | 1 | IF+15 | ||||
| 10 | Personal clave | 1 | NTP+15 | ||||
| 11 | Plan de seguridad | 1 | NTP+15 | ||||
| 12 | Carta de garantía | 1 | Aceptación + 15 | ||||
| SECCIÓN 09 90 00 | |||||||
| 13 | Cada tipo de recubrimiento y/o producto suministrado | 4 | |||||
| SECCIÓN 22 00 00 | |||||||
| 14 | Tubos de polietileno de alta densidad PE100 | 4 | |||||
| 15 | Accesorios de conexión para tuberías de polietileno | 4 | |||||
| 16 | Tubería de acero galvanizado DIN 2440 | 4 | |||||
| 17 | Hidrante contraincendios tipo barril | 4 | |||||
| 18 | Conexión rápida para hidrante | 4 | |||||
| 19 | Válvula de compuerta | 4 | |||||
| 20 | Caja de válvulas | 4 | |||||
| 21 | T de conexión con bridas | 4 | |||||
| 22 | Conexión Gibault | 4 | |||||
| 23 | Brida y manguito universal | 4 | |||||
| 24 | Desconector - Backflow Preventer (RPPD) | 4 | |||||
| 25 | Caudalímetros de agua | 4 | |||||
| 26 | Ventosa | 4 | |||||
| 27 | Empresa para estudio de fugas | 4 | |||||
| 28 | Informe de detección de fugas | 4 | Antes de la Inspección final |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N