17-00 41 00 Part B Proposal 106711.pdf

PDF 321 KB Posted

Attached to
PW ITB - 106711 - Water Main Replacements - Contract 2026 -
Solicitation number
26-0149
Issued by
Tarrant County, Fort Worth City, Texas

About this file

This is a bid list and proposal document for Water Main Replacements - Contract 2026, issued by a Texas water department. The work encompasses extensions, replacements, and relocations of water mains, service lines, and related construction to upgrade existing water infrastructure or provide water service to individual customers and developers. The contract includes 198 line items covering a comprehensive range of materials and services, including PVC water pipe in sizes from 4" to 24" (ranging from 100 to 1,600 linear feet), ductile iron pipe, concrete cylinder pipe, gate valves, fire hydrants, air valve assemblies, tapping sleeves and valves, water service lines in various sizes, meter vaults, temporary water services, concrete and asphalt pavement repairs, sewer line replacements, and traffic control. Items are priced on unit bases including per each, per linear foot, per ton, per vertical foot, per cubic yard, per square yard, and lump sum. Work order mobilization and emergency mobilization are also included as billable items.

Pricing for all line items is left blank in the bid list for contractor completion, with unit prices and total amounts to be written in words and numerals by bidders. The contract is funded through the Water and Sewer Capital Projects Fund, with work orders issued to the contractor after payment of applicable estimated costs by the customer and/or developer. Street use permits are listed at a fixed price of $100 per permit with a total of $5,000.00 for 50 permits. No incumbent information, set-asides, renewal options, response deadlines, or award dates are specified in this bid list document. The contract represents a comprehensive water infrastructure project requiring bidders to provide competitive pricing across diverse water main materials, appurtenances, installation methods, and site restoration activities.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID LIST

ITEM NO. QTY.

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

1. 0170.0102 100 Ea. Work Order Mobilization 01 70 00 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

2. 0170.0103 10 Ea. Work Order Emergency Mobilization 01 70 00 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

3. 3311.0061 200 Lf. 4" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

4. 3311.0161 800 Lf. 6" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

5. 3311.0261 1600 Lf. 8" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

6. 3311.0361 400 Lf. 10" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

7. 3311.0461 400 Lf. 12" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

8. 3311.0461 500 Lf. 16" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

B - 1

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

9. 3311.0561 500 Lf. 24" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

10. 3311.0051 100 Lf. 4" DIP Water 33 11 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

11. 3311.0151 100 Lf. 6" DIP Water 33 11 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

12. 3311.0251 100 Lf. 8" DIP Water 33 11 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

13. 3311.0351 100 Lf. 10" DIP Water 33 11 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

14. 3311.0451 100 Lf. 12" DIP Water 33 11 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

15. 3311.0551 100 Lf. 16" DIP Water 33 11 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

16. 3311.0551 100 Lf. 24" DIP Water 33 11 10 $ $ Per Linear Foot:

_________________________ Dollars

B - 2

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

17. 500 Lf. 16" Pretensioned Conc. Cylinder Pipe

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

18. 500 Lf. 24" Pretensioned Conc. Cylinder Pipe

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

19. 3305.2002 50 Lf. 4" Water Carrier Pipe (DI w/ SS Casing Spacers)

33 05 24

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

20. 3305.2002 50 Lf. 6" Water Carrier Pipe (DI w/ SS Casing Spacers)

33 05 24

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

21. 3305.2002 50 Lf. 8" Water Carrier Pipe (DI w/ SS Casing Spacers)

33 05 24

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

22. 3305.2003 50 Lf. 10" Water Carrier Pipe (DI w/ SS Casing Spacers)

33 05 24

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

23. 3305.2004 50 Lf. 12" Water Carrier Pipe (DI w/ SS Casing Spacers)

33 05 24

Per Linear Foot:

_________________________ Dollars

B - 3

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

24. 3305.2005 50 Lf. 16" Water Carrier Pipe (DI w/ SS Casing Spacers)

33 05 24

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

25. 3305.2005 50 Lf. 24" Water Carrier Pipe (DI w/ SS Casing Spacers)

33 05 24

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

26. 3305.1002 50 Lf. 16" Casing By Open Cut (Welded Steel) 33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

27. 3305.1003 50 Lf. 20" Casing By Open Cut (Welded Steel) 33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

28. 3305.1004 50 Lf. 24" Casing By Open Cut (Welded Steel) 33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

29. 3305.1005 50 Lf. 30" Casing By Open Cut (Welded Steel) 33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

30. 3305.1006 50 Lf. 36" Casing By Open Cut (Welded Steel) 33 05 22

Per Linear Foot:

_________________________ Dollars

B - 4

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

31. 3305.1102 50 Lf. 16" Casing By Other Than Open Cut (Welded Steel w/ Grout)

33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

32. 3305.1103 50 Lf. 20" Casing By Other Than Open Cut (Welded Steel w/ Grout)

33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

33. 3305.1104 50 Lf. 24" Casing By Other Than Open Cut (Welded Steel w/ Grout)

33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

34. 3305.1105 50 Lf. 30" Casing By Other Than Open Cut (Welded Steel w/ Grout)

33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

35. 3305.1106 50 Lf. 36" Casing By Other Than Open Cut (Welded Steel w/ Grout)

33 05 22

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

36. 3312.3001 20 Ea. 4" Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

37. 3312.3002 25 Ea. 6" Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars

B - 5

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

38. 3312.3003 25 Ea. 8" Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

39. 3312.3004 10 Ea. 10" Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

40. 3312.3005 10 Ea. 12" Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

41. 3312.3006 5 Ea. 16" Gate Valve w/ Vault 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

42. 3312.3006 5 Ea. 16" Gate Valve - Direct Bury 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

43. 3312.3006 5 Ea. 24" Gate Valve w/ Vault 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

44. 3312.3006 5 Ea. 24" Gate Valve - Direct Bury 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

45. 3312.3101 5 Ea. 4" Cut-in Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars

B - 6

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

46. 3312.3102 5 Ea. 6" Cut-in Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

47. 3312.3103 5 Ea. 8" Cut-in Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

48. 3312.3104 5 Ea. 10" Cut-in Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

49. 3312.3105 5 Ea. 12" Cut-in Gate Valve 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

50. 3312.3106 1 Ea. 16" Cut-in Gate Valve w/ Vault 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

51. 3312.3106 1 Ea. 16" Cut-in Gate Valve - Direct Bury 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

52. 3312.3106 1 Ea. 24" Cut-in Gate Valve w/ Vault 33 12 20 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

53. 3312.3106 1 Ea. 24" Cut-in Gate Valve - Direct Bury 33 12 20 $ $ Per Each:

_________________________ Dollars

B - 7

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

54. 0241.1301 5 Ea. Remove 4" Water Valve 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

55. 0241.1302 5 Ea. Remove 6" Water Valve 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

56. 0241.1303 5 Ea. Remove 8" Water Valve 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

57. 0241.1304 5 Ea. Remove 10" Water Valve 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

58. 0241.1305 5 Ea. Remove 12" Water Valve 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

59. 0241.1351 2 Ea. Remove & Salvage 16" Water Valve 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

60. 0241.1351 2 Ea. Remove & Salvage 24" Water Valve 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

61. 3311.0001 10 Tn. Ductile Iron Water Fittings < 16" Dia. 33 11 11

Per Ton:

_________________________ Dollars

B - 8

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

62. 3311.0001 10 Tn. Ductile Iron Water Fittings 16" Dia. & Larger

33 11 11

Per Ton:

_________________________ Dollars and _____________________ Cents

63. 1 Ls. 16" Concrete Cylinder Pipe Fittings (per attached list) $ $ Per Each:

_________________________ Dollars and _____________________ Cents

64. 1 Ls. 24" Concrete Cylinder Pipe Fittings (per attached list) $ $ Per Each:

_________________________ Dollars and _____________________ Cents

65. 3312.0001 20 Ea. Fire Hydrant 33 12 40 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

66. 3305.0101 20 Vf. Fire Hydrant Stem Extension 33 05 14 $ $ Per Vertical Foot:

_________________________ Dollars and _____________________ Cents

67. 0241.1510 5 Ea. Salvage Fire Hydrant 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

68. 3312.1002 1 Ea. 1" Combination Air Valve Assembly for Water (in Vault)

33 12 30

Per Each:

_________________________ Dollars and _____________________ Cents

69. 3312.1002 1 Ea. 2" Combination Air Valve Assembly for Water (in Vault)

33 12 30

Per Each:

_________________________ Dollars

B - 9

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

70. 3312.1002 1 Ea. 3" Combination Air Valve Assembly for Water (in Vault)

33 12 30

Per Each:

_________________________ Dollars and _____________________ Cents

71. 3312.6002 1 Ea. 4" Blow Off Valve 33 12 60 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

72. 3312.6002 1 Ea. 6" Blow Off Valve 33 12 60 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

73. 3312.6002 1 Ea. 8" Blow Off Valve 33 12 60 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

74. 3312.4002 1 Ea. 6" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

75. 3312.4004 1 Ea. 8" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

76. 3312.4005 1 Ea. 8" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

77. 3312.4102 1 Ea. 10" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars

B - 10

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

78. 3312.4103 1 Ea. 10" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

79. 3312.4104 1 Ea. 10" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

80. 3312.4106 1 Ea. 12" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

81. 3312.4107 1 Ea. 12" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

82. 3312.4108 1 Ea. 12" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

83. 3312.4109 1 Ea. 12" x 12" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

84. 3312.4111 1 Ea. 16" x 6" Tapping Sleeve & Valve 33 12 25 $ $

Per Each:

_________________________ Dollars and _____________________ Cents

85. 3312.4112 1 Ea. 16" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars

B - 11

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

86. 3312.4113 1 Ea. 16" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

87. 3312.4114 1 Ea. 16" x 12" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

88. 3312.4114 1 Ea. 16" x 16" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

89. 3312.4203 1 Ea. 20" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

90. 1 Ea. 21" x 8" Tapping Sleeve & Valve $ $ Per Each:

_________________________ Dollars and _____________________ Cents

91. 3312.4209 1 Ea. 24" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

92. 3312.4209 1 Ea. 24" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

93. 3312.4209 1 Ea. 24" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars

B - 12

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

94. 3312.4209 1 Ea. 24" x 12" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

95. 3312.4209 1 Ea. 24" x 16" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

96. 3312.4212 1 Ea. 24" x 24" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

97. 50 Ea. 3/4" Water Tap to Main $ $ Per Each:

_________________________ Dollars and _____________________ Cents

98. 100 Lf. 3/4" Copper Service Line $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

99. 50 Ea. 1" Water Tap to Main $ $ Per Each:

_________________________ Dollars and _____________________ Cents

100. 100 Lf. 1" Copper Service Line $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

101. 3312.2004 100 Lf. 1" Private Water Service 33 12 10 $ $ Per Linear Foot:

_________________________ Dollars

B - 13

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

102. 3312.2002 50 Lf. 1" Bored Water Service 33 12 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

103. 50 Ea. 1 1/2" Water Tap to Main $ $ Per Each:

_________________________ Dollars and _____________________ Cents

104. 100 Lf. 1 1/2" Copper Service Line $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

105. 3312.2104 100 Lf. 1 1/2" Private Water Service 33 12 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

106. 3312.2102 50 Lf. 1 1/2" Bored Water Service 33 12 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

107. 50 Ea. 2" Water Tap to Main $ $ Per Each:

_________________________ Dollars and _____________________ Cents

108. 100 Lf. 2" Copper Service Line $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

109. 3312.2204 100 Lf. 2" Private Water Service 33 12 10 $ $ Per Linear Foot:

_________________________ Dollars

B - 14

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

110. 3312.2202 50 Lf. 2" Bored Water Service 33 12 10 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

111. 25 Ea. Class A PVC Meter Box (Furnish & Set)

Per Each:

_________________________ Dollars and _____________________ Cents

112. 25 Ea. Class B PVC Meter Box (Furnish & Set)

Per Each:

_________________________ Dollars and _____________________ Cents

113. 10 Ea. Class C PVC Meter Box (Furnish & Set)

Per Each:

_________________________ Dollars and _____________________ Cents

114. 2 Ea. 1" Multiple Service Branch $ $ Per Each:

_________________________ Dollars and _____________________ Cents

115. 2 Ea. 1 1/2" Multiple Service Branch $ $ Per Each:

_________________________ Dollars and _____________________ Cents

116. 2 Ea. 2" Multiple Service Branch $ $ Per Each:

_________________________ Dollars and _____________________ Cents

117. 3304.0102 1500 Lf. 2" Temporary Water Services 33 04 30 $ $ Per Linear Foot:

_________________________ Dollars

B - 15

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

118. 3312.2801 10 Ea. Meter Vault for 3" Meter 33 12 11 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

119. 3312.2802 10 Ea. Meter Vault for 4" Meter 33 12 11 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

120. 3312.2803 10 Ea. Meter Vault for 6" Meter 33 12 11 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

121. 3312.2804 5 Ea. Meter Vault for 8" Meter 33 12 11 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

122. 3312.2805 5 Ea. Meter Vault for 10" Meter 33 12 11 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

123. 3312.0002 5 Ea. Water Sampling Station 33 12 50 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

124. 0241.1602 5 Ea. Remove Concrete Water Vault 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

125. 5 Ea. Sprinkler System Backflow Preventer Relocation $ $ Per Each:

_________________________ Dollars

B - 16

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

126. 5 Ea. Relocate 3/4" Water Meter $ $ Per Each:

_________________________ Dollars and _____________________ Cents

127. 5 Ea. Relocate 1" Water Meter $ $ Per Each:

_________________________ Dollars and _____________________ Cents

128. 5 Ea. Relocate 1 1/2" Water Meter $ $ Per Each:

_________________________ Dollars and _____________________ Cents

129. 5 Ea. Relocate 2" Water Meter $ $ Per Each:

_________________________ Dollars and _____________________ Cents

130. 0241.1218 10 Ea. 2" or Smaller Water Abandonment Plug

02 41 14

Per Each:

_________________________ Dollars and _____________________ Cents

131. 0241.1218 10 Ea. 4"-12" Water Pressure Plug 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

132. 0241.1218 5 Ea. 16"-24" Water Pressure Plug 02 41 14 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

133. 3305.0109 1000 Lf. Trench Safety 33 05 10 $ $ Per Linear Foot:

_________________________ Dollars

B - 17

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

134. 50 Lf. Water Main Extra Depth (> than 1') $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

135. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (0' - 5' )

33 05 30

Per Each:

_________________________ Dollars and _____________________ Cents

136. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (5' - 10' )

33 05 30

Per Each:

_________________________ Dollars and _____________________ Cents

137. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (10' - 20' )

33 05 30

Per Each:

_________________________ Dollars and _____________________ Cents

138. 3305.0116 25 Cy. Concrete Encasement for Utility Pipes 33 05 10

Per Cubic Yard:

_________________________ Dollars and _____________________ Cents

139. 3305.0203 100 Cy. Imported Embedment/Backfill, CLSM (Flowable Fill)

33 05 10

Per Cubic Yard:

_________________________ Dollars and _____________________ Cents

140. 50 Cy. Imported Embedment/Backfill, Type B

Per Cubic Yard:

_________________________ Dollars

B - 18

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

141. 3137.0101 20 Cy. Concrete Riprap 31 37 00 $ $ Per Cubic Yard:

_________________________ Dollars and _____________________ Cents

142. 3137.0102 20 Cy. Large Stone Riprap, dry 31 37 00 $ $ Per Cubic Yard:

_________________________ Dollars and _____________________ Cents

143. 3137.0103 20 Cy. Large Stone Riprap, grouted 31 37 00 $ $ Per Cubic Yard:

_________________________ Dollars and _____________________ Cents

144. 3292.0100 20 Sy. Block Sod Placement 32 92 13 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

145. 3292.0400 20 Sy. Seeding, Broadcast 32 92 13 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

146. 3292.0400 20 Sy. Seeding, Hydromulch 32 92 13 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

147. 3292.0400 20 Sy. Seeding, Soil Retention Blanket 32 92 13 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

148. 50 Cy. Type B Concrete (#2500) $ $ Per Cubic Yard:

_________________________ Dollars

B - 19

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

149. 50 Cy. Type E Concrete (#1500) $ $ Per Cubic Yard:

_________________________ Dollars and _____________________ Cents

150. 3213.0301 40 Sy. 4" Conc Sidewalk 32 13 20 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

151. 3213.0351 20 Sy. 4" Conc Sidewalk, Exposed Aggregate 32 13 20

Per Square Yard:

_________________________ Dollars and _____________________ Cents

152. 3213.0401 50 Sy. 6" Concrete Driveway 32 13 20 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

153. 3213.0451 20 Sy. 6" Concrete Driveway, Exposed Aggregate

32 13 20

Per Square Yard:

_________________________ Dollars and _____________________ Cents

154. 3216.0101 100 Lf. 6" Conc Curb and Gutter (Replaced) 32 16 13 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

155. 100 Lf. 6" Conc Curb and Gutter Attached to Conc. Pvmt (Replaced) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

156. 3216.0301 20 Sy. 9" Conc Valley Gutter, Residential 32 16 13 $ $ Per Square Yard:

_________________________ Dollars

B - 20

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

157. 3216.0302 20 Sy. 11" Conc Valley Gutter, Arterial/Industrial

32 16 13

Per Square Yard:

_________________________ Dollars and _____________________ Cents

158. 3201.0151 100 Lf. Asphalt Pvmt Repair, Water Service 32 01 17 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

159. 3201.0111 100 Lf. 4' Wide Asphalt Pvmt Repair, Residential

32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

160. 3201.0112 300 Lf. 5' Wide Asphalt Pvmt Repair, Residential

32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

161. 3201.0113 300 Lf. 6' Wide Asphalt Pvmt Repair, Residential

32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

162. 3201.0121 300 Lf. 4' Wide Asphalt Pvmt Repair, Arterial 32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

163. 3201.0122 300 Lf. 5' Wide Asphalt Pvmt Repair, Arterial 32 01 17

Per Linear Foot:

_________________________ Dollars

B - 21

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

164. 3201.0123 300 Lf. 6' Wide Asphalt Pvmt Repair, Arterial 32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

165. 3201.0131 300 Lf. 4' Wide Asphalt Pvmt Repair, Industrial 32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

166. 3201.0132 300 Lf. 5' Wide Asphalt Pvmt Repair, Industrial 32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

167. 3201.0133 300 Lf. 6' Wide Asphalt Pvmt Repair, Industrial 32 01 17

Per Linear Foot:

_________________________ Dollars and _____________________ Cents

168. 3201.0201 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Residential

32 01 17

Per Square Yard:

_________________________ Dollars and _____________________ Cents

169. 3201.0202 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Arterial

33 01 17

Per Square Yard:

_________________________ Dollars and _____________________ Cents

170. 3201.0203 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Industrial

34 01 17

Per Square Yard:

_________________________ Dollars

B - 22

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

171. 3201.0301 100 Sy. 2" Thick Extra Width Asphalt Over Existing Base

32 01 17

Per Square Yard:

_________________________ Dollars and _____________________ Cents

172. 3201.0302 100 Sy. 3" Thick Extra Width Asphalt Over Existing Base

32 01 17

Per Square Yard:

_________________________ Dollars and _____________________ Cents

173. 3201.0303 100 Sy. 4" Thick Extra Width Asphalt Over Existing Base

32 01 17

Per Square Yard:

_________________________ Dollars and _____________________ Cents

174. 3201.0400 75 Lf. Temporary Asphalt Paving Repair 32 01 18 $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

175. 3211.0211 40 Sy. 6" Flexible Base, Type B, GR-1 32 11 23 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

176. 3211.0212 40 Sy. 6" Flexible Base, Type B, GR-2 32 11 23 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

177. 200 Sy. High Early Strength Conc. $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

178. 3201.0614 300 Sy. Conc Pvmt Repair, Residential 32 01 29 $ $ Per Square Yard:

_________________________ Dollars

B - 23

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

179. 3201.0616 300 Sy. Conc Pvmt Repair, Arterial/Industrial 32 01 29 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

180. 300 Sy. Conc. Pvmt Repair Beyond Defined Width, Residential $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

181. 100 Sy. Conc. Pvmt Repair Beyond Defined Width, Arterial/Industrial $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

182. 3214.0300 100 Sy. Brick Pvmt Repair 32 14 16 $ $ Per Square Yard:

_________________________ Dollars and _____________________ Cents

183. 3214.0600 100 Sy. Brick Pvmt Repair (City Supplied Brick) 32 14 16

Per Square Yard:

_________________________ Dollars and _____________________ Cents

184. 50 Lf. 6" DIP Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

185. 50 Lf. 6" PVC Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars

B - 24

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

186. 50 Lf. 8" DIP Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

187. 50 Lf. 8" PVC Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

188. 50 Lf. 10" DIP Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

189. 50 Lf. 10" PVC Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

190. 50 Lf. 12" DIP Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

191. 50 Lf. 12" PVC Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

192. 50 Lf. 16" DIP Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars

B - 25

DESCRIPTION OF ITEMS WITH

BID PRICES WRITTEN IN WORDS

SPECIFICATION

SECTION NO.

UNIT

PRICE

TOTAL

AMOUNT

193. 50 Lf. 15" PVC Sewer (Replc. At Variable Depth) $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

194. 25 Lf. 4" SDR for San. Sewer Service Replc. $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

195. 25 Lf. 6" SDR for San. Sewer Service Replc. $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

196. 25 Lf. 8" SDR for San. Sewer Service Replc. $ $ Per Linear Foot:

_________________________ Dollars and _____________________ Cents

197. 50 Ea. Street Use Permit $ $100.00 $ $5,000.00 Per Each:

__ _One Hundred__ _ Dollars and _________No___ _____ Cents

198. 3471.0003 50 Ea. Traffic Control 34 71 13 $ $ Per Each:

_________________________ Dollars and _____________________ Cents

TOTAL UNIT I BID $

B - 26

Sheet1