This is a Bid Proposal Part B document for a Water Main Replacements contract issued by the City of Austin, Texas. The project encompasses extensions, replacements, and relocations of water mains, service lines, and related infrastructure to upgrade existing water systems or provide water service to individual customers and developers. The contract work includes a comprehensive range of water distribution components spanning 159 line items with quantities ranging from single units to 1,500 linear feet. Items include various pipe sizes (4" through 30") in both PVC and ductile iron materials, gate valves, fire hydrants, tapping sleeves, water service connections, meter vaults, and ancillary equipment. The work also incorporates site restoration elements such as asphalt and concrete pavement repairs, seeding, curb and gutter installation, and temporary water service provisions. Additionally, the scope includes exploratory excavation, trench safety, utility encasement, and backfill material options. Funding for the project derives from the Water and Sewer Capital Projects Fund, with work orders issued to the contractor following customer or developer payment of applicable estimated costs.

The bid proposal requires contractors to provide unit pricing for each line item with prices written in both numerical and word formats. Pricing is established on a per-unit basis, including per linear foot, per each, per ton, per cubic yard, per square yard, and per square foot depending on the specific item. The document does not indicate specific response deadlines, bid opening dates, or contract award dates within the proposal form itself. No set-asides, incumbent contractor information, or bonding requirements are detailed in this particular bid sheet. The proposal structure allows for flexible pricing across diverse construction materials and services, enabling the city to accommodate variable project needs through work order authorization based on actual project requirements and customer funding availability.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 ITEM NO. BID LIST ITEM NO. QTY. DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS SPECIFICATION SECTION UNIT PRICE TOTAL AMOUNT

1.0170.0102100Ea.Work Order Mobilization01 70 00$$
Per Each:
____________________ Dollars & ___________________ Cents
2.0170.010325Ea.Work Order Emergency Mobilization01 70 00$$
Per Each:
____________________ Dollars & ___________________ Cents
3.3311.0061200Lf.4" PVC Water Pipe33 11 12$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
4.3311.0161800Lf.6" PVC Water Pipe33 11 12$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
5.3311.02611200Lf.8" PVC Water Pipe33 11 12$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
6.3311.0361400Lf.10" PVC Water Pipe33 11 12$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
7.3311.0461400Lf.12" PVC Water Pipe33 11 12$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
8.3311.0051100Lf.4" DIP Water33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
9.3311.0151100Lf.6" DIP Water33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
10.3311.0251100Lf.8" DIP Water33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
11.3311.0351100Lf.10" DIP Water33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
12.3311.0451100Lf.12" DIP Water33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
13.3305.2002100Lf.8" Water Carrier Pipe (DI w/ SS Casing Spacers)33 05 24$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
14.3305.2003100Lf.10" Water Carrier Pipe (DI w/ SS Casing Spacers)33 05 24$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
15.3305.2004100Lf.12" Water Carrier Pipe (DI w/ SS Casing Spacers)33 05 24$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
16.3305.1002100Lf.16" Casing By Open Cut (Welded Steel)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
17.3305.1003100Lf.20" Casing By Open Cut (Welded Steel)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
18.3305.1004100Lf.24" Casing By Open Cut (Welded Steel)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
19.3305.1005100Lf.30" Casing By Open Cut (Welded Steel)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
20.3305.1102100Lf.16" Casing By Other Than Open Cut (Welded Steel w/ Grout)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
21.3305.1103100Lf.20" Casing By Other Than Open Cut (Welded Steel w/ Grout)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
22.3305.1104100Lf.24" Casing By Other Than Open Cut (Welded Steel w/ Grout)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
23.3305.1105100Lf.30" Casing By Other Than Open Cut (Welded Steel w/ Grout)33 05 22$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
24.3312.300120Ea.4" Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
25.3312.300225Ea.6" Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
26.3312.300325Ea.8" Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
27.3312.300410Ea.10" Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
28.3312.300510Ea.12" Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
29.3312.31015Ea.4" Cut-in Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
30.3312.31025Ea.6" Cut-in Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
31.3312.31035Ea.8" Cut-in Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
32.3312.31045Ea.10" Cut-in Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
33.3312.31055Ea.12" Cut-in Gate Valve33 12 20$$
Per Each:
____________________ Dollars & ___________________ Cents
34.0241.13015Ea.Remove 4" Water Valve02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
35.0241.13025Ea.Remove 6" Water Valve02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
36.0241.13035Ea.Remove 8" Water Valve02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
37.0241.13045Ea.Remove 10" Water Valve02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
38.0241.13055Ea.Remove 12" Water Valve02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
39.3311.000115Tn.Ductile Iron Water Fittings w/ Restraint33 11 11$$
Per Ton:
____________________ Dollars & ___________________ Cents
40.3312.000120Ea.Fire Hydrant33 12 40$$
Per Each:
____________________ Dollars & ___________________ Cents
41.3305.010120Vf.Fire Hydrant Stem Extension33 05 14$$
Per Vertical Foot:
____________________ Dollars & ___________________ Cents
42.0241.15105Ea.Salvage Fire Hydrant02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
43.3312.40011Ea.6" x 6" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
44.3312.40021Ea.8" x 6" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
45.3312.40031Ea.8" x 8" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
46.3312.40041Ea.10" x 6" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
47.3312.40051Ea.10" x 8" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
48.3312.41041Ea.10" x 10" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
49.3312.41061Ea.12" x 6" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
50.3312.41071Ea.12" x 8" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
51.3312.41081Ea.12" x 10" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
52.3312.41091Ea.12" x 12" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
53.3312.41111Ea.16" x 6" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
54.3312.41121Ea.16" x 8" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
55.3312.41131Ea.16" x 10" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
56.3312.41141Ea.16" x 12" Tapping Sleeve & Valve33 12 25$$
Per Each:
____________________ Dollars & ___________________ Cents
57.25Ea.3/4" Water Tap to Main$$
Per Each:
____________________ Dollars & ___________________ Cents
58.100Ea.3/4" Copper Service Line$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
59.100Ea.3/4" Private Water Service$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
60.50Ea.3/4" Bored Water Service$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
61.25Ea.1" Water Tap to Main$$
Per Each:
____________________ Dollars & ___________________ Cents
62.100Ea.1" Copper Service Line$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
63.3312.2004100Lf.1" Private Water Service33 12 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
64.3312.200250Ea.1" Bored Water Service33 12 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
65.25Ea.1 1/2" Water Tap to Main$$
Per Each:
____________________ Dollars & ___________________ Cents
66.100Ea.1 1/2" Copper Service Line$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
67.3312.2104100Lf.1 1/2" Private Water Service33 12 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
68.3312.210250Ea.1 1/2" Bored Water Service33 12 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
69.25Ea.2" Water Tap to Main$$
Per Each:
____________________ Dollars & ___________________ Cents
70.100Ea.2" Copper Service Line$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
71.3312.2204100Lf.2" Private Water Service33 12 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
72.3312.220250Ea.2" Bored Water Service33 12 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
73.3312.22021Ea.Plumbing Permit33 12 10$$32.82$$32.82
Per Linear Foot:
____________________ Dollars & ___________________ Cents
74.25Ea.Class A PVC Meter Box (Furnish & Set)$$
Per Each:
____________________ Dollars & ___________________ Cents
75.25Ea.Class B PVC Meter Box (Furnish & Set)$$
Per Each:
____________________ Dollars & ___________________ Cents
76.10Ea.Class C PVC Meter Box (Furnish & Set)$$
Per Each:
____________________ Dollars & ___________________ Cents
77.5Ea.Class A Conc. Meter Box (Furnish & Set)$$
Per Each:
____________________ Dollars & ___________________ Cents
78.5Ea.Class B Conc. Meter Box (Furnish & Set)$$
Per Each:
____________________ Dollars & ___________________ Cents
79.2Ea.1" Multiple Service Branch$$
Per Each:
____________________ Dollars & ___________________ Cents
80.2Ea.1 1/2" Multiple Service Branch$$
Per Each:
____________________ Dollars & ___________________ Cents
r
81.2Ea.2" Multiple Service Branch$$
Per Each:
____________________ Dollars & ___________________ Cents
82.5Ea.Relocate 3/4" Water Meter$$
Per Each:
____________________ Dollars & ___________________ Cents
83.5Ea.Relocate 1" Water Meter$$
Per Each:
____________________ Dollars & ___________________ Cents
20
84.5Ea.Relocate 1 1/2" Water Meter$$
Per Each:
____________________ Dollars & ___________________ Cents
85.5Ea.Relocate 2" Water Meter$$
Per Each:
____________________ Dollars & ___________________ Cents
86.5Ea.Sprinkler System Backflow Preventer Relocation$$
Per Each:
____________________ Dollars & ___________________ Cents
87.3304.01021500Lf.2" Temporary Water Services33 04 30$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
88.3312.280110Ea.Meter Vault for 3" Meter33 12 11$$
Per Each:
____________________ Dollars & ___________________ Cents
89.3312.280210Ea.Meter Vault for 4" Meter33 12 11$$
Per Each:
____________________ Dollars & ___________________ Cents
90.3312.280310Ea.Meter Vault for 6" Meter33 12 11$$
Per Each:
____________________ Dollars & ___________________ Cents
91.3312.28045Ea.Meter Vault for 8" Meter33 12 11$$
Per Each:
____________________ Dollars & ___________________ Cents
92.3312.28055Ea.Meter Vault for 10" meter33 12 11$$
Per Each:
____________________ Dollars & ___________________ Cents
93.0241.16025Ea.Remove Concrete Water Vault02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
94.3312.00025Ea.Water Sampling Station33 12 50$$
Per Each:
____________________ Dollars & ___________________ Cents
95.0241.121810Ea.2" or Smaller Water Abandonment Plug02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
96.0241.121810Ea.4"-12" Water Abandonment Plug02 41 14$$
Per Each:
____________________ Dollars & ___________________ Cents
97.5Ea.16" Water Pressure Plug$$
Per Each:
____________________ Dollars & ___________________ Cents
98.50Ea.Water Main Extra Depth (> than 1')$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
99.3305.0109100Lf.Trench Safety33 05 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
100.3305.01035Ea.Exploratory Excavation of Existing Utilities (0' - 5' )33 05 30$$
Per Each:
____________________ Dollars & ___________________ Cents
101.3305.01035Ea.Exploratory Excavation of Existing Utilities (5' - 10' )33 05 30$$
Per Each:
____________________ Dollars & ___________________ Cents
102.3305.01035Ea.Exploratory Excavation of Existing Utilities (10' - 20' )33 05 30$$
Per Each:
____________________ Dollars & ___________________ Cents
103.3305.011625Cy.Concrete Encasement for Utility Pipes33 05 10$$
Per Cubic Yard:
____________________ Dollars & ___________________ Cents
104.3305.0203100Cy.Imported Embedment/Backfill, CLSM (Flowable Fill)33 05 10$$
Per Cubic Yard:
____________________ Dollars & ___________________ Cents
105.3305.0203100Cy.Imported Embedment/Backfill, Crushed Rock33 05 10$$
Per Cubic Yard:
____________________ Dollars & ___________________ Cents
106.3305.0203100Cy.Imported Embedment/Backfill, (CSS) Concrete Stabilized Sand33 05 10$$
Per Cubic Yard:
____________________ Dollars & ___________________ Cents
107.100Cy.Imported Embedment/Backfill, (Type B)$$
Per Cubic Yard:
____________________ Dollars & ___________________ Cents
108.3137.010110Sy.Concrete Riprap31 37 00$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
109.3137.010210Sy.Large Stone Riprap, Dry31 37 00$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
110.3137.010310Sy.Large Stone Riprap, Grouted31 37 00$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
111.3292.0100100Sy.Block Sod Placement32 92 13$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
112.3292.0400100Sy.Seeding, Hydromulch32 92 13$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
113.3201.0151200Lf.Seeding, Soil Retention Blanket32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
114.3201.0151200Lf.Asphalt Pvmt Repair, Water Service32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
115.3201.0111300Lf.4' Wide Asphalt Pvmt Repair, Residential32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
116.3201.0112300Lf.5' Wide Asphalt Pvmt Repair, Residential32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
117.3201.0113300Lf.6' Wide Asphalt Pvmt Repair, Residential32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
118.3201.0121300Lf.4' Wide Asphalt Pvmt Repair, Arterial32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
119.3201.0122300Lf.5' Wide Asphalt Pvmt Repair, Arterial32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
120.3201.0123300Lf.6' Wide Asphalt Pvmt Repair, Arterial32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
121.3201.0131300Lf.4' Wide Asphalt Pvmt Repair, Industrial32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
122.3201.0132300Lf.5' Wide Asphalt Pvmt Repair, Industrial32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
123.3201.0133300Lf.6' Wide Asphalt Pvmt Repair, Industrial32 01 17$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
124.3201.0201300Sy.Asphalt Pvmt Repair Beyond Defined Width, Residential32 01 17$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
125.3201.0202300Sy.Asphalt Pvmt Repair Beyond Defined Width, Arterial33 01 17$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
126.3201.0203300Sy.Asphalt Pvmt Repair Beyond Defined Width, Industrial34 01 17$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
127.3201.0301100Sy.2" Extra Width Asphalt Over Exist. Base32 01 17$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
128.3201.0302100Sy.3" Extra Width Asphalt Over Exist. Base32 01 17$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
129.3201.0303100Sy.4" Extra Width Asphalt Over Exist. Base32 01 17$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
130.3201.0400100Lf.Temporary Asphalt Paving Repair32 01 18$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
131.3211.021150Sy.6" Flexible Base, Type B, GR-132 11 23$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
132.3211.021250Sy.6" Flexible Base, Type B, GR-232 11 23$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
133.200Sy.High Early Strength Conc.$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
134.3201.0614300Sy.Conc Pvmt Repair, Residential32 01 29$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
135.3201.0616300Sy.Conc Pvmt Repair, Arterial/Industrial32 01 29$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
136.300Sy.Conc. Pvmt Over Exist. Base, Residential$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
137.100Sy.Conc. Pvmt Over Exist. Base, Arterial/Industrial$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
138.3214.0300100Sy.Brick Pvmt Repair32 14 16$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
139.3214.0600100Sy.Brick Pvmt Repair (City Supplied Brick)32 14 16$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
140.3216.0101300Lf.6" Conc Curb and Gutter (Replaced)32 16 13$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
141.300Lf.6" Conc Curb & Gutter Attached to Conc. Pvmt (Replaced)$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
142.3216.030150Sy.9" Conc Valley Gutter, Residential32 16 13$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
143.3216.030250Sy.11" Conc Valley Gutter, Arterial/Industrial32 16 13$$
Per Square Yard:
____________________ Dollars & ___________________ Cents
144.3213.0301300Sf.4" Conc Sidewalk32 13 20$$
Per Square Foot:
____________________ Dollars & ___________________ Cents
145.3213.0351200Sf.4" Conc Sidewalk, Exposed Aggregate32 13 20$$
Per Square Foot:
____________________ Dollars & ___________________ Cents
146.3213.0401300Sf.6" Concrete Driveway32 13 20$$
Per Square Foot:
____________________ Dollars & ___________________ Cents
147.3213.0451200Sf.6" Concrete Driveway, Exposed Aggregate32 13 20$$
Per Square Foot:
____________________ Dollars & ___________________ Cents
148.3331.411250Lf.6" DIP Sewer Pipe (Replc. At Variable Depth)33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
149.50Lf.6" PVC Sewer Pipe (Replc. At Variable Depth)$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
150.3331.411950Lf.8" DIP Sewer Pipe (Replc. At Variable Depth)33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
151.50Lf.8" PVC Sewer Pipe (Replc. At Variable Depth)$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
152.3331.420550Lf.10" DIP Sewer (Replc. At Variable Depth)33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
153.50Lf.10" PVC Sewer Pipe (Replc. At Variable Depth)$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
154.3331.421250Lf.12" DIP Sewer (Replc. At Variable Depth)33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
155.50Lf.12" PVC Sewer Pipe (Replc. At Variable Depth)$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
156.3331.422250Lf.16" DIP Sewer (Replc. At Variable Depth)33 11 10$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
157.50Lf.15" PVC Sewer Pipe (Replc. At Variable Depth)$$
Per Linear Foot:
____________________ Dollars & ___________________ Cents
158.3471.000350Ea.Traffic Control34 71 13$$
Per Each:
____________________ Dollars & ___________________ Cents
159.50Ea.Street Use Permit$$
Per Each:
____________________ Dollars & ___________________ Cents

TOTAL AMOUNT BID $