This is a Bid Proposal Part B form for Water Main Replacements - Contract 2026, issued by the Water Department in Texas. The contract encompasses extensions, replacements, and relocations of water mains, service lines, and associated construction required to upgrade existing water infrastructure or provide water service to individual customers and developers. The work is funded through the Water and Sewer Capital Projects Fund, with work orders issued to the contractor following payment of applicable estimated costs by customers and developers. The bid proposal requests pricing for 159 line items spanning multiple categories including mobilization and emergency work orders, PVC and ductile iron water pipes ranging from 4 inches to 12 inches in diameter, water carrier pipes, casing installation, gate valves, fire hydrants, tapping sleeves and valves, water service connections and meters, temporary water services, meter vaults, water abandonment plugs, exploratory excavation, concrete encasement, backfill materials, and pavement repair work for asphalt, concrete, brick, curb and gutter, sidewalks, driveways, and sewer pipe replacement at variable depths.
Bidders are required to provide unit pricing in both numerical and written word formats for each line item, with pricing structured per each, linear foot, ton, vertical foot, square yard, or cubic yard as applicable. The bid form does not specify response deadlines, bid opening dates, site visit requirements, or bidder conference schedules within the provided document. One line item (Plumbing Permit) shows a fixed price of $32.82. The contract does not contain information regarding set-asides, incumbent contractors, contract term length, or renewal options within this bid proposal section. Bidders should submit complete pricing for all 159 items to be considered for award of this water infrastructure improvement contract.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
NO.
BID LIST
ITEM NO. QTY.
BID PRICES WRITTEN IN
WORDS
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
1. 0170.0102 100 Ea. Work Order Mobilization 01 70 00 $ $ Per Each:
____________________ Dollars & ___________________ Cents
2. 0170.0103 25 Ea. Work Order Emergency 01 70 00 $ $ Per Each:
____________________ Dollars & ___________________ Cents
3. 3311.0061 200 Lf. 4" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
4. 3311.0161 800 Lf. 6" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
5. 3311.0261 1200 Lf. 8" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
6. 3311.0361 400 Lf. 10" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
7. 3311.0461 400 Lf. 12" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
8. 3311.0051 100 Lf. 4" DIP Water 33 11 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
9. 3311.0151 100 Lf. 6" DIP Water 33 11 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
B - 1
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
10. 3311.0251 100 Lf. 8" DIP Water 33 11 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
11. 3311.0351 100 Lf. 10" DIP Water 33 11 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
12. 3311.0451 100 Lf. 12" DIP Water 33 11 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
13. 3305.2002 100 Lf. 8" Water Carrier Pipe (DI w/ SS Casing Spacers) 33 05 24 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
14. 3305.2003 100 Lf. 10" Water Carrier Pipe (DI w/ SS Casing Spacers) 33 05 24 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
15. 3305.2004 100 Lf. 12" Water Carrier Pipe (DI w/ SS Casing Spacers) 33 05 24 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
16. 3305.1002 100 Lf. 16" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
17. 3305.1003 100 Lf. 20" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars &
B - 2
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
18. 3305.1004 100 Lf. 24" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
19. 3305.1005 100 Lf. 30" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
20. 3305.1102 100 Lf. 16" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
21. 3305.1103 100 Lf. 20" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
22. 3305.1104 100 Lf. 24" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
23. 3305.1105 100 Lf. 30" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
24. 3312.3001 20 Ea. 4" Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
25. 3312.3002 25 Ea. 6" Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars &
B - 3
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
26. 3312.3003 25 Ea. 8" Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
27. 3312.3004 10 Ea. 10" Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
28. 3312.3005 10 Ea. 12" Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
29. 3312.3101 5 Ea. 4" Cut-in Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
30. 3312.3102 5 Ea. 6" Cut-in Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
31. 3312.3103 5 Ea. 8" Cut-in Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
32. 3312.3104 5 Ea. 10" Cut-in Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
33. 3312.3105 5 Ea. 12" Cut-in Gate Valve 33 12 20 $ $ Per Each:
____________________ Dollars & ___________________ Cents
34. 0241.1301 5 Ea. Remove 4" Water Valve 02 41 14 $ $ Per Each:
____________________ Dollars &
B - 4
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
35. 0241.1302 5 Ea. Remove 6" Water Valve 02 41 14 $ $ Per Each:
____________________ Dollars & ___________________ Cents
36. 0241.1303 5 Ea. Remove 8" Water Valve 02 41 14 $ $ Per Each:
____________________ Dollars & ___________________ Cents
37. 0241.1304 5 Ea. Remove 10" Water Valve 02 41 14 $ $ Per Each:
____________________ Dollars & ___________________ Cents
38. 0241.1305 5 Ea. Remove 12" Water Valve 02 41 14 $ $ Per Each:
____________________ Dollars & ___________________ Cents
39. 3311.0001 15 Tn. Ductile Iron Water Fittings w/ Restraint 33 11 11 $ $ Per Ton:
____________________ Dollars & ___________________ Cents
40. 3312.0001 20 Ea. Fire Hydrant 33 12 40 $ $ Per Each:
____________________ Dollars & ___________________ Cents
41. 3305.0101 20 Vf. Fire Hydrant Stem Extension 33 05 14 $ $ Per Vertical Foot:
____________________ Dollars & ___________________ Cents
42. 0241.1510 5 Ea. Salvage Fire Hydrant 02 41 14 $ $ Per Each:
____________________ Dollars & ___________________ Cents
43. 3312.4001 1 Ea. 6" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars &
B - 5
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
44. 3312.4002 1 Ea. 8" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
45. 3312.4003 1 Ea. 8" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
46. 3312.4004 1 Ea. 10" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
47. 3312.4005 1 Ea. 10" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
48. 3312.4104 1 Ea. 10" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
49. 3312.4106 1 Ea. 12" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
50. 3312.4107 1 Ea. 12" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
51. 3312.4108 1 Ea. 12" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
52. 3312.4109 1 Ea. 12" x 12" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars &
B - 6
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
53. 3312.4111 1 Ea. 16" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
54. 3312.4112 1 Ea. 16" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
55. 3312.4113 1 Ea. 16" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
56. 3312.4114 1 Ea. 16" x 12" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:
____________________ Dollars & ___________________ Cents
57. 25 Ea. 3/4" Water Tap to Main $ $ Per Each:
____________________ Dollars & ___________________ Cents
58. 100 Ea. 3/4" Copper Service Line $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
59. 100 Ea. 3/4" Private Water Service $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
60. 50 Ea. 3/4" Bored Water Service $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
61. 25 Ea. 1" Water Tap to Main $ $ Per Each:
____________________ Dollars &
B - 7
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
62. 100 Ea. 1" Copper Service Line $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
63. 3312.2004 100 Lf. 1" Private Water Service 33 12 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
64. 3312.2002 50 Ea. 1" Bored Water Service 33 12 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
65. 25 Ea. 1 1/2" Water Tap to Main $ $ Per Each:
____________________ Dollars & ___________________ Cents
66. 100 Ea. 1 1/2" Copper Service Line $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
67. 3312.2104 100 Lf. 1 1/2" Private Water Service 33 12 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
68. 3312.2102 50 Ea. 1 1/2" Bored Water Service 33 12 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
69. 25 Ea. 2" Water Tap to Main $ $ Per Each:
____________________ Dollars & ___________________ Cents
70. 100 Ea. 2" Copper Service Line $ $ Per Linear Foot:
____________________ Dollars &
B - 8
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
71. 3312.2204 100 Lf. 2" Private Water Service 33 12 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
72. 3312.2202 50 Ea. 2" Bored Water Service 33 12 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
73. 3312.2202 1 Ea. Plumbing Permit 33 12 10 $ $32.82 $ $32.82 Per Linear Foot:
____________________ Dollars & ___________________ Cents
74. 25 Ea. Class A PVC Meter Box (Furnish & Set) $ $ Per Each:
____________________ Dollars & ___________________ Cents
75. 25 Ea. Class B PVC Meter Box (Furnish & Set) $ $ Per Each:
____________________ Dollars & ___________________ Cents
76. 10 Ea. Class C PVC Meter Box (Furnish & Set) $ $ Per Each:
____________________ Dollars & ___________________ Cents
77. 5 Ea. Class A Conc. Meter Box (Furnish & Set) $ $ Per Each:
____________________ Dollars & ___________________ Cents
78. 5 Ea. Class B Conc. Meter Box (Furnish & Set) $ $ Per Each:
____________________ Dollars &
B - 9
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
79. 2 Ea. 1" Multiple Service Branch $ $ Per Each:
____________________ Dollars & ___________________ Cents
80. 2 Ea. 1 1/2" Multiple Service Branch $ $ Per Each:
____________________ Dollars & ___________________ Cents r
81. 2 Ea. 2" Multiple Service Branch $ $
Per Each:
____________________ Dollars & ___________________ Cents
82. 5 Ea. Relocate 3/4" Water Meter $ $ Per Each:
____________________ Dollars & ___________________ Cents
83. 5 Ea. Relocate 1" Water Meter $ $ Per Each:
____________________ Dollars & ___________________ Cents
84. 5 Ea. Relocate 1 1/2" Water Meter $ $ Per Each:
____________________ Dollars & ___________________ Cents
85. 5 Ea. Relocate 2" Water Meter $ $ Per Each:
____________________ Dollars & ___________________ Cents
86. 5 Ea. Sprinkler System Backflow Preventer Relocation $ $ Per Each:
____________________ Dollars & ___________________ Cents
87. 3304.0102 1500 Lf. 2" Temporary Water Services 33 04 30 $ $ Per Linear Foot:
____________________ Dollars &
B - 10
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
88. 3312.2801 10 Ea. Meter Vault for 3" Meter 33 12 11 $ $ Per Each:
____________________ Dollars & ___________________ Cents
89. 3312.2802 10 Ea. Meter Vault for 4" Meter 33 12 11 $ $ Per Each:
____________________ Dollars & ___________________ Cents
90. 3312.2803 10 Ea. Meter Vault for 6" Meter 33 12 11 $ $ Per Each:
____________________ Dollars & ___________________ Cents
91. 3312.2804 5 Ea. Meter Vault for 8" Meter 33 12 11 $ $ Per Each:
____________________ Dollars & ___________________ Cents
92. 3312.2805 5 Ea. Meter Vault for 10" meter 33 12 11 $ $ Per Each:
____________________ Dollars & ___________________ Cents
93. 0241.1602 5 Ea. Remove Concrete Water Vault 02 41 14 $ $ Per Each:
____________________ Dollars & ___________________ Cents
94. 3312.0002 5 Ea. Water Sampling Station 33 12 50 $ $ Per Each:
____________________ Dollars & ___________________ Cents
95. 0241.1218 10 Ea. 2" or Smaller Water Abandonment Plug
02 41 14
Per Each:
____________________ Dollars & ___________________ Cents
96. 0241.1218 10 Ea. 4"-12" Water Abandonment Plug 02 41 14 $ $ Per Each:
____________________ Dollars &
B - 11
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
97. 5 Ea. 16" Water Pressure Plug $ $ Per Each:
____________________ Dollars & ___________________ Cents
98. 50 Ea. Water Main Extra Depth (> than 1') $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
99. 3305.0109 100 Lf. Trench Safety 33 05 10 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
100. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (0' - 5' ) 33 05 30 $ $ Per Each:
____________________ Dollars & ___________________ Cents
101. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (5' - 10' ) 33 05 30 $ $ Per Each:
____________________ Dollars & ___________________ Cents
102. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (10' - 20' ) 33 05 30 $ $ Per Each:
____________________ Dollars & ___________________ Cents
103. 3305.0116 25 Cy. Concrete Encasement for Utility Pipes 33 05 10 $ $ Per Cubic Yard:
____________________ Dollars & ___________________ Cents
104. 3305.0203 100 Cy. Imported Embedment/Backfill, CLSM (Flowable Fill) 33 05 10 $ $ Per Cubic Yard:
____________________ Dollars &
B - 12
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
105. 3305.0203 100 Cy. Imported Embedment/Backfill, Crushed Rock 33 05 10 $ $ Per Cubic Yard:
____________________ Dollars & ___________________ Cents
106. 3305.0203 100 Cy. Imported Embedment/Backfill, (CSS) Concrete Stabilized Sand 33 05 10 $ $ Per Cubic Yard:
____________________ Dollars & ___________________ Cents
107. 100 Cy. Imported Embedment/Backfill, (Type B) $ $ Per Cubic Yard:
____________________ Dollars & ___________________ Cents
108. 3137.0101 10 Sy. Concrete Riprap 31 37 00 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
109. 3137.0102 10 Sy. Large Stone Riprap, Dry 31 37 00 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
110. 3137.0103 10 Sy. Large Stone Riprap, Grouted 31 37 00 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
111. 3292.0100 100 Sy. Block Sod Placement 32 92 13 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
112. 3292.0400 100 Sy. Seeding, Hydromulch 32 92 13 $ $ Per Square Yard:
____________________ Dollars &
B - 13
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
113. 3201.0151 200 Lf. Seeding, Soil Retention Blanket 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
114. 3201.0151 200 Lf. Asphalt Pvmt Repair, Water Service 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
115. 3201.0111 300 Lf. 4' Wide Asphalt Pvmt Repair, Residential 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
116. 3201.0112 300 Lf. 5' Wide Asphalt Pvmt Repair, Residential 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
117. 3201.0113 300 Lf. 6' Wide Asphalt Pvmt Repair, Residential 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
118. 3201.0121 300 Lf. 4' Wide Asphalt Pvmt Repair, Arterial 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
119. 3201.0122 300 Lf. 5' Wide Asphalt Pvmt Repair, Arterial 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
120. 3201.0123 300 Lf. 6' Wide Asphalt Pvmt Repair, Arterial 32 01 17 $ $ Per Linear Foot:
____________________ Dollars &
B - 14
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
121. 3201.0131 300 Lf. 4' Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
122. 3201.0132 300 Lf. 5' Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
123. 3201.0133 300 Lf. 6' Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
124. 3201.0201 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Residential 32 01 17 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
125. 3201.0202 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Arterial 33 01 17 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
126. 3201.0203 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Industrial 34 01 17 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
127. 3201.0301 100 Sy. 2" Extra Width Asphalt Over Exist.
Base 32 01 17 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
128. 3201.0302 100 Sy. 3" Extra Width Asphalt Over Exist.
Base 32 01 17 $ $ Per Square Yard:
B - 15
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
____________________ Dollars &
B - 16
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
129. 3201.0303 100 Sy. 4" Extra Width Asphalt Over Exist.
Base 32 01 17 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
130. 3201.0400 100 Lf. Temporary Asphalt Paving Repair 32 01 18
Per Linear Foot:
____________________ Dollars & ___________________ Cents
131. 3211.0211 50 Sy. 6" Flexible Base, Type B, GR-1 32 11 23 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
132. 3211.0212 50 Sy. 6" Flexible Base, Type B, GR-2 32 11 23 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
133. 200 Sy. High Early Strength Conc. $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
134. 3201.0614 300 Sy. Conc Pvmt Repair, Residential 32 01 29 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
135. 3201.0616 300 Sy. Conc Pvmt Repair, Arterial/Industrial
32 01 29
Per Square Yard:
____________________ Dollars & ___________________ Cents
136. 300 Sy. Conc. Pvmt Over Exist. Base, Residential $ $ Per Square Yard:
____________________ Dollars &
B - 17
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
137. 100 Sy. Conc. Pvmt Over Exist. Base, Arterial/Industrial $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
138. 3214.0300 100 Sy. Brick Pvmt Repair 32 14 16 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
139. 3214.0600 100 Sy. Brick Pvmt Repair (City Supplied Brick)
32 14 16
Per Square Yard:
____________________ Dollars & ___________________ Cents
140. 3216.0101 300 Lf. 6" Conc Curb and Gutter (Replaced) 32 16 13 $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
141. 300 Lf. 6" Conc Curb & Gutter Attached to Conc. Pvmt (Replaced) $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
142. 3216.0301 50 Sy. 9" Conc Valley Gutter, Residential 32 16 13
Per Square Yard:
____________________ Dollars & ___________________ Cents
143. 3216.0302 50 Sy. 11" Conc Valley Gutter, Arterial/Industrial 32 16 13 $ $ Per Square Yard:
____________________ Dollars & ___________________ Cents
144. 3213.0301 300 Sf. 4" Conc Sidewalk 32 13 20 $ $ Per Square Foot:
____________________ Dollars &
B - 18
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
145. 3213.0351 200 Sf. 4" Conc Sidewalk, Exposed Aggregate 32 13 20 $ $ Per Square Foot:
____________________ Dollars & ___________________ Cents
146. 3213.0401 300 Sf. 6" Concrete Driveway 32 13 20 $ $ Per Square Foot:
____________________ Dollars & ___________________ Cents
147. 3213.0451 200 Sf. 6" Concrete Driveway, Exposed Aggregate
32 13 20
Per Square Foot:
____________________ Dollars & ___________________ Cents
148. 3331.4112 50 Lf. 6" DIP Sewer Pipe (Replc. At Variable Depth)
33 11 10
Per Linear Foot:
____________________ Dollars & ___________________ Cents
149. 50 Lf. 6" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
150. 3331.4119 50 Lf. 8" DIP Sewer Pipe (Replc. At Variable Depth)
33 11 10
Per Linear Foot:
____________________ Dollars & ___________________ Cents
151. 50 Lf. 8" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
152. 3331.4205 50 Lf. 10" DIP Sewer (Replc. At Variable Depth)
33 11 10
Per Linear Foot:
____________________ Dollars &
B - 19
SPECIFICATI
ON SECTION
UNIT
PRICE
TOTAL
AMOUNT
153. 50 Lf. 10" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
154. 3331.4212 50 Lf. 12" DIP Sewer (Replc. At Variable Depth)
33 11 10
Per Linear Foot:
____________________ Dollars & ___________________ Cents
155. 50 Lf. 12" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
156. 3331.4222 50 Lf. 16" DIP Sewer (Replc. At Variable Depth)
33 11 10
Per Linear Foot:
____________________ Dollars & ___________________ Cents
157. 50 Lf. 15" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:
____________________ Dollars & ___________________ Cents
158. 3471.0003 50 Ea. Traffic Control 34 71 13 $ $ Per Each:
____________________ Dollars & ___________________ Cents
159. 50 Ea. Street Use Permit $ $ Per Each:
____________________ Dollars & ___________________ Cents
TOTAL AMOUNT BID $
B - 20