10-00 41 00 Bid Proposal Part B REV.pdf

PDF 247 KB Posted

Attached to
PW ITB - 106711 - Water Main Replacements - Contract 2026 -
Solicitation number
26-0149
Issued by
Tarrant County, Fort Worth City, Texas

About this file

This is a Bid Proposal Part B form for Water Main Replacements - Contract 2026, issued by the Water Department in Texas. The contract encompasses extensions, replacements, and relocations of water mains, service lines, and associated construction required to upgrade existing water infrastructure or provide water service to individual customers and developers. The work is funded through the Water and Sewer Capital Projects Fund, with work orders issued to the contractor following payment of applicable estimated costs by customers and developers. The bid proposal requests pricing for 159 line items spanning multiple categories including mobilization and emergency work orders, PVC and ductile iron water pipes ranging from 4 inches to 12 inches in diameter, water carrier pipes, casing installation, gate valves, fire hydrants, tapping sleeves and valves, water service connections and meters, temporary water services, meter vaults, water abandonment plugs, exploratory excavation, concrete encasement, backfill materials, and pavement repair work for asphalt, concrete, brick, curb and gutter, sidewalks, driveways, and sewer pipe replacement at variable depths.

Bidders are required to provide unit pricing in both numerical and written word formats for each line item, with pricing structured per each, linear foot, ton, vertical foot, square yard, or cubic yard as applicable. The bid form does not specify response deadlines, bid opening dates, site visit requirements, or bidder conference schedules within the provided document. One line item (Plumbing Permit) shows a fixed price of $32.82. The contract does not contain information regarding set-asides, incumbent contractors, contract term length, or renewal options within this bid proposal section. Bidders should submit complete pricing for all 159 items to be considered for award of this water infrastructure improvement contract.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

NO.

BID LIST

ITEM NO. QTY.

BID PRICES WRITTEN IN

WORDS

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

1. 0170.0102 100 Ea. Work Order Mobilization 01 70 00 $ $ Per Each:

____________________ Dollars & ___________________ Cents

2. 0170.0103 25 Ea. Work Order Emergency 01 70 00 $ $ Per Each:

____________________ Dollars & ___________________ Cents

3. 3311.0061 200 Lf. 4" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

4. 3311.0161 800 Lf. 6" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

5. 3311.0261 1200 Lf. 8" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

6. 3311.0361 400 Lf. 10" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

7. 3311.0461 400 Lf. 12" PVC Water Pipe 33 11 12 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

8. 3311.0051 100 Lf. 4" DIP Water 33 11 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

9. 3311.0151 100 Lf. 6" DIP Water 33 11 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

B - 1

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

10. 3311.0251 100 Lf. 8" DIP Water 33 11 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

11. 3311.0351 100 Lf. 10" DIP Water 33 11 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

12. 3311.0451 100 Lf. 12" DIP Water 33 11 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

13. 3305.2002 100 Lf. 8" Water Carrier Pipe (DI w/ SS Casing Spacers) 33 05 24 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

14. 3305.2003 100 Lf. 10" Water Carrier Pipe (DI w/ SS Casing Spacers) 33 05 24 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

15. 3305.2004 100 Lf. 12" Water Carrier Pipe (DI w/ SS Casing Spacers) 33 05 24 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

16. 3305.1002 100 Lf. 16" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

17. 3305.1003 100 Lf. 20" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars &

B - 2

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

18. 3305.1004 100 Lf. 24" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

19. 3305.1005 100 Lf. 30" Casing By Open Cut (Welded Steel) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

20. 3305.1102 100 Lf. 16" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

21. 3305.1103 100 Lf. 20" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

22. 3305.1104 100 Lf. 24" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

23. 3305.1105 100 Lf. 30" Casing By Other Than Open Cut (Welded Steel w/ Grout) 33 05 22 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

24. 3312.3001 20 Ea. 4" Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

25. 3312.3002 25 Ea. 6" Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars &

B - 3

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

26. 3312.3003 25 Ea. 8" Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

27. 3312.3004 10 Ea. 10" Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

28. 3312.3005 10 Ea. 12" Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

29. 3312.3101 5 Ea. 4" Cut-in Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

30. 3312.3102 5 Ea. 6" Cut-in Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

31. 3312.3103 5 Ea. 8" Cut-in Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

32. 3312.3104 5 Ea. 10" Cut-in Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

33. 3312.3105 5 Ea. 12" Cut-in Gate Valve 33 12 20 $ $ Per Each:

____________________ Dollars & ___________________ Cents

34. 0241.1301 5 Ea. Remove 4" Water Valve 02 41 14 $ $ Per Each:

____________________ Dollars &

B - 4

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

35. 0241.1302 5 Ea. Remove 6" Water Valve 02 41 14 $ $ Per Each:

____________________ Dollars & ___________________ Cents

36. 0241.1303 5 Ea. Remove 8" Water Valve 02 41 14 $ $ Per Each:

____________________ Dollars & ___________________ Cents

37. 0241.1304 5 Ea. Remove 10" Water Valve 02 41 14 $ $ Per Each:

____________________ Dollars & ___________________ Cents

38. 0241.1305 5 Ea. Remove 12" Water Valve 02 41 14 $ $ Per Each:

____________________ Dollars & ___________________ Cents

39. 3311.0001 15 Tn. Ductile Iron Water Fittings w/ Restraint 33 11 11 $ $ Per Ton:

____________________ Dollars & ___________________ Cents

40. 3312.0001 20 Ea. Fire Hydrant 33 12 40 $ $ Per Each:

____________________ Dollars & ___________________ Cents

41. 3305.0101 20 Vf. Fire Hydrant Stem Extension 33 05 14 $ $ Per Vertical Foot:

____________________ Dollars & ___________________ Cents

42. 0241.1510 5 Ea. Salvage Fire Hydrant 02 41 14 $ $ Per Each:

____________________ Dollars & ___________________ Cents

43. 3312.4001 1 Ea. 6" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars &

B - 5

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

44. 3312.4002 1 Ea. 8" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

45. 3312.4003 1 Ea. 8" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

46. 3312.4004 1 Ea. 10" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

47. 3312.4005 1 Ea. 10" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

48. 3312.4104 1 Ea. 10" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

49. 3312.4106 1 Ea. 12" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

50. 3312.4107 1 Ea. 12" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

51. 3312.4108 1 Ea. 12" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

52. 3312.4109 1 Ea. 12" x 12" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars &

B - 6

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

53. 3312.4111 1 Ea. 16" x 6" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

54. 3312.4112 1 Ea. 16" x 8" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

55. 3312.4113 1 Ea. 16" x 10" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

56. 3312.4114 1 Ea. 16" x 12" Tapping Sleeve & Valve 33 12 25 $ $ Per Each:

____________________ Dollars & ___________________ Cents

57. 25 Ea. 3/4" Water Tap to Main $ $ Per Each:

____________________ Dollars & ___________________ Cents

58. 100 Ea. 3/4" Copper Service Line $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

59. 100 Ea. 3/4" Private Water Service $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

60. 50 Ea. 3/4" Bored Water Service $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

61. 25 Ea. 1" Water Tap to Main $ $ Per Each:

____________________ Dollars &

B - 7

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

62. 100 Ea. 1" Copper Service Line $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

63. 3312.2004 100 Lf. 1" Private Water Service 33 12 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

64. 3312.2002 50 Ea. 1" Bored Water Service 33 12 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

65. 25 Ea. 1 1/2" Water Tap to Main $ $ Per Each:

____________________ Dollars & ___________________ Cents

66. 100 Ea. 1 1/2" Copper Service Line $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

67. 3312.2104 100 Lf. 1 1/2" Private Water Service 33 12 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

68. 3312.2102 50 Ea. 1 1/2" Bored Water Service 33 12 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

69. 25 Ea. 2" Water Tap to Main $ $ Per Each:

____________________ Dollars & ___________________ Cents

70. 100 Ea. 2" Copper Service Line $ $ Per Linear Foot:

____________________ Dollars &

B - 8

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

71. 3312.2204 100 Lf. 2" Private Water Service 33 12 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

72. 3312.2202 50 Ea. 2" Bored Water Service 33 12 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

73. 3312.2202 1 Ea. Plumbing Permit 33 12 10 $ $32.82 $ $32.82 Per Linear Foot:

____________________ Dollars & ___________________ Cents

74. 25 Ea. Class A PVC Meter Box (Furnish & Set) $ $ Per Each:

____________________ Dollars & ___________________ Cents

75. 25 Ea. Class B PVC Meter Box (Furnish & Set) $ $ Per Each:

____________________ Dollars & ___________________ Cents

76. 10 Ea. Class C PVC Meter Box (Furnish & Set) $ $ Per Each:

____________________ Dollars & ___________________ Cents

77. 5 Ea. Class A Conc. Meter Box (Furnish & Set) $ $ Per Each:

____________________ Dollars & ___________________ Cents

78. 5 Ea. Class B Conc. Meter Box (Furnish & Set) $ $ Per Each:

____________________ Dollars &

B - 9

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

79. 2 Ea. 1" Multiple Service Branch $ $ Per Each:

____________________ Dollars & ___________________ Cents

80. 2 Ea. 1 1/2" Multiple Service Branch $ $ Per Each:

____________________ Dollars & ___________________ Cents r

81. 2 Ea. 2" Multiple Service Branch $ $

Per Each:

____________________ Dollars & ___________________ Cents

82. 5 Ea. Relocate 3/4" Water Meter $ $ Per Each:

____________________ Dollars & ___________________ Cents

83. 5 Ea. Relocate 1" Water Meter $ $ Per Each:

____________________ Dollars & ___________________ Cents

84. 5 Ea. Relocate 1 1/2" Water Meter $ $ Per Each:

____________________ Dollars & ___________________ Cents

85. 5 Ea. Relocate 2" Water Meter $ $ Per Each:

____________________ Dollars & ___________________ Cents

86. 5 Ea. Sprinkler System Backflow Preventer Relocation $ $ Per Each:

____________________ Dollars & ___________________ Cents

87. 3304.0102 1500 Lf. 2" Temporary Water Services 33 04 30 $ $ Per Linear Foot:

____________________ Dollars &

B - 10

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

88. 3312.2801 10 Ea. Meter Vault for 3" Meter 33 12 11 $ $ Per Each:

____________________ Dollars & ___________________ Cents

89. 3312.2802 10 Ea. Meter Vault for 4" Meter 33 12 11 $ $ Per Each:

____________________ Dollars & ___________________ Cents

90. 3312.2803 10 Ea. Meter Vault for 6" Meter 33 12 11 $ $ Per Each:

____________________ Dollars & ___________________ Cents

91. 3312.2804 5 Ea. Meter Vault for 8" Meter 33 12 11 $ $ Per Each:

____________________ Dollars & ___________________ Cents

92. 3312.2805 5 Ea. Meter Vault for 10" meter 33 12 11 $ $ Per Each:

____________________ Dollars & ___________________ Cents

93. 0241.1602 5 Ea. Remove Concrete Water Vault 02 41 14 $ $ Per Each:

____________________ Dollars & ___________________ Cents

94. 3312.0002 5 Ea. Water Sampling Station 33 12 50 $ $ Per Each:

____________________ Dollars & ___________________ Cents

95. 0241.1218 10 Ea. 2" or Smaller Water Abandonment Plug

02 41 14

Per Each:

____________________ Dollars & ___________________ Cents

96. 0241.1218 10 Ea. 4"-12" Water Abandonment Plug 02 41 14 $ $ Per Each:

____________________ Dollars &

B - 11

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

97. 5 Ea. 16" Water Pressure Plug $ $ Per Each:

____________________ Dollars & ___________________ Cents

98. 50 Ea. Water Main Extra Depth (> than 1') $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

99. 3305.0109 100 Lf. Trench Safety 33 05 10 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

100. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (0' - 5' ) 33 05 30 $ $ Per Each:

____________________ Dollars & ___________________ Cents

101. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (5' - 10' ) 33 05 30 $ $ Per Each:

____________________ Dollars & ___________________ Cents

102. 3305.0103 5 Ea. Exploratory Excavation of Existing Utilities (10' - 20' ) 33 05 30 $ $ Per Each:

____________________ Dollars & ___________________ Cents

103. 3305.0116 25 Cy. Concrete Encasement for Utility Pipes 33 05 10 $ $ Per Cubic Yard:

____________________ Dollars & ___________________ Cents

104. 3305.0203 100 Cy. Imported Embedment/Backfill, CLSM (Flowable Fill) 33 05 10 $ $ Per Cubic Yard:

____________________ Dollars &

B - 12

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

105. 3305.0203 100 Cy. Imported Embedment/Backfill, Crushed Rock 33 05 10 $ $ Per Cubic Yard:

____________________ Dollars & ___________________ Cents

106. 3305.0203 100 Cy. Imported Embedment/Backfill, (CSS) Concrete Stabilized Sand 33 05 10 $ $ Per Cubic Yard:

____________________ Dollars & ___________________ Cents

107. 100 Cy. Imported Embedment/Backfill, (Type B) $ $ Per Cubic Yard:

____________________ Dollars & ___________________ Cents

108. 3137.0101 10 Sy. Concrete Riprap 31 37 00 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

109. 3137.0102 10 Sy. Large Stone Riprap, Dry 31 37 00 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

110. 3137.0103 10 Sy. Large Stone Riprap, Grouted 31 37 00 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

111. 3292.0100 100 Sy. Block Sod Placement 32 92 13 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

112. 3292.0400 100 Sy. Seeding, Hydromulch 32 92 13 $ $ Per Square Yard:

____________________ Dollars &

B - 13

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

113. 3201.0151 200 Lf. Seeding, Soil Retention Blanket 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

114. 3201.0151 200 Lf. Asphalt Pvmt Repair, Water Service 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

115. 3201.0111 300 Lf. 4' Wide Asphalt Pvmt Repair, Residential 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

116. 3201.0112 300 Lf. 5' Wide Asphalt Pvmt Repair, Residential 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

117. 3201.0113 300 Lf. 6' Wide Asphalt Pvmt Repair, Residential 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

118. 3201.0121 300 Lf. 4' Wide Asphalt Pvmt Repair, Arterial 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

119. 3201.0122 300 Lf. 5' Wide Asphalt Pvmt Repair, Arterial 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

120. 3201.0123 300 Lf. 6' Wide Asphalt Pvmt Repair, Arterial 32 01 17 $ $ Per Linear Foot:

____________________ Dollars &

B - 14

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

121. 3201.0131 300 Lf. 4' Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

122. 3201.0132 300 Lf. 5' Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

123. 3201.0133 300 Lf. 6' Wide Asphalt Pvmt Repair, Industrial 32 01 17 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

124. 3201.0201 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Residential 32 01 17 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

125. 3201.0202 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Arterial 33 01 17 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

126. 3201.0203 300 Sy. Asphalt Pvmt Repair Beyond Defined Width, Industrial 34 01 17 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

127. 3201.0301 100 Sy. 2" Extra Width Asphalt Over Exist.

Base 32 01 17 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

128. 3201.0302 100 Sy. 3" Extra Width Asphalt Over Exist.

Base 32 01 17 $ $ Per Square Yard:

B - 15

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

____________________ Dollars &

B - 16

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

129. 3201.0303 100 Sy. 4" Extra Width Asphalt Over Exist.

Base 32 01 17 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

130. 3201.0400 100 Lf. Temporary Asphalt Paving Repair 32 01 18

Per Linear Foot:

____________________ Dollars & ___________________ Cents

131. 3211.0211 50 Sy. 6" Flexible Base, Type B, GR-1 32 11 23 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

132. 3211.0212 50 Sy. 6" Flexible Base, Type B, GR-2 32 11 23 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

133. 200 Sy. High Early Strength Conc. $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

134. 3201.0614 300 Sy. Conc Pvmt Repair, Residential 32 01 29 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

135. 3201.0616 300 Sy. Conc Pvmt Repair, Arterial/Industrial

32 01 29

Per Square Yard:

____________________ Dollars & ___________________ Cents

136. 300 Sy. Conc. Pvmt Over Exist. Base, Residential $ $ Per Square Yard:

____________________ Dollars &

B - 17

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

137. 100 Sy. Conc. Pvmt Over Exist. Base, Arterial/Industrial $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

138. 3214.0300 100 Sy. Brick Pvmt Repair 32 14 16 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

139. 3214.0600 100 Sy. Brick Pvmt Repair (City Supplied Brick)

32 14 16

Per Square Yard:

____________________ Dollars & ___________________ Cents

140. 3216.0101 300 Lf. 6" Conc Curb and Gutter (Replaced) 32 16 13 $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

141. 300 Lf. 6" Conc Curb & Gutter Attached to Conc. Pvmt (Replaced) $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

142. 3216.0301 50 Sy. 9" Conc Valley Gutter, Residential 32 16 13

Per Square Yard:

____________________ Dollars & ___________________ Cents

143. 3216.0302 50 Sy. 11" Conc Valley Gutter, Arterial/Industrial 32 16 13 $ $ Per Square Yard:

____________________ Dollars & ___________________ Cents

144. 3213.0301 300 Sf. 4" Conc Sidewalk 32 13 20 $ $ Per Square Foot:

____________________ Dollars &

B - 18

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

145. 3213.0351 200 Sf. 4" Conc Sidewalk, Exposed Aggregate 32 13 20 $ $ Per Square Foot:

____________________ Dollars & ___________________ Cents

146. 3213.0401 300 Sf. 6" Concrete Driveway 32 13 20 $ $ Per Square Foot:

____________________ Dollars & ___________________ Cents

147. 3213.0451 200 Sf. 6" Concrete Driveway, Exposed Aggregate

32 13 20

Per Square Foot:

____________________ Dollars & ___________________ Cents

148. 3331.4112 50 Lf. 6" DIP Sewer Pipe (Replc. At Variable Depth)

33 11 10

Per Linear Foot:

____________________ Dollars & ___________________ Cents

149. 50 Lf. 6" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

150. 3331.4119 50 Lf. 8" DIP Sewer Pipe (Replc. At Variable Depth)

33 11 10

Per Linear Foot:

____________________ Dollars & ___________________ Cents

151. 50 Lf. 8" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

152. 3331.4205 50 Lf. 10" DIP Sewer (Replc. At Variable Depth)

33 11 10

Per Linear Foot:

____________________ Dollars &

B - 19

SPECIFICATI

ON SECTION

UNIT

PRICE

TOTAL

AMOUNT

153. 50 Lf. 10" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

154. 3331.4212 50 Lf. 12" DIP Sewer (Replc. At Variable Depth)

33 11 10

Per Linear Foot:

____________________ Dollars & ___________________ Cents

155. 50 Lf. 12" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

156. 3331.4222 50 Lf. 16" DIP Sewer (Replc. At Variable Depth)

33 11 10

Per Linear Foot:

____________________ Dollars & ___________________ Cents

157. 50 Lf. 15" PVC Sewer Pipe (Replc. At Variable Depth) $ $ Per Linear Foot:

____________________ Dollars & ___________________ Cents

158. 3471.0003 50 Ea. Traffic Control 34 71 13 $ $ Per Each:

____________________ Dollars & ___________________ Cents

159. 50 Ea. Street Use Permit $ $ Per Each:

____________________ Dollars & ___________________ Cents

TOTAL AMOUNT BID $