J-9_St_Louis_Facility_Survey_Volume_II.PDF

PDF 20 MB Posted

Attached to
St. Louis Job Corps Solicitation
Solicitation number
1630J1-18-N-00001
Issued by

About this file

Solicitation attachment J-9 - Facility Survey Volume II

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ST LOUIS

Job Corps Center St. Louis, MO

Facility Planning Report Volume II

Supporting Data

Final April 2017

Department of Labor/ Office of Job Corps

ST LOUIS

Job Corps Center St. Louis, MO

Facility Planning Report Volume II

Supporting Data

Final April 2017

Recreation Building 102

VOLUME II - SUPPORTING DATA

EXECUTIVE SUMMARY

1.0 SITE LAYOUT AND PLANS

• Location Map

• Exisiting Site Plan

2.0 DESCRIPTIONS

• Buildings and Structures

• Space Utilization By Function

• NSF by Building

• Environmental Management Report

• Asbestos Report

• Radon Report

• Site Descriptions

• Building Descriptions

3.0 DEFICIENCIES

APPENDICES - CORRESPONDENCE AND REPORTS

Appendix A.

• Center Review Meeting Minutes

• Survey Brief

• Student Questionnaire

Appendix B.

• Life Safety Defi ciencies and List

Appendix C.

• O&M Defi ciencies List

Appendix D.

• Active Warranty List

Executive Summary

The facility survey for St. Louis Job Corps Center (St. Louis JCC) was conducted 17 – 25 October 2016. The information presented in Volume II, Supporting Data, represents the current status of the campus.

The information includes the following:

Existing site layout Overall status of existing building and structures Space utilization by building and function compared to recommended standards Status of environmental elements of the Center’s operations Details on the site and buildings and structures based on architectural, electrical, and mechanical survey and supporting documentation Presentation of the status of historical deficiencies and compilation of deficiencies documented through this survey Supporting documentation, as presented in the appendices of the center review meeting; survey brief and student questionnaire; life safety IA/IIA transmittal; and active warranties

Section 1.0 of this volume addresses site layout and plans while Section 2.0 presents details on the buildings and structures. Section 3.0 presents deficiencies and their status as well as new ones identified in this survey. The appendices provide additional information as noted below:

Appendix A. Survey Brief Questionnaire Appendix B. Life Safety Deficiencies and List Appendix C. O&M Deficiencies List Appendix D. Active Warranty Report

EXECUTIVE SUMMARY

1.0 - Site Layout and Plans

ST LOUIS

JOB CORPS CENTER

ST LOUIS, MISSOURI

ST LOUIS JCC

10 MI50

2.0 - Descriptions

BUILDINGS AND STRUCTURES

00703 ST LOUIS 04/04/2017

1Page: of Date:

0101 - WELCOME CENTER

0102 - RECREATION CENTER

0103 - CAFETERIA/CULINARY ARTS

0104 - DORMITORY A FEMALE DORM

0105 - DORMITORY B MALE DORM

0106 - DORMITORY C MALE DORM

0208C - SECOND WELDING SHOP

0222 - MEDICAL/DENTAL

0223A - VACANT

0223B - EDUCATION BUILDING

0225A - BUNKER STORAGE A

0225B - BUNKER STORAGE B

0228 - GYMNASIUM

0232A-H - VOC TRAINING SHOPS

0234 - ADMIN/WAREHOUSE

0234A - EDUCATION TRAILER

0235 - ORIENTATION BUILDING

0244 - WELDING/BRICKLAYER SHOP

0300 - OUTREACH & ADMISSIONS

0302 - LINDELL VOC TRAINING

0307 - CARPENTRY STORAGE

0232 - FLAMMABLE STORAGE (30Ft x 20Ft) 0233 - GROUNDS EQUIPMENT (16Ft x 12Ft)

0234B - MISCELLANEOUS STORAGE

(40Ft x 20Ft)

0234C - MISCELLANEOUS STORAGE

(16Ft x 12Ft) 0234D - VEHICLE STORAGE (20Ft x 20Ft) 0244A - MASONRY STORAGE (20Ft x 14Ft) 0305 - ORIENTATION GAZEBO (12Ft

DIAMETER)

0311 - CARPORT (30Ft x 20Ft) 0315 - CARPORT (30Ft x 20Ft) 0316 - GREENHOUSE (48Ft x 24Ft) 0321 - PICNIC PAVILION (20Ft x 20Ft) 0322 - CONTAINER (40Ft x 8Ft) 0323 - CONTAINER (40Ft x 8Ft)

Name GSF

1,324 12,489 14,827 31,140 30,856 25,658 2,407

12,940 72,320 17,780 2,687 5,036

12,057 23,396 47,814

1,699 7,290 1,750

18,046 1,440

1,152

Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active

Active

Active

Active

Active Active

Active

Active Active Active Active Active Active

StatusType

Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Structure

Structure

Structure

Structure

Structure Structure

Structure

Structure Structure Structure Structure Structure Structure

Use Group Built Flrs Const

Business Assembly Assembly Residential Residential Residential Factory/Ind.

Business Residential Business Storage Storage Assembly Business Mixed Use Business Business Factory/Ind.

Business Business Storage Storage

Storage

Storage

Storage

Storage Storage

Assembly

Assembly Utility/Misc.

Utility/Misc.

Assembly Storage Storage

Good Good Good Fair

Good Good Good Fair Poor Fair

Good Good Good Good Fair

Good Good Fair

Good Good Good Good

Good

Fair

Fair

Good Good

Good

Good Good Good Good Good Good

ConditionAsset Number

0070308055 0070308056 0070308066 0070308075 0070308076 0070308077 0070300002 0070300003 0070300004 0070300005 0070308057 0070308058 0070300006 0070300008 0070300009 0070308054 0070300022 0070300011 0070300013 0070300019 0070308060 0070300018

0070300021

0070308063

0070308064

0070308080 0070308059

0070300025

0070308071 0070308073 0070308074 0070308081 0070308082 0070308083

21 343,641

13 5,976

34 349,617

Buildings

Structures

Total

GSF

GSF

GSF

Summary

04/04/2017

Space Utilization By Function 00703 St Louis Page: 1 of Date:

HOUSING

EDUCATION

FOOD SERVICE

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

Resident Men Resident Women Total Residents

Residents 440 Non Residents 80

520Total Students

(440)

(520)

(520)

DIFFERENCE

42,240

38,990

9,360

60,513

57,814

11,731

Lounge Other Sleeping excl. SPD(116 rooms; 440 beds) Storage

Academic (520) Non-Academic

12 -- ACT (Off-Ctr) 20 -- Bricklayer + 40 -- Carpentry + 20 -- Cement Masonry + 30 -- Cert. Nursing Asst.

60 -- Culinary Arts + 24 -- Facilities Maint. and Const. + 54 -- Material Handler 30 -- Office Administration 20 -- Painting + 30 -- Pharmacy Tech + 20 -- Plastering + 30 -- Security Officer 50 -- TCU Transportation 24 -- Welding +

Vocational Theory (258)

Dining (2 Servings) Food Preparation Food Storage

8,312 4,438

47,151

8,501 10,101

3,327 4,997 2,247 1,183 2,321 5,109

4,279 1,180 2,207 1,485 2,785 4,436

2,030

6,349 3,950 1,432

4,400 3,520

31,680 2,640

5,200 5,200

1,500 3,000 1,500 1,200 3,600 1,800 3,510 1,350 1,500 1,350 1,500

1,500 1,800

2,580

4,160 3,120 2,080

3,912

15,471 -2,028

3,301 4,901

1,827 1,997

-17

-1,279 3,309 -2,795

-439 2,779

-170

1,285 2,636

-550

2,189 -648

Vocations

18,273

18,824

2,371

04/04/2017

Space Utilization By Function 00703 St Louis Page: 2 of Date:

RECREATION

MEDICAL/DENTAL

ADMINISTRATION

STORAGE/SUPPORT

VACANT

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

TOTAL 264.88 137,735 219,799

(520)

(520)

(520)

(520)

(0)

DIFFERENCE

343,641

0.64

TOTAL GSF

NET TO GROSS RATIO

23,200

3,145

10,400

17,524

3,246

7,711

17,010

44,250

Arts & Crafts Gymnasium Meeting Room Miscellaneous Recreation Multipurpose Room Recreation Office Recreation Room Recreation/Snack Bar Snack Bar Weight Room

Medical/Dental

Administration

Operations & Maintenance Warehouse

Vacant

6.05

1,264 7,135

3,139

2,014 1,118

3,246

7,711

2,088 14,922

44,250

3,145

4,160 6,240

1,264 7,135

3,139

2,014 1,118

-2,689

-2,072 8,682

44,250

RESIDENT

NON-RESIDENT

(440)

(80) 15

50 22,000 1,200

-5,676

-2,689

6,610

44,250

82,064

Net Square Footage By Building Date: 04/04/2017 Page: 1

Center: ST LOUIS (00703) of 5

HOUSING

Sleeping excl. SPD

Lounge

Storage

Other

Function Suggested

NSF

16,643 13,861 16,647

2,549 2,554 3,209

1,376 1,685 1,377

0104 - DORMITORY A FEMALE DORM

0106 - DORMITORY C MALE DORM

0105 - DORMITORY B MALE DORM

0104 - DORMITORY A FEMALE DORM

0105 - DORMITORY B MALE DORM

0106 - DORMITORY C MALE DORM

0106 - DORMITORY C MALE DORM

0105 - DORMITORY B MALE DORM

0104 - DORMITORY A FEMALE DORM

0105 - DORMITORY B MALE DORM

0104 - DORMITORY A FEMALE DORM

0106 - DORMITORY C MALE DORM

Bldg Name Actual NSF Difference

47,151

8,312

4,438

Sub Total: 60,513

31,680

4,400

2,640

3,520

42,240

15,471

3,912

-2,028

( 440

18,273

40 rooms; 152 beds 36 rooms; 136 beds 40 rooms; 152 beds

Page: 2

Center: ST LOUIS (00703) of 5

EDUCATION

Academic

Vocational Theory (258)

Carpentry

Cement Masonry

Culinary Arts

Welding

Painting

Plastering

Bricklayer

Facilities Maint. and Const.

Non-Academic

Function Suggested

NSF

1,898 2,150 1,786 2,260

1,161

1,330 3,667

2,247

1,871

1,464 2,972

4,279

2,207

2,599

4,381

1,463

2,217

4,229

0223B - EDUCATION BUILDING

0223B - EDUCATION BUILDING

0223B - EDUCATION BUILDING

0223B - EDUCATION BUILDING

0223B - EDUCATION BUILDING

0244 - WELDING/BRICKLAYER SHOP

0232A-H - VOC TRAINING SHOPS

0208C - SECOND WELDING SHOP

0307 - CARPENTRY STORAGE

0232A-H - VOC TRAINING SHOPS

0232A-H - VOC TRAINING SHOPS

0103 - CAFETERIA/CULINARY ARTS

0223B - EDUCATION BUILDING

0208C - SECOND WELDING SHOP

0244 - WELDING/BRICKLAYER SHOP

0232A-H - VOC TRAINING SHOPS

0232A-H - VOC TRAINING SHOPS

0225B - BUNKER STORAGE B

0244 - WELDING/BRICKLAYER SHOP

0225B - BUNKER STORAGE B

0232A-H - VOC TRAINING SHOPS

0223B - EDUCATION BUILDING

0235 - ORIENTATION BUILDING

0223B - EDUCATION BUILDING

0302 - LINDELL VOC TRAINING

0300 - OUTREACH & ADMISSIONS

0232A-H - VOC TRAINING SHOPS

0302 - LINDELL VOC TRAINING

0234 - ADMIN/WAREHOUSE

Bldg Name Actual NSF Difference

8,501

2,030

4,997

2,247

2,321

4,436

4,279

2,207

3,327

5,109

10,101

5,200

2,580

3,000

1,500

3,600

1,800

1,500

1,500

1,500

1,800

5,200

3,301

-550

1,997

-1,279

2,636

2,779

1,827

3,309

4,901

( 520 )

Page: 3

Center: ST LOUIS (00703) of 5

EDUCATION

FOOD SERVICE

Security Officer

TCU Transportation

Material Handler

Pharmacy Tech

Office Administration

Cert. Nursing Asst.

Dining (2 Servings)

Food Preparation

Food Storage

Function Suggested

NSF

1,485

2,785

1,180

1,183

5,183 1,166

3,950

1,432

0302 - LINDELL VOC TRAINING

0302 - LINDELL VOC TRAINING

0234 - ADMIN/WAREHOUSE

0302 - LINDELL VOC TRAINING

0223B - EDUCATION BUILDING

0302 - LINDELL VOC TRAINING

0103 - CAFETERIA/CULINARY ARTS

0302 - LINDELL VOC TRAINING

0103 - CAFETERIA/CULINARY ARTS

0103 - CAFETERIA/CULINARY ARTS

Bldg Name Actual NSF Difference

1,485

2,785

1,180

1,183

6,349

3,950

1,432

Sub Total:

Sub Total:

57,814

11,731

1,500

3,510

1,350

1,350

1,200

4,160

3,120

2,080

38,990

9,360

1,285

-2,795

-170

-439

-17

2,189

-648

( 520

18,824

2,371

Page: 4

Center: ST LOUIS (00703) of 5

RECREATION

MEDICAL/DENTAL

ADMINISTRATION

Multipurpose Room

Snack Bar

Arts & Crafts

Gymnasium

Weight Room

Miscellaneous Recreation

Recreation/Snack Bar

Recreation Room

Meeting Room

Recreation Office

Medical/Dental

Administration

Function Suggested

NSF

3,139

1,264

7,135

1,118

2,014

3,246

5,222

0102 - RECREATION CENTER

0102 - RECREATION CENTER

0102 - RECREATION CENTER

0228 - GYMNASIUM

0228 - GYMNASIUM

0228 - GYMNASIUM

0102 - RECREATION CENTER

0102 - RECREATION CENTER

0102 - RECREATION CENTER

0228 - GYMNASIUM

0102 - RECREATION CENTER

0222 - MEDICAL/DENTAL

0234A - EDUCATION TRAILER

0101 - WELCOME CENTER

0234 - ADMIN/WAREHOUSE

0302 - LINDELL VOC TRAINING

0225B - BUNKER STORAGE B

Bldg Name Actual NSF Difference

3,139

1,264

7,135

1,118

2,014

3,246

7,711

Sub Total:

Sub Total:

Sub Total:

17,524

3,246

7,711

3,145

10,400

23,200

3,145

10,400

-2,689

-5,676

-2,689

Page: 5

Center: ST LOUIS (00703) of 5

STORAGE/SUPPORT

VACANT

Warehouse

Operations & Maintenance

Vacant

Function Suggested

NSF

12,746 1,466

2,522 41,728

0234 - ADMIN/WAREHOUSE

0225B - BUNKER STORAGE B

0225A - BUNKER STORAGE A

0225A - BUNKER STORAGE A

0302 - LINDELL VOC TRAINING

0225B - BUNKER STORAGE B

0222 - MEDICAL/DENTAL

0223A - VACANT

Bldg Name Actual NSF Difference

14,922

2,088

44,250

Sub Total:

Sub Total:

17,010

44,250

6,240

4,160

10,400

8,682

-2,072

44,250

6,610

44,250

Environmental Management Report Center: ST LOUIS (00703)

Page: 1 Date: 04/04/2017 of 1

SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)

Commercial Waste Service

HAZARDOUS MATERIALS STORAGE (EPCRA)

Yes Building 232 - Flammable Storage Building

Organic solvent (5 gals) Yes

PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)

N/A0

PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)

ASBESTOS AND PCB MANAGEMENT (TSCA)

AIR POLLUTION CONTROL (CAA)

N/A None

Non-Attainment

Solid Waste Disposal :

Hazardous Waste Generator :

Hazardous Waste ID :

Generator Classification :

Hazardous Materials Storage :

Hazardous Materials ID :

HazMat Storage Area :

HazMat Spill Response Plan :

Number of Regulated USTs :

Number of Un-regulated USTs :

Local Hazardous Use Permit :

LEPC Notification :

EPA Generator ID Number :

Hazardous Waste Disposal :

RCRA Compliance

ID LocationFuel Type Capacity

Number of ASTs :

Asbestos Survey Date :

Asbestos Type :

Asbestos Coordinator :

Coordinator Training Date:

Custodial/Maintenance Training :

AHERA Regulated :

Management Plan Approval :

PCB Transformer Testing :

PCB Transformers :

PCB-Contaminated Transformers :

Transformers Labelled :

Regional Air Quality :

Permitted Air Pollution Source :

Source Description :

Waste Management, Inc.

Yes Organic Solvent (5 gals/month)

Conditionally Exempt Small Quantity Generator N/A Not Reported

No No

Overfill Leak Corrosion

SPCC Plan Required : SPCC Plan Completed :

No N/A

02/08/1990 Friable/Non-Friable Ronald Moore 01/09/2001 Yes No N/A Yes Yes

CO, Ozone

ID Fuel Type Capacity Location Overfill

Prevention Secondary ContainmentTank Status

Tank Status Prevention/Detection

Asbestos-Containing Materials Inventory

Date: 04/04/2017Center : St Louis (00703) Page: 1 of 1

Heating Heating

Heating Floor Finishes Heating

Water Plumbing Floor Finishes Heating Floor Finishes

Plumbing (Bldg)

Heating Heating Floor Finishes Floor Finishes Roof Repair/Replacement Floor Finishes

Heating

Bldg System

Bldg System

Bldg System

Bldg System

Bldg System

Bldg System

Tank insulation Pipe insulation

Pipe fitting insulation Spark Proof VFT (bottom layer) Pipe insulation

Tank Insulation Debris/Contaminated Soil Pipe Insulation Spark Proof VFT (bottom layer)

Tank Insulation

Pipe fitting insulation Pipe insulation Spark Proof VFT(Bottom Layer) Debris/contaminated soil Roof flashing 12x12 floor tile (covered)

Tank insulation

Category Description

Category Description

Category Description

Category Description

Category Description

Category Description

Sq. Ft.

Lin. Ft.

Ea.

Sq. Ft.

Lin. Ft.

Sq. Ft.

Sq. Ft.

Lin. Ft.

Sq. Ft.

Sq. Ft.

Ea.

Lin. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Location

Location

Location

Location

Location

Location

Unit

Unit

Unit

Unit

Unit

Unit

Quantity

Quantity

Quantity

Quantity

Quantity

Quantity

Basement Basement

Crawlspace First Floor Crawlspace

Crawlspace Crawlspace Crawlspace Throughout Building

Mechanical Mezzanine

Crawlspace Crawlspace Throughout Crawlspace Throughout Cafeteria

Basement

48920

20850

20850

43650

Building :

Building :

Building :

Building :

Building :

Building :

0222 - MEDICAL/DENTAL

0223A - VACANT

0223B - EDUCATION BUILDING

0228 - GYMNASIUM

0234 - ADMIN/WAREHOUSE

0244 - WELDING/BRICKLAYER SHOP

Radon

Page: 1 of 2

0101 - WELCOME CENTER

0102 - RECREATION CENTER

0103 - CAFETERIA/CULINARY ARTS

0104 - DORMITORY A FEMALE DORM

0105 - DORMITORY B MALE DORM

0106 - DORMITORY C MALE DORM

0208C - SECOND WELDING SHOP

0222 - MEDICAL/DENTAL

0223A - VACANT

0223B - EDUCATION BUILDING

0225A - BUNKER STORAGE A

0225B - BUNKER STORAGE B

0228 - GYMNASIUM

0232A-H - VOC TRAINING SHOPS

0234 - ADMIN/WAREHOUSE

0234A - EDUCATION TRAILER

0235 - ORIENTATION BUILDING

0244 - WELDING/BRICKLAYER SHOP

0300 - OUTREACH & ADMISSIONS

0302 - LINDELL VOC TRAINING

0307 - CARPENTRY STORAGE

Bldg Name

05/14/1990

05/14/1990

08/12/1992

05/14/1990

05/14/1990

05/14/1990

05/14/1990

05/14/1990

05/14/1990

05/14/1990

Test Date

No

No

No

No

No

No

Yes

Yes

Yes

Yes

No

No

Yes

Yes

Yes

No

No

Yes

Yes

Yes

No

Radon Testing

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

Test Result

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Mitigation Mitigation Date

Radon

Page: 2 of 2

RADON EXPLANATORY NOTES

The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than

4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.

Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;

(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.

Site Description

Road between dormitories and Voc. Training Shops Building 232A-H

Page: 1 Date: 04/04/2017 of 5

Comments:

Paving Type for Roads & Parking

There is a combination of new and old sidewalks and roads. Sections of older and deteriorated roads and parking areas have not been repaired, but will be improved as part of a National Project.

Paving Type for Sidewalks

Asphalt Concrete

Comments:

Topography Buildings and Structures

Center is fully enclosed by fencing. There is a wood fence at the transformer and a combination of chain link and decorative fencing around the perimeter of the site property line.

ROADS, PARKING & SIDEWALKS

Water Source Water Authority Service Meter On-Site Treatment Plant

1. Water System

Treatment Type Storage Type Storage Capacity(Gallons)

NoMasterCity of St. LouisPublic Water Authority

None 0None

Comments:

Comments:

Fire Hydrants On-Site Water Supply Storage Capacity

(Gallons) Pressure Source FD Response Time (Minutes)

Yes 0 2None Municipal

The Center is served by the St. Louis Municipal Fire Department, which is located approximately two miles from the Center and has a response time of approximately five minutes. Fire hydrants are located at adequate intervals to provide protection for the Center facilities.

Number of Deficiencies = 1

Number of Deficiencies = 1

Number of Deficiencies = 5

SITE FEATURES

UTILITIES

2. Fire Protection System

Buildings Structures21 13Flat

Surrounding

Outdoor Recreation

Light Industrial, National Guard Station, Residential

North Perimeter

South and East Perimeter

West Perimeter

West Perimeter

Metal Decorative

Chain Link

Chain Link

Metal Decorative

Location Type

Maintenance Responsibility System Capacity Adequate System Condition

Center Center Yes Good

Separate Loop

No

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Center Yes Good

Ownership

Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Fair Yes Fair

Number of Deficiencies = 1

Fencing

Other Features

Page: 2 Date: 04/04/2017 of 5

Sewage Treatment Flow

Utility

Publicly Owned Treatment Works

Center

Gravity

Maintenance ResponsibilityOwnership

Comments: Natural gas usage is measured at a master meter. Each building is provided with a sub-meter.

Laclead Gas Company

Comments:

Electric Company PCB Trans.

Transformer Mounting Transformer Ownership

Systems Ownership Maintenance Responsibility

Ameren/Union Electric Company

Service is brought from primary overhead lines along Strattford Avenue at the center northern boundary. Service enters the center at multiple points from Strattford Avenue with overhead lines running southward. The secondary service to older buildings on center are overhead except Admin/Warehouse Building 234. This building's overhead service has been recently converted to underground with a new pad-mounted transformer located in the back.

Recreation Center Building 102, Cafeteria/Culinary Arts Building 103, Dormitory Buildings 104, 105 & 106 also have underground services with a pad-mounted transformer located in the back of each respective building. All buildings services are 120/208V, 3 phase, 4 wire except Building 208C which has 480/277V, 3 phase, 4 wire service. The vast majority of buildings on center have their own meter. Buildings 102 and 228 share the same meter. Buildings 234, 234A and 235 also share a meter. Building 232 A-H has five overhead service drops with a separate meter for each of the five hard vocation bays.

Pole and Platform Utility

Utility Utility

No

4,160 Volts, 3-Phase

120/208V, 3-Ph, 4 Wire; 480/277V, 3-Ph, 4 WireOverhead & Underground

OverheadPrimary Service

Secondary Service

Distribution Characteristics

3. Sanitary Sewer System/ Sewage Treatment Plant

5. Fuel Distribution System

System Capacity Adequate System Condition

Yes Good

4. Storm Water System Number of Deficiencies = 3

Drain Type On-Site Storm Water Management

Underground N/A

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Yes GoodCenter

Gas Company Metering

Individual

Ownership Maintenance Responsibility System Capacity Adequate System Condition

Center Center Yes Good

7. Electrical (Service)

Transformer Maint Resp

Utility

System Capacity Adequate System Condition

Yes Good

Generator

None

ATS MTS

No No

6. Central Plant: None

Metering Individual

Page: 3 Date: 04/04/2017 of 5

Comments:

Telephone Company

On-site Line Owner

Southwestern Bell provides four T1 lines to the Center which terminate in the main telephone and data/communication room in Admin/Warehouse Building 234. Standard analog phone system is converted to digital voice over internet protocol (VoIP) by way of Cisco IP phones with RJ-45 Ethernet connectors and internet connection. The Job Corps Data Center (JCDC) provides and installs all network cabling, couplers and devices necessary for network connectivity to the VoIP phone and data/communication systems. Optical fiber cabling is used for inter-building connections. Three T1 lines are dedicated to VoIP, Internet and data/communication respectively, and the fourth T1 line is reserved as backup. The building fire alarm system center wide is stand alone. Some buildings have audio/visual fire alarm devices installed on the exterior. The security system includes interior and exterior CCTV cameras, black & white monitors, door alarm contacts, motion sensors and a metal detector. Satellite dish is provided in dormitory, recreation, education and administration buildings.

Southwestern Bell Telephone Co.

Maint. Responsibility

Utility Utility

Cameras, Black and White Monitors, Door Alarms, Motion Detectors

9. Electrical (Communication/Alarm/Security)

Yes

Stand-Alone

VOIP

System Capacity Adequate System Condition

GoodYes

8. Electrical (Site Lighting)

Roadways Parking Walkways Building Outdoor Sports

Mounting

Control

Pole Pole Pole Building None

Photocell, Time Clock Photocell, Time Clock Photocell, Time Clock Photocell, Time Clock None

System Ownership Maintenance Responsibility System Capacity Adequate System Condition

Utility, Center Utility, Center Yes Good

Comments: The site lighting system includes pole-mounted and building-mounted exterior lights. The pole-mounted lights are owned and maintained by the utility company. The center owns and maintains the building-mounted exterior lights.

Number of Deficiencies = 10

STORAGE TANKS: None

Fire Alarm Security

Page: 4 Date: 04/04/2017 of 5

ACCESSIBILITY

Yes

Comments:

UnknownYesYes

DOL entered into a Memorandum of Agreement with the Missouri State Preservation Officer SHPO to perform a HABS III level recordation, to publish historic narrative and to design an interpretive signage in order to keep alive the history of the Center and its contribution to the war effort during WWII and to commemorate its association with the birth of the Labor movement in the US. The recordation will include Buildings 208C, 222, 223A, 223B, 225A, 225B, 232A-H, 234, and 244.

No

Nationally Registered Site

Site Eligible for National Register

Located in Historic District

Archaeological Significance

Earthquake Risk

Medium Low LowMedium HighIBC Low

LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest

Fire

Number of Deficiencies = 6

Accessible Parking: Accessible Slope:

Yes

Curb Cuts:

Yes

Ramps:

YesYes

Site Accessible Route:

GENERAL SITE CONDITION

Rating X Good Fair Poor

HISTORIC PRESERVATION

NATURAL HAZARDS

The site condition is not impacting the functional use of the facilities.

The site condition IS impacting the functional use of the facilities.

The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.

Active Energy Use Reduction Program

Active Water Use Reduction Program

Approximate or Measured Waste Recycled

Use of School Dude or CMMS for Preventative Maintenance

Green Purchasing Policy Practiced

Site Stormwater Absorption Measures in Place

Center has Onsite Renewable Energy (PV or Wind)

Center has a Chartered Green Committee & Roster

Center Uses Green Cleaning Practices

SUSTAINABILITY

Yes

Yes

NO

NO

Yes

Yes

NO

NO

38 %

Page: 5 Date: 04/04/2017 of 5

SATELLITE SITE DESCRIPTION

Location:

Description:

Ownership Maintenance Responsibility

3860 Lindell BLVD., St. Louis, MO

The Lindell Site contains one building, Lindell VOC Training Building 302. This is a three story concrete and limestone building used for off site vocational training.

DOL Center

Rating The site condition is not impacting the functional use of the facilities.

The site condition IS impacting the functional use of the facilities.

The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.

Good Fair Poor

X

SATELLITE SITE CONDITION

Building Descriptions and Structures

BUILDING 101 - WELCOME CENTER

Building Descriptions

Page: 1 of 106

Building: 0101 - WELCOME CENTER

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Wood Wood

Brick EIFS

Wall Roof Rigid Batt

Metal Unit - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors Business 1,324 732 1 Owned 2004 Not Evaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

N/A

Yes

Yes

N/A

Yes

Yes

N/A

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Insulation4.

Exterior Doors5.

Material

There is ponding on the corner of the roof above the mechanical room.

There is a gutter with downspouts over the entrance side of the metal roof.

Drainage Year Life

Remaining Type Area Served

EPDM

Metal

Gutters and Downspouts

Surface Run-off

Flat

Pyramid

Entire Building

Vestibule

Number of Deficiencies = 1

Comments:

Comments:

3. Roof

Entire Building

Area Served

Page: 2 of 106

Building: 0101 - WELCOME CENTER

INTERIOR FINISH

Ceramic Tile Concrete Vinyl Tile

Ceramic Tile Drywall

Metal Unit - Metal Frame

Mechanical Restroom

Comments: This rooftop fan (Penn #DX08B) also ventilates the janitor's closet.

Ventilation Area Served

VERTICAL CIRCULATION

Curb Cuts Comments: There are curb cuts in the sidewalks around the building.

Awning Units - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;

Fixed - Aluminum Frame; Single Glazing; Fixed - Metal Frame; Single Glazing;

Acoustical Tile Gypsum Board

Exhaust Ventilation

Windows6.

Floors1.

Interior Walls2.

3.

Interior Doors4.

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

The furnace was built by Carrier (#58MCA080, 74 MBH output, direct vent, 5/2004).Comments:

HVAC

Heat1.

Gas-Fired Furnace

Single Duct None Electric Natural None Entire Building

Ventilation2.

Ceilings

Page: 3 of 106

Building: 0101 - WELCOME CENTER

The 20 gallon electric water heater was built by State Industries, model CPE201CMSA.Comments:

None None None

Electric Water Cooler Hose Bibb Lavatory Mop Sink Water Closet (Tank)

Gas (Natural)

None None ABC Type Fire Extinguisher

Copper Copper Electric None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Split Direct Expansion (Air

Source)

Single Duct Refrigerant Electric Natural None Entire Building

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

All of the equipment was built by Carrier. The furnace (#58MCA080, 5/2004) has a DX coil (#CT4842C210, 6/2004) set on its discharge that is provided cooling by a condensing unit (#38BRG0423, 3-1/2 ton, 11/2003).

Comments:

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

FIRE PROTECTION

3. Air Conditioning

Page: 4 of 106

Building: 0101 - WELCOME CENTER

Comments: Overhead service is provided from a 25 kVA pole-mounted transformer on Starttford Avenue. Service enters the building through a 200A weatherproof main disconnect switch fused at 200A and located on the west exterior wall adjacent to the utility meter. This switch energizes a 250A main-lug-only panelboard located in the mechanical room.

FIRE ALARM

Comments: Various building security systems including magnetic door alarms and motion detectors and CCTV cameras are interconnected to the building for monitoring. The center's security surveillance system includes a color monitor, located in this building which monitors all exterior and interior cameras installed throughout the center, except cameras that are associated with the recreation center and cafeteria. A metal detector is also installed in the lobby of this building. A wireless radio system for staff communication is also provided.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Smoke Detector-Battery operated

Connected to Main System Cameras, Color Monitor Connected to Main System TV with VCR

Telephone Security Public Address Television

Comments: Recorded footcandle levels during the 2013 Survey include natural light contribution.

High Intensity Discharge (HID) Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by time clock and photocells.

T8 - Fluorescent

Compact Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Offices

Corridors & Stairs

Equipment Rooms (Elec/Mech)

Toilets

Storage Rooms

Area Recommended Level

Recorded Level Light Type

Battery Backup Battery Backup

Main Disconnect Switch 120/240V, 1-Phase, 3 Wire Panelboard Receptacles, GFCI, Switches

Emergency Exit

ELECTRICAL SERVICES

Exterior Lighting1.

Interior Lighting2.

Emergency /Exit Lighting3.

COMMUNICATION

Type Location N/A N/A

CARBON MONOXIDE DETECTION

LIGHTING

Detection Required No

Number of Deficiencies = 0

Page: 5 of 106

Building: 0101 - WELCOME CENTER

GENERAL BUILDING CONDITION

Rating

Comments:

X Good Fair Poor

The roof is leaking at one corner.

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas No YesYes

BUILDING UTILITY METERING

Structure: Good Exterior: Fair Interior: Good Mechanical: Good Electrical: Good

This building has been recommended for demolition in the Long Range Development Plan after construction of a new Welcome Center. the replacement will be due to location and programmatic reasons.

DEMOLITION RECOMMENDATION

IMPAIRMENT

Potentially Impaired

DOL Responded

DOL Determination

Potential Impaired Comments DOL Determination Discussion/Comments

BUILDING 102 - RECREATION CENTER

Page: 6 of 106

Building: 0102 - RECREATION CENTER

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Loadbearing Masonry Steel

Brick CMU Masonry

Wall Roof Rigid Rigid

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors Assembly 12,489 8,656 1 Owned 2004 Not Evaluated

Comments: Urinals in the men's room are not accessible.

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Insulation4.

Material

Roof leaks above the entry lobby.

The age and estimated remaining roof life is based on visual observation during the October 2016 Facility Survey.

Drainage Year Life

Remaining Type Area Served

EPDM

Steel

Scuppers and Downspouts

Surface Run-off

Flat

Flat

Entire Building

Snack Bar Stack Space

Number of Deficiencies = 1

Comments:

Comments:

3. Roof

Page: 7 of 106

Building: 0102 - RECREATION CENTER

INTERIOR FINISH

Ceramic Tile Concrete Glass Block Vinyl Tile

CMU Metal Toilet Partitions

Metal Unit - Metal Frame Metal Unit with Glass - Metal Frame

Metal Overhead Shutter - Steel Frame

VERTICAL CIRCULATION

Concrete Stairs Metal Ladder Ramp Wood Stairs Comments: There is a vertical metal ladder to the roof hatch. Concrete stairs and a concrete ramp leading to the entry. Wood stairs lead to the stage in the multi-purpose room.

Metal Unit - Metal Frame Metal Unit with Glass - Metal Frame

Fixed - Aluminum Frame; Double Glazing; Fixed - Vinyl Frame; Double Glazing;

Hopper - Aluminum Frame; Double Glazing;

Acoustical Tile Exposed Ceiling Grid Exposed Structure Gypsum Board

Exterior Doors5.

Windows6.

Floors1.

Interior Walls2.

3. Number of Deficiencies = 1

Interior Doors4.

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

The building has five gas-fired rooftop HVAC units (four Carrier 48HJ series, from 59 to 148 MBH output and a 48HGF016, 328 MBH output serving the multi-purpose room) all built in 2004.

Comments:

HVAC

Heat1.

Gas-Fired Single Duct None Electric Mechanical None Entire Building

Page: 8 of 106

Building: 0102 - RECREATION CENTER

Mechanical

Mechanical

Mechanical

Kiln Area

Restroom/Janitor's Closet

Paint Storage

Comments:

Comments:

Comments:

Ventilation is by a rooftop fan (Penn #DX11B).

Ventilation is by a rooftop fan (Penn #DX08B).

Ventilation is by a rooftop fan (Penn #DX06R).

The 50 gallon electric water heater was built by State Industries, model CPE522ORTA.Comments:

Cast Iron/PVC Indoor None

Electric Water Cooler Hose Bibb Lavatory Mop Sink Service Sink Sink Two Compartment Sink Urinal Water Closet (Flush Valve)

Gas (Natural)

Comments:

None None ABC Type Fire Extinguisher

Ventilation Area Served

Copper Copper Electric None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Packaged Direct

Expansion (Air Source)

Single Duct None Electric Mechanical Economizer Entire Building

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

Exhaust Ventilation

The building has five DX rooftop HVAC units (four Carrier 48HJ series, from 5 to 7-1/2 ton and a 48HGF016, 15 ton serving the multi-purpose room) all built in 2004. The economizer mode for the largest unit is furnished with power relief.

Comments:

Ventilation2.

System Type

Number of Deficiencies = 1

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

Number of Deficiencies = 1FIRE PROTECTION

The gas used by Building 228 and Building 102 is metered as it enters Building 228.

Page: 9 of 106

Building: 0102 - RECREATION CENTER

Comments: Underground service is provided from a 3x75 kVA pole-mounted utility-owned transformer bank located south of the building. Service terminates in a 1000A main switchboard with a 1000A main circuit breaker and built-in voltmeter/ammeter located in the electrical/mechanical room. The adjacent Gymnasium Building 228 is also served from this switchboard. A utility meter and a CT cabinet are installed on the electrical/mechanical room exterior wall.

FIRE ALARM

Comments: The fire alarm control/annunciator panel is a Simplex 4010 located in the manager office. This panel also backfeeds and monitors the existing Simplex 2001 system in the adjacent gymnasium. The Simplex remote annunciator panel is located in the main lobby adjacent to the entrance.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Audible Alarm Control/Annunciator Panel Heat Detector Manual Pull Station Remote Annunciator Panel Smoke Detector Visual Alarm

Comments: Recorded footcandle levels during the 2013 Survey include natural light contribution. Recessed light fixtures with compact fluorescent lamps located in the suspended ceiling supplement ambient lighting by linear fluorescent fixtures in the main lobby and the seating area. Track lighting is also utilized in the multi-purpose room.

Comments: Combination emergency light/exit signs are also provided.

High Intensity Discharge (HID) Comments: Exterior building-mounted light fixtures are controlled by time clock and photocell.

T8 - Fluorescent

T8 - Fluorescent

Compact and T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Compact Fluorescent

T8 - Fluorescent

Compact and T8 - Fluorescent

T8 - Fluorescent

Offices

Conference Rooms

Corridors & Stairs

Equipment Rooms (Elec/Mech)

Lounges

Reception

Toilets

Recreation

Storage/Warehouse-Active

Area Recommended Level

Recorded Level Light Type

Battery Backup Battery Backup

Switchboard 120/208V, 3-Phase, 4 Wire Panelboard, Loadcenter Receptacles, GFCI, Switches

Emergency Exit

ELECTRICAL SERVICES Number of Deficiencies = 1

Exterior Lighting1.

Interior Lighting2. Number of Deficiencies = 1

Emergency /Exit Lighting3. Number of Deficiencies = 2

LIGHTING

Page: 10 of 106

Building: 0102 - RECREATION CENTER

Comments: The building is connected to the center LAN system. The building security system includes exterior and interior CCTV cameras, a colored monitor, a security keypad, motion detectors and door alarms.

Ceiling speakers are provided and connected to the central PA system in Building 234. Outlets for data, phone and cable television are also provided.

Connected to Main System Color Monitor, Cameras Connected to Main System Local Cable Company

Telephone Security Public Address Television

GENERAL BUILDING CONDITION

Rating X Good

Fair Poor

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas No YesZone

BUILDING UTILITY METERING

Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good

Type Location N/A N/A

CARBON MONOXIDE DETECTION

Detection Required No

Number of Deficiencies = 0

IMPAIRMENT

Potentially Impaired

DOL Responded

BUILDING 103 - CAFETERIA/CULINARY ARTS

Page: 11 of 106

Building: 0103 - CAFETERIA/CULINARY ARTS

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Loadbearing Masonry Steel

Brick Masonry Metal Siding Window Wall

Wall Roof Rigid Rigid

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors Assembly 14,827 12,436 1 Owned 2007 Not Evaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Insulation4.

Material Drainage Year Life

Remaining Type Area Served

EPDM

Metal

Gutters and Downspouts

Surface Run-off

Flat

Barrel

Entire Building

Vestibule

3. Roof

Page: 12 of 106

Building: 0103 - CAFETERIA/CULINARY ARTS

INTERIOR FINISH

Ceramic Tile Concrete Quarry Tile Vinyl Tile

Brick CMU Ceramic Tile FRP

Metal Rollup - Metal Frame Metal Unit - Metal Frame

Stainless Bi-swing - Metal Frame Metal Overhead Grille - Steel Frame

VERTICAL CIRCULATION

Concrete Stairs Metal Ladder Ramp Comments: There is a vertical metal ladder to the roof hatch. There are concrete stairs and concrete ramps leading to the entrance.

Metal Unit - Metal Frame Metal Unit with Glass - Metal Frame

Fixed - Aluminum Frame; Double Glazing; Fixed - Metal Frame; Single Glazing;

Hopper - Aluminum Frame; Double Glazing;

Acoustical Tile Exposed Ceiling Grid Exposed Structure Gypsum Board

Exterior Doors5.

Windows6. Number of Deficiencies = 1

Floors1.

Interior Walls2.

3.

Interior Doors4. Number of Deficiencies = 2

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

There are five Trane rooftop HVAC units (all built 7/2006) serving the building with heat (RTU-1&2, both #YDC211C, 203 MBH output; RTU-3&4, both #YCD151CD, 203 MBH output; RTU-6, #YCH063, 108 MBH output) and a Carrier unit (RTU-5, #48TDF012, 144 MBH output).

There are four gas-fired heated makeup air units (AbsolutAire) for the kitchen exhaust.

Comments:

Comments:

HVAC

Heat1.

Gas-Fired Packaged

Gas-Fired

Single Duct

Makeup Air Unit

None

None

Electric

Electric

Mechanical

Mechanical

None

None

Entire Building

Kitchen

Page: 13 of 106

Building: 0103 - CAFETERIA/CULINARY ARTS

Mechanical Kitchen/Restrooms

Comments: There are eight rooftop exhaust fans built by Carnes and Penn Ventilator. Four of the fans ventilate two 15'x12' kitchen hoods.

There are two A. O. Smith gas-fired water heaters model #BTH-400A, (both built 8/2007), 130 gallon capacity, 399.9 MBH input and 465.3 recovery GPH.

Comments:

Cast Iron/PVC Outdoor and Indoors None

Hose Bibb Lavatory Mop Sink Multi-Compartment Sink Multi-Hand Wash Sink Service Sink Sink Urinal Water Closet (Flush Valve)

Gas (Natural)

Ventilation Area Served

Copper Copper Gas-Fired None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Packaged Direct

Expansion (Air Source)

Split Direct Expansion (Air

Source)

Single Duct

Single Duct

None

Refrigerant

Electric

Electric

Mechanical

Natural

None

None

Entire Building

Electronic Equipment

Room

PLUMBING

Exhaust Ventilation

There are five Trane rooftop HVAC units (all built 7/2006) serving the building with cooling (RTU-1&2, both #YDC211C, 17-1/2 ton; RTU-3&4, both #YCD151CD, 12-1/2 ton; RTU-6, #YCH063, 5 ton) and a Carrier unit (RTU-5, #48TDF012, 10 ton).

The cooling is provided by a condensing unit ( York #TCGD18S41S1A,1.5 ton serving center telep.

switch room).

Comments:

Comments:

Number of Deficiencies = 1

Ventilation2.

System Type

Number of Deficiencies = 1

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

Page: 14 of 106

Building: 0103 - CAFETERIA/CULINARY ARTS

Wet None ABC Type Fire Extinguisher, K Type Fire Extinguisher, Wet Chemical

Comments: Underground service is provided from a 500 kVA pad-mounted transformer located in the back of the building. Service terminates in a 2000A two-section switchboard located in the mechanical/electrical room. The switchboard has a 2000A main circuit breaker and is protected by a TVSS device. A pull box, a CT cabinet and a meter are installed on the mechanical/electrical room across from the transformer.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Comments: Recorded footcandle levels during the 2013 Survey include natural light contribution. Day lighting control is utilized for serving and dining areas. Day lighting control equipment includes day lighting controller, photocell and electronic switches. Parabolic fluorescent fixtures with dimmable ballasts are utilized in the dining area. This lighting is supplemented by recessed downlights with compact fluorescent lamps and dimmable ballasts. Recessed downlights with compact fluorescent lamps are also utilized in the serving area.

Compact Fluorescent High Intensity Discharge (HID) Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by time clock and photocells.

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Compact and T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Offices

Equipment Rooms (Elec/Mech)

Toilets

Dining/Lunch Rooms

Dishwashing

Food Preparation

Storage Rooms

Classrooms

Storage/Warehouse-Active

Area Recommended Level

Recorded Level Light Type

Switchboard 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Sprinkler System Stand Pipe System Fire Suppression

Number of Deficiencies = 2FIRE PROTECTION

ELECTRICAL SERVICES Number of Deficiencies = 1

Exterior Lighting1.

Interior Lighting2.

Location UL300 Compliance Status Kitchen

Culinary Arts

Compliant

Compliant

UL300 COMMERCIAL KITCHEN HOOD FIRE SUPPRESSION

Page: 15 of 106

Building: 0103 - CAFETERIA/CULINARY ARTS

FIRE ALARM

Comments: The fire alarm control/annunciator panel Fire Lite Alarms/Honeywell model MS-92000UDLS, located in the culinary arts director office. The Fire Lite remote annunciator panel is located in the vestibule. Audio/visual (A/V) alarm devices are installed on the exterior of the building for added protection.

Comments: The building houses a telephone closet, that according to the long range plan will be utilized as the main telephone/data closet for the whole center. Currently the systems are in the transition stage; the data closet in this building and the main data closet located in the Building 234 are interconnected by fiber optic cable and independently monitored from JCDC. The building security system includes exterior and interior CCTV cameras and a color monitor located in the data closet. Ceiling speakers are provided and connected to the central PA system in Building 234. Outlets for data, phone and cable television are also provided.

Audible Alarm Control/Annunciator Panel Duct Smoke Detector Exterior Tamper Switch Exterior V/A Device Flow Switch Heat Detector Magnetic Door Holder Remote Annunciator Panel Smoke Detector Tamper Switch Visual Alarm

Connected to Main System Color Monitor, Cameras Connected to Main System Local Cable Company

Telephone Security Public Address Television

Comments:

Battery Backup Battery Backup Emergency Exit

GENERAL BUILDING CONDITION

Rating X Good

Fair Poor

Emergency /Exit Lighting3. Number of Deficiencies = 2

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas No YesYes

BUILDING UTILITY METERING

Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good

Type Location N/A N/A

CARBON MONOXIDE DETECTION

Detection Required No

Number of Deficiencies = 0

IMPAIRMENT

Potentially Impaired

DOL Responded

BUILDING 104 - DORMITORY A FEMALE DORM

Page: 16 of 106

Building: 0104 - DORMITORY A FEMALE DORM

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete

Concrete

Loadbearing Masonry/Steel

Loadbearing Masonry\Steel

Wood

Steel

Brick Masonry EIFS

Wall Roof Rigid Batt

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors Residential 31,140 21,095 2 Owned 2011 Not Evaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

N/A

Yes

Yes

Yes

Yes

Yes

Yes

N/A

Yes

No

Yes

ACCESSIBILITY

Structural Systems1. Number of Deficiencies = 1

Exterior Walls2.

Insulation4.

Material

A truss joint has failed. Roof leaks onto the second floor lounge.

Drainage Year Life

Remaining Type Area Served

Asphalt Shingles

Single Ply

Gutters and Downspouts

Gutters and Downspouts

Hip

Flat

Dorm Rooms

Common Area\Canopy

Number of Deficiencies = 1

Comments:

3. Roof

Dorm Rooms

Common Area\Canopy

Page: 17 of 106

Building: 0104 - DORMITORY A FEMALE DORM

INTERIOR FINISH

Carpet Ceramic Tile Concrete Vinyl Tile

CMU Drywall

Metal Unit - Metal Frame Metal Unit with Glass - Metal Frame

Mechanical Restroom

Comments: There is a general exhaust fan in the building.

Ventilation Area Served

VERTICAL CIRCULATION

Metal Pan w/Concrete Stairs Comments: Metal pan with concrete stairs lead to the second floor.

Metal Unit - Metal Frame Storefront - Storefront Frame

Awning Units - Aluminum Frame; Double Glazing; Double Hung - Aluminum Frame; Double Glazing;

Fixed - Aluminum Frame; Double Glazing; Fixed - Metal Frame; Single Glazing;

Acoustical Tile Exposed Structure Gypsum Board

Exhaust Ventilation

Exterior Doors5.

Windows6. Number of Deficiencies = 3

Floors1.

Interior Walls2.

3.

Interior Doors4.

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

HVAC

Heat1.

Gas-Fired Furnace

Single Duct None Electric Natural None Entire Building

Ventilation2. Number of Deficiencies = 3

Page: 18 of 106

Building: 0104 - DORMITORY A FEMALE DORM

Galvanized Steel Outdoor None

Electric Water Cooler Hose Bibb Lavatory Mop Sink Multi-Compartment Sink Shower/Bathtub

Gas (Natural)

Wet None ABC Type Fire Extinguisher

Comments: Underground service is provided from a pad-mounted transformer located in the back of the building.

Service terminates in a 1000A two-section switchboard located in the mechanical/electrical room. The switchboard has a 1000A main circuit breaker and is protected by a TVSS device. A pull box, a CT cabinet and a meter are installed on the exterior of the mechanical/electrical room.

Copper Copper Gas-Fired None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Split Direct Expansion (Air

Source)

Single Duct None Electric Mechanical None Entire Building

High Intensity Discharge (HID) Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by time clock and photocells.

Switchboard 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

There are Carrier split systems serving the entire building.Comments:

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

Number of Deficiencies = 2FIRE PROTECTION

ELECTRICAL SERVICES Number of Deficiencies = 2

Exterior Lighting1.

Page: 19 of 106

Building: 0104 - DORMITORY A FEMALE DORM

FIRE ALARM

Comments: The fire alarm control/annunciator panel is a Gamewell/FCI E3 series, located in the RA office. A remote annunciator panel of the same model is located in the vestibule.

Audible Alarm Control/Annunciator Panel Duct Smoke Detector Flow Switch Heat Detector Manual Pull Station Remote Annunciator Panel Smoke Detector Tamper Switch Visual Alarm

Connected to Main System Closed Circuit TV None Satellite Dish

Telephone Security Public Address Television

Comments: Recorded footcandle levels during the 2013 Survey include natural light contribution.

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Compact Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Offices

Corridors & Stairs

Equipment Rooms (Elec/Mech)

Toilets

Laundry Room

Housing Lounge

Shower

Sleeping Rooms

Study Room

Area Recommended Level

Recorded Level Light Type

Battery Backup Battery Backup Emergency Exit

Number of Deficiencies = 2

Interior Lighting2.

Emergency /Exit Lighting3. Number of Deficiencies = 2

COMMUNICATION

Electric Water Gas No YesYes

BUILDING UTILITY METERING

Type Location None None

CARBON MONOXIDE DETECTION

Detection Required Yes

Number of Deficiencies = 1

Page: 20 of 106

Building: 0104 - DORMITORY A FEMALE DORM

GENERAL BUILDING CONDITION

Rating

Comments:

X Good Fair Poor

A roof truss hanger has failed. Related rooms are unsafe for occupancy.

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.