| CONTRACTOR COST PROPOSAL TEMPLATE | |
| PROJECT NAME: MISCELLANEOUS BUILDING REPAIRS | |
| MISSISSIPPI JOB CORPS CENTER | |
| VERSION: | DATE: |
| Prepared by: | |
| DIVISION AND DESIGN SUMMARY | LABOR | MATERIALS/SUB | EQUIPMENT | TOTAL | | | | |
| Division 2 - Demolition | | | | $ - 0 | | | | |
| Division 3 - Concrete | | | | $ - 0 | | | | |
| Division 4 - Masonry | | | | $ - 0 | | | | |
| Division 5 - Metals | | | | $ - 0 | | | | |
| Division 6 - Woods and Plastics | | | | $ - 0 | | | | |
| Division 7 - Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | | |
| Division 8 - Doors and windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | | |
| Division 9 - Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | | |
| Division 10 - Specialties | | | | $ - 0 | | | | |
| Division 11 - Equipment | | | | $ - 0 | | | | |
| Division 12 - Furnishings | $ - 0 | | | $ - 0 | | | | |
| Division 13 - Special Construction | | | | $ - 0 | | | | |
| Division 14 - Conveying Equipment | | | | $ - 0 | | | | |
| Division 21 - Fire Suppression | | | | $ - 0 | | | | |
| Division 22 - Plumbing | | | | $ - 0 | | | | |
| Division 23 - Mechanical | | | | $ - 0 | | | | |
| Division 26 - Electrical | | | | $ - 0 | | | | |
| Division 28- Electronic Safety and Security | | | | $ - 0 | | | | |
| Division 31 - Excavation | | | | $ - 0 | | | | |
| Division 32 - Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 |
| Division 33 - Utilities | | | | $ - 0 | | | | |
| Design (For Design/Build Projects) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | | |
| General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | |
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | ck | |
| | Contractor Overhead | | $0.00 | 0.00% | ERROR:#REF! | | |
| | SUBTOTAL WITH OVERHEAD | | $0.00 | | | | |
| | Contractor Profit | | $0.00 | 0.00% | | | |
| | SUBTOTAL WITH O&P | | $0.00 | | | | |
| | Bonds/Insurance | | 0.00 | 0.00% | | | |
| | TOTAL | | $0.00 | | | | |
| INSTRUCTIONS TO BIDDER | | | | | | | | |
| 1. Only complete cells shaded in yellow. All other cells are automatically calculated. | | | | | | | | |
| 2. Add tasks to "CSI DIVISION" Tab and applicable units, rates, and quantifies. If a CSI Section is N/A, leave blank. | | | | | | | | |
| 3. If this is a Design-Build project, add applicable rates, hours, and materials costs to "DESIGN" Tab. | | | | | | | | |
| 4. Add applicable units, rates, and quantifies in the "GENERAL CONDITIONS" Tab. | | | | | | | | |
| 5. Add applicalbe Overhead, Profit, and Bonds/Insurance Percentages in the "SUMMARY" Tab. | | | | | | | | |
&A
CSI Division PROJECT NAME: REPAIRS AND RESTORATION TO EDUCATION BLDG.14,GYM BLDG.17, CONSTRUCTION TRADES.27 AND CAFETERIA BLDG.67 DATE:
| ITEM | RATE | HOURS | TOTAL | UNIT | QTY | UNIT RATE | TOTAL | RATE | DURATION | TOTAL | ITEM TOTAL |
| Division 2 - Demolition | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 3 - Concrete | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 4 - Masonry | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 5 - Metals | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 6 - Woods and Plastics | | | $ - 0 | | | | $ - 0 | | DAYS | $0.00 | $ - 0 |
| Division 7 - Thermal and Moisture Protection | $ - 0 | | $ - 0 | $0.00 | $ - 0 |
| Roof Repair Work @ Gymnasium Building 17 and Construction Trades Building 27 | | | | | |
| Cleaning Roof Surface to receive coating- | | | | | |
| Clean surface, Dry and free surface of substances that could affect bond- scope includes remove heavy deposits of dirt, leaves and other debris from the roof using broom or air broomer, etc- | | | | | |
| Gymnasium Building 17 - Broom/ Air Broomer | | SF | | | |
| Construction Trade Building 27- Broom/ Air Broomer | | SF | | | |
| Gymnasium Building 17 - Pressure Washing | SF |
| Construction Trade Building 27-Pressure Washing | SF |
| Fasteners- Remove and replace all exposed Fasteners | |
| Gymnasium Building 17 | PKG |
| Construction Trade Building 27 | PKG |
| Allow 5% for Repairs- Budget | |
| Gymnasium Building 17 | SF |
| Construction Trade Building 27 | SF |
| Primer on Metal Substrate | |
| Gymnasium Building 17 | SF |
| Construction Trade Building 27 | SF |
| Water Repellents- Silicone Water Based roller applied -Roof Coating on cleaned Corrugated Metal | |
| Elastomeric Roofing- "Sprayed -On" Silicone coating | |
| Gymnasium Building 17 | SF |
| Gymnasium Building 17- Warranty 10years | SF |
| Construction Trade Building 27 | SF |
| Construction Trade Building 27- Warranty 10years | SF |
| Additional Work | |
| Allow for individual metal standing-seam roof systems repairs, associated gutter, downspout and splash-block structures to be repaired and/ or replaced | |
| Provide and install new continuous approx. 12-inch high vertical roof eave fascia's, gutters and new downspouts including concrete splash blocks. Expansion joints | |
| Eaves Fascia: Gymnasium Building 17 | LF |
| Eaves Fascia: Construction Trade Building 27 | LF |
| Roof Gutter: Gymnasium Building 17 | LF |
| Roof Gutter: Construction Trade Building 27 | LF |
| Downspout: Gymnasium Building 17 | LF |
| Downspout: Construction Trade Building 27 | LF |
| Conc. Splashblock: Gymnasium Building 17 | EA |
| Conc. Splashblock: Construction Trade Building 27 | EA |
| Division 8 - Doors and windows- Building 14- Education | $ - 0 | | $ - 0 | $ - 0 | $ - 0 |
| Selective Demolition of Windows | | | | | |
| Aluminum Window Units 4'-0" x 6'-8" | | EA | | | |
| Remove Caulk, spray with surfactant and fine clean surrounds, vacuum surfaces, fine brush, wet wipes Window surrounds | | LF | | | |
| New Work | | | | | |
| New Aluminum Window Units-4'-0" x 6'-8" x 4-1/2" deep. Including Frame and Glazing | | EA | | | |
| Window Sill- continuous Metal base window sill flashing | | LF | | | |
| Caulk all windows | | LF | | | |
| Division 9 - Finishes | $0.00 | | $ - 0 | $0.00 | $ - 0 |
| Wall Treatment @ North-West Wall Education Building 14 | | | | | |
| Demo o/s only; Prepare Surface and replace w/ new drywall. | | | | | |
| Surface prep, primer and Paint to match existing | | | | | |
| Remediation of mold | | | | | |
| Southwest Administrator’s Office Window B . Remove and properly dispose of gypsum board. Prep and repaint entire wall to match existing color and finish. Affected areas shall be wet wiped with an approved disinfectant and HEPA Vacuumed until visible mold has been removed. | | | | | |
| Allow Polyethylene Sheeting 6 mil as cover along side of Bldg. 14 existing Drywall to be demolished. | | | | | |
| Demolish mold affected Drywall | | | | | |
| Carefully Drywall demo. o/s only | | SF | | | |
| Pre-cleaning, HEPA Vacuum and wet wipe, surfaces of Windows on the Southwest side | | SF | | | |
| Pre-cleaning, HEPA Vacuum and wet wipe, floor surfaces on the Southwest side | | SF | | | |
| Decontamination Mold containment Area | | | | | |
| Spray and Roll Polyethylene sheeting, Bag Polythene in Mold Waste Bag, Containerize bagged material in drums and Cart to Dumpster | | LS | | | |
| Mold waste packaging, Handling and Disposal-Containerize wrapped Drywall and cart to Dumpster | | SF | | | |
| Disposal Charges | | LS | | | |
| OSHA Testing. Bldgs14 | | | | | |
| Certified Technician | | | | | |
| Industrial Hygienist | | | | | |
| Sampling and analysis. | | EA | | | |
| New Work | | | | | |
| Prepare Surface and replace with 360 SF of gypsum board; 5/8 inch thick. Mold resistant. Allow for necessary backup Insulation etc | | SF | | | |
| Paint replaced Drywall to match existing.-Low VOC Paint | | SF | | | |
| Painting | | | | | |
| Touch-up Paint in Rooms around window openings- Budget. | | SF | | | |
| Interior Repair Work @ Building 67 | | | |
| Demolition Work | | | |
| Demolish existing Floor finishes in Cafeteria Lobby, Restroom corridor, Queue, Dinning area, Corridors and Serving Area | SF | | |
| New Work | | | |
| Quarry Tile in Cafeteria Lobby, Restroom corridor, Queue, Dinning area, Corridors and Serving Area- Assume 6" x 6"x 1/2" th | SF | ERROR:#DIV/0! | ERROR:#DIV/0! |
| Wall Treatment @ Building 67-Cafeteria | |
| Prep, patch, sand smooth and paint all gypsum wallboard and CMU cracked wall conditions at perimeter of both cafeteria skylight fascia conditions, dining area corridor, serving/ dish wash areas janitor closet | |
| Prep, patch, sand smooth CMU cracked wall | SF |
| Prep, patch, sand smooth and paint all gypsum wallboard | SF |
| Paint patched gypsum wallboard to match existing.-Low VOC Paint | SF |
| Division 10 - Specialties | | | $ - 0 | | | $ - 0 | | | $0.00 | $ - 0 |
| Section not used | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 11 - Equipment | | | $ - 0 | | | $ - 0 | | | $0.00 | $ - 0 |
| Section not used | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 12 - Furnishings | | | $ - 0 | | | $ - 0 | | | $0.00 | $ - 0 |
| Furniture | | | | | | | | | | |
| Move Cafeteria Furniture during and after construction activities- Allowance | | | | LS | | | | | | |
| Division 13 - Special Construction | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 14 - Conveying Equipment | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 21 - Fire Suppression | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 22 - Plumbing | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 23 - Mechanical | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 26 - Electrical | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 28- Electronic Safety and Security | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 31 - Excavation | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| Division 32 - Exterior Improvements-Building 14- EDUCATION | | | $ - 0 | | | | $ - 0 | | | $0.00 | $ - 0 |
| Rework Exterior Grading Along Entire South Exterior Wall Adjacent to Office Wing. | | | | | | | | | | | |
| Remove Shrubbery and Replace after regrade- Allow | | | | EA | | | | | | | |
| Remove and Haul Topsoil + Grass off site | | | | CY | | | | | | | |
| Regrade - Along South wall to create positive drainage away from building. | | | | SY | | | | | | | |
| Topsoil Placement and Grading-Fine grading and Seeding incl Lime, fertilizer & Seed | | | | SY | | | | | | | |
| Weep Holes | | | | | | | | | | | |
| Clean out existing / Drill thru' and provide New Weep Hole inserts to improve moisture relief @ North-South Wall. | | | | EA | | | | | | | |
| Division 33 - Utilities | | | $ - 0 | | | $ - 0 | | | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $0.00 | $ - 0 |
| SUBTOTAL CSI DIVISIONS | | | $ - 0 | | | $ - 0 | | | $0.00 | $ - 0 |
| | | $ - 0 | | | $ - 0 | | | $ - 0 | $ - 0 |
&A &P/&N
DESIGN (DB ONLY)
DESIGN: REPAIRS AND RESTORATION TO EDUCATION BLDG.14,GYM BLDG.17, CONSTRUCTION TRADES.27 AND CAFETERIA BLDG.67
| LABOR HOURS | | | | | | | | | | | | |
| Design (for Design/Build Projects) | RATE | SITE VISITS | 15% | 30% | 60% | 100% | CA SERVICES | SUBMITTAL REVIEW | CLOSEOUT DOCS | TOTAL HOURS | TOTAL | |
| Architect | | | | | | | | | | 0 | $ - 0 | 26 |
| Project Manager | | | | | | | | | | 0 | $ - 0 | |
| Structural Engineer | | | | | | | | | | 0 | $ - 0 | |
| Electrical Engineer | | | | | | | | | | 0 | $ - 0 | SOW page 19-20 |
| Mechanical Engineer | | | | | | | | | | 0 | $ - 0 | SOW page 19-20 |
| CADD | | | | | | | | | | 0 | $ - 0 | |
| Specification Writer | | | | | | | | | | 0 | $ - 0 | |
| Geotechnical Engineer | | | | | | | | | | 0 | $ - 0 | |
SUBTOTAL HOURS 0 0 0 0 0 0 0 0 0 $0.00
| MATERIALS/SUBCONTRACTORS | | | | | | | | | | | |
| Design (for Design/Build Projects) | RATE | SITE VISITS | 15% | 50% or 60% | 60% | 100% | CA SERVICES | SUBMITTAL REVIEW | CLOSEOUT DOCS | TOTAL HOURS | TOTAL |
| Asbestos / Lead paint Study | | | | | | | | | | 0 | $ - 0 |
| Sample Analysis | | | | | | | | | | 0 | $ - 0 |
| Estimate mileage travel | | | | | | | | | | 0 | $ - 0 |
| Drawings /Design Narratives | | | | | | | | | | 0 | $ - 0 |
| Geotechnical Engineer Report + Narrative | | | | | | | | | | 0 | $ - 0 |
| Specifications | | | | | | | | | | 0 | $ - 0 |
| SUBTOTAL MATERIALS/SUB | | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
SUBTOTAL DESIGN $0.00
&A &P/ &N
GENERAL CONDITIONS
| PROJECT NAME: REPAIRS TO EDUCATION BLDG.14,GYM BLDG.17, CONSTRUCTION TRADES.27 AND CAFETERIA BLDG.67 | | | | | | | | | | | | | |
| | | GENERAL CONDITIONS | | | | | | DATE: | | | | |
| ITEM DESCRIPTION | QTY | UNITS | MATERIAL/SUB | | LABOR | | EQUIPMENT | | TOTAL | | | | |
| | | UNIT COST | COST | UNIT COST | COST | UNIT COST | COST | | 47 | | | |
| SALARIES | | | | | | | | | | 6.7142857143 | 1.6785714286 | | |
| Project Manager (Labor) | | Hours | | | | $ - 0 | | | $ - 0 | 66.875 | | | |
| Quality Control Manager (Labor) | | Hours | | | | $ - 0 | | | $ - 0 | | | 89 | 712 |
| Superintendent (Labor) | | Hours | | | | $ - 0 | | | $ - 0 | | | 12.7142857143 | 17.8 |
| SALARIES SUBTOTAL | 0.0 | Hours | | | | $ - 0 | | | $ - 0 | | | 3 | |
| VEHICLES | | | | | | | | | | | | | |
| Project Manager Vehicle | 0.0 | Days | | | | | | $ - 0 | $ - 0 | | | | |
| Project Superintendent Vehicle | 0.0 | Days | | | | | | $ - 0 | $ - 0 | | | | |
| QCM Vehicle | 0.0 | Days | | | | | | $ - 0 | $ - 0 | | | | |
| VEHICLES SUBTOTAL | | | | | | | | $ - 0 | $ - 0 | | | | |
| PER DIEM | | | | | | | | | | | | | |
| Project Manager Per Diem | 0.0 | Days | | $ - 0 | | | | | $ - 0 | | | | |
| Project Superintendent Per Diem | 0.0 | Days | | $ - 0 | | | | | $ - 0 | | | | |
| QCM Per Diem | 0.0 | Days | | $ - 0 | | | | | $ - 0 | | | | |
| PER DIEM SUBTOTAL | | | | $ - 0 | | | | | $ - 0 | | | | |
| LODGING | | | | | | | | | | | | | |
| Project Manager Lodging | | Days | | $ - 0 | | | | | $ - 0 | | | | |
| Project Superintendent Lodging | | Days | | $ - 0 | | | | | $ - 0 | | | | |
| QCM Lodging | | Days | | $ - 0 | | | | | $ - 0 | | | | |
| LODGING SUBTOTAL | | | | $ - 0 | | | | | $ - 0 | | | | |
| CELL PHONE | | | | | | | | | | | | | |
| Project Manager Cell Phone | 0.0 | Days | | $ - 0 | | | | | $ - 0 | | | | |
| Project Scheduler Cell Phone | 0.0 | Days | | $ - 0 | | | | | $ - 0 | | | | |
| Project Superintendent Cell Phone | 0.0 | Days | | $ - 0 | | | | | $ - 0 | | | | |
| QCM Cell Phone | 0.0 | Days | | $ - 0 | | | | | $ - 0 | | | | |
| CELL PHONE SUBTOTAL | | | | $ - 0 | | | | | $ - 0 | | | | |
| OTHER | | | | | | | | | | | | | |
| Rental Equipment-Scaffolds ETC | | LS | | | | | | | | | | | |
| Manufacturer's Rep. Roofing Inspections + Reports | | LS | | | | | | | | | | | |
| Field Office Printer/Copier | | Months | | | | | | | | | | | |
| Warranty Requirements | | LS | | | | | | | | | | | |
| As-builts | | LS | | | | | | | | | | | |
| Photographs | | LS | | | | | | | | | | | |
| Post Signs- Hazard | | LS | | | | | | | | | | | |
| Protection Allowance | | LS | | | | | | | | | | | |
| Field Office Supplies | | Months | | | | | | | | | | | |
| Report- Leak Investigation Report | | LS | | | | | | | | | | | |
| Temp Lighting | | Days | | | | | | | | | | | |
| Office Trailer | | Months | | | | | | | | | | | |
| Office Trailer Setup/ Pull down | | LS | | | | | | | | | | | |
| Sanitary Facilities | | Months | | | | | | | | | | | |
| Soils and Concrete inspection | | LS | | | | | | | | | | | |
| Tools | | Weeks | | | | | | | | | | | |
| Construction Waste Disposal | | Weeks | | | | | | | | | | | |
| Final Cleaning | | HRS | | | | | | | | | | | |
| OTHER SUBTOTAL | | | | $ - 0 | | $ - 0 | | $ - 0 | $ - 0 | | | | |
| GENERAL CONDITIONS SUBTOTAL | | | | $ - 0 | | $ - 0 | | $ - 0 | $ - 0 | | | | |