Replace HVAC System in Building 13 and the Domestic Hot Water System Serving Buildings 13 and 14 at the Pittsburgh Job Corps Center
Solicitation number
1630DC-18-R-00023
Issued by

About this file

Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TITLE: DESIGN BUILD – REPLACE HVAC SYSTEM IN BUILDING 13 AND THE

DOMESTIC HOT WATER SYSTEM SERVING BUILDINGS 13 & 14 at the PITTSBURGH

JOB CORPS CENTER, PITTSBURGH, PENNSYLVANIA

The work involves engineering design and construction services for phased replacement of the failing HVAC system serving the second and third floors of Building 13 and the domestic hot water generating system that serves both Buildings 13 and 14 at the Pittsburgh Job Corps Center. For Building 13’s second and third floors, the work includes replacing the existing dormitory HVAC system with one that is properly designed to be in compliance with applicable life-safety and building codes.

Pittsburgh Job Corps Center 7175 Highland Drive Pittsburgh, PA 15206

- This requirement has been set-aside for a competitive 100% Total Small Business.

- The estimated Construction Cost is between $2,000,000 and $5,000,000.

- Please Reference Section C for the Statement of Work.

- Contractor shall submit one copy of the proposal via email to ramso.bryan@dol.gov by the solicitation due date. Paper copy submittals are not required for this solicitation. Include the solicitation number in the subject line of the email.

- Please see Section L for further Offeror instructions.

- Questions on the Solicitation will be due on July 24, 2018 at 5:00 pm Eastern Time.

X

1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 4-85) STANDARD FORM 1442

Prescribed by GSA YFAR (48 CFR) 52.236-1(d) NSN 7540-01-155-3212

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL: Bryan Ramso, Contract Specialist (202) 693-3618

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____10______ calendar days and complete it within ___447___ calendar days after receiving award, notice to proceed. This performance period is X mandatory, negotiable. (See _____________________________.)

YES NO

A. Sealed offers in original and __One (1)__copies to perform the work required are due at the place specified in Item 8 by _2:00 PM EDT__ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference

D. Offers providing less than ___90 ______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NOTICE: SET-ASIDE for 100% Total Small Business Competitive

1630DC-18-R-00023

X

7-10-2018 1 of 129

U.S. Department of Labor, ETA/OCM SEE SECTION L Division of Job Corps Procurement 200 Constitution Avenue, NW Room N-4643 Washington DC 20210

52.211-10

X Ten (10) Days

8/16/2018

X mailto:ramso.bryan@dol.gov

DUNS CAGE:

See Block 7

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO.

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due.

AMOUNTS CLIN 0001 ………………………………………………………………………………….…. $ ______________

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20B. SIGNATURE 20C. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation, is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work, requisitions identified award consummates the contract. which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER

TO SIGN

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

OFFER

AWARD

STANDARD FORM 1442(REV. 4-85)BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14)

(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) MARIA J. PIZARRO, CPCM CFCM Contracting Officer

Division of Job Corps Procurement

(Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

ETA

U.S. Department of Labor ETA Payment Office 200 Constitution Avenue NW, Suite N-4702 Washington, DC 20210

1630DC-18-R-00023

Table of Contents

PART I - THE SCHEDULE ............................................................................................................................... A-1

SECTION A - SOLICITATION/CONTRACT FORM .................................................................................... A-1

SF 1442 SOLICITATION, OFFER, AND AWARDNOTICE: Total SET-ASIDE (Construction, Alteration, or Repair) ................................................................................................................................... A-1

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS .................................................................. B-1

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ......................................... C-1

[For this Solicitation, there are NO clauses in this Section] .................................................................................. C-1

SECTION D - PACKAGING AND MARKING ............................................................................................... D-1

SECTION E - INSPECTION AND ACCEPTANCE ....................................................................................... E-1

E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE .................................. E-1 E.2 INSPECTION AND ACCEPTANCE ............................................................................................................ E-1

SECTION F - DELIVERIES OR PERFORMANCE ....................................................................................... F-1

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE ................................... F-1

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

ALTERNATE I (APR 1984) ........................................................................................................................ F-1 F.3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) .................................................. F-1 F.4 PERIOD OF PERFORMANCE ..................................................................................................................... F-2 F.5 PLACE OF PERFORMANCE ........................................................................................................................ F-2

SECTION G - CONTRACT ADMINISTRATION DATA .............................................................................. G-1

G.1 PRE-CONSTRUCTION CONFERENCE ..................................................................................................... G-1 G.2 PERIODIC PROJECT MEETINGS .............................................................................................................. G-1 G.3 SUBCONTRACTS ........................................................................................................................................ G-1 G.4 SHOP DRAWINGS ....................................................................................................................................... G-1 G.5 OPERATIONS, STORAGE AREAS AND SECURITY .............................................................................. G-2 G.6 PROJECT SAFETY ....................................................................................................................................... G-3 G.7 DISPOSAL OF REFUSE ............................................................................................................................... G-3 G.8 SCHEDULE OF PROGRESS ........................................................................................................................ G-3 G.9 PAYMENTS TO CONTRACTOR ................................................................................................................ G-4 G.10 METHOD OF PAYMENT .......................................................................................................................... G-4 G.11 FURNISHING INFORMATION AND RECORDS .................................................................................... G-4 G.12 WORKERS’ COMPENSATION LAWS .................................................................................................... G-5 G.13 REQUIRED INSURANCE .......................................................................................................................... G-5 G.14 EQUITABLE ADJUSTMENTS .................................................................................................................. G-6 G.15 WEATHER DELAYS (EXCUSABLE DELAY) ........................................................................................ G-8 G.16 TEST RESULTS .......................................................................................................................................... G-8 G.17 SUBSTANTIAL COMPLETION ................................................................................................................ G-8 G.18 CONTRACT CLOSEOUT .......................................................................................................................... G-9 G.19 PRECEDENCE OF PLANS, SPECIFICATIONS, AND CLAUSES ......................................................... G-9 G.20 INVOICE PREPARATION AND SUBMISSION .................................................................................... G-10

SECTION H - SPECIAL CONTRACT REQUIREMENTS ........................................................................... H-1

H.1 COMMENCEMENT OF WORK .................................................................................................................. H-1 H.2 SUBCONTRACTING RESPONSIBILITIES ............................................................................................... H-1 H.3 ENVIRONMENTAL COMPLIANCE .......................................................................................................... H-1 H.4 INSTALLATION RULES AND REGULATIONS ...................................................................................... H-1 H.5 SPECIAL UTILITY PROVISION ................................................................................................................ H-1 H.6 DESIGNATION OF GOVERNMENT INSPECTOR ................................................................................... H-1 H.7 ACCOUNTING AND AUDITING SERVICES ........................................................................................... H-1 H.8 SUBMISSION OF CORRESPONDENCE .................................................................................................... H-2 H.9 OTHER CONTRACTORS ............................................................................................................................ H-2 H.10 DISPOSITION OF MATERIAL ................................................................................................................. H-2 H.11 HAZARDOUS OCCUPATION ORDERS .................................................................................................. H-2 H.12 DATA COLLECTION FOR THE DEPARTMENT OF LABOR ............................................................... H-2 H.13 RIGHTS AND OBLIGATIONS .................................................................................................................. H-3 H.14 INITIATION OF LIQUIDATED DAMAGES ............................................................................................ H-3 H.15 MODIFICATIONS AND CHANGE ORDERS .......................................................................................... H-3 H.16 PERMITS ..................................................................................................................................................... H-4 H.17 OVERTIME WORK .................................................................................................................................... H-4

PART II - CONTRACT CLAUSES ................................................................................................................... I-1

SECTION I - CONTRACT CLAUSES ............................................................................................................ I-1

I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE .....................................I-1 I.2 INFORMATION REGARDING RESPONSIBILTY OF MATTERS (FEB 2012) ..........................................I-4

I.3 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRCT

AWARDS (JUL 2013) ...................................................................................................................................I-5 I.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) ...........I-7

I.5 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (DEC 2010) (DEVIATION) ..................................................................................................................I-8 I.6 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013) ....................................................I-9

I.7 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (SEPT 2013) ........................................................................................I-11

I.8 52.223-3 HAZARDOUS MATERIAL IDENTIFICAITON AND MATERIAL

SAFETY DATA (JAN 1997) .......................................................................................................................I-12 I.9 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014) ................................I-13

I.10 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT CONSTRUCTION

MATERIALS (MAY 2014) ........................................................................................................................I-16 I.11 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) ALT I (DEC 2007).I-16 I.12 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010) ....................I-17 I.13 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014) .........................I-18 I.14 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ........................I-23 I.15 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) .................................................................I-24 I.16 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) ..................................................I-25

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS .................................... J-1

SECTION J - LIST OF ATTACHMENTS ........................................................................................................ J-1

J.1 WAGE DETERMINATION ............................................................................................................................ J-1

J.1 JCH 814 ............................................................................................................................................................ J-1

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS ........................................................................................................... K-1

K.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE ..................... K-1 K.2 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985) ......................... K-1 K.3 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2012) ................................. K-2 K.4 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010) ......................... K-4 K.5 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (APR 2012) ........................................ K-5

K.6 52.219-28 POST-AWARD SMALL DISADVANTAGED BUSINESS REREPRESNTATION

(JUL 2013) ..................................................................................................................................................... K-8 K.7 SIGNATURE BLOCK ................................................................................................................................ K-10

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS ........................................................................................................................................ L-1

L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE ...................... L-1

L.2 52.215-20 REQUIREMENTS FORCERTIFIED COSTOR PRICING DATA AND DATA

OTHER THAN CERTIFIED COST OR PRICING DATA (OCT 2010) ................................................ L-1 L.3 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................................................. L-2

L.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) ................................................. L-2 L.5 52.233-2 SERVICE OF PROTEST (SEP 2006) ............................................................................................. L-3 L.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE 1 (FEB 1995) .............................. L-4 L.7 52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997) ...................................... L-4 L.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE ........................................ L-4 L.9 52.252-3 ALTERATIONS IN SOLICITATIONS (APR1984) ....................................................................... L-4 L.10 GENERAL PROPOSAL PREPARATION INSTRUCTIONS ................................................................... L-4

SECTION M – EVALUATION FACTORS FOR AWARD ........................................................................... M-1

1630DC-18-R-00023 Section B Supplies or Services and Price/Costs

B-1

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

PRICE/COST SCHEDULE

CLIN SUPPLIES/

SERVICES

QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 LS --------- $

Firm Fixed Price

The Contractor shall provide all supervision, personnel, equipment, transportation, material, and all incidentals necessary to perform the Services to Replace HVAC System in Building 13 and the Domestic Hot Water System Serving Buildings 13 and 14 at the Pittsburgh Job Corps Center.

TOTAL **$

**Enter amount on the Block 17 on Page 2 of SF 1442.

B.2 DELIVERABLE - RELEASABLE COPIES - FREEDOM OF INFORMATION ACT

The Freedom of Information Act (FOIA) permits withholding information under several exemptions, including Exemption 4 which protects "trade secrets and commercial or financial information obtained from a person [that is] privileged or confidential," 5 U.S.C. 552(b) (4). Within five business days of contract award, the contractor shall provide a statement that the contract is available for full disclosure under the FOIA or provide a scanned PDF of the redacted copy of the contract identifying the specific potions the contractor believes are covered by the particular exemption requested. Any redactions must be fully supported under the FOIA. In the event the Government notifies the contractor that it does not agree with a proposed redaction, the contractor shall have five business days to submit additional information to support the requested redaction. For subcontracts, within 5 business days of the contractor's award of any subcontract over $500,000 the contractor shall provide the Government a scanned PDF copy of the subcontract with a statement that the copy is either available for full disclosure, or identifying the specific portions believed to be covered by the particular exemption requested.

Redactions should be limited to those protections provided under the FOIA. Following the procedures above, the Government has the right to notify the contractor of any disagreement with proposed redaction or exemption requests.

1630DC-18-R-00023 Section C Description/Specifications

C-1

DESIGN-BUILD SCOPE OF WORK

FOR

REPLACE HVAC SYSTEM IN BUILDING 13 AND THE

DOMESTIC HOT WATER SYSTEM SERVING BUILDINGS 13 & 14

AT THE

PITTSBURGH JOB CORPS CENTER

PITTSBURGH, PENNSYLVANIA

U.S. DEPARTMENT OF LABOR

PROJECT NO. 3968

February 2018 DBSOW

C-2

TABLE OF CONTENTS

I. GENERAL .......................................................................................................................... C-4 II. DESIGN REQUIREMENTS/SPECIFIC INSTRUCTIONS .............................................. C-4

A. LEGALLY MANDATED STANDARDS ..................................................................... C-4

1. Code of Federal Regulations ..................................................................................... C-4

2. National and State Building Codes ........................................................................... C-5

3. Permits and Licenses................................................................................................. C-5

B. JOB CORPS GUIDELINES ........................................................................................... C-5

1. JCH-814: Planning, Design, and Construction Administration Guidelines for

Architects and Engineers .......................................................................................... C-5 C. OTHER STANDARDS.................................................................................................. C-6

1. Life Cycle Cost (LCC) Analyses .............................................................................. C-6

2. Ssutainable Design and Building Requirements ....................................................... C-6

3. Energy Conservation ................................................................................................. C-6

4. Environmentall Preferable Products ......................................................................... C-7

5. Asbestos-Containing Materials ................................................................................. C-7

6. Commissioning ......................................................................................................... C-8

7. Existing Facility Investigative Survey ...................................................................... C-9

D. SPECIFIC INSTRUCTIONS .......................................................................................... C-9

1. Center Operation/Phasing of the Work ..................................................................... C-9

2. Contractor Responsibilites ........................................................................................ C-9

3. Submittal Requirements .......................................................................................... C-10

4. Web-Based Project Management System ............................................................... C-11

5. Building Design ...................................................................................................... C-12

6. Site Visits – Construction Observation – Construction Progress Meetings ........... C-12

7. Availability of Existing Documents........................................................................ C-12

8. Contract Document Reproduction .......................................................................... C-12

III. USE OF SITE .................................................................................................................... C-13 IV. EXTENT OF WORK ........................................................................................................ C-13

A. SITE IMPROVEMENT AND UTILITIES .................................................................. C-13

1. Design Objectives ................................................................................................... C-13

B. GENERAL BUILDING DESIGN REQUIREMENTS ................................................ C-14

1. Mechanical/Plumbing ............................................................................................. C-14

2. Electrical ................................................................................................................. C-18

3. Warranties ............................................................................................................... C-21

V. CONSTRUCTION REQUIREMENTS/SPECIFIC INSTRUCTIONS .............................. C-22 A. SPECIFIC INSTRUCTIONS........................................................................................ C-22

1. Quality Requirements ............................................................................................. C-22

2. Temporary Facilities ............................................................................................... C-23

3. Adherence to Scope of Work .................................................................................. C-24

4. Incidental Cutting and Patching .............................................................................. C-24

5. Coordination of Work ............................................................................................. C-24

C-3

VI. SKETCHES ....................................................................................................................... C-26

A. LOCATION MAP ........................................................................................................ C-26 B. VICINITY MAP ........................................................................................................... C-27 C. SITE PLAN ................................................................................................................... C-28 D. FLOOR PLANS ............................................................................................................ C-29

VII. PROJECT SCHEDULE .................................................................................................... C-34 ATTACHMENT 1 - CONTRACTOR QUICK REFERENCE CHECKLIST ......................... C-35

ATTACHMENT 2 - SUGGESTED LANGUAGE FOR QUALITY CONTROL, TESTING

AND INSPECTION SERVICES .............................................................................................. C-42 ATTACHMENT 3 – DORMITORY PTAC PHASING CONCEPT ....................................... C-35

C-4

DESIGN-BUILD SCOPE OF WORK

REPLACE HVAC SYSTEM IN BUILDING 13 AND THE

DOMESTIC HOT WATER SYSTEM SERVING BUILDINGS 13 & 14

AT THE

PITTSBURGH JOB CORPS CENTER

I. GENERAL

The work involves engineering design and construction services for phased replacement of the failing HVAC system serving the second and third floors of Building 13 and the domestic hot water generating system that serves both Buildings 13 and 14 at the Pittsburgh Job Corps Center. For Building 13’s second and third floors, the work includes replacing the existing dormitory HVAC system with one that is properly designed to be in compliance with applicable life-safety and building codes. The extent of work is described in Parts IV & V of this scope of work (SOW).

“Contractor Quick Reference Checklist,” Attachment 1, is a required form that identifies a simplified but not all inclusive list of issues that the Contractor (Contractor) needs to address as due diligence items during the design phase. The JCH-814, September 2013 paragraphs shown provide an initial design reference; however, reference to other sources may be required to fully address the issue.

“Suggested Language for Quality Control, Testing, and Inspection Services”, Attachment 2, provides suggested language for consideration to ensure the Contractor develops and uses effective quality control, testing, and inspection procedures to ensure construction meets contract requirements.

II. DESIGN REQUIREMENTS/ SPECIFIC INSTRUCTIONS

A. LEGALLY MANDATED STANDARDS

The Contractor shall conform to:

1. Code of Federal Regulations

a) Safety and Health………………………………………..OSHA CFR Part 1926.62

Because the work may disturb painted wall surfaces, provide the services of an independent industrial hygiene consultant to conduct representative paint sampling as necessary (in buildings erected before 1979) to determine the lead content of painted surfaces affected by the renovation. If lead paint is identified on surfaces to be disturbed by renovation activities, the Contractor shall include the following information in the project documents:

• The locations and concentrations of lead-containing paint in areas affected by the renovation

• A requirement of the contractor to comply with the OSHA Lead Standard for Construction Industry (29 CFR 1926.62), and other environmental or occupational safety and health regulations as applicable

C-5

• A statement prohibiting scraping or sanding of lead painted surfaces. Where removal or demolition of lead painted building components is required, these building components shall be removed intact wherever possible.

• A requirement that all construction debris shall be disposed of in accordance with applicable solid and hazardous waste regulations. It is anticipated that lead-painted building components will be disposed as normal construction debris.

b) Life Safety Code……………...…………………………………………NFPA-101

The Contractor’s responsibility for safety related requirements extends to all impacted areas and access ways affected by the work.

2. National and State Building Codes

The Contractor shall conform to all applicable construction codes, ordinances, and regulations including the national building code used in the local area, laws and local ordinances. The most recent version of the IBC shall be used. Deviations and interpretations shall be subject to the approval of the Contracting Officer.

3. Permits and Licenses

The Pittsburgh Job Corps Center is a federally owned facility and operated by the U.S.

Department of Labor (DOL).

The Contractor shall research and be responsible for paying for and obtaining all regulatory, permitting and licensing requirements required to perform this work in Pittsburgh, Pennsylvania and in accordance with JCH-814, 2013 Section 1.7. No drawings or specifications shall be submitted for building permits unless express notification in writing is received from the Contracting Officer.

B. JOB CORPS GUIDELINES

1. JCH-814: Planning, Design, and Construction Administration Guidelines for Architects and

Engineers

Job Corps publication JCH-814, September 2013 "Planning, Design, and Construction Administration Guidelines for Architects and Engineers," including the September 2015 Amendment 1, is a companion document to this scope of work. This will be referenced as “JCH-814” from this point forward in this scope of work. JCH-814 can be found at http://www.solicitationattachments.com/jch814. It presents the Contractor additional design criteria not specifically stated in the scope of work. Where conflicts occur between the requirements of the contract and JCH-814, the requirements of the contract shall take precedence.

http://www.solicitationattachments.com/

C-6

C. OTHER STANDARDS

1. Life Cycle Cost (LCC) Analyses

LCC shall be utilized as the basis for recommendations in making the selections of energy sources, systems and equipment, and building materials. However, the design must be consistent and in accordance with the extent of the scope of work and the budget. At the 60% submittal, the LCC analyses for the mechanical systems and fuel shall be submitted with recommendations for review, and shall be approved and revised as necessary as equipment is selected and specified. The LCC's shall be run on NIST's BLCC and Discount software programs. On request, the Department of Labor will furnish this software to the Contractor free of charge. The BLCC program shall be run on the OMB A-94 guidelines, using the discount factor from the latest edition of OMB Circular No. A-94, under “Real Interest Rates.”

The BLCC software is also available on the Federal Energy Management Program website at http://www1.eere.energy.gov/femp/information/download_blcc.html under the heading “BLCC 5.3(latest version)” for a Windows version.

2. Sustainable Design and Building Requirements

The project shall use design methodologies, materials, systems and components that will minimize negative environmental impacts, increase energy efficiency and make use of renewable energy technologies. Within budget constraints it shall embody best current sustainable design and building practices. The project team is to propose the highest possible implementation of these strategies for consideration by the Department of Labor, the Regional DOL office, and the Job Corps Center.

3. Energy Conservation

All new work is to be designed in accordance with energy conservation opportunities and applicable federal directives. In response to energy conservation concerns, all proposed construction shall conform to the current edition of the Model Energy Code of the State of Pennsylvania and ASHRAE 90.1-2010 for all buildings except low-rise residential buildings.

Low-rise residential buildings, three stories or fewer above grade, shall conform to the International Energy Conservation Code IECC 2012. The ASHRAE 90.1 -2010 standards or IECC 2009 for low rise residential buildings shall be used as a baseline for energy comparisons.

It is the U.S. Department of Labor’s policy to purchase energy and water consuming products which are in the upper 25% of energy and water efficiency whenever practicable and cost effective. All work must be designed to meet or exceed the requirements of the Energy Policy Act of 2005 (or latest version), which includes Sections 103, 104, 109, 131, 553;

Executive Order 13693; and all other applicable federal, state, and local codes and directives.

New equipment shall be Energy Star or FEMP designated products where applicable.

C-7

Building annual energy consumption calculations, methods and presentation shall conform to nationally recognized standards such as found in ASHRAE Handbooks. A calculation summary statement of the estimated annual energy consumption, expressed in BTU/GSF/YR shall be submitted with the 60% and final review submittal for the building. Building energy shall include lighting, all HVAC energy including heating, cooling, and ventilating loads, fans and pump motors energy, and domestic hot water supply energy.

The Contractor shall submit an energy analysis per ASHRAE 90.1-2010 Appendix G showing that the design reduces energy consumption by at least 20% compared to the baseline building. This analysis will be provided with each design submission and will be revised as necessary with succeeding submittals.

The Contractor shall evaluate options for the use of energy and water conservation measures in building design and shall include a description of recommended options in the DESIGN NARRATIVE (see JCH-814 for narrative requirements).

4. Environmentally Preferable Products

The Contractor shall evaluate options for the use of environmentally preferable products and environmentally preferable building design and shall include a description of recommended options in the DESIGN NARRATIVE (see JCH-814 for narrative requirements).

5. Asbestos-Containing Materials

An asbestos survey of the center’s buildings was conducted in December 1990. The results of the survey and subsequent lab tests confirm the presence of asbestos-containing materials (ACM) in certain locations of the buildings. A copy of the report is available for download at http://www.solicitationattachments.com/pittsburghhvac. It is not intended that all asbestos identified in the report be removed. Asbestos containing materials shall only be removed as necessary to complete the rehabilitation work.

Friable ACM shall be abated prior to any demolition. Non-friable ACM shall be abated only as necessary to comply with the EPA National Emissions Standard for Hazardous Air Pollutants (NESHAP) (40 CFR 61 Subpart M), and applicable State and Local regulations.

All asbestos abatement shall be done by licensed, trained asbestos workers, supervisors, and Contractors. An asbestos abatement work plan shall be prepared by a licensed, trained asbestos project designer for submittal. Asbestos abatement work plan shall include the list and location of materials to be abated, methods of abatement, containment setup and location, decontamination procedures, respiratory protection, all worker licenses, training certifications and medical certifications, and disposal plan including transportation and final disposal location. All asbestos work shall be done in accordance with applicable federal, state, and local regulations. The Contractor shall provide the services of an independent industrial hygienist or environmental consultant to conduct on-site project monitoring and air monitoring services during asbestos abatement, including laboratory services as needed. The consultant shall:

http://www.solicitationattachments.com/pittsburghhvac

C-8

a) Conduct a field investigation to identify ACM affected by the rehabilitation activities. The field investigation shall include destructive testing as required to identify and quantify the presence of ACM. Where a field investigation is required to be performed in an occupied building, the Contractor shall coordinate with DOL and the center operator to determine the appropriate after-hours schedule for conducting of the investigation. It is not intended that the ACM previously identified will be retested.

However, suspect ACM not previously identified should be sampled to determine asbestos-content.

b) Conduct on-site project monitoring and air-monitoring services during asbestos abatement including laboratory services as needed:

• Baseline air sampling (prior to abatement) with Phase Contrast Microscopy (PCM) laboratory analyses

• In-progress air monitoring and sampling with PCM laboratory analyses

• Final visual clearance inspections and final clearance air sampling using aggressive air sampling techniques. Sampling shall be conducted in compliance with all applicable Federal, State, and local requirements.

• Submit a final abatement report certifying that asbestos abatement work has been completed in accordance with all applicable Federal, State, and local regulations.

Note: The Contractor will pay for all costs for additional sampling and analyses resulting from improper execution of the asbestos removal or final clean up.

6. Commissioning

The boilers (inclusive of boiler controls) shall be commissioned by an experienced Commissioning Agent (CxA) provided by the Contractor and acting on behalf of the Owner (Department of Labor). Commissioning standards shall be per the Building Commissioning Association’s Building Commissioning Handbook, Second Edition. Building Commissioning shall be as indicated on the Building Commissioning Compliance Form. The CxA may be from an independent firm hired by the Contractor or a member of the Contractor’s design team firm, but not a member of the design team itself. In addition, the CxA shall:

a) Provide 60% design phase review and comment on selected mechanical systems. Design review comments are to be included in the design submissions.

b) Provide training and orientation of commissioned systems to the appointed maintenance and operations staff. The CxA shall provide a video of this training on CD to DOL and the Center.

c) Provide a systems operating manual for the facility maintenance staff with the information needed to understand and optimally operate the commissioned systems

C-9

7. Existing Facility Investigative Survey

The work is to be performed on an existing building for which record drawings are not available. The Contractor shall perform an investigative survey to determine if there are hidden conditions or elements, which will impact the proposed design. Demolition may be required to expose suspected unknown elements such as:

a) The survey shall determine if multiple ceilings exist or if there are multiple layers of floor covering.

b) The survey shall determine the extent of any hidden structural elements. The design and spacing of hidden structural elements shall be investigated.

c) The survey shall locate any hidden mechanical or electrical components, the presence of which would impact the proposed design.

Any openings in the exposed finishes created to perform the investigative survey shall be sealed and restored in all areas where there are occupants. Any openings hidden by the exposed finish¸ such as a drop-in ceiling, need only be sealed.

Care shall be taken to avoid disruption of suspected or known ACM.

D. SPECIFIC INSTRUCTIONS

1. Center Operation/Phasing of the Work

The Center shall remain in operation throughout the construction phase. The Contractor shall, as part of this contract, coordinate with DOL and evolve a set of construction documents that will minimize disruption of center operations during construction. Proper scheduling and phasing of the construction work is required to allow the center to operate in a normal fashion during construction.

The Center will allow one wing to be vacated at any given time. Work shall be performed Monday through Friday between the hours of 8AM - 4PM. Attachment 3 – Dormitory PTAC Phasing Concept Plan identifies the 2nd and 3rd floor wings as separate areas. These areas depict the intent of phasing the project and follows along with the breakup of electrical power within the building. The Contractor shall work with DOL and the Center to develop a detailed phasing plan based on this concept. The Contractor shall allow the Center a two-week transition period between phases. The work associated with the replacement of the domestic hot water and kitchen steam system will be targeted at the period of the last three weeks of December through the first week of January to coincide with the Center winter break period.

2. Contractor Responsibilities

The Contractor’s design shall meet the programmatic requirements as outlined in this scope of work and in the JCH-814.

C-10

Although this scope of work may identify specific elements of construction, it is the Contractor's responsibility to provide any and all elements which are incidental to provide a fully complete and functional facility.

The Contractor is required to provide twenty (20) high quality photographs in digital and paper format to document the completed facility. Submission of the requisite photo record shall be following remediation of the Substantial Completion Punch List.

3. Submittal Requirements

The required submissions are as follows; percentages are an approximate fraction of completed construction documents:

Progress Contract Documents 60%

Contract Documents 100% and Coordination Drawings

Construction Documents Final

All submittals shall be in accordance with JCH-814 Section 8.4.

The Contractor shall provide Progress Construction Documents (60%) submission based on the schedule contained in Section VII.

The Contractor shall provide a Final Contract Documents and Coordination Drawings (100%) submission, including all corrections and the design review comment responses from the 60% submission, based on the schedule contained in Section VII.

The For-Construction documents, to include all corrections and design review comment responses from the 100% submission, shall be submitted two (2) weeks from receipt of the Final Contract Documents and Coordination Drawings approval by the Contracting Officer.

Three copies of the updated CONTRACTOR QUICK REFERENCE checklist shall be provided with each design submission.

Submittals for Review

For each submission, the Contractor shall submit five (5) sets of drawings (2 sets full size, 3 sets ½ size) and project documents, as well as three (3) sets of life cycle analyses, design calculations and design narratives to the Contracting Officer for review and acceptance. In addition, one (1) set of drawings and specifications shall be mailed directly by the Contractor to the Pittsburgh Job Corps Center at each submission stage.

Pittsburgh Job Corps Center

Attn.: Center Director 7175 Highland Drive Pittsburgh, PA 15206

C-11

Each design submittal shall be incorporated into an “AutoCAD (version 14 or later)” and PDF compatible electronic “CD” and be delivered to the Department of Labor by the Contractor in addition to the drawing/specification sets required. Complete project documents shall also be furnished on electronic “CD” media that is “Word” (Microsoft Office) compatible.

The levels of detail required for each stage of the submittals are outlined in JCH-814, Section 8.4.

The Contractor is required to maintain the schedule per the contract, and must indicate to the CO ways and means to recover lost time due to delays. No additional time will be given to the Contractor unless it is determined by the CO that the delay is legitimate and unavoidable and that the Contractor has prudently exercised all options within its authority and ability to avert such delays.

The Contractor shall, at a minimum, submit the following for approval before commencing construction:

• Schedule, CPM in Microsoft Project or Primavera P6, with electronic files

• Safety Plan

• Quality Plan

• Construction phasing and layout plan

• Materiel and equipment manufacturer’s cut sheets

• Installation shop drawings

4. Web-Based Project Management System

DOL shall provide, and requires the Contractor to use, the secure online construction management system, Submittal Exchange©, that will expedite submittal information and management exchanges between members of the Contractor’s team, the ESC, DOL and other designated project stakeholders. Submittal Exchange will be provided at DOL’s expense and the Contractor will be required to attend a one-hour on-line training session before use.

The system offers an unlimited user automatic information exchange, and electronic closeout documentation for the entire project. The program service provides a comprehensive online system for exchanging, reviewing, and archiving construction communications as well as product manufacturer training for users.

The extent of use of Submittal Exchange shall be determined by DOL and the Contractor during the Pre-Construction Conference. The following features of Submittal Exchange may be utilized: Project Data and Shop Drawing Submittals, Design Submittals, Construction Submittals, Substantial Completion, RFI’s, ASI's, Proposal Requests, Potential Change Orders (PCOs), Construction Schedule, HPSB, Meeting Minutes, Monthly Executive Reports, Construction Photos, Construction Videos, Coordination Drawings, Reports, Deficiency Notices/Notice of Non-Compliance, Tests & Inspections, Warranties, Closeout, C-12

Punch Lists, Commissioning, and Operations and Maintenance Manuals. Requests for Proposals (RFP) and Proposals shall not be posted to Submittal Exchange.

5. Building Design

The Contractor must be familiar with Pittsburgh, Pennsylvania construction methods and building materials, and shall provide a design that exemplifies the optimum balance of economy, aesthetics, life-safety, ease of maintenance and speed of construction.

6. Site Visits - Construction Observation – Construction Progress Meetings

The Contractor’s contract administration services shall include all duties and responsibilities as outlined in JCH-814, Chapter 9. The Contractor shall prepare a monthly construction progress report. The report shall include an updated CPM schedule, a minimum of 10 electronic photos of all aspects of the project and a list of open issues with the responsible person and target date for resolution identified. A representative of the Department of Labor’s Engineering Support Contractor (ESC) may visit the site at least once a month. During this visit, the Contractor’s payment application will be quantified and verified by the Contracting Officer’s representative.

Once construction commences, in coordination with the ESC and Center, the Contractor shall organize, prepare agenda, and conduct weekly construction progress meetings, record and prepare meeting minutes, and distribute to team members and attendees within three days after the…