Amendment_0001.pdf
PDF 383 KB Posted
- Attached to
- Roof and Accessories Replacement - Building 1 - New Haven Job Corps Center, New Haven, CT
- Solicitation number
- 1630DC-17-R-00020
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| New_Haven_Roof_Project_-_Solicitation_No._1630DC-17-R-00020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1630DC-17-R-00020
X
X
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning ____1_____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. NOTE: The proposal due date has been extended to 2:00 PM EDT, June 13, 2017.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 8
0001 6/1/2017 3642
ETA OCM JOB CORPS bramso
U.S. Department of Labor ETA/OCM/Division of Job Corps Procurement 200 Constitution Avenue, NW Room N-4643 Washington DC 20210
5/5/2017
N/A
Project Title: Design/Build – Building 1 Roof and Accessories Replacement at the New Haven Job Corps Center Located in New Haven, Connecticut
a. The purpose of this Amendment is as follows:
1) INCORPRATE the attached questions and answers into the solicitation.
2) Incorporate the changes in the SOW.
3) Attached is the Pre-Bid Attendance Sheet, dated May 18, 2017
Maria J. Pizarro, CPCM CFCM Branch Chief, Contracting Officer
Division of Job Corps Procurement/ A/E & Construction Eastern Branch
AMENDMENT 0001
SOLICITATION 1630DC-17-R-00020
QUESTIONS AND ANSWERS
DESIGN/BUILD – BUILDING 1 ROOF AND ACCESSORIES REPLACEMENT
New Haven Job Corps Center New Haven, Connecticut
Issued By: The U.S. Department of Labor.
The following responses to Bidders’ questions are hereby incorporated in Solicitation 1630DC-17-R-00020, GENERALLY.
Q 1. Is this project sales tax exempt?
ANSWER: There is no guarantee that it will be tax exempt. Please refer to FAR Clause 52.229-3 – Federal, State and Local Taxes.
Q 2. If the project is sales tax exempt can the government provide a sales tax exemption certificate?
ANSWER: The Government can provide a tax exempt letter and it will be up to the state whether or not they accept it.
Q 3. Will the Government provide comprehensive written badging requirements for the project if badging is required?
ANSWER: The Center will provide the required entry badges.
Q 4. Where will the designated parking area be for workers accessing the construction site?
ANSWER: In front of the Maintenance Shop.
SPECIFICALLY.
Q 5. Has the work area been checked for asbestos?
ANSWER: No Asbestos is anticipated.
Q 6. What is the Governments’ policy if asbestos products are encountered during construction?
ANSWER: Follow the contract’s Changes clause, and submit a Request for Change (RFC) for unforeseen conditions to abate/remove any Asbestos Containing Material (ACM) should any ACM be found.
Q 7. Who is responsible for lightning protection?
ANSWER: Lightning protection is not part of this SOW.
Q 8. Please provide a set of as-built plans for the building in question.
ANSWER: Reference drawings may be downloaded from http://www.solicitationattachments.com/newhavenroof
Q 9. Which two (2) roof hatches are to be replaced? There were two different sizes of roof hatches that we saw.
ANSWER: See Section C, C-4, B. General, which states that:
“Provide new roof hatches to match existing. The Contractor is responsible for surveying and designing the new hatches to meet all applicable codes. Product data and shop drawings are required”.
http://www.solicitationattachments.com/newhavenroof
Q 10. We noticed that there are skylights in a couple locations, and they seem to be a little foggy/chalked.
We see that the skylight curbs are to be raised up according to the statement of work, however are there considerations with replacing them as part of this project?
ANSWER: Curbs should be raised if the new insulation thickness reduces the curbs height to less than 8’ above finished surface. The SOW does not call for replacement of Skylights.
Q 11. Will existing drawings be available during the bid phase?
ANSWER: Reference drawings may be downloaded from
Q 12. Is there any existing information on the (2) Trane rooftop mechanical units that will be replaced?
ANSWER: The two Roof Top Units to be replaced are models TCD102B300DA and TCD120B300DA service, and they service the Café Serving Line and the Café Dining room.
Q 13. How many exhaust fans will be replaced? 6 are identified in the proposal. If available, please provide sizes and information on exhaust fans to be replaced.
ANSWER: See Section C, C-4, I. General, which states that:
“The contractor is responsible for surveying the roof top mounted exhaust and intake units for operability. All units must be documented in the design as operable or not. Those proposed to be replaced will be so marked on the design as such. In the event that more than 6 units are found to be in need of replacement, the larger capacity units are to be given precedence”.
Q 14. For purposes of reinstalling existing lights (currently on roof edges) on the brick façade, what is the exterior wall construction?
ANSWER: Brick Masonry.
Q 15. For purposes of interior work (i.e. electrical wiring/ connecting RTU’s), are interior ceilings drop ceilings typically?
ANSWER: Yes.
Q 16. What times will interior work be allowed? (i.e. off-hours/ night-work only)
ANSWER: The Center’s opening hours are 8am to 5pm. The actual work hours for this project must be coordinated with the Center during the Pre-Construction meeting.
Q 17. For reinstalled exterior lights, is the intent to re-use the existing steel mounting plates (installed on top of existing parapets) and install the re-used plates on the side of the building? Or are new mounting plates for lights required?
ANSWER: The Contractor must verify existing conditions. The intent is to reuse existing light fixtures and hardware, if feasible.
Q 18. Existing roof drain leaders are round PVC. Is the intent to replace these leaders with aluminum?
Please note that all existing roof drain boots appear to be round cast iron type – if rectangular roof leaders are used, boot adapters will be required at each location.
ANSWER: See Section C, C-11, III. Extent of Site, A.1 calls for:
“[…] a complete replacement of the roof system in compliance with NRCA and system manufacturer’s requirements”.
Q 19. Is the existing roof deck metal corrugated type, typically? Do any areas have concrete roof deck?
ANSWER: It is the Contractor’s responsibility to investigate all site conditions. See Section C, C-11, III.
Extent of Site, A.1, which states that:
“The work will include all design and investigation for the replacement of the existing roof.” If during the course of investigation unforeseen conditions are found, this would be addressed under unforeseen conditions”.
Additional site inspections may be arranged through the Center’s Administration Manager, Ms. Ashley Jones on (203) 907 4332.
Q 20. Is the condition of the existing roof deck known? Should a certain square footage allowance be used for deck replacement?
ANSWER: Deck replacement is not anticipated. See also response to Q19.
Q 21. To meet wind uplift requirements, is it believed the existing roof deck will require additional roof deck fastening down to existing structure?
ANSWER: No. Referring to section 1510 of IBC “Re-roofing “there is no requirement noted for upgrading the structural system”.
SOLICITATION 1630DC-17-R-00020
SCOPE OF WORK CHANGES
DESIGN/BUILD – BUILDING 1 ROOF AND ACCESSORIES REPLACEMENT
New Haven Job Corps Center New Haven, Connecticut
Issued By: The U.S. Department of Labor.
The following Scope of Work changes are hereby incorporated in Solicitation 1630DC-17-R-00020 as Amendments to Section C, Scope of Work dated June, 2016.
1. TABLE OF CONTENTS/ATTACHEMENT 3:
Delete:
SAMPLE ROOFING SYSTEM WARRANTY.
Replace with:
REQUIRED ROOFING SYSTEM WARRANTY.
2. SCOPE OF WORK TITLE:
ROOFS and WINDOW REPLACEMENT ON BUILDINGS 2 and 7 AT THE BARRANQUITAS JOB
CORPS CENTER
Replace with:
BUILDING 1 ROOF and ACCESSORES REPLACEMENT AT THE NEW HAVEN JOB CORPS
CENTER.
3. I.GENERAL/Last bullet:
“There are two existing roof hatches that have been repainted and will be replaced”
4. III. EXTENT OF WORK / A / 1. Design Objectives:
“The Contractor is to provide a complete design including plans and specifications for the replacement of the built-up roofing on Building 1. The work will include all investigation and design for replacement of the existing roof. The design will include all details to accommodate the existing roof conditions including, but not limited to, all required flashings, drip edges with water diverter, accessories, and terminations necessary to provide a fully watertight roofing system with warranty. The warranty required for the roofing will include coverage for 5 years on labor and 20 years on materials. The design will accommodate any removal and reinstallation of incidental materials and rooftop equipment which must be removed and reinstalled due to the construction of the new roofs. The design will include an evaluation of the existing building components and how it integrates with the intended roof systems in order to meet current allowable snow and wind loads for New Haven, Connecticut and comply with the Executive Order 13693, and "Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings." All work to be accomplished in accordance with the NRCA”
Replace with (changes highlighted):
“The Contractor is to provide a complete design including plans and specifications for the replacement of the built-up roofing on Building 1. The work will include all investigation and design for replacement of the existing roof. The design will include all details to accommodate the existing roof conditions including, but not limited to, all required flashings, copings, drip edges with water diverter, accessories, and terminations necessary to provide a fully watertight roofing system with warranty. The warranty required for the roofing will include coverage for 5 years on labor and 20 years on materials. The design will accommodate any removal and reinstallation of incidental materials and rooftop equipment which must be removed and reinstalled due to the construction of the new roofs. The design will include an evaluation of the existing building components and how it integrates with the intended roof systems in order to meet current allowable snow and wind loads for New Haven, Connecticut and comply with the Executive Order 13693, and "Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings." All work to be accomplished in accordance with the NRCA”.
5. III. EXTENT OF WORK / B / 1 / a:
“The Design-Build Contractor is responsible for the safety of all faculty, staff and students entering and exiting the building. All entrances will have covered pedestrian walkways that will substantially limit traffic flow except along the sidewalk or paved path a minimum of 25 feet from the building, full width of the sidewalk”.
Replace with:
“The Design-Build Contractor is responsible for the safety of all faculty, staff and students entering and exiting the building. All entrances will have covered pedestrian walkways that will substantially limit traffic flow except along the sidewalk”.
6. III. EXTENT OF WORK / B / 1 / g / 6:
“The Contractor shall provide a warranty. See Attachment 2 Appendix A for the roofing system warranty execution specifications and Attachment 3 Appendix B for the sample warranty”.
Replace with (changes highlighted):
“The Contractor shall provide a warranty. See Attachment 2 Appendix A for the roofing system warranty execution specifications and Attachment 3 Appendix B for the required warranty”.
7. ATTACHMENT 3 / TITLE:
SAMPLE ROOFING SYSTEM WARRANTY.
Replace with (changes highlighted):
REQUIRED ROOFING SYSTEM WARRANTY.
ATTACHMENT 1
| Amendment 0001-Barranquitas |
| New Haven JCC--Project 3642 Building1 Roof and Accessories Replacements Amendment No. 1 QAs -- Final |
| New Haven JCC--Project 3642 Building1 Roof and Accessories Replacements Amendment No. 2 SOW Changes -- Final |
| Attendance Sheet |
File details come from the government source that posted it. Updated .