1620000390_3.pdf

PDF 387 KB Posted

Attached to
RFP FN1626-26 UNICOR PALLET RACKING INSTALLS
Solicitation number
FN1626-26
Issued by

About this file

This is a Request for Quotation (RFQ) for warehouse racking and storage installation services issued by Federal Prison Industries (UNICOR), a Department of Justice entity.

UNICOR seeks a single-award, five-year Indefinite Delivery-Indefinite Quantity (IDIQ) contract with a guaranteed minimum of $5,000 for installation of pallet racking, storage cabinets, lockers, and metal storage systems throughout UNICOR's customer facilities across the continental United States, Alaska, Puerto Rico, Hawaii, and occasionally overseas. The contract is 100 percent small business set-aside under NAICS code 238390 (Other Building Finishing Contractors), with a $19.0 million business size standard. Solicitation FN1626-26 has a closing date of October 9, 2026, at 2:00 PM EST, with a 90-day offer acceptance period. Delivery requirements specify 21 days after receipt of first order, then 14 days for subsequent orders (calendar days). The contract is firm fixed price with delivery FOB destination. Liquidated damages of up to $500 per calendar day apply for late delivery, with no maximum limit, though the Government is open to discussions for mitigation.

Scope of work includes disassembly and demolition of obsolete racking, installation of new configurations, retrofitting and repairs, engineering studies, floor capacity testing, sprinkler installation, and load rating markings. Offerors must provide pricing on all line items covering 12 different service categories totaling approximately 229 million pounds of work. Key personnel requirements include a Program Manager, Quality Assurance/Quality Control Manager, and dedicated Project Managers for each delivery order. Offerors must demonstrate ISO 9001 certification or quality management system documentation, complete a Business Management Questionnaire with three relevant references from the past 3-5 years, maintain active SAM registration, submit an ACH form, and provide electronic proposals by the deadline. Evaluation prioritizes ability to meet specifications, past performance, and price, with non-cost factors significantly more important than cost. Questions must be submitted by September 30, 2026, at 2:00 PM EST to Barbara.McMaster@usdoj.gov.

View the file

Other files

File Type Posted
FN1626-26 A0001 PALLET RACKING INSTALLS.pdf PDF
ACH FORM.pdf PDF
FN1626-26 SPREADSHEET.xlsx XLSX spreadsheet
BUSINESS QUESTIONNAIRE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 67ORDER NUMBER:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

UEI

Document Number

1620000390

FN1626-26

Barbara McMaster 662-751-4800

COCO

COCO

391014499

UNDETERMINED SOURCE

NA BLANK

WASHINGTON DC 20534

UNICOR FPI CENTRAL ACCOUNTS PAYABLE

PO BOX 11849

LEXINGTON, KY 40578-1849

1620000390 See Section B

UNICOR FUNDS 15X4500 FUNDS SHALL BE OBLIGATED BY INDIVIDUAL DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF

Barbara McMaster

X

238390

DATE

09/23/2026

10/09/2026

2:00 PM

COCO

UNICOR, FPI CENTRAL OFFICE

400 1ST ST NW

WASHINGTON DC 20534-0004

UNICOR, FPI CENTRAL OFFICE

400 1ST ST NW

WASHINGTON DC 20534-0004

09/23/2026

UNICOR, FPI CENTRAL OFFICE

400 1ST ST NW

WASHINGTON DC 20534-0004

09/23/2026 x

$19 million x

Page 2 of 67ORDER NUMBER:

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date

Request for Quotation

1620000390

Terms:

00001 ABNRMLEXP 75,000 LB 10/30/2026

ABNORMAL-EXPENSES

00002 INSTMEZZWT 525,000 LB 10/30/2026

INSTALL,MEZZANINE-PRODUCTS,WEST

00003 INSTPALRCKET 9,375,000 LB 10/30/2026

INSTALL,PALLET-RACK-PRODUCTS,EAST

00004 DSSMBLMEZZET 1,820,000 LB 10/30/2026

DISASSEMBLY-AND-REMOVAL,MEZZANINE,EAST

00005 DSSMBLPALRCKET 500,000 LB 10/30/2026

DISASSEMBLY-AND-REMOVAL,PALLET-RACK,EAST

00006 DSSMBLPALRCKWT 500,000 LB 10/30/2026

DISASSEMBLY-AND-REMOVAL,PALLET-RACK,WEST

00007 INSTMEZZET 100,000 LB 10/30/2026

INSTALL,MEZZANINE-PRODUCTS,EAST

00008 INSTPALRCKWT 562,000 LB 10/30/2026

INSTALL,PALLET-RACK-PRODUCTS,WEST

00009 PALMEZOFFLDEAST 16,550 LB 10/30/2026

PALLET-RACK-OR-MEZZ-OFFLOADING,(EAST)

00010 PALMEZOFFLDWEST 7,500,000 LB 10/30/2026

PALLET-RACK-OR-MEZZ-OFFLOADING,(WEST)

00011 DSSMBLSHVWT 62,500,000 LB 10/30/2026

DISASSEMBLY-AND-REMOVAL,SHELV,WEST

00012 DSSMBLSHVET 37,500,000 LB 10/30/2026

Page 3 of 67ORDER NUMBER:

Request for Quotation

1620000390

DISASSEMBLY-AND-REMOVAL,SHELV,EAST

SECTION A - Solicitation FN1626-26

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

Federal Prison Industries (FPI), which operates under the trade name

UNICOR, is a wholly-owned Government Corporation within the Department of Justice, under the Federal Prison System. The Corporation was created by Congress in 1934, and provides employment, education, and training opportunities to inmates under Federal custody. UNICOR operates approximately 62 factories in over 52 locations. Its production lines are extensive and include over 118 different products and services sold to other Federal Agencies and the Department of Defense.

Product is to be delivered FOB Destination to the following UNICOR location:

Services are to be provided throughout the continental United States, Alaska, Puerto Rico, Hawaii and occasionally OCONUS.

GENERAL INTENTION: This solicitation is expected to be a 100% small business set aside, with the anticipation of a single award five (5) year, Firm Fixed Price, Indefinite Delivery-Indefinite Quantity type of contract.

The NAICS code for this requirement is 238390 Other Building Finishing

Contractors Business Standard Size is $19.0 million.

Guaranteed Minimum is $5,000.00, over the duration of the contract.

Solicitation quantities are estimated 5-year quantities.

Delivery will be 21 days after receipt of first order, 14 days for each order placed thereafter. Day represents calendar day. If your firm is unable to meet the 14 day lead time, please state required lead time below

Page 4 of 67ORDER NUMBER:

1620000390

__________ Day lead time

All offerors shall read the solicitation in its entirety prior to submission of any questions. All questions SHALL be submitted in writing. At no time shall offerors contact individuals at the individual factories.

No questions will be answered verbally. All questions shall be submitted in writing to Barbara.McMaster@usdoj.gov by Wednesday, September 30, 2026, at 2:00 pm EST and must reference the solicitation number

FN1626-26 in the subject of the request. No questions will be answered after that date. An amendment will be issued with answers to all questions received before the deadline.

Any amendments issued to this solicitation shall be synopsized in the same manner as this solicitation and must be acknowledged by each offeror. Solicitation number is FN1626-26, and this solicitation is issued as a Request for Proposal (RFP). It is anticipated that this solicitation will result in a Single Award, five (5) year, Firm Fixed

Price, Indefinite Delivery-Indefinite Quantity type of contract.

Offer closing date is Friday, October 9, 2026, at 2:00PM EST. Proposals received after this time WILL NOT BE CONSIDERED FOR AWARD. Questions shall be emailed to Barbara.McMaster@usdoj.gov no later than Wednesday, September 30, 2026, at 2:00 pm EST. Questions received after this time will not be answered.

The following information pertains to the Standard Form 1449

Solicitation:

OMB 1103-0018

The offer acceptance period is 90 calendar days. Block 31b, Barbara

McMaster, Contract Specialist

NOTE: UNICOR may add other factories or materials to contract at a later date through a modification to the awarded contract.

Page 5 of 67ORDER NUMBER:

1620000390

All solicitations (also future procurement) and any other information

(amendments, etc.) may be obtained through SAM.gov at www.sam.gov.

All offerors must complete the following information prior to submission of offer to be considered for award, in addition to the requirements of

Section L.

1. All Offerors must complete the ACH form and have an active registration in SAM http://sam.gov.

What is SAM?

The System for Award Management (SAM) is combining eight federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. The benefits of SAM include streamlined and integrated processes, elimination of data redundancies, and reduced costs while providing improved capability.

With one user ID and password, SAM will benefit contractors by providing access to all the capabilities associated with:

1. Registering to do business with the Government

2. Representing/Self-Certifying as a Small Business

3. Viewing Business Opportunities (SAM.gov)

2. Section B: PROVIDE PRICING ON ALL LINES ON PRICING SPREADSHEET (see pricing spreadsheet). An electronic copy must be submitted by closing date and time of solicitation. This electronic form is posted as part of this solicitation package. Electronic copy of solicitation must be returned to Barbara.McMaster@usdoj.gov by closing date and time of solicitation.

3. Section L:

FPI 999.999-9 Business Management Questionnaire:

All offerors must complete the Business Management questionnaire with three references from the past three (3) to five (5) years that are the same or similar in scope to this requirement. References that are not for the same or similar items in the solicitation will receive neither favorable nor unfavorable rating.

Page 6 of 67ORDER NUMBER:

1620000390

The UNIQUE ENTITY ID (UEI) and TIN numbers must match your information in www.sam.gov

4. UEI Number: _________________

5. TIN Number: _________________

6. One (1) electronic copy of entire proposal must be included in proposal package emailed to Barbara.McMaster@usdoj.gov by offer closing date and time of Friday, October 9, 2026, by 2:00 pm EST. Vendors proposals shall request email confirmation from UNICOR staff that their proposal has been received.

7. ISO 9001 Certification:

If your firm is ISO 9001 certified, offerors must provide proof of

ISO9001 certification by submitting the ISO Certification as part of your written offer. If your firm is not ISO Certified, please submit a copy of your company's quality management system, also state whether your company intends to seek ISO certification in the future and if so when. In addition, offerors shall submit ISO certification or Quality

Management System for all subcontractors (suppliers) involved in the performance of this contract.

The NAICS code associated with this requirement is 238390 Other Building

Finishing Contractors Business Standard Size is $19.0 million.

NOTICE TO GOVERNMENT WHEN CONTRACTOR(S) DELAYS:

In the event the contractor(s) encounter difficulty in meeting performance requirements, or when there is an anticipated difficulty in complying with the delivery terms or completion dates, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely delivery/performance of this contract, the contractor must immediately notify the Field

Administrative Contracting Officer at UNICOR El Reno in writing, giving pertinent details. This information will not be construed as a waiver by the Government of the required delivery schedule, or the Governments rights to impose consideration against delinquencies or other remedies provided by this contract.

Page 7 of 67ORDER NUMBER:

1620000390

Contractor agrees that FPI is in the category of the most favored or best commercial customer category of the Contractor and as such, the

Contractor will:

During the contract period, the Contractor shall report to the

Contracting Officer all price reductions offered to the category of customers that are considered by the Contractor to be their most favored or best commercial customer.

1. A price reduction shall apply to purchases under this contract if, after the award date, the Contractor-

,,i) Revises downward its commercial catalog, price list, schedule, etc., to its best commercial customers (or category of customers) below the awarded price under this contract;

,,ii) Grants more favorable discounts or terms and conditions to its best commercial customers than those contained in this contract that would result in prices below the awarded price under this contract, an/or

,,iii) Grants special discounts to its best commercial customer (or category of customers) that would result in prices lower than the awarded price under this contract.

2. The Contractor shall offer the price reduction to FPI with the same effective date, and for the same time period, as extended to the commercial customer (or category of customers).

The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

The Contractor shall notify the Contracting Officer of any price reduction subject to this clause as soon as possible, but not later than

15 calendar days after its effective date.

Future requirements for these or similar items from this, or other

UNICOR factories, may be added to the resulting contract if considered to fall within the scope of work and the price is determined to be fair and reasonable.

INVOICES ARE TO BE EMAILED TO:

Accountspayable@usdoj.gov

Page 8 of 67ORDER NUMBER:

1620000390

Department of Justice – Justice Management Division

ACQUISITION POLICY NOTICE

March 13, 2026

2026-01

Acquisition Policy Oversight

COVID-19 Contractor Protocols - Update

Executive Order (EO) 14042, Ensuring Adequate COVID Safety

CONTRACTOR’S RESPONSIBILITY: It is the responsibility of the Contractor to follow any Special Security Requirements of the facility where the work is performed in the performance of the contract and to consider the effects of those security requirements in the pricing of the proposal.

Pricing Spreadsheet:

As part of this solicitation a required pricing spreadsheet listing the following items:

·,,Part number

·,,Factory location

·,,Estimated solicitation quantity

·,,Price

·,,Lead time if different than the required 14 day (This could be more or less than the 14 days. Less will be looked at favorably in evaluation process)

The period of performance may vary depending on the actual award date but will not occur prior to October 9, 2026.

Section C - Statement of Work

UNICOR Office Furniture Group has a contract requirement for installation of pallet racking, storage cabinets, lockers, Military/institution metal furniture and various metal storage systems.

The objective of the solicitation is to maximize the cube utilization and correct the safety problems of obsolete warehouse racking and storage systems throughout UNICOR’s customers. The racking and storage solutions provided under this contract will optimize safety by helping to ensure that UNICOR warehouse racking and storage systems are compliant with the National Fire Protection Association (NFPA) code and the Unified Facilities Criteria (UFC). Furthermore, the improved racking

Page 9 of 67ORDER NUMBER:

1620000390 and storage will increase cube utilization to meet audit readiness standards and improve inventory accuracy of high dollar sensitive UNICOR customers managed material.

1.0 Scope of Work.

1.1,,Scope. This Statement of Work (SOW) defines the tasks required to provide supplies in support of UNICOR El Reno’s racking systems. This includes, but is not limited to, the installation of new racking and storage configurations, retrofitting/upgrading/repairing existing racking and storage configurations, and the demolition and removal of existing storage configurations.

1.2,,Description of Work. The Contractor shall provide all supervision/management, personnel, materials, supplies, equipment, tools and transportation, except for those items specified as Government furnished property, necessary to perform the ERMT Metals defined in the

SOW. This work may consist of (1) disassembly and/or demolition and removal of obsolete racking and storage configurations and associated debris, (2) installation and assembly of new racking and storage configurations, and (3) other retrofit, upgrade, and/or repair requirements to make existing racking and storage configurations operational. The delivery orders that are awarded to ERE1 against the

IDIQ Contract will define the work required for each individual project.

The Contractor shall complete each project within timeframes that support customer requirements.

The Government may provide technical direction as a means of assisting the Contractor to accomplish the work detailed in the SOW; however, the Government will not control the methods used by the Contractor to perform the work set forth in the SOW.

1.3 General Operation Conditions and Requirements.

1.3.1 Place of Performance. The basic Contract will be issued through

FPI, UNICOR in El Reno, OK. However, the primary place of performance for work performed under this Contract will be at various Government

Page 10 of 67ORDER NUMBER:

1620000390 sites throughout Indo-Pacific region, Europe and these United States. To that end, each individual Delivery Order placed under this Contract will identify the location of work for that Order.

1.3.2 Period of Performance. The Period of Performance for this IDIQ is not to exceed five (5) years from the date of contract award.

Additionally, each individual Delivery Order will include a period of performance for that project.

A.,,The Contractor is not expected to work on Government observed

Federal holidays. In the event an Executive Order issued by the

President of the United States declares Agencies of the Federal

Government closed for a regularly scheduled workday, the COR, in conjunction with the KO and/or the Contract Specialist, will determine and advise the Contractor on whether work can be performed on that day.

1.3.3 Hours of Operation and Access to the Host Installation.

A.,,The normal hours of operation for most sites is Monday through

Friday, 0700-1530, excluding Federal Holidays. Contractor personnel shall be on site during the normal hours of operation. However, some

Distribution Centers are 24-hour operations. Consequently, some work must be performed outside of the normal hours of operation. Such work shall be coordinated with the COR.

B.,,The Contractor may be allowed, as required to minimize interruption of production operations, to perform work outside of regular hours.

Where work is desired to be performed other than during regular hours, the Contractor shall request permission from the COR at least 48 hours in advance in order for the necessary arrangements to be made.

C.,,Due to changing traffic requirements brought on by construction, changing missions, and security concerns within the Host Installation, access to the Host Installation is subject to change, sometimes with little or no warning. Inbound and outbound traffic restrictions may exist.

1.4 Government Interaction.

Page 11 of 67ORDER NUMBER:

1620000390

A.,,Contracting Officer (KO) and Contracting Officer’s Representative

(COR). The Contractor’s primary interaction with the Government shall be through the Contracting Officer (KO) and the Contracting Officer’s

Representative (COR), if assigned, to this contract. The COR, if assigned, will be identified by separate letters. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions:

1.,,Provide the primary interface between the Contractor and the Host

Installation Headquarters.

2.,,Assure that the Contractor performs the technical requirements of the contract.

3.,,Perform inspections necessary in connection with contract performance.

4.,,Maintain written and oral communications with the Contractor concerning technical aspects of the contract.

5.,,Issue written interpretations of technical requirements, including

Government drawings, designs, and specifications.

6.,,Monitor the Contractor's performance, conduct quality assurance evaluations, and notify the KO and contractor of any efficiencies and deficiencies.

7.,,Assist in identifying and incorporating process improvements.

8.,,Coordinate availability of Government Furnished Property (GFP).

9.,,Provide access and site entry of Contractor personnel.

A COR; when assigned, will be assigned separately with each delivery order against the contract. The COR will vary per delivery order depending on the various sites and engineering responsibility. A letter of designation issued to the COR, a copy of which is sent to the

Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price and estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

,,B. Designated Government Representative. The government for each distribution center/delivery order shall designate a government representative as a site point of contact (POC) that will evaluate the

Page 12 of 67ORDER NUMBER:

1620000390 installation process and provide input and aid the COR and KO at the various levels of completion. These evaluations will be coordinated with

COR input and official contract changes will still be coordinated through the COR and approved by the KO. The POC will not have authority relating to the contract or contract payments.

,,C. The Government and the Contractor will have personnel working in the same area. The Government will provide general instructions on limitations and deadlines. Contractor personnel will independently carry out the tasks identified in this SOW. Completed work will be verified by the Government POC and/or COR for adherence to project specifications, procedures, accuracy, and completeness. Project specifications shall include but are not limited to SOW, drawings, layout, bill of material, and other required documents.

D. All contract personnel attending meetings, answering Government telephones, corresponding by e-mail, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of the members of the public that they are Government officials. All Contractor employees shall always wear ID badges conspicuously on his or her outer clothing above the waist and shall identify themselves as Contractors while in the workplace and at meetings.

1.5 Resource Requirements

1.5.1 Key Personnel. The Contractor shall employ the experienced personnel necessary to perform all work required under this contract and its subsequent Delivery Orders. The Contractor, or Contractor and

Subcontractor Team, must have the necessary qualifications to provide these services. The Contractor shall identify all key personnel by name, position, and firm (if other than prime contractor, provide address

(city/state) where the firm is located)).

Exclusive of the Program, Contract, and Financial Management functions, the Contractor may utilize subcontractors or consultants identified in the accepted proposal or subsequently approved by FPI UNICOR to perform

Page 13 of 67ORDER NUMBER:

1620000390 any of the functions required by the tasks detailed in this SOW. Project

Managers can be from the prime or teaming relationships.

A.,, Program Manager (PgM). The Contractor shall designate one (1) individual as the Program Manager (PgM) to serve as the single point of contact (POC) for coordination of program issues with FPI, UNICOR. The

PgM shall be responsible for the overall management of the contract including cost, schedule, and technical quality. The PgM shall be competent, experienced, and knowledgeable in the design, engineering, manufacturing, layout, construction and installation of large-scale racking and storage projects for logistics facilities. The PgM shall take immediate corrective action when performance is not acceptable to

FPI, UNICOR. The PgM shall oversee the development and implementation of record keeping, administrative, safety and quality control programs.

B.,, Quality Assurance/Quality Control (QA/QC) Manager. The Contractor shall designate one (1) individual trained within its organization to be responsible for overall management of Quality Assurance and Quality

Control (QA/QC) and have the authority to act in all QA/QC matters. The

QA/QC manager shall have a thorough knowledge of current UNICOR warehouse racking and storage design, engineering, manufacturing, layout, construction and installation methods, standards, and practices.

In addition, the QA/QC manager shall be experienced in incorporating

UNICOR warehouse racking and storage standards and practices into the

UNICOR processes. The QA/QC Manager is responsible for ensuring compliance with the requirements identified in the SOW and the

Contractor Quality Control Plan. Compliance includes but is not limited to proper materials, correct amounts, acceptable quality, proper installation, and adherence to plan/layout.

C.,,Project Manager(s) (PM). The Contractor shall designate an individual as the dedicated Project Manager (PM) for each Delivery

Order. The PM shall be the single POC for the performance of all Project level Tasks and shall be responsible to the PgM for the management and execution of the approved Delivery Order and all Federal, State, and local laws and regulations. The PM shall maintain close communication and coordination with the COR. The PM, when performing work on site, shall be on site for the duration of each workday and available to meet

Page 14 of 67ORDER NUMBER:

1620000390 with the COR or designated Government Representative within one (1) hour of notification during duty hours and within two (2) hours after normal working hours. The PM may act as the PgM, with the approval of the COR, provided the nature, complexity, and level of effort (LOE) of the

Project level Tasks will not interfere with or diminish performance of the Program level Tasks.

1.5.2 Non-Key Personnel. The Government has determined that the following labor categories are required to meet the requirements of the contract. Personnel assigned to or utilized by the Contractor in the performance of this contract shall meet the experience, educational, or other background requirements set forth below.

A. Construction and Racking Installation Personnel. The Contractor shall utilize only personnel that meet or exceed industry standards for qualifications and experience following all regulations. The COR may request the resumes of any personnel to confirm that personnel meet the requirements for the job category. Each individual shall be trained and have the requisite experience within their discipline to ensure activities, to include planning, field activities, report writing, design recommendations, etc., are of the quality to meet the Project

Objectives.

B. Availability of Installation Teams. To the maximum extent practical, the Contractor shall compete orders when sub-contracting multiple crews.

It is critical to FPI, UNICOR that additional crews are available to allow projects to either be expedited or to work on more than one racking installation at a time.

C. No employee or representative of the Contractor will be admitted to the site of work unless he/she furnishes satisfactory proof that he is a citizen of the United States, or, if an alien, his residence within the United States is legal. All Contractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Said outer garment employee identification shall not be substituted for DoD required passes or badges.

D. The Contractor shall ensure that all personnel have the ability to

Page 15 of 67ORDER NUMBER:

1620000390 read, write, speak, and proficiently communicate using the English language in oral and written communications; that they completely understand the requirements of this Statement of Work; and that they have the ability to work independently and well with others in a team environment. It is acceptable in some instances to have a lead installer assist with team communications when necessary. This shall be coordinated with the KO and COR prior to the start of any work.

1.6 Quality Management

1.6.1,, Quality Management Plan. FPI, UNICOR is committed to a highly interactive relationship between the Contractor and Government quality management personnel and activities. The Contractor shall establish and implement a process-based quality management system (QMS) to facilitate the interaction across quality personnel and activities. The Quality

Management Plan component of the QMS will demonstrate the Contractor’s dedication to ensuring the best possible products are delivered to the

FPI, UNICOR end user. The Contractor shall provide a Quality Management

Plan compliant with FAR 52.246-2(b), “Inspection of Supplies-Fixed

Price”. The Contractor’s Quality Plan shall describe in detail its risk and preventive action-based approach to quality planning, assurance, control and improvement for the design, manufacturing, and life cycle maintenance of its products.

1.6.2,, Quality Assurance Provision

A.,,Inspection. Inspection of the rack installation and rack functional usage will be performed by the KO or designated representative to ensure that the materials and services conform to each Delivery order. Failure of the system to pass inspection is cause for rejection. The foreman or project manager for the vendor must verify the quantity, quality, and type.

B.,,Documentation. The Contractor shall obtain and submit all documentation required for the installation of pallet and package racks in the geographical seismic area identified in each Delivery order. The documentation must include but is not limited to project layout and bill

Page 16 of 67ORDER NUMBER:

1620000390 of material.

C.,,Partial Acceptance and Government Occupancy. The Government will provide a building section for the Contractor for installation of the racks while continuing to operate in the rest of the building. The

Contractor shall provide the Government occupancy to the portion of the building section’s racks after successful completion of each installation and inspection.

1.7,,Security

A.,,The Contractor or any representative of the Contractor entering DoD locations to perform contract requirements shall abide by all security regulations and may be subject to security checks. Contractor personnel and property shall be subject to search and seizure upon entering, while on, and upon leaving the DoD locations pursuant to installation regulations.

B.,,Contractor personnel shall conduct and present themselves IAW acceptable professional business etiquette and workplace decorum at all times. The Contractor shall remove any individual from the site whose continued presence or employment on this contract is deemed by the KO or

COR to be contrary to the public interest, deemed to adversely affect health, morale, welfare, or good order and discipline on the installation, or inconsistent with the best interests of national security. IAW USC Title 18, Crimes and Criminal Procedure, Part I, Crimes, Chapter 67, Military and Navy, Section 1382, the Installation

Commander has the authority to bar individuals from the Host

Installation.

C.,,In the event of a strike by Contractor personnel, the Contractor shall be responsible for the cost of any increased security as determined necessary by the Installation Commander.

D.,,The contractor needs to sign off that all necessary training is complete prior to start of any project work.

Page 17 of 67ORDER NUMBER:

1620000390

E. The Contractor shall report any security violations to the KO or COR within one (1) hour up to three(3) hours of discovery. A security violation is any knowing, willful, or negligent action that could reasonably be expected to result in an unauthorized disclosure of classified information; to include a loss or gain of classified material. The contractor must wait for KO or COR to acknowledge their violation has been received and they have the okay to resume work. They cannot resume work at the site until receiving either verbal or written authorization to resume work.

1.7.1,, Incident Reporting. The Contractor shall submit a written incident report for each job-connected injury, occurrence of property damage, or motor vehicle accident to the PM or his/her designated representative. The Contractor and PM or designated representative will complete the Mishap Report per Host Installation guidelines. The estimated absence in days, if any, by employees due to injury and/or cost of property or vehicle damages shall be included.

1.7.2,, Personal Protective Equipment (PPE). The Contractor shall require their personnel to wear personal protection equipment (PPE)

(e.g., safety shoes or safety boots, hearing protection, eye protection, gloves, safety harnesses, etc.) in all areas and on all jobs as required by the Host Installation and IAW OSHA standards. The Contractor shall provide signage identifying all hard hat areas. The Government will not be responsible for furnishing or paying for the cost of PPE.

1.7.3,,Housekeeping and Waste and Debris Removal. The Contractor shall maintain a high level of workplace housekeeping at all times throughout the performance of this contract. The job site shall be cleaned at the end of each day of all debris (concrete chips, dirt, dust, water, etc.)

and waste material (metal, wood, plastic, packaging, packing, packaging, solvents, etc.). All scrap, waste, and spoil material shall be removed on a daily basis. All on-site waste and debris generated in performing this contract shall be disposed of off-site at Contractor arrangement and expense.

1.7.4,, Flammable and other hazardous materials. The Contractor shall comply with all OSHA standards for the storage, handling, dispensing and

Page 18 of 67ORDER NUMBER:

1620000390 application of flammable paints, solvents, i.e. motor fuels<(>,<)> corrosives, caustics, compressed gases, combustibles and other hazardous materials. This includes the use of ventilation, personal protective equipment, respiratory protection, lavage, monitoring for airborne contaminants and requirements to convey to workers the hazards associated with the operation. Only a one (1) day supply of flammable/other hazardous material may be kept at the job site. All other job stock of flammable/other hazardous material shall be stored

IAW with applicable OSHA standards at a Host Installation location remote from the job site as approved by the Host Installation Safety

Officer.

1.7.5,,Material Safety Data Sheets (MSDS). The Contractor shall submit current Safety Data Sheets(SDS) for all materials, including substitutions, prior to use on the project. All SDS’s submitted shall be reviewed by the distribution site safety personnel and approved ahead of time. This review with safety shall be coordinated with contractor, COR and POC.

1.7.6,,Hot Work Processes. Welding, cutting or use of flame devices require prior approval of the Host Installation Fire Department, Fire

Chief, and shall be performed in accordance with ANSI/AWS Z49.1:2012. A welding screen shall be used whenever welding is being done. The

Contractor shall have a firewatcher on duty whenever there is welding, cutting or open flame devices being used. The firewatcher shall have contractor supplied fire extinguisher with him during all grinding/flame cutting and welding operations. After welding is complete, the contractor shall maintain a fire watch for minimum 30 minutes after completion of work. At no time will Contractor use or block installed fire equipment, valve houses, or post indicator valves unless authorized by the Fire Department. Failure to follow this procedure may result in removal of personnel responsible permanently from the installation.

1.7.7,,Construction Equipment. Gasoline, diesel, and LPG fueled equipment use inside of buildings during installation requires approval from the Host Installation ESOH Office and will be kept to a minimum to preclude the build-up of carbon monoxide and other hazardous and noxious

Page 19 of 67ORDER NUMBER:

1620000390 fumes. Electric motor driven arc welding machines are preferred for welding. If gasoline or diesel engine welding machines are used, the machines will be kept outside of the building with welding cables running inside, or, the engine exhaust will be piped to the outside of the building subject to approval by the ESOH Office.

1.8 Preparedness Exercises

SECTION C-2: DEFINITIONS, ACRONYMS, and APPLICABLE DOCUMENTS.

2.0 General. The following documents of the exact issue form a part of this requirement to the extent specified herein. In the event of a conflict between the documents referenced herein and the contents of this SOW, this SOW shall be considered a superseding requirement. Any final interpretation of standards involving compliance with any applicable regulatory standard, other pertinent federal/State laws or codified regulations will rest with FPI UNICOR

2.1.1 Design Drawings. The Government will provide design drawings for each warehouse racking and storage project. The drawings will be conceptual in nature and shall be used for reference only. Where required to design, fit, and install the racks, dimensions shall not be taken from drawings but shall be taken in the field from measurements at the site location. All dimensions and quantities given in this specification and on the drawings are given in nominal values;

therefore, the Contractor may be required to make on-site measurements.

SECTION C-3: GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, SYSTEMS,

TRAINING, and SUPPORT SERVICES.

3.0 General. The Government will identify all Government furnished property, equipment, systems, training, and support services within each

Page 20 of 67ORDER NUMBER:

1620000390 individual Delivery Order issued under this Contract. The Contractor shall use the property, equipment, systems, and services supplied by the

Government only to perform work under this contract or as authorized by the KO or COR.

3.1 Utilities. The Government will provide electricity (120v, 15a, 60 Hz receptacles as a minimum) and nominal amounts of city water from existing sources for Contractor use during installation. Make up and take down of connections and lines shall be the Contractor’s responsibility. Prior to final acceptance, the Contractor shall remove all temporary connections and lines. The Contractor shall provide compressed air and any additional power requirements.

SECTION C-4: CONTRACTOR FURNISHED MATERIAL, SUPPLIES, EQUIPMENT,

TRAINING, SUPPORT SERVICES, and RESPONSIBILITIES.

4.0 General. The Contractor shall furnish all material, supplies, equipment, training, and support services required to perform the work under this contract that are not listed in Section C-3 of this SOW.

Title to all Contractor furnished items shall remain with the

Contractor. Contractor furnished equipment shall meet the same safety requirements as those established for Government equipment. The

Contractor shall furnish all of the necessary personnel and special equipment (MHE, cranes, etc.) and shall be responsible for offloading all Contractor furnished equipment and material delivered to the site.

The Contractor shall give the Government Representative or designee 48 hours advanced notice of all Contractor material and equipment deliveries to the work site.

4.1 Contractor Responsibility for GFP Accountability. Title to all GFP shall remain vested with the Government throughout the Period of

Performance of this contract. The Contractor shall safeguard the custody of, maintain proper care for, and provided quantitative and physical control over all GFP.

SECTION C-5: TASK REQUIREMENTS

Page 21 of 67ORDER NUMBER:

1620000390

5.0,,General. The work required by this contract shall be performed IAW this SOW and its subsequent Delivery Orders. The following represents the general task requirements that may be included in totality or in part for each specific Delivery Order.

5.0.1,, Parts and Services. The vendor shall provide a price list with pricing for all parts covered in the contract along with all necessary services such as but not limited to an engineering study. For parts that

UNICOR does not cover on the price list should be included in the prime contractor’s price list.

5.0.2,, Demo. Tear down of existing racks shall be necessary when included in the SOW of delivery orders. Demo shall include existing electrical, lighting, sprinklers, etc. as specified. Rental of equipment for demo and/or disposal shall be the vendor’s responsibility. Any disposal related to demo shall also be the vendor’s responsibility.

5.0.3,, Installation. Installation of new racking shall be necessary when included in the SOW of delivery orders. Note: The vendor shall submit a request for any specific information regarding floor/slab, roof, electrical, etc. needed pertaining to vendor’s installation which would be supplied by the government. This shall take place prior to the pre-installation conference, but no later than 30 days after delivery order award.

5.0.4,, Sprinkler Installation. Sprinkler installation shall be required when included in the SOW of delivery orders. No installation shall take place without completed plan drawings, calculations, and prior approval from the contracting officer.

5.0.5,, Specialty components. Specialty components not on parts list shall be priced in a percentage difference comparable to similar parts.

If the price difference is outside the comparable percentage;

negotiations/discussions shall be required with vendor and KO to determine a fair and reasonable alternative.

5.0.6,, High Priority/Expedite Requirements. On occasion KO may require vendor to provide expedited quotes ahead of existing pipeline of

Page 22 of 67ORDER NUMBER:

1620000390 quotation requests. On occasion KO may require high-priority projects be started/completed ahead of other projects in current pipeline.

Negotiations/discussions for these special requests will be coordinated between KO and vendor.

5.0.7,, Re-utilization Tear Down/Setup. On occasion there may be requirements for tearing down racking and setting up in other buildings or locations. These requirements may be in addition to the purchase and setup of new racking or they may be entirely re-utilization service. In some instances installations may require re-purposing where some or all of the racking is not UNICOR racking.

5.0.8,, Load Rating Markings. All racking whether new or repurposed shall be marked with load ratings based on the engineering study for each project. All sections of racking shall have load rating markings as per specs noted in 2.2.3.1

5.0.9,, Engineering Study. An engineering study shall be required for all projects, both new and/or repurposed racking. Engineering studies shall be developed based on the desired configuration in the project scope of work.

5.0.10,,Fire Protection Requirements. Vendor shall follow NFPA, UFC

(United Facilities Criteria), and FM Global for fire protection standards for all racking and bin boxes.

SECTION C-6: WAREHOUSE RACKING AND STORAGE TASKS.

6.1 Warehouse Racking and Storage Tasks.

6.1.1 Project Kick Off Meetings. The Contractor shall participate in post contract award Project Kick Off Meetings. The meetings will serve as a forum to address contractual and/or procedural issues related to the overall project and to finalize project related strategies. The meetings will also serve as pre - construction conferences during which project scheduling may be reviewed and finalized based on Government re-warehousing activities, and, Contractor manufacturing, and mobilization timelines. Preliminary design drawings may be reviewed during these meetings as well.

Page 23 of 67ORDER NUMBER:

1620000390

6.1.2 Design Review Meetings. The Contractor shall participate in preliminary and critical design review meetings to present, finalize, and gain final approval of all planned racking and storage system configurations and bills of materials. The outcome of these meetings will provide the Contractor with formal notice to proceed from the

Government for manufacturing, delivery, and installation based on the agreed upon Project Schedule.

6.1.3 Floor Testing. The Contractor shall perform an engineered floor capacity test and provide results to the PM or designated representative for review and acceptance before installing the racks. The Engineering

Report shall be used to confirm that the existing concrete floor shall support the loads including the racks to be installed. No drilling or alteration of the floor shall be done without coordination and approval from the Host Installation ESOH Office for drilling requirements. If the report shows that expected load exceeds the capacity of the floor, a determination shall be made by the PM, based on those findings as to plausible alternatives.

6.1.4 Warehouse Racking and Storage Supplies.

A. The Contractor will be required to install new and/or upgrade, retrofit, and/or repair existing warehouse racking and storage systems. This work may include, but not be limited to:

·,,Engineering and design to provide preliminary and final drawings and material lists.

·,,The disassembly and/or demolition and removal of obsolete racking and storage configurations and associated debris.

·,,The installation and assembly of new racking and storage configurations.

·,,Other retrofit, upgrade, and/or repair requirements to make existing racking and storage configurations operational.

B.,,The Contractor shall provide the necessary materials, hardware, equipment, and transportation to perform the work required by each individual Delivery Order. The required supplies may include, but not be limited to:

·,,Pallet Racking Systems, to include shelf beams, decking, decking channel, frame uprights, corner guards, heavy-duty crossbars, and

Page 24 of 67ORDER NUMBER:

1620000390 forklift bump rails;

·,,Cantilever Storage Rack Systems;

·,,Heavy Capacity Stacking Rack Systems;

·,,Associated hardware and accessories (e.g., fastening devices, cargo netting, and sprinkler systems);

·,,Finishing materials (e.g., paint, signage, and labelling);

·,,The only signage, stickers, etc. on parts shall refer to final rack system capabilities as determined in engineering analysis.

·,,All necessary transportation and installation equipment.

6.1.5 Government Acceptance Meetings. The Contractor shall participate in Government Acceptance Meetings to obtain final Government Acceptance of the installed racking and storage solution. These meetings will take place after the Contractor has completed all work required by the

Delivery Order SOW and has successfully passed all inspections. The

Contractor shall provide final as-built drawings and technical data at this time. (CDRL A003; CDRL A004).

6.2 Deliverables.

6.2.1 Installation Schedule. The Contractor shall prepare and submit an

Installation (Project) Schedule. The schedule shall detail the execution of all contractually and Delivery Order imposed tasks. The schedule shall provide the Government with planned performance information to assist the Contractor and the Government in project planning and control. Submission approval and acceptance is required prior to formal design and manufacture notice to proceed is granted. The schedule shall be submitted electronically in MS Project format NLT 30 days after contract award.

6.2.2 Preliminary Engineering Layout/Design Drawings. The Contractor shall prepare and submit preliminary Engineering Drawings and Associated

Lists. The Contractor shall provide engineering layout, design drawings, and associated engineered floor test report, equipment design drawings, and materials lists for all equipment to be supplied IAW the specifications detailed in this Contract and each individual Delivery order. A Professional Engineer (PE) stamp will be required (post

Page 25 of 67ORDER NUMBER:

1620000390 contract award; not during the solicitation/proposal stage) on all contractor design prints to attest to the design stability based on intended geographic location (seismic) of racking system. The PE stamp signifies that the maximum deflection permitted for load is within the parameters of the referenced standard. The Contractor shall certify each rack configuration for the maximum load rating and post the rating on each rack row (first and last upright in each row shall have a decal with max load).

Submission approval and acceptance is required prior to formal manufacture notice to proceed is granted. All documents shall be submitted electronically in AutoCAD 2015 (or later) and PDF format NLT

20 days after contract award.

6.2.3 Technical Representatives List. The Contractor shall prepare and submit a Technical Representative List. The Contractor shall provide contact information for the Government’s use in obtaining technical and warranty support from the Contractor and its Subcontractors, Vendors, and Suppliers after the completion and final acceptance of all contractually and Delivery Order imposed tasks.

All documents shall be submitted electronically in PDF format NLT 30 days prior to the completion of the Contract.

SECTION D PACKAGING AND MARKETING Not applicable

SECTION E - INSPECTION AND ACCEPTANCE El. 52.246-4 Inspection of

Services-Fixed-Price. (AUG 1996)

SECTION F - DELIVERIES OR PERFORMANCE

F1. FPI 1000F1 DELIVERY ORDER Supplement: LCL APPR

Delivery Orders will be submitted to offeror(s) via email. UNICOR does not mail delivery orders. Order confirmation shall be signed and dated in blocks 30 a, b and c of the delivery order and written confirmation must be returned to the contracting officer within 24 hours of order receipt.

Page 26 of 67ORDER NUMBER:

1620000390

Order confirmation containing the following information must be emailed to Barbara.McMaster@usdoj.gov or designee.

a.,,Date of order b.,,Purchase order number c.,,Item number and description, quantity, and unit price d.,,Delivery or performance date e.,,Place of delivery f.,,Shipping instructions g.,,Accounting data h.,,Any other pertinent information

Delivery lead time shall be twenty-one (21) days for the first delivery and (14) days for every order thereafter, unless a different delivery lead time is negotiated at the time of contract award, based on alternate delivery lead time proposed by offeror.

****PLEASE NOTE, DELIVERY DAY IS CALENDAR DAYS******

F2. FPI 1000F2 TIME OF DELIVERY/DELIVERY SCHEDULE

Supplement: LCL APPR

Delivery Order will be provided through:

Primary:

Barbara McMaster, Contract Specialist, UNICOR OFG, Central Office, 662-751-4800, EXT 4112 email Barbara.McMaster@usdoj.gov.

Secondary…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .