ATTACHMENT_1_SPECS_PR_Apartment.pdf
PDF 29 MB Posted
- Attached to
- Pine Ridge Quarters Apartment Building Federal contract opportunity
- Solicitation number
- 16-161-SOL-00039
About this file
ATTACHMENT 1 SPECS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0001_Amendment_2-24-17.pdf | ||
| ATTACHMENT_5_Photos_of_Site.pdf | ||
| ATTACHMENT_1_DRAWINGS.pdf | ||
| ATTACHMENT_3_-_BONDS_FORMS_.pdf | ||
| ATTACHMENT_4_-_PRE-PROPOSAL_INQUIRY_FORM.pdf | ||
| ATTACHMENT_2_-_General_Decision_Numbers.pdf | ||
| A15_Solicitation-1-27.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16-161-SOL-00039
Pine Ridge Quarters Apartment Building
2016-0009 IHS Staff Quarters
TABLE OF CONTENTS
CONTRACT: GENERAL, MECHANICAL, ELECTRICAL & CIVIL CONSTRUCTION
PROJECT: PINE RIDGE STAFF QUARTERS
INDIAN HEALTH SERVICES
PINE RIDGE, SOUTH DAKOTA
ARCHITECTS PROJECT NUMBER: 2016-0009
TITLE PAGE:
TABLE OF CONTENTS:
TECHNICAL SPECIFICATIONS:
CIVIL CONSTRUCTIONS - TABLE OF CONTENTS
Division Section Title Pages
DIVISION 01 - GENERAL REQUIREMENTS
01 3240 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 3260 CONSTRUCTION STAKING AND LAYOUT
01 4010 QUALITY CONTROL SERVICES
01 7830 OPERATION AND MAINTENANCE DATA AND PRODUCTS
DIVISION 03 - CONCRETE
03 3010 CAST-IN-PLACE CONCRETE
DIVISION 31 - EARTHWORK
31 2310 EXCAVATION AND EMBANKMENT
31 2322 TRENCHING, BACKFILLING, AND COMPACTING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1134 GRAVEL CUSHION
32 1310 CONCRETE PAVEMENT
32 1320 CURB AND GUTTER, FILLET, VALLEY GUTTER, AND
APPROACH PAVEMENT
32 1330 SIDEWALKS
32 9210 SEEDING AND FERTILIZING
DIVISION 33 - UTILITIES
33 1120 WATER MAINS AND APPURTENANCES
33 1125 HORIZONTAL DIRECTIONAL DRILLING
33 3110 WASTEWATER PIPING AND APPURTENANCES
GENERAL, MECHANICAL & ELECTRICAL CONSTRUCTION - TABLE OF CONTENTS
Division Section Title Pages
DIVISION 1 - GENERAL REQUIREMENTS
01210 ALLOWANCES 1
01300 ELECTRONIC SUBMITTAL PRODEDURES 1
01500 GENERAL REQUIREMENTS 5
DIVISION 2 - SITE CONSTRUCTION
02230 SITE CLEARING 2
02300 EARTHWORK 4
02301 SOIL INVERTIGATION REPORT 38
02611 SUBDRAINAGE 2
DIVISION 3 - CONCRETE
03300 CAST-IN-PLACE CONCRETE 8
DIVISION 4 – MASONRY
04810 UNIT MASONRY ASSEMBLIES 7
DIVISION 5 – METALS
05500 METAL FABRICATIONS 4
DIVISION 6 - WOOD AND PLASTICS
06100 ROUGH CARPENTRY 3
06160 SHEATHING 2
06176 METAL-PLATE-CONNECTED WOOD TRUSSES 3
06402 INTERIOR ARCHITECTURAL WOODWORK 5
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07210 BUILDING INSULATION 3
07215 SPARY FOAM INSULATION 1
07411 METAL ROOF PANELS 5
07412 METAL SOFFIT PANELS 3
07460 SIDING 2
07620 SHEET METAL FLASHING AND TRIM 4
07710 MANUFACTURED ROOF SPECIALTIES 2
07720 ROOF ACCESSORIES 2
07841 THROUGH-PENETRATION FIRESTOP SYSTEMS 3
07842 FIRE-RESISTIVE SYSTEMS 2
07920 JOINT SEALANTS 3
DIVISION 8 - DOORS AND WINDOWS
08110 STEEL DOORS AND FRAMES 3
08114 SLIP-ON STEEL FRAMES 2
08211 FLUSH WOOD DOORS 3
08212 PRE-FINISHED WOOD FIBER PANEL DOORS & BI-FOLDS 2
08214 ALUMINUM CLAD WOOD HINGED DOORS 3
08411 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS 4
08561 VINYL WINDOWS 3
08711 DOOR HARDWARE 11
08800 GLAZING 5
DIVISION 9 - FINISHES
09250 GYPSUM BOARD 3
09310 CERAMIC TILE 4
09511 ACOUSTICAL PANEL CEILING 3
09651 LUXURY VINYL TILE 3
09652 SHEET VINYL FLOOR COVERINGS 2
09680 CARPET 2
09681 WALK-OFF CARPET 2
09770 SPECIAL WALL SURFACES (FRP PANELS) 2
09912 PAINTING 6
DIVISION 10 - SPECIALTIES
10155 TOILET COMPARTMENTS 2
10431 SIGNS 2
10520 FIRE –PROTECTION SPECIALTIES 2
10521 SECURITY FIRE-PROTECTION SPECIALTIES 1
10801 TOILET AND BATH ACCESSORIES 3
DIVISION 11 - EQUIPMENT
11451 RESIDENTIAL APPLICANCES & FURNITURE 3
DIVISION 12 - FURNISHINGS
12366 VANITY SINK TOPS & SOLID-SURFACE 1
DIVISION 13 TO 14
NOT APPLICABLE
DIVISION 15 - MECHANICAL
SEE MECHANICAL INDEX
DIVISION 16 - ELECTRICAL
SEE ELECTRICAL INDEX
A16101 TABLE OF CONTENTS Page 1 Pine Ridge Staff Quarters Indian Health Service
12/30/2016
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 3240 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 3260 CONSTRUCTION STAKING AND LAYOUT
01 4010 QUALITY CONTROL SERVICES
01 7830 OPERATION AND MAINTENANCE DATA AND PRODUCTS
DIVISION 03 - CONCRETE
03 3010 CAST-IN-PLACE CONCRETE
DIVISION 31 - EARTHWORK
31 2310 EXCAVATION AND EMBANKMENT
31 2322 TRENCHING, BACKFILLING, AND COMPACTING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1134 GRAVEL CUSHION
32 1310 CONCRETE PAVEMENT
32 1320 CURB AND GUTTER, FILLET, VALLEY GUTTER, AND
APPROACH PAVEMENT
32 1330 SIDEWALKS
32 9210 SEEDING AND FERTILIZING
DIVISION 33 - UTILITIES
33 1120 WATER MAINS AND APPURTENANCES
33 1125 HORIZONTAL DIRECTIONAL DRILLING
33 3110 WASTEWATER PIPING AND APPURTENANCES
A16101 Pine Ridge Staff Quarters Indian Health Service
01 3240 - 1 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES
SECTION 01 3240
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
PART 1 - GENERAL
1.01 GENERAL
A. The Contractor shall submit shop drawings, product data, and samples for all equipment and materials as set forth in the specifications.
B. The Contractor is required to submit to the Engineer a detailed schedule of necessary shop drawings and product data.
1.02 SUBMITTAL REQUIREMENTS
A. Shop Drawings:
1. Shop drawings shall be submitted in sufficient detail to show the type, size, arrangement, and function of all components.
2. Details shall refer to Plan Sheet number, specification section, schedule, or other reference to the Contract Documents.
B. Product Data:
1. Product data shall clearly show the pertinent product, model number, size, performance characteristics, connections, anchorages, and other data necessary to evaluate compliance with project requirements.
2. Delete extraneous information not applicable to the Work and supplement with additional information where standard literature or drawings do not provide information specifically applicable to the Work.
C. Samples:
1. Submit samples in sufficient size or quantity to fully illustrate characteristics, color, texture, pattern, and details of the product when requested by the Owner or Engineer.
1.03 PROCEDURES
A. Contractor Responsibility:
1. The Contractor shall review all shop drawings and samples prior to submission and shall verify the complete conformance of the submittal with project requirements.
2. Field measurements shall be verified before submittals and any variation from project requirements shall be identified and brought to the attention of the Engineer in writing.
B. Submittal Requirements:
1. Submit shop drawings, product data, and samples in strict accordance with the schedule.
2. Submit two (2) copies for use and distribution by the Engineer and such additional number of copies needed for Contractor use or for the use of his subcontractors or suppliers.
a. Electronic submittals may be used if approved by the Engineer.
3. Coordinate with the Engineer quantities or volumes of samples required.
4. Each submittal shall contain the following minimum information:
a. Date of submission.
b. Project title.
c. Contractor's name.
d. Supplier or manufacturer's names and addresses.
e. Identification of product with reference to specification number and/or plan sheet.
f. Field measurements and dimensions.
g. Reference to applicable standards (ASTM, etc.).
h. Clear identification of deviations from standard items or deviations from specifications.
i. Contractor's stamp certifying as to his review and verification of all criteria and field measurements. Stamp must be signed and dated.
5. Sequentially number the transmittal form.
C. Engineer's Review:
1. The Engineer will review submittals and mark as "approved," "rejected," or "revise and resubmit."
Indian Health Service
01 3240 - 2 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES
2. Two (2) copies will be retained for the Engineer's use with all other copies returned to the Contractor.
3. If resubmission is required, the Contractor shall make the necessary corrections and make an entirely new submittal with the same number of copies as required for an initial submittal.
4. Resubmitted data must clearly show changes other than those requested by the Engineer.
5. The Engineer will review submittals with reasonable promptness and in accordance with the submittal schedule.
6. The Engineer will return without review any material not submitted directly from the
Contractor, such as submittals from subcontractors or suppliers.
D. Engineer's Responsibility:
1. The Engineer will assume no responsibility for the correctness, dimensional accuracy, or completeness of submittals.
2. The Engineer's review will in no way relieve the Contractor of his responsibility to furnish materials and products in compliance with the Contract Documents.
3. Unless deviations from Contract Documents are clearly identified in the submittal, the Engineer's review does not constitute an acceptance by the Engineer.
1.04 SUBSTITUTIONS
A. The contract is based on the standards of quality established in the Contract Documents.
B. Substitutions will be permitted only with prior review of the Engineer before the bid opening.
C. Submit complete data for proposed substitutions not later than seven (7) days in advance of the bid opening date.
D. Products or equipment which are specified by reference to standard specifications (ASTM, etc.)
and products specified by reference to a specific manufacturer's name and catalog number do not require further review, except as provided during the normal submittal process after contract award.
E. "Or Equivalent" Provisions:
1. Where the phrase "or equivalent" is used in the specifications, do not assume that a substitute material or product will be considered as equivalent unless the item has been specifically reviewed by the Engineer.
2. The Engineer is solely responsible for evaluating substitutions and his decision shall be final.
PART 2 – PRODUCTS – NOT USED
PART 3 – EXECUTION – NOT USED
END OF SECTION 01 3240
Indian Health Service
01 3260 - 1 CONSTRUCTION STAKING AND
LAYOUT
SECTION 01 3260
CONSTRUCTION STAKING AND LAYOUT
PART 1 - GENERAL
1.01 GENERAL
A. The Contractor will be responsible for the accurate construction of all work to the lines, grades, and elevations indicated on the Drawings. The Engineer will furnish basic survey control described herein, but will not necessarily provide all layout and staking services which may be required for specific items of Work.
1.02 SURVEY CONTROL PROVIDED BY THE ENGINEER
A. Engineer will establish, at the expense of the Owner, such baseline and control points, bench marks, and other data necessary for the Contractor's layout work. The Engineer will provide survey controls as follows:
1. Basic survey control and construction staking for this project.
2. Staking culverts, fencing, and miscellaneous work as determined necessary by the Engineer.
3. Work Limits
B. The staking furnished by the Engineer will be performed generally in the sequence and at such time as the Contractor requests. The Contractor shall provide at least 48 hours advance notice to the Engineer if staking is needed.
1.03 ELECTRONIC DESIGN FILES FOR USE IN MACHINE CONTROL
A. After award of the project and completion of the contract agreement process, the Contractor may choose to request electronic design data and information from Calrk Engineering Corp. for the Contractor’s use with machine control software and equipment during construction of the project. Calrk Engineering Corp. may provide electronic surface files in dtm, Landxml, or dxf format for the Contractor’s use with electronic machine control equipment.
B. It is Calrk Engineering Corp.’s standard practice to provide such electronic information with a disclaimer and release of liability caveat attached directly to those electronic files. Contractor is advised the only document governing construction of the project is the printed Plans and Specifications. Electronic files provided by Calrk Engineering Corp. are provided only as an aid and assistance to the Contractor for use of electronic machine control equipment. Contractor shall verify the compatibility of their machine control software and equipment with the electronic files provided. Contractor is solely responsible for the construction of the project in accordance with the printed Plans and Specifications. Deviations or discrepancies between Contractor operated machine control equipment and printed Plans and Specifications will not be considered a basis for additional compensation or a basis for acceptance of work that does not conform to the lines, grades, and specifications in the printed Contract Documents and Plan drawings.
C. The Contractor’s acceptance and use of electronic design information shall constitute acceptance and agreement to the conditions outlined above for the Contractor’s use of such data.
1.04 LOST OR DESTROYED SURVEY CONTROL
A. When control points provided by the Engineer are destroyed during the course of the work, the
Contractor shall notify the Engineer and shall replace such points or stakes based on remaining control points and using procedures meeting approval of the Engineer.
B. If it is necessary for the Engineer to replace survey control lost or destroyed due to the Contractor’s activities, the Engineer reserves the right to charge the Contractor on an hourly basis of $110 per hour plus applicable expenses for the work required to replace the lost or destroyed stakes. No replacement staking will be performed without the Contractor’s written authorization.
Indian Health Service
01 3260 - 2 CONSTRUCTION STAKING AND
LAYOUT
1.05 CHANGES OR DISCREPANCIES ON SURVEY LAYOUT
A. The Engineer shall be promptly notified of any discrepancies in the staking discovered by the
Contractor or others. The Contractor shall not make changes or relocations without written approval of the Engineer.
PART 2 – PRODUCTS – NOT USED
PART 3 – EXECUTION – NOT USED
END OF SECTION 01 3260
Indian Health Service
01 4010 - 1 QUALITY CONTROL SERVICES
SECTION 01 4010
QUALITY CONTROL SERVICES
PART 1 - GENERAL
1.01 LABORATORY TESTS
A. The Owner will employ and pay for the testing services by the Engineer or by another laboratory testing service as determined necessary and required for this project. Testing will include, but not necessarily be limited to, the following:
1. Testing of backfill compaction over water mains, gravity sewer, force main, and related appurtenances.
2. Other testing as may be required.
B. The Contractor shall cooperate with the Engineer or laboratory to facilitate testing as necessary.
C. Employment of the Engineer or the laboratory to perform quality control testing shall in no way relieve the Contractor of any obligations of the contract.
D. The Contractor shall employ and pay for the services of an independent testing laboratory to perform specified services and testing related to design of mixes, source acceptance, testing of aggregates and other materials, and those tests associated with field testing work set forth in Part 3 of this specification.
1.02 QUALIFICATION OF LABORATORY
A. Meet basic requirements of ASTM E329 - Standard Specification for Agencies Engaged
Construction Inspection and/or Testing.
B. Approved by the Engineer.
1.03 REPORTS BY LABORATORY
A. Submit two (2) copies of all reports to the Engineer detailing the procedures and results of all tests.
B. Include the following with each report:
1. Date of report
2. Name of laboratory technician
3. Project title and number
4. Temperature and weather
5. Date and time of sampling or inspection
6. Identification of product and specifications section
7. Location of sample in the Project
8. Type of test/inspection
9. Results of test/inspection
10. Conformance with Contract Documents
11. When requested by Engineer, provide interpretation of results
1.04 LIMITATION OF LABORATORY AUTHORITY
A. Laboratory is not authorized to:
1. Alter, release, revoke, or enlarge on requirements of the Contract Documents.
2. Approve or accept any portion of the Work.
3. Perform any duties of the Contractor.
4. Stop work.
1.05 SCHEDULE OF LABORATORY TESTS REQUIRED
A. Section 03 3310 - Cast-in-Place Concrete B. Section 31 2200 - Grading C. Section 31 2322 - Trenching, Backfilling, and Compacting D. Section 32 1110 - Aggregate Base Course
Indian Health Service
01 4010 - 2 QUALITY CONTROL SERVICES
PART 2 - PRODUCTS - NOT USED
PART 3 - EXECUTION
3.01 MANUFACTURER’S FIELD SERVICES
A. Contractor shall provide and pay for the services of manufacturer's representatives to perform the specified services.
B. Specific services to be required vary with equipment or systems provided. Refer to specific specifications sections for scope of services.
3.02 QUALIFICATIONS OF MANUFACTURER'S REPRESENTATIVE
A. Authorized representative of manufacturer.
B. With manufacturer for at least two (2) years of uninterrupted service.
C. Experience specifically applicable to the type and size of equipment or system used on this project.
3.03 FIELD TESTING
A. Contractor shall pay all costs associated with field testing of specified materials and equipment.
B. Specific services to be required vary with materials or equipment used. Refer to specific sections of the specifications for scope of services.
3.04 TESTING REQUIREMENTS
A. Provide all materials, labor, equipment, and services for testing.
B. Notify Engineer of all tests at least 24 hours in advance.
C. Repair all materials and equipment which fail during testing.
3.05 SCHEDULE OF FIELD TESTS REQUIRED
A. Tests by Contractor:
1. Leak testing of pipelines and hydraulic structures
a. Section 33 1120 - Water Mains and Appurtenances
2. Bacterial Testing
a. Section 33 1120 - Water Mains and Appurtenances
B. Tests by Owner:
1. Section 03 3310 - Cast-in-Place Concrete: Slump, Air Content, and Cylinders
2. Section 31 2322 - Trenching, Backfilling, and Compacting: Density
3. Section 32 1110 - Aggregate Base Course: Density
END OF SECTION 01 4010
Indian Health Service
01 7830 - 1 OPERATION AND
MAINTENANCE DATA AND
PRODUCTS
SECTION 01 7830
OPERATION AND MAINTENANCE DATA AND PRODUCTS
PART 1 - GENERAL
1.01 GENERAL
A. The Contractor shall provide spare parts, maintenance materials, special tools, and other similar items as specified in the individual specification sections. Provide also any unspecified items which are furnished by the manufacturer or supplier.
B. Maintenance items shall be properly stored in weathertight facilities until delivered to the Owner.
1.02 DELIVERY TO OWNER
A. At or prior to the time of inspection for substantial completion, deliver all required items to the Owner and place in storage locations designated by the Owner.
B. Prepare an inventory invoice of all items delivered and verify with the Engineer. Identify any damage or deficiency in delivered items, and any missing items.
C. The Owner, Engineer, and Contractor shall sign the invoice certifying that all listed items were delivered in good condition unless noted otherwise.
D. The Contractor shall promptly obtain and deliver all items to replace damaged, defective, or missing items noted on the original invoice. Prepare and submit invoices for replacement items and obtain Owner's and Engineer's signature.
E. Final payment will not be made until the above described procedures have been satisfied.
PART 2 – PRODUCTS – NOT USED
PART 3 – EXECUTION
3.01 OPERATION AND MAINTENANCE MANUALS
A. The Contractor shall compile product data, maintenance information, and related material necessary for the Owner's proper use and operation of products furnished under the Contract.
The Contractor shall further fully instruct Owner's personnel in product maintenance and equipment operation.
3.02 QUALITY OF SUBMITTALS
A. All operation and maintenance data shall be prepared by professionally-trained personnel, completely familiar with the product. Written and graphic instructions shall be thorough, legible, and complete in all respects.
3.03 FORMAT
A. All operations and maintenance submittals shall be in 8 1/2" x 11" size or 11" x 17" folded to 8
1/2" x 11". Larger drawings shall be reduced in scale or may be folded and inserted in 8 1/2" x 11" envelopes if reduction is impractical. Provide indexed tabs for each component or section.
B. Each volume of operating and maintenance data for the various categories of products or equipment shall have an identifying cover sheet on heavy paper with typed or commercially printed titles, including "OPERATING AND MAINTENANCE INSTRUCTIONS", project title, subject matter covered, manufacturer's identification, and other applicable identification.
C. Manuals shall be assembled and bound in high quality 3-ring or 3-post type binders. Verify binding order, formats with Engineer.
3.04 GENERAL CONTENTS OF MANUALS
A. Each volume of manuals shall have the following minimum information:
1. Table of Contents:
a. Contractor's name, address, phone.
b. Product or system tabulation and index.
c. Listing with each product or system of subcontractor or installer, maintenance contractor, or service representative, area of responsibility, and local supply source for parts and replacements. Include all names, addresses, phone numbers.
Indian Health Service
01 7830 - 2 OPERATION AND
MAINTENANCE DATA AND
PRODUCTS
d. Product identification reference to plans and specification numbers.
2. Product Data: Include only material which is relevant to the project and clearly identify all data applicable to the installation.
3. Drawings: Drawings shall be used to supplement written data as necessary and shall show only relevant features. Coordinate drawings with project record drawings to assure correct illustration of completed installation. Copies of project record drawings are not appropriate as maintenance drawings.
4. Written Text: Written instructions and data shall be organized in a consistent format with logical and clearly written instructions for each procedure.
5. Copies of Warranties, Bonds, and Service Contracts: An instruction sheet shall accompany each item with proper instructions regarding claims procedures in the event of failure, plus any special instructions which might affect the validity of warranties or bonds.
3.05 CONTENTS OF MANUALS FOR MATERIALS AND FINISHES
A. Provide a maintenance manual for the materials and finishes listed in the schedule of manuals.
Manual contents shall include the following:
1. For architectural products, include manufacturer's catalog number, size, composition, texture, color, and related descriptive information.
2. Information necessary for reordering replacement items from the manufacturer.
3. Instructions for care and maintenance including recommended cleaning agents and methods, cautions regarding undesirable agents or methods, and a recommended schedule for cleaning and/or maintenance.
4. For moisture and weather protection systems, give full manufacturer's data including applicable codes and standards, chemical composition, installation details, and instructions for inspection, maintenance, and repair.
5. Miscellaneous data not listed above, but required by the various sections of specifications or necessary for proper maintenance of the product.
3.06 PROCEDURES FOR SUBMITTAL
A. Materials and Finishes:
1. Submit three (3) preliminary copies of manuals not less than 15 days before request for final inspection.
2. Engineer will review and return one (1) copy if acceptable or two (2) copies if unacceptable with deficiencies noted.
3. Final inspection will not be made until preliminary manuals are accepted.
4. Submit two (2) hard copies and one (1) electronic copy of final manuals within 10 days after final inspection. Final payment will not be made until receipt of final accepted manuals.
3.07 INSTRUCTION OF OWNER'S PERSONNEL
A. Prior to final inspection or acceptance, the Contractor shall arrange for instruction of Owner's operating personnel in the operation, adjustment, and maintenance of all products, equipment, and systems. Refer to specification for field services by manufacturer's representative.
1. The manufacturer’s representative shall instruct the Owner’s representative on site how to operate and maintain the lift station and equipment.
B. Manuals must be complete and accepted in preliminary form before conducting instructions to
Owner's personnel.
END OF SECTION 01 7830
Indian Health Service
03 3010 - 1 CAST-IN-PLACE CONCRETE
SECTION 03 3010
CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Cast-in-place concrete, the extent of which is shown on the drawings.
B. Concrete formwork C. Miscellaneous concrete elements, including thrust blocks and manholes D. Concrete curing
1.02 ADDITIONAL REQUIREMENTS SPECIFIED ELSEWHERE
A. Section 01 3240 - Shop Drawings, Product Data, and Samples B. Section 01 4010 - Quality Control Services
1.03 MEASUREMENT AND PAYMENT
A. Concrete - Slab-on-Grade or Slab-on-Fill: Includes formwork, reinforcement, concrete, placement accessories, consolidating and leveling, troweling, and curing.
1. Measurement & Payment by: Square Yard
B. Concrete - PCC & Driveway Pavement: Includes formwork, reinforcement, concrete, placement accessories, consolidating and leveling, troweling, and curing.
1. Measurement & Payment by: Square yard
C. Concrete - Sidewalk: Includes formwork, reinforcement, concrete, placement accessories, consolidating and leveling, troweling, and curing.
1. Measurement & Payment by: Square foot
D. Concrete - Curb and Gutter: Includes formwork, reinforcement, concrete, placement accessories, consolidating and leveling, troweling, and curing.
1. Measurement & Payment by: Linear foot
E. Concrete - Type 1 Curb Ramp with Detectable Warning Panel: Includes formwork, concrete, placement, accessories, and curing.
1. Measuremen & Paymentt: By the contract unit.
F. Concrete - Blocks: Includes formwork, concrete, placement, accessories, and curing.
1. Payment shall be included with the cost of installing each fitting. No separate measurement or payment will be made.
1.04 SUBMITTALS
A. Product Data: Submit manufacturer's product data with application and installation instructions for proprietary materials and items, including reinforcement and forming accessories, admixtures, patching compounds, joint systems, curing compounds, and others as required by the Engineer.
B. Submit shop drawings for fabrication, bending, and placement of concrete reinforcement.
Comply with ACI 315-80 "Manual of Standard Practice for Detailing Reinforced Concrete Structures" showing bar schedules, stirrup spacing, diagrams of bent bars, arrangement of concrete reinforcement. Include special reinforcement required for openings through concrete structures.
C. Mix Design: Submit proposed concrete mix design.
1. Slump on which design is based.
2. Gallons of water per cubic yard.
3. Brand, type, and quantity of cement.
4. Specific gravity and gradation of each aggregate.
5. Aggregate ratios.
6. Dry weight of aggregate per cubic yard.
7. Brand, type, and quantity of each admixture.
Indian Health Service
03 3010 - 2 CAST-IN-PLACE CONCRETE
8. Air entrainment content.
9. Compressive strengths of 7-day and 28-day test specimens of mix design proposed for use.
10. Indicate proposed mix design complies with requirements of ACI 301, Section 4 - Concrete
Mixtures.
11. Indicate proposed mix design complies with requirements of ACI 318, Chapter 5 - Concrete
Quality, Mixing, and Placing.
D. Laboratory Test Reports: Submit two (2) copies of laboratory test reports for concrete materials and mix design test as specified.
E. Material Certificates: Provide materials certificates in lieu of material laboratory test reports when permitted by Engineer. Material certificates shall be signed by manufacturer and Contractor, certifying that each material item complies with, or exceeds specified requirements.
1.05 QUALITY ASSURANCE
A. Codes and Standards: Comply with provisions of the following codes, specifications, and standards, except where more stringent requirements are shown or specified.
1. ACI 301 "Specifications for Structural Concrete for Buildings."
2. ACI 304 "Recommended Practice for Measuring, Mixing, Transporting and Placing
Concrete."
3. ACI 318 "Building Code Requirements for Reinforced Concrete."
4. ACI 347 "Recommended Practice for Concrete Formwork."
5. Concrete Reinforcing Steel Institute, "Manual of Standard Practice."
B. Qualifications of Installers: Throughout the progress of installation of the work of this section, provide at least one (1) person who shall be thoroughly familiar with the specified requirements, completely trained and experienced in the necessary skills, and who shall be present at the site and shall direct all work performed under this section. Use adequate number of skilled workmen to ensure installation in strict accordance with the drawings and specifications.
C. Materials and installed work may require testing and retesting, as directed by the Engineer, at any time during progress of the work. Allow free access to material stockpiles and facilities.
Tests not specifically indicated to be done at Owner's expense, including retesting of rejected materials and installed work, shall be done at Contractor's expense.
1.06 PRODUCT DELIVERY AND HANDLING
A. Prepare delivery ticket for each load of ready-mixed concrete and deliver to Owner's representative.
B. Ticket to include: quantity, mix proportions or identifier, time when cement added, water added at site (if any), and temperature (air).
PART 2 - PRODUCTS
2.01 FORM MATERIALS
A. Forms for Exposed Finish Concrete: Unless otherwise indicated, construct formwork for exposed concrete surfaces with plywood, metal, metal-framed plywood faced, or other acceptable panel-type materials to provide continuous straight, smooth, exposed surfaces.
1. Furnish in largest practicable sizes to minimize number of joints and to conform to joint system shown on drawings. Provide form material with sufficient thickness to withstand pressure of newly-placed concrete without bow or deflection.
B. Forms for Unexposed Finish Concrete: Form concrete surfaces which will be unexposed in finished structure with plywood, lumber, metal, or other acceptable material. Provide lumber dressed on at least two edges and one side for tight fit.
C. Form Coating: Provide commercial formulation form-coating compounds that will not bond with, stain, nor adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
Indian Health Service
03 3010 - 3 CAST-IN-PLACE CONCRETE
2.02 REINFORCING MATERIALS
A. Reinforcing Bars: ANSI/ASTM A615, Grade 60, deformed.
B. Steel Wire: ANSI/ASTM A82, plain, cold-drawn, steel.
C. Welded Wire Fabric: ANSI/ASTM A185, welded steel wire fabric.
D. Supports for Reinforcement: Provide supports for reinforcement including bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire fabric in place. Use wire bar type supports complying with CRSI recommendations, unless otherwise acceptable.
1. For slabs-on-grade, use supports with sand plates or horizontal runners where base material will not support chair legs.
2. For exposed-to-view concrete surfaces, where legs of supports are in contact with forms, provide supports with legs which are plastic protected (CRSI, Class 1) or stainless steel protected (CRSI, Class 2).
2.03 CONCRETE MATERIALS
A. Portland Cement: ANSI/ASTM C150, Type II - Moderate, unless otherwise acceptable to
Engineer.
1. Use cement for entire project from same source, unless otherwise acceptable to Engineer.
B. Normal Weight Aggregates: ANSI/ASTM C33, and as herein specified. Provide aggregates from single source.
C. Water: Potable.
D. Air-Entraining Admixture: ANSI/ASTM C260.
E. Calcium chloride not permitted.
F. Fly ash not permitted.
2.04 RELATED MATERIALS
A. Non-Shrink Grout: CRD-C 588, factory premixed grout subject to compliance with requirements, provide Type D, nonmetallic, one of the following:
1. "Masterflow 713"; Master Builders.
2. "Sonogrout"; Sonneborn-Contech.
3. "Euco-NS"; Euclid Chemical Co.
4. "Five Star Grout"; U. S. Grout Co.
5. "Duragrout"; L & M Const. Chemical Co.
6. Engineer approved equal
B. Moisture-Retaining Cover for Curing: One of the following, complying with ANSI/ASTM C171:
1. Waterproof paper.
2. Polyethylene film.
3. Polyethylene-coated burlap.
C. Liquid Membrane-Forming Curing Compound: Federal Spec TT-C-800, Type I, unless other type acceptable to the Engineer.
1. Products offered by manufacturers to comply with the requirements for membrane-forming curing compounds include the following:
a. "Klearseal"; Setcon Industries.
b. "Floor Coat"; The Euclid Chemical Corp.
c. "MB-429"; Master Builders.
d. "Kure N Seal 800"; Sonneborn-Contech.
e. "Klorkure 800"; Setcon Industries.
f. "Clear Seal 800"; W. R. Grace.
g. "Dress and Seal"; L & M Const. Chemicals.
h. "Sealco 800"; Gifford-Hill.
i. "Horn WB-309 Cure"; AC Horn, Inc.
j. Engineer approved equal.
Indian Health Service
03 3010 - 4 CAST-IN-PLACE CONCRETE
D. Expansion Joint Materials:
1. Fiber: Nonextruding, ASTM D554.
2. Foam: Resilient closed cell polyurethane
a. Acceptable Products:
1) W.R. Meadows "Rescor"
2) Masco flexible foam expansion joint filler
3) Engineer approved equal
3. Sealer: Cold applied, polymer based elastomer
a. Acceptable Products:
1) W.R. Meadows "Gardox"
2) Dow Corning 890-SL
3) Engineer approved equal
2.05 PROPORTIONING AND DESIGN OF MIXES
A. Prepare design mixes for each type and strength of concrete by either laboratory trial batch or field experience methods as specified in ACI 301. If trial batch method is used, use an independent testing facility acceptable to Engineer for preparing and reporting proposed mix designs.
B. Submit written reports to Engineer of each proposed mix for each class of concrete at least fifteen (15) days prior to start of work. Do not begin concrete production until mixes have been reviewed by Engineer.
C. Concrete of the various mixes indicated as required in these specifications or on the drawings shall be proportioned in accordance with the following requirements as a minimum. Appropriate structural concrete designs shall be furnished by the Contractor.
Location Walls & Slabs in Contact With Soil
Footings, Pipe Easements and Interior Slabs and not Subject to Freezing
Miscellaneous Concrete Permanently Exposed to Weather, Such as Sidewalks, Pipe Supports, Etc.
Compressive strength at 28 days
4000 psi 3000 psi 4000 psi
Minimum Cement Content
578 lbs/CY 517 lbs/CY 578 lbs/CY
Maximum Water Cement Ratio
0.45 0.53 0.45
Size of Course Aggregate
3/4" 3/4" 3/4"
*Slump Range 3" - 4" 2" - 3" 3" - 4"*** **Air Content 5% - 7.5% 5% - 7.5% 5% - 7.5%
1. *Slump Ranges do not apply if an approved high range water reducing agent is used.
2. **Air may be omitted from interior floor slabs not subject to freezing.
3. ***Maximum 2" slump for slip form paving.
D. Admixtures: Add acceptable admixtures as recommended in ACI 211.1 and at rates recommended or required by manufacturer.
2.06 CONCRETE MIXES
A. Ready-Mix Concrete: Comply with requirements of ANSI/ASTM C94, and as herein specified.
Each batch or truckload of concrete shall be in place within 1 1/2 hours from the time the water is introduced into the mixture. Retempering of delayed batches which have stiffened shall be prohibited. Indiscriminate addition of water to increase slump shall be prohibited. When the
Indian Health Service
03 3010 - 5 CAST-IN-PLACE CONCRETE
concrete arrives at the project with slump below that suitable for placing, water may be added only if neither the maximum permissible water-cement ratio nor the maximum slump is exceeded. The water must be incorporated by additional mixing equal to at least half of the total mixing required. Any addition of water above that permitted by the limitation of water-cement ratio shall be accompanied by a quantity of cement sufficient to maintain the specified water-cement ratio. Such addition must be reviewed by the Engineer.
B. During hot weather, or under conditions contributing to rapid setting of concrete, a shorter mixing time than specified in ANSI/ASTM C94 may be required.
1. When air temperature is between 85 degrees F and 90 degrees F, reduce mixing and delivery time from 1 1/2 hours to 75 minutes.
2. When air temperature is above 90 degrees F, reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.01 FORMS
A. Design, erect, support, brace and maintain form work to support vertical and lateral loads that might be applied until such loads can be supported by concrete structure. Construct form work so concrete members and structure are of correct size, shape, alignment, elevation, and position.
B. Design form work to be readily removable without impact, shock, or damage to cast-in-place concrete surfaces and adjacent materials.
C. Construct forms to sizes, shapes, lines and dimensions shown, and to obtain accurate alignment, locations, grades, level and plumb work in finished structures. Provide for openings, offsets, sinkages, keyways, recesses, moldings, rustications, reglets, chamfers, blocking, screeds, bulkheads, anchorages and inserts, and other features required in work. Use selected materials to obtain required finishes. Solidify butt joints and provide backup at joints to prevent leakage of cement paste.
D. Fabricate forms for easy removal without hammering or prying against concrete surfaces.
Provide crush plates or wrecking plates where stripping may damage cast concrete surfaces.
Provide top forms for inclined surfaces where slope is too steep to place concrete with bottom forms only. Kerf wood inserts for forming keyways, reglets, recesses, and the like, to prevent swelling and for easy removal.
E. Provide temporary openings where interior area of form work is inaccessible for cleanout, for inspection before concrete placement, and for placement of concrete. Securely brace temporary openings and set tightly to forms to prevent loss of concrete mortar. Locate temporary openings on forms at inconspicuous locations.
F. Form Ties: Factory-fabricated, adjustable-length, removable or snap-off metal form ties, designed to prevent form deflection, and to prevent spalling concrete surfaces.
1. Unless otherwise indicated, provide ties so portion remaining within concrete after removal is at least 1 1/2" inside concrete.
2. Unless otherwise shown, provide form ties which will not leave holes larger than 1" diameter in concrete surface.
G. Provisions for Other Trades: Provide openings in concrete form work to accommodate work of other trades. Determine size and location of openings, recesses and chases from trades providing such items. Accurately place and securely support items built into forms.
H. Cleaning and Tightening: Thoroughly clean forms and adjacent surfaces to receive concrete.
Remove chips, wood, sawdust, dirt, or other debris just before concrete is placed. Retighten forms and bracing after concrete placement is completed to eliminate mortar leaks and maintain proper alignment.
3.02 PLACING REINFORCEMENT
A. Comply with Concrete Reinforcing Steel Institute's "Recommended Practice for Placing
Reinforcing Bars," for details and methods of reinforcement placement and supports, and as herein specified.
Indian Health Service
03 3010 - 6 CAST-IN-PLACE CONCRETE
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other materials which reduce or destroy bond with concrete.
C. Accurately position, support and secure reinforcement against displacement by form work, construction, or concrete placement operations. Locate and support reinforcing by metal chairs, runners, bolsters, spacers, and hangers, as required.
D. Place reinforcement to obtain the required coverages for concrete protection. Arrange, space and securely tie bars and bar supports to hold reinforcement in position during concrete placement operations. Set wire ties so ends are directed into concrete, not toward exposed concrete surfaces.
E. Bending: Bend bars cold.
F. Splices:
1. Lap all splices 32 bar diameters, but at least 24".
2. Continue bars through corners using bent bar laps.
3.03 JOINTS
A. Construction Joints: Locate and install construction joints, which are not shown on drawings, so as not to impair strength and appearance of the structure, as acceptable to Engineer.
B. Provide keyways at least 1 1/2" deep in construction joints in walls, slabs, beams, columns and between walls and footings; accepted bulkheads designed for this purpose may be used for slabs.
C. Place construction joints perpendicular to the main reinforcement. Continue reinforcement across construction joints except for slabs on grade.
D. Build in water stops at all construction joints shown on the plans, or at other construction joint locations for tank and other structures used for water containment.
E. Isolation Joints in Slabs-on-Ground: Construct isolation joints in slabs-on-ground at points of contact between slabs on ground and vertical surfaces, such as column pedestals, foundation walls, grade beams, and elsewhere as indicated.
F. Contraction (Control) Joints in Slabs-on-Ground: Construct contraction joints in slabs-on-ground to form panels of patterns as shown. Use inserts 1/4" wide x 1/4" per inch of slab depth, unless otherwise indicated.
G. Form contraction joints by inserting premolded hardboard or fiberboard strip into fresh concrete until top surface of strip is flush with slab surface. After concrete has cured, remove inserts and clean groove of loose debris.
1. Contraction joints may be formed by saw cuts as soon after slab finishing as possible without dislodging aggregate.
H. Joint filler and sealant materials shall be proposed by Contractor and approved by the Engineer.
3.04 INSTALLATION OF EMBEDDED ITEMS
A. General: Set and build into work anchorage devices and other embedded items required for other work that is attached to, or supported by cast-in-place concrete. Use setting drawings, diagrams, instructions, and directions provided by suppliers of items to be attached thereto.
B. Edge Forms and Screed Strips for Slabs: Set edge forms or bulkheads and intermediate screed strips for slabs to obtain required elevations and contours in finished slab surface. Provide and secure units sufficiently strong to support types of screed strips by use of strike-off templates or accepted compacting type screeds.
3.05 PREPARATION OF FORM SURFACES
A. Coat contact surfaces of forms with a form-coating compound before reinforcement is placed.
B. Thin form-coating compounds only with thinning agent of type, and in amount, and under conditions of form coating compound manufacturer's directions. Do not allow excess form-coating material to accumulate in forms or to come into contact with concrete surfaces
Indian Health Service
03 3010 - 7 CAST-IN-PLACE CONCRETE
against which fresh concrete will be placed. Apply in compliance with manufacturer's instructions.
C. Coat steel forms with a non-staining, rust-preventative form oil or otherwise protect against rusting. Rust-stained steel form work is not acceptable.
3.06 CONVEYING CONCRETE
A. Convey concrete to the point of final deposit using equipment and methods which will prevent separation or loss of ingredients.
B. Place concrete in its final position within forms without moving concrete mix laterally more than 5 feet.
3.07 CONCRETE PLACEMENT
A. General: Comply with ACI 304, and as herein specified.
B. Notify Engineer not less than 24 hours prior to commencement of placement operations.
C. Preplacement Inspection: Before placing concrete, inspect and complete form work installation, reinforcing steel, and items to be embedded or casted. Notify other crafts to permit installation of their work; cooperate with other trades in setting such work. Moisten wood forms immediately before placing concrete where form coatings are not used.
D. Coordinate the installation of joint materials and moisture barrier with placement of forms and reinforcing steel.
E. Deposit concrete continuously or in layers of such thickness that no concrete will be placed on concrete which has hardened sufficiently to cause the formation of seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as herein specified. Deposit concrete as nearly as practicable to its final location to avoid segregation.
F. Placing Concrete in Forms: Deposit concrete in forms in horizontal layers not deeper than 24" and in a manner to avoid inclined construction joints. Where placement consists of several layers, place each layer while preceding layer is still plastic to avoid cold joints.
G. Consolidate placed concrete by mechanical vibrating equipment supplemented by hand-spading, rodding or tamping. Use equipment and procedures for consolidation of concrete in accordance with ACI recommended practices.
H. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations not farther than visible effectiveness of machine. Place vibrators to rapidly penetrate placed layer and at least 6" into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to set. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing segregation of mix.
I. Placing Concrete Slabs: Deposit and consolidate concrete slabs in a continuous operation, within limits of construction joints, until the placing of a panel or section is completed.
J. Bring slab surfaced to correct level with straightedge and strikeoff. Use bull floats or darbies to smooth surface, free of humps or hollows. Do not disturb slab surfaces prior to beginning finishing operations.
K. Maintain reinforcing in proper position during concrete placement operations.
L. Cold Weather Placing: Protect concrete work from physical damage or reduced strength which could be caused by frost, freezing actions, or low temperatures, in compliance with ACI 306 and as herein specified.
1. When air temperature has fallen to or is expected to fall below 40 degrees F, uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 60 degrees F, and not more than 80 degrees F at point of placement.
2. Do not use frozen materials or materials containing ice or snow.
3. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.
4. Do not use calcium chloride, salt and other materials containing antifreeze agents or chemical accelerators, unless otherwise accepted in mix designs.
Indian Health Service
03 3010 - 8 CAST-IN-PLACE CONCRETE
M. Hot Weather Placing: When hot weather conditions exist that would seriously impair quality and strength of concrete, place concrete in compliance with ACI 305 and as herein specified.
1. Cool ingredients before mixing to maintain concrete temperature at time of placement below
90 degrees F. Mixing water may be chilled, or chopped ice may be used to control temperature provided water equivalent of ice is calculated to total amount of mixing.
2. Cover reinforcing steel with water soaked burlap if it becomes too hot, so that steel temperature will not exceed the ambient air temperature immediately before embedment in concrete. Wet forms thoroughly before placing concrete.
N. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken.
3.08 FINISH OF FORMED SURFACES
A. Rough Form Finish: For formed concrete surfaces not exposed-to-view in the finish work or by other construction, unless otherwise indicated. This is the concrete surface having texture imparted by form facing material used, with tie holes and defective areas repaired and patched and fins and other projections exceeding 1/4" in height rubbed down or chipped off.
B. Smooth Form Finish: For formed concrete surfaces exposed-to-view, or that are to be covered with a coating material applied directly to concrete, or a covering material applied directly to concrete, such as waterproofing, dampproofing, painting, or other similar system. This is as-cast concrete surface obtained with selected form facing material, arranged orderly and symmetrically with a minimum of seams. Repair and patch defective areas with fins or other projections completely removed and smoothed.
C. Smooth Rubbed Finish: Provide smooth rubbed finish to scheduled concrete surfaces, which have received smooth form finish treatment, not later than one day after form removal.
1. Moisten concrete surfaces and rub with carborundum brick and other abrasive until a uniform color and texture is produced. Do not apply cement grout other than that created by the rubbing process.
D. Related Unformed Surfaces: At tops of walls, horizontal offsets and similar unformed surfaces occurring adjacent to formed surfaces, strike-off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces, unless otherwise shown.
3.09 MONOLITHIC SLAB FINISHES
A. Float Finish: Apply float finish to monolithic slab surfaces to receive trowel finish and other finishes as hereinafter specified.
1. After screening, consolidating, and leveling concrete slabs, do not work surface until ready for floating. Begin floating when surface water has disappeared or when concrete has stiffened sufficiently to permit operation of power-driven floats, or both. Consolidate surface with power-driven floats, or by handfloating if area is small or inaccessible to power units. Check and level surface plane to a tolerance not exceeding 1/4" in 10 feet when tested with a 10 foot straightedge. Cut down high spots and fill low spots. Uniformly slope surfaces to drains. Immediately after leveling, refloat surface to a uniform, smooth, granular texture.
B. Trowel Finish: Apply trowel finish to monolithic slab surfaces to be exposed-to-view, and slab surfaces to be covered with resilient flooring, paint, urethane, or other thin film finish coating system. After floating, begin first trowel finish operation using a power-driven trowel. Begin final troweling when surface produces a ringing sound as trowel is moved over surface. Consolidate concrete surface by final hand-troweling operation, free of trowel marks, uniform in texture and appearance. Tolerances shall be true planes not exceeding 1/8" from finish floor elevation in 10 feet as determined by 10 foot straightedge placed anywhere on the slab in any direction. Grind smooth surface defects which would telegraph through applied floor covering system.
C. Nonslip Broom Finish: Apply nonslip broom finish to exterior concrete platforms, steps, and ramps, and elsewhere as indicated.
Indian Health Service
03 3010 - 9 CAST-IN-PLACE CONCRETE
1. Immediately after trowel finishing, slightly roughen concrete surface by brooming with fiber bristle broom perpendicular to main traffic route. Coordinate required final finish with Engineer before application.
3.10 SCHEDULE OF CONCRETE FINISH
Location Concrete Type of Finish Surface Treatment Floor Float None Sidewalk Curb & Gutter Repair areas
Nonslip Broom Nonslip Broom Nonslip Broom
None None None
3.11 BONDING TO HARDENED…