ATTACHMENT_1_DRAWINGS.pdf
PDF 13 MB Posted
- Attached to
- Pine Ridge Quarters Apartment Building Federal contract opportunity
- Solicitation number
- 16-161-SOL-00039
About this file
ATTACHMENT 1 DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0001_Amendment_2-24-17.pdf | ||
| ATTACHMENT_3_-_BONDS_FORMS_.pdf | ||
| ATTACHMENT_5_Photos_of_Site.pdf | ||
| ATTACHMENT_1_SPECS_PR_Apartment.pdf | ||
| ATTACHMENT_4_-_PRE-PROPOSAL_INQUIRY_FORM.pdf | ||
| ATTACHMENT_2_-_General_Decision_Numbers.pdf | ||
| A15_Solicitation-1-27.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH-EAST ELEVATION3 SCALE: 1/8" = 1'-0"
SOUTH-EAST ELEVATION1 SCALE: 1/8" = 1'-0"
SOUTH-WEST ELEVATION4 SCALE: 1/8" = 1'-0"
NORTH-WEST ELEVATION2 SCALE: 1/8" = 1'-0"
EL. 100'-0"
FIN. FLOOR
EL. 109'-1 1/8"
TRUSS BEARING
EL. 108'-11 1/8"
SOFFIT ELEVATION
2' -0
4"
EL. 100'-0"
FIN. FLOOR
EL. 109'-1 1/8"
TRUSS BEARING
EL. 108'-11 1/8"
SOFFIT ELEVATION
2' -0
4"
EL. 100'-0"
FIN. FLOOR
EL. 109'-1 1/8"
TRUSS BEARING
EL. 108'-11 1/8"
SOFFIT ELEV.
2' -0
4"
PROJECT DIRECTORY
ARCHITECT:
STRUCTURAL:
HKG ARCHITECTS, INC.
524 S. ARCH ST., P.O. BOX 55
ABERDEEN, SD 57402-0055
(605) 225-6820
FAX: (605) 225-7770
3330 FIECHTNER DRIVE, SUITE 206
FARGO, NORTH DAKOTA 58103
TELEPHONE (701) 235-5593 FAX (701) 235-5594
CONSULTING STRUCTURAL ENGINEERS
OLIEN
ARSON
TYPICAL SYMBOLS / MATERIALS INDEX TO DRAWINGS
COVER SHEET / EXTERIOR ELEVATIONS1
SHEET CONTENTS
3 ENLARGED PLANS
4 WALL TYPES, WALL SECTIONS & INTERIOR ELEVATIONS
PINE RIDGE STAFF QUARTERS
INDIAN HEALTH SERVICE
PINE RIDGE, SOUTH DAKOTA 57770
EAST HIGHWAY 18
FLOOR PLAN, DETAILS, FURNITURE & ROOM FINISH SCHED.
REFLECTED CEILING PLAN, ROOF PLAN
DOOR & WINDOW SCHEDULE, ELEVATIONS & DETAILS
FOUNDATION PLANS1
ROOF FRAMING PLANS2
SECTIONS & DETAILSS3
OVERALL HVAC VENTILATION PLANM4
ENLARGED WASTE AND VENT PLANSM5
MECHANICAL &
ELECTRICAL:
E3 ENLARGED ELECTRICAL PLAN
OVERALL HYDRONIC PIPING PLANM3
OVERALL WASTE AND VENT PLANM1
MECHANICAL SITE PLANM0
WEST PLAINS ENGINEERING, INC.
4609 S. TECHLINK CIRCLE
SIOUX FALLS, SD 57106
(605) 362-3753www.westplainsengineering.com
4609 SOUTH TECHLINK CIRCLE SIOUX FALLS, SD 57106
PHONE: (605) 362-3753 FAX: (605) 362-3759
RAPID CITY, SD SIOUX FALLS, SD CASPER, WY CEDAR RAPIDS, IA BISMARCK, ND
E1
E2 OVERALL LIGHTING FLOOR PLAN
OVERALL POWER AND SPECIAL SYSTEMS FLOOR PLAN
CIVIL:
OVERALL DOMESTIC PLUMBING PLANM2
E0 ELECTRICAL SITE PLAN
CLARK ENGINEERING
2301 8TH AVE NE, SUITE 125
PO BOX 20
ABERDEEN, SD 57401-0020
(605) 225-3494
FAX: (605) 225-5433
CODE REQUIREMENTS IBC 2015
OCCUPANCY TYPE: R-2
OCCUPANCY SEPARATION REQUIREMENTS: NONE
CONSTRUCTION TYPE: VB
ALLOWABLE BUILDING AREA: R-2 28,000 S.F./FLOOR
ALLOWABLE AREA: R-2/S-1 28,000 S.F. ALLOWED
ACTUAL AREA PROPOSED: 19,728 S.F.
NUMBER OF FLOORS: ONE (1)
BASIC ALLOWABLE BUILDING HEIGHT/FLOOR AREA:
OCCUPANCY TYPE: R-2
CONSTRUCTION TYPE: VB
BASIC ALLOWABLE HEIGHT: 3 STORIES, 60'-0"
ACTUAL HEIGHT PROPOSED: 22'-10"
EXTERIOR WALL & OPENING PROTECTION:
FIRE RATING OF EXTERIOR WALL: 0 HOUR COMPLIES
FIRE RATING OF NON BEARING EXTERIOR WALL: 0 HOUR COMPLIES
FIRE RATING OF OPENINGS: 0 HOUR COMPLIES
ALLOWABLE OPENING % NO LIMIT COMPLIES
SUMMARY OF ALLOWABLE HEIGHT, AREA, & CONSTRUCTION TYPE:
ALLOWABLE HEIGHT: 60'-0"
ALLOWABLE AREA: 28,000 S.F.
ACTUAL AREA: 19,728 S.F.
CONSTRUCTION TYPE: VB
AREA SEPARATION REQUIRED: NONE
BUILDING PERIMETER DISTANCE: 933'-4"
FIRE RESISTIVE REQUIREMENTS:
STRUCTURAL FRAME: 0 HOUR COMPLIES
EXTERIOR BEARING WALLS: 0 HOUR COMPLIES
INTERIOR BEARING WALLS: 0 HOUR COMPLIES
EXTERIOR NON BEARING WALLS: 0 HOUR COMPLIES
PARTITIONS - PERMANENT: 0 HOUR COMPLIES
FLOORS: 0 HOUR COMPLIES
SHAFT ENCLOSURES: 0 HOUR COMPLIES
ROOF: 0 HOUR COMPLIES
EXTERIOR DOORS & WINDOWS: 0 HOUR COMPLIES
STAIRWAY CONSTRUCTION: 0 HOUR COMPLIES
CORRIDORS: 30 MINUTE COMPLIES
MECHANICAL EQUIPMENT ROOM: 0 HOUR COMPLIES
FIRE DAMPERS: 0 EXTERIOR COMPLIES
GLAZING: 0 INTERIOR COMPLIES
AUTOMATIC FIRE SPRINKLER PROVIDED THROUGHOUT
EXIST ACCESS TRAVEL DISTANCE: 325'-0"
ACTUAL ACCESS TRAVEL DISTANCE: 132'-9"
MAXIMUM COMMON PATH OF EGRESS TRAVEL DISTANCE 125'-0"
ACCESSIBLE PARKING SPACES REQUIRED ONE (1)
ACCESSIBLE DWELLING UNITS AND SLEEPING UNITS REQUIRED WITHOUT ROLL-IN SHOWERS ONE (1)
E5 ELECTRICAL SCHEDULES
E4 ELECTRICAL DETAILS
ENLARGED DOMESTIC PLUMBING PLANM6
ENLARGED HVAC VENTILATION PLANM7
MECHANICAL SYMBOLS AND DETAILSM8
MECHANICAL SCHEDULESM9
C1 EXISTING SITE TOPOGRAPHY
C2 PLAN NOTES & TYPICAL DETAILS
C3 SITE LAYOUT & PAVEMENT JOINT LAYOUT
C4 SITE UTILITIES & SEWER/WATER PLAN & PROFILES
C5 SITE PLAN AND PROFILES
C6 STAKING INFORMATION & PAVEMENT ELEVATIONS
C7 RETENTION POND LAYOUT & DETAILS
C8 EROSION CONTROL PLAN & SWPPP
DOWNSPOUT LOCATIONS, PROVIDE SPLASH BLOCK
SEE STRUCTURAL FOR FOOTINGS, FOUNDATIONS AND
STOOPS
KEYED NOTES
1 1 1 1 1 1 1
1111111
1 1 1 1 1 1 1 1 1
HKG Architects, Inc. Aberdeen, S.D.
CERT. NO.
REVISED DATE
CHECKED BY ____
DM
DATE
12 -30 -16
PROJECT NO.
OF -6
TRACED BY ____
DRAWN BY ____
Plans for:
2016-0009
PINE RIDGE STAFF QUARTERS
INDIAN HEALTH SERVICE
EAST HIGHWAY 18
PINE RIDGE, SD 57770
DDDEXTERIOR ELEVATIONS 1
hkg.todd
DM 12-30-16
Gas-Existing Overhead Power-Existing
Sanitary Sewer-Existing Silt Fencing
Overhead Telephone-Existing Overhead Television-Existing
Underground Cable Television-Existing
Storm Sewer-Existing Reinforced Concrete Pipe-Proposed
Stop Sign
Fiber Optic
Underground Telephone-Existing Underground Power-Existing
Water-Existing
Fence Chain Link-Existing Fence Wooden-Existing
Sprinkler Head Street Light Street Sign
Double Post Sign Telephone Pedestal Television/Cable Pedestal Power Box Power Pedestal Power Pole Power Pole w/Light Guy Pole Guy Wire
Fiber Optic Pedestal
Single Post Sign
Flag Pole
Tree-Deciduous
Light Pole
Tree-Coniferous
Control Point
Bush Rebar w/Plastic Cap
Sanitary Sewer Cleanout Sanitary Sewer Manhole
Storm Sewer Manhole Drop Inlet Water Valve Water Curb Stop Fire Hydrant 2 Fire Hydrant 3
Irrigation System-Existing
LINETYPES & SYMBOLS
STOP
Concrete Surfacing Existing Asphalt Surfacing Proposed New Asphalt Proposed PCC Pavement
Proposed Construction Limits Proposed Contour Lines Proposed Water Service Proposed Sanitary Service
SW Sidewalk TC Top of Curb TS Top of Surfacing GT Gutter G Proposed Ground
STOP
W
W
W
W
W
S
S
STOP
Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
EXISTING SITE TOPOGRAPHY
Existing Site C1 HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for:
2016-0009
MJN
Clark Engineering : A16101.001
INDEX OF CIVIL SHEETS
C1 - EXISTING SITE TOPOGRAPHY / ESTIMATE OF QUANTITIES
C2 - PLAN NOTES & TYPICAL DETAILS
C3 - SITE LAYOUT & PAVEMENT JOINT LAYOUT
C4 - SITE UTILITIES & SEWER/WATER PLAN & PROFILES
C5 - SITE PLAN AND PROFILES
C6 - STAKING INFORMATION & PAVEMENT ELEVATIONS
C7 - RETENTION POND LAYOUT & DETAILS
C8 - EROSION CONTROL PLAN & SWPPP
ESTIMATE OF QUANTITIES SCHEDULE "B"
NO. ITEM
QUANTITY
UNIT
1 REMOVE TREES 2 EA
2 REMOVE 6" APPROACH CONCRETE 168 SF
3 SAW CUT CONCRETE PAVEMENT 64 LF
4 REMOVE 4" SIDEWALK 100 SY
5 REMOVE INPLACE PCC PAVEMENT 89 SY
6 SILT FENCE 520 LF
7 F&I EROSION CONTROL BLANKET 1743 SY
STRIP & STOCKPILE TOPSOIL (4")
1280 CY
9 UNCLASSIFIED EXCAVATION & EMBANKMENT 2630 CY
10 F&I 4" GRAVITY SEWER 70 LF
11 F&I 4"x45° BEND 8 EA
12 F&I 4" RV SERVICE RISER ASSEMBLY 4 EA
13 F&I 6" GRAVITY SEWER 164 LF
14 F&I 6"x4" SERVICE WYE 4 EA
15 F&I 6" CLEAN OUT ASSEMBLY 1 EA
16 F&I 8" GRAVITY SEWER BY HDD 218 LF
17 F&I 8" GRAVITY SEWER 126 LF
18 F&I 8"x6" SERVICE WYE 1 EA
19 F&I 48" SANITARY SEWER MANHOLES 2 EA
20 CONNECTION TO EXISTING SANITARY SEWER 1 EA
F&I 6" PVC WATER MAIN (Class 200 psi)
254 LF
F&I 6" PVC WATER MAIN by HDD
208 LF
23 F&I FIRE HYDRANT 1 EA
24 F&I 6" GATE VALVE & BOX 2 EA
25 F&I 6" POST INDICATING VALVE 1 EA
CONNECTION TO WATER MAIN (INCLUDE COUPLINGS)
1 EA
27 F&I 6"x6"x6" TEE 2 EA
28 F&I 6"x90° WATER MAIN BEND 1 EA
29 F&I 6"x3" SERVICE SADDLE AND CORPORATION STOP 1 EA
30 F&I 3" PVC DOMESTIC WATER SERVICE 71 LF
31 F&I 3" CURB STOP AND BOX 1 EA
32 F&I 2" WATER SERVICE LINE FOR RV PARKING 167 LF
F&I 2" CURB STOP & BOX (RV PARKING)
5 EA
34 3/4" FREEZELESS YARD HYDRANT FOR RV CONNECTION 4 EA
35 F&I 12" CLASS 150 STORM SEWER 28 LF
36 F&I STORM WATER HEADWALL 1 EA
37 F&I POND OVERFLOW WIER 304 SF
PLACE TOPSOIL (6")
706 CY
F&I GRAVEL CUSHION (FOR PAVEMENTS)
1709 TN
40 F&I CURB SIDEWALK 2604 SF
41 F&I 24" CURB & GUTTER 821 LF
42 F&I FILLET 112 SF
43 F&I VALLEY GUTTER 343 SF
44 F&I DETECTABLE WARNING PANEL 24 SF
F&I SIDEWALK (4")
957 SF
46 F&I 6" REINFORCED PCC PAVEMENT 4408 SY
47 PAVEMENT MARKING AND STRIPING 1 LS
48 HANDICAP PARKING SIGN 2 EA
49 F&I 5' CHAIN LINK FENCE 652 LF
F&I 5' CHAIN LINK FENCE GATE (5')
11 EA
51 F&I 6' CHAIN LINK FENCE W/ PRIVACY LATTICE 45 LF
F&I 6' CHAIN LINK FENCE GATE (7')
2 EA
53 F&I 4" RV SERVICE RISER ASSEMBLY 4 EA
54 SEEDING & FERTILIZING 1.4 AC
55 MULCHING 1.1 AC
F&I LANDSCAPE CURB (GRAY-NON TEXTURE)
716 LF
RUBBER LANDSCAPE MULCH (4" THICK)
1435 SF
F&I ENGINEERED FILL (GRAVEL CUSHION)
11865 TN
59 BUILDING & FOUNDATION EXCAVATION 3315 CY
F&I BOLLARD
4 EA
61 PIPE INSULATION 109 LF
62 STAND UP CURB - TYPE B6 469 LF
Pine Ridge Staff Quarters Indian Health Service East Highway 18 Pine Ridge, South Dakota 57770
H
O
U
S
E
G
A
R
A
G
E
H
O
U
S
I
N
G
U
I
T
G
A
R
A
G
E
G
A
R
A
G
E
G
A
R
A
G
E
H
O
U
S
I
I
T
H
O
U
S
I
I
T
12-30-16
HANDICAP RAMP DETAIL
HANDICAP RAMP DETAIL
EXPANSION JOINT DETAIL
CONSTRUCTION JOINT
24" CONCRETE CURB & GUTTER
CONCRETE VALLEY GUTTER
SILT FENCING DETAIL
SIDEWALK DETAIL
& STRIPING DETAIL
PAVEMENT MARKING
HANDICAP PARKING SIGN
GENERAL NOTES REGARDING PAVEMENT MARKING
PCC PAVEMENT DETAIL
SAWED CONTRACTION JOINT
SECTION B-B
FILLET SECTION DETAIL
SECTION A-A
CURB SIDEWALK DETAIL
PIPE INSULATION DETAIL
STAND UP CURB - TYPE B DETAIL
LANDSCAPE CURB DETAIL
SALVAGE AND REPLACE TOPSOIL
BEDDING MATERIAL
STORM WATER DISCHARGE
WATER FOR COMPACTION
EXISTING UNDERGROUND UTILITIES
SCOPE OF WORK
SUBMITTAL OF RECORD DRAWINGS (AS-BUILTS):
MAINTENANCE OF WATER SERVICE
STORM WATER CONSTRUCTION PERMIT
PROOF ROLLING SUBGRADE
DEWATERING PERMIT
WASTE
DETECTABLE WARNING PANELS
TRAFFIC CONTROL, CONSTRUCTION SIGNING & GENERAL MAINTENANCE OF TRAFFIC
STAGGING AREA/S
SAWING EXISTING CONCRETE
BUILDING EXCAVATION AND ENGINEERED FILL
Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
PLAN NOTES TYPICAL DETAILS
PLAN NOTES AND
DETAILS C2
HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for: MJN
2016-0009
Clark Engineering: A16101.001
Pine Ridge Staff Quarters Indian Health Service East Highway 18 Pine Ridge, South Dakota 57770
W
W
W
W
S
S
STOP
STA. ??? - ??? ???
Structure - (44)
RIM=3293.88
INV=3282.88 (8" PVC Pipe) NW INV=3282.88 (8" PVC Pipe) SE INV=3282.78 (8" PVC Pipe) NE
8" PVC
Pipe @
0.77%
8" PVC Pipe @ 0.40%
W
W
W
W
W
S
S
STOP
STA. ??? - ??? ???
Structure - (44)
RIM=3293.88
INV=3282.88 (8" PVC Pipe) NW INV=3282.88 (8" PVC Pipe) SE INV=3282.78 (8" PVC Pipe) NE
8" PVC
Pipe @
0.77%
8" PVC Pipe @ 0.40%
Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
SITE LAYOUT WITH REMOVALS & DIMENSIONS
Site Layout Pavement Joint Layout C3
HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for: MJN
FENCING & PAVEMENT MARKING
PAVMENT JOINT LAYOUT
2016-0009
Clark Engineering : A16101.001
H
O
U
S
E
G
A
R
A
G
E
H
O
U
S
I
I
T
G
A
R
A
G
E
G
A
R
A
G
E
G
A
R
A
G
E
H
O
U
S
I
I
T
H
O
U
S
I
I
T
H
O
U
S
E
G
A
R
A
G
E
H
O
U
S
I
I
T
G
A
R
A
G
E
G
A
R
A
G
E
G
A
R
A
G
E
H
O
U
S
I
I
T
H
O
U
S
I
I
T
Pine Ridge Staff Quarters Indian Health Service East Highway 18
W
W
W
W
S
S
STOP
STA. ??? - ??? ???
Structure - (44)
RIM=3293.88
INV=3282.88 (8" PVC Pipe) NW INV=3282.88 (8" PVC Pipe) SE INV=3282.78 (8" PVC Pipe) NE
8" PVC
Pipe @
0.77%
8" PVC Pipe @ 0.40%
STA. ??? - ??? ???
Structure - (44)
RIM=3293.88
INV=3282.88 (8" PVC Pipe) NW INV=3282.88 (8" PVC Pipe) SE INV=3282.78 (8" PVC Pipe) NE
8" PVC Pipe @ 0.40%
TYPICAL TRENCH DETAIL
MANHOLE DETAIL
VALVE SETTING DETAIL
HYDRANT SETTING DETAIL
TYPICAL SEWER CLEANOUT
RV SEWER RISER
YARD HYDRANT SETTING DETAIL
TYPICAL CURB STOP DETAIL
Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
SANITARY SEWER AND WATERSITE UTILITIES
Site Utilities Sanitary Sewer and Water
Plan & Profiles C4 HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for: MJN
PLAN & PROFILES
2016-0009
Clark Engineering : A16101.001
Pine Ridge Staff Quarters Indian Health Service East Highway 18
W
W
W
S
S
STOP
Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
SITE PLAN AND PROFILES
Site Plan and Profiles C5 HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for: MJN
X-SECTION A-A
X-SECTION A-A
X-SECTION B-B
X-SECTION C-C
X-SECTION D-D
X-SECTION E-E
X-SECTION B-B
X-SECTION C-C
X-SECTION D-D
X-SECTION E-E
0+00
0+00
0+00
0+00
0+00
2+50
2+50
2+50
2+50
2+50
X-SECTION F-F
0+00
2+50
X-SECTION F-F
2016-0009
Clark Engineering : A16101.001
G
A
R
A
G
E
H
O
U
S
I
I
T
G
A
R
A
G
E
G
A
R
A
G
E
G
A
R
A
G
E
H
O
U
S
I
I
T
H
O
U
S
I
I
T
Pine Ridge Staff Quarters Indian Health Service East Highway 18
W
W
W
S
S
STOP
STA. ??? - ??? ???
Structure - (44)
RIM=3293.88
INV=3282.88 (8" PVC Pipe) NW INV=3282.88 (8" PVC Pipe) SE INV=3282.78 (8" PVC Pipe) NE
8" PVC
Pipe @
0.77%
8" PVC Pipe @ 0.40%
W
W
W
W
W
S
S
STOP
STA. ??? - ??? ???
Structure - (44)
RIM=3293.88
INV=3282.88 (8" PVC Pipe) NW INV=3282.88 (8" PVC Pipe) SE INV=3282.78 (8" PVC Pipe) NE
8" PVC
Pipe @
0.83%
8" PVC
Pipe @
0.77%
8" PVC Pipe @ 0.40%
153 155
164165
170 171
172173
205206
Gas-Existing Overhead Power-Existing
Sanitary Sewer-Existing Silt Fencing
Overhead Telephone-Existing Overhead Television-Existing
Underground Cable Television-Existing
Storm Sewer-Existing Reinforced Concrete Pipe-Proposed
Stop Sign
Fiber Optic
Underground Telephone-Existing Underground Power-Existing
Water-Existing
Fence Chain Link-Existing Fence Wooden-Existing
Sprinkler Head Street Light Street Sign
Double Post Sign Telephone Pedestal Television/Cable Pedestal Power Box Power Pedestal Power Pole Power Pole w/Light Guy Pole Guy Wire
Fiber Optic Pedestal
Single Post Sign
Flag Pole
Tree-Deciduous
Light Pole
Tree-Coniferous
Control Point
Bush Rebar w/Plastic Cap
Sanitary Sewer Cleanout Sanitary Sewer Manhole
Storm Sewer Manhole Drop Inlet Water Valve Water Curb Stop Fire Hydrant 2 Fire Hydrant 3
Irrigation System-Existing
LINETYPES & SYMBOLS
STOP
Concrete Surfacing Existing Asphalt Surfacing Proposed New Asphalt Proposed PCC Pavement
Proposed Construction Limits Proposed Contour Lines Proposed Water Service Proposed Sanitary Service
SW Sidewalk TC Top of Curb TS Top of Surfacing GT Gutter G Proposed Ground
Point Table
Point #
Northing
15,636,781.978
15,636,773.313
15,636,824.645
15,636,805.738
15,636,744.949
15,636,683.017
15,636,667.249
15,636,588.953
15,636,562.526
15,636,600.452
15,636,597.698
15,636,593.954
15,636,619.889
15,636,588.851
15,636,584.856
15,636,589.189
15,636,583.197
15,636,578.865
15,636,550.924
15,636,555.257
15,636,566.520
15,636,551.262
15,636,556.552
15,636,563.484
15,636,567.478
15,636,560.545
15,636,551.880
15,636,547.888
15,636,542.256
15,636,546.250
15,636,471.881
15,636,467.887
15,636,460.955
15,636,464.950
15,636,391.158
15,636,387.164
15,636,381.532
15,636,385.526
15,636,378.594
15,636,374.600
15,636,368.968
15,636,372.962
15,636,577.132
15,636,539.852
15,636,300.137
15,636,337.417
15,636,587.914
15,636,587.499
15,636,527.524
15,636,527.831
15,636,383.798
15,636,365.452
15,636,515.811
15,636,516.123
15,636,544.732
15,636,544.420
15,636,666.988
15,636,532.711
15,636,531.081
15,636,531.348
15,636,523.357
15,636,523.090
15,636,521.715
15,636,325.442
15,636,352.104
15,636,386.773
15,636,380.430
15,636,481.343
15,636,525.584
15,636,544.632
15,636,558.934
15,636,591.423
15,636,708.626
15,636,566.530
15,636,733.100
15,636,736.030
15,636,630.880
15,636,483.555
15,636,448.321
15,636,527.459
15,636,526.882
15,636,301.067
15,636,338.642
15,636,369.870
15,636,338.739
15,636,409.971
15,636,405.240
15,636,480.917
15,636,478.865
15,636,325.175
15,636,310.138
15,636,314.565
15,636,379.913
15,636,376.179
15,636,371.250
15,636,383.550
15,636,396.032
15,636,408.215
15,636,487.652
15,636,574.527
15,636,628.030
15,636,653.589
15,636,688.246
15,636,722.904
15,636,757.562
15,636,768.321
Easting
2,296,590.509
2,296,595.501
2,296,519.756
2,296,555.006
2,296,522.400
2,296,486.575
2,296,495.661
2,296,540.779
2,296,556.007
2,296,621.823
2,296,632.066
2,296,625.568
2,296,594.465
2,296,637.742
2,296,630.810
2,296,628.314
2,296,617.916
2,296,620.413
2,296,571.925
2,296,569.429
2,296,562.938
2,296,562.498
2,296,647.120
2,296,643.126
2,296,650.057
2,296,654.048
2,296,659.045
2,296,652.113
2,296,655.358
2,296,662.290
2,296,705.144
2,296,698.213
2,296,702.207
2,296,709.139
2,296,751.661
2,296,744.729
2,296,747.975
2,296,754.906
2,296,758.900
2,296,751.969
2,296,755.214
2,296,762.146
2,296,621.411
2,296,556.717
2,296,694.851
2,296,759.546
2,296,522.330
2,296,506.353
2,296,507.917
2,296,523.894
2,296,545.856
2,296,512.140
2,296,509.202
2,296,521.198
2,296,520.453
2,296,508.457
2,296,489.775
2,296,493.276
2,296,488.567
2,296,498.814
2,296,499.022
2,296,488.776
2,296,493.563
2,296,498.681
2,296,508.223
2,296,572.281
2,296,581.553
2,296,552.256
2,296,531.955
2,296,533.281
2,296,536.914
2,296,532.242
2,296,498.195
2,296,580.078
2,296,869.139
2,296,854.196
2,296,671.721
2,296,756.781
2,296,695.638
2,296,506.096
2,296,477.904
2,296,803.575
2,296,833.836
2,296,815.864
2,296,504.812
2,296,576.335
2,296,567.524
2,296,540.263
2,296,525.227
2,296,810.804
2,296,789.115
2,296,795.797
2,296,830.935
2,296,827.638
2,296,826.919
2,296,808.559
2,296,830.220
2,296,794.345
2,296,748.570
2,296,698.509
2,296,667.678
2,296,652.950
2,296,632.979
2,296,613.008
2,296,593.037
2,296,586.837
Elevation
3290.31
0.00
0.00
0.00
3288.40
3287.75
3287.50
3287.50
3288.35
3288.58
3288.64
0.00
3288.40
3289.12
3289.20
3289.00
3289.40
3289.60
3290.38
3290.18
3288.37
3290.18
3289.66
3289.70
3289.62
3289.50
3289.49
3289.66
3290.00
3289.84
3289.84
3290.00
3290.00
3289.84
3289.84
3290.00
3289.52
3289.36
3289.36
3289.52
3290.00
3289.84
3290.50
3290.50
3290.50
3290.50
3284.00
3284.00
3284.00
3284.00
3284.00
3284.00
3283.50
3283.50
3283.50
3283.50
3287.10
3287.10
3286.25
3286.25
3286.25
3286.25
3287.10
3287.10
3285.00
3285.00
3286.00
3286.00
3286.00
3286.00
3286.00
3286.00
3289.21
3289.90
3294.01
0.00
0.00
0.00
0.00
3284.38
3284.38
3290.50
3290.36
3289.21
3286.00
3286.00
3285.00
3285.00
3284.00
0.00
3290.55
3290.65
3291.55
0.00
3291.19
3289.66
0.00
3289.57
3289.27
3288.94
3288.74
3289.24
3289.50
3289.70
3290.00
3290.30
Description
Back of Curb
10' Radius Point
40' Radius Point
Edge of Pavement
Edge of Pavement
Edge of Pavement
Edge of Pavement
Edge of Pavement
Back of Curb
Back of Curb
Back of Curb
8' Radius Point
Top of Pavement
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Sidewalk
Building Corner
Building Corner
Building Corner
Building Corner
Bottom of Pond
Bottom of Pond
Bottom of Pond
Bottom of Pond
Bottom of Pond
Bottom of Pond
Sediment Pool
Sediment Pool
Sediment Pool
Sediment Pool
Center of Berm
Center of Berm
OVER FLOW
OVER FLOW
OVER FLOW
OVER FLOW
Center of Berm
Center of Berm
Pond Point
Pond Point
Pond Point
Pond Point
Pond Point
Pond Point
Pond Point
Pond Point
Cleanout 1
Manhole 2
Manhole 3
Water Main Point 1
Water Main Point 2
Water Main Point 3
Water Main at Building
INV/PIPE
INV/PIPE
Back of Curb
Top of Pavement
Top of Pavement
Pond Point
Pond Point
Pond Point
Pond Point
Pond Point
1.7' Radius Point
Sidewalk
Back of Curb
Back of Curb
5' Radius Point
Back of Curb
Back of Curb
25' Radius Point
Back of Curb
Back of Curb
Back of Curb
Back of Curb
Back of Curb
Back of Curb
Back of Curb
Back of Curb
Back of Curb Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
STAKING INFORMATION PAVEMENT ELEVATIONS
Staking Information Pavement Elevations C6
HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for: MJN
CONTROL POINTS
Point No. Northing East Elevation Description
1 15,638,370.869 2,304,172.682 3,291.145 BM OT0883
2 15,638,982.698 2,301,053.587 3,272.612 BM OT0924
3 15,636,339.607 2,296,852.915 3,292.417 CP
4 15,636,946.060 2,296,550.951 3,295.807 CP
100 15,637,088.316 2,296,603.006 3,295.078 X
101 15,635,932.943 2,296,493.988 3,283.713 RBRC 6774
102 15,635,927.109 2,296,221.489 3,277.059 RBR
103 15,635,983.241 2,298,861.009 3,285.727 RBR
104 15,636,029.557 2,296,331.682 3,281.638 RBRC 6014
105 15,636,129.526 2,296,329.010 3,282.134 RBRC 6014
106 15,636,329.465 2,296,323.833 3,281.408 RBRC 6014
2016-0009
Datum Used: NAD83 on UTM 13 North
Clark Engineering : A16101.001
Pine Ridge Staff Quarters Indian Health Service East Highway 18
W
HEADWALL DETAIL
GATE
POND OUTFLOW STRUCTURE
POND OUTFLOW WIER
A - A
A
A
B B
B - B
Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
DETENTION PONDDETENTION POND LAYOUT
Retention Pond Layout Retention Pond
Plan & Profiles Details
C7 HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for: MJN
PLAN PROFILES & DETAILS
2016-0009
Clark Engineering : A16101.001
Pine Ridge Staff Quarters Indian Health Service East Highway 18
STOP
STA. ??? - ??? ???
Structure - (44)
RIM=3293.88
INV=3282.88 (8" PVC Pipe) NW INV=3282.88 (8" PVC Pipe) SE INV=3282.78 (8" PVC Pipe) NE
8" PVC
Pipe @
0.77%
8" PVC Pipe @ 0.40%
Clark Engineering Corporation
2301 8th Ave NE, Suite 125
Aberdeen, SD 57401
(605) 225-3494 www.clark-eng.com
EROSION CONTROL PLAN AND SWPPP
Erosion Control Plan
SWPPP C8
HKG Architects, Inc. Aberdeen, S.D.
KH
Plans for: MJN v Construction Changes (4.4)
When changes are made to the construction project that will require alterations in the temporary erosion controls of the site, the Storm Water
Pollution Prevention Plan (SWPPP) will be amended to provide appropriate protection to disturbed areas, all storm water structures, and adjacent waters. The Project Engineer will modify the SWPPP plan (DOT 298) and drawings to reflect the needed changes. Copies of changes will be routed per DOT 298. Copies of forms and the SWPPP will be retained in a designated place for review over the course of the project.
v CERTIFICATIONS
Ø Certification of Compliance with Federal, State, and Local
Regulations
The Storm Water Pollution Prevention Plan (SWPPP) for this project reflects the requirements of all local municipal jurisdictions for storm water management and sediment and erosion control as established by ordinance, as well as other state and federal requirements for sediment and erosion control plans, permits, notices or documentation as appropriate.
Ø Prime Contractor
This section is to be executed by the General Contractor after the award of the contract. This section may be executed any time there is a change in the Prime Contractor of the project.
I certify under penalty of law that this document and all attachments will be revised or maintained under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Authorized Signature v CONTACT INFORMATION
Ø Contractor Information:
§ Prime Contractor Name:
§ Contractor Contact Name:
§ Address:
§ Address:
§ City: State: Zip:
§ Office Phone: Field:
§ Cell Phone: Fax:
Ø Erosion Control Supervisor
§ Name:
§ Address:
§ Address:
§ City: State: Zip:
§ Office Phone: Field:
§ Cell Phone: Fax:
Ø Project Engineer
Ø Name: Clark Engineering Corp.
§ Business Address: 2301 8th Ave NE Suite 125, Aberdeen SD
§ Job Office Location: N/A
§ City: Aberdeen State: SD Zip: 57401
§ Office Phone: 605-225-3494
§ Cell Phone: Fax:605-225-5433
Ø SD DENR Contact Spill Reporting
§ Business Hours Monday-Friday (605) 773-3296
§ Nights and Weekends (605) 773-3231
Ø SD DENR Contact for Hazardous Materials
§ (605) 773-3153
Ø National Response Center Hotline
§ (800) 424-8802
5.
6.
1.
4.
3.7.
2.
STORM WATER POLLUTION PREVENTION PLAN CHECKLIST
(The numbers right of the title headings are reference numbers to the
GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED
WITH CONSTRUCTION ACTIVITIES
v SITE DESCRIPTION (4.2 1)
Ø Project Limits: See Title Sheet (4.2 1.b)
Ø Project Description: See Title Sheet (4.2 1.a.)
Ø Site Map(s): See Title Sheet and Plans (4.2 1.f. (1)-(6))
Ø Major Soil Disturbing Activities (check all that apply)
§ þ Stripping and stockpiling topsoil
§ þ Excavation/borrow
§ þ Grading and shaping
§ o Filling
§ þ Cutting and filling
§ o Other (describe):
Ø Total Project Area 3.6± Acres (4.2 1.b.)
Ø Total Area To Be Disturbed 3.45± Acres (4.2 1.b.)
Ø Existing Vegetative Cover (%) 89%
Ø Soil Properties: Predominantly Topsoil overlaying Lean Clay (4.2 1. d.)
Ø Name of Receiving Water Body/Bodies: South Fork Snake Creek
(4.2 1.e.)
v ORDER OF CONSTRUCTION ACTIVITIES (4.2 1.c.)
(Stabilization measures shall be initiated as soon as possible, but in no case later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. Initiation of final or temporary stabilization may exceed the 14-day limit if earth disturbing activities will be resumed within 21 days.)
Ø Strip and stockpile topsoil.
Ø Install utilities and site grading.
Ø Install erosion control wattles.
Ø Final grading and shaping.
Ø Place topsoil on disturbed areas.
Ø Reseed all disturbed areas. (Contractor)
Ø Install erosion control blanket. (Contractor)
Ø Wattles and other erosion measures will be removed by owner after vegetation is established.
v EROSION AND SEDIMENT CONTROLS (4.2 2.a.(1)(a)-(f))
(Check all that apply)
Ø Stabilization Practices (See Detail Plan Sheets)
§ þ Temporary Seeding (Cover Crop Seeding)
§ þ Permanent Seeding
§ þ Sodding
§ o Planting (Woody Vegetation for Soil Stabilization)
§ o Mulching (Grass Hay or Straw)
§ o Hydraulic Mulch (Wood Fiber Mulch)
§ o Soil Stabilizer
§ o Bonded Fiber Matrix
§ o Erosion Control Blankets or Mats
§ o Vegetation Buffer Strips
§ o Roughened Surface (e.g. tracking)
§ o Dust Control
§ o Other
Ø Structural Temporary Erosion and Sediment Controls
§ þ Silt Fence
§ o Floating Silt Curtain
§ o Straw Bale Check
§ o Temporary Berm
§ o Temporary Slope Drain
§ o Straw Wattles or Rolls
§ o Turf Reinforcement Mat
§ þ Rip Rap
§ o Gabions
§ o Rock Check Dams
§ o Sediment Traps/Basins
§ þ Inlet Protection
§ o Outlet Protection
§ o Surface Inlet Protection (Area Drain)
§ o Curb Inlet Protection
§ o Stabilized Construction Entrances
§ o Entrance/Exit Equipment Tire Wash
§ o Interceptor Ditch
§ o Concrete Washout Area
§ o Temporary Diversion Channel
§ o Work Platform
§ o Temporary Water Barrier
§ o Temporary Water Crossing
§ þ Other
Ø Wetland Avoidance
Will construction and/or erosion and sediment controls impinge on regulated wetlands? Yes o No þ If yes, the structural and erosion and sediment controls have been included in the total project wetland impacts and have been included in the 404 permit process with the
USACE.
Ø Storm Water Management (4.2 2.b., (1) and (2))
Storm water management will be handled by temporary controls outlined in “EROSION AND SEDIMENT CONTROLS” above, and any permanent controls needed to meet permanent storm water management needs in the post construction period. Permanent controls will be shown on the plans and noted as permanent.
Ø Other Storm Water Controls (4.2 2.c., (1) and (2))
§ Waste Disposal
All liquid waste materials will be collected and stored in sealed metal containers approved by the project engineer. All trash and construction debris from the site will be deposited in the approved containers. Containers will be serviced as necessary, and the trash will be hauled to an approved disposal site or licensed landfill. All onsite personnel will be instructed in the proper procedures for waste disposal, and notices stating proper practices will be posted in the field office. The general contractor's representative responsible for the conduct of work on the site will be responsible for seeing waste disposal procedures are followed.
§ Hazardous Waste
All hazardous waste materials will be disposed of in a manner specified by local or state regulations or by the manufacturer. Site personnel will be instructed in these practices, and the individual designated as the contractor's on-site representative will be responsible for seeing that these practices are followed.
§ Sanitary Waste
Portable sanitary facilities will be provided on all construction sites.
Sanitary waste will be collected from the portable units in a timely manner by a licensed waste management contractor or as required by any local regulations.
LANDSCAPE MULCH
. Mulch shall meet the following minimum standards:
· Landscape mulch shall be made from 100% recycled rubber designed for commercial landscaping applications
· Provides a soft surface
· Creates a pliable and resilient surface
· 99.9% wire free
· Exceeds standards set by the U. S. Consumer Product Safety Commission
· Made from non-toxic, environmentally-friendly materials approved by the EPA.
· Inhibits growth of molds and fungi
· Minimum available standard colors Earthtone, Redwood, and Forest Green. Color choice by owner.
*Installation Guidelines
· The ground area where the playground will lie shall be in locations that will not hold water, or have slight grade to allow for proper drainage.
· Heavy duty weed fabric shall be installed under rubber Mulch to separate the mulch from subgrade. Depending on the size of the landscape, it is recommended to use large rolls of weed fabric to minimize the number seams. Longitudinal and Traverse seams shall be lapped 2'.
· Use landscape stakes or staples to stake down weed fabric seams and corners.
Make sure the stakes are completely hammered down. The fabric shall be staked (stapled) a minimum of 2' along seams and in a 2' grid.
· Rubber landscape mulch shall be placed 4” thick.
v Spill Prevention (4.2 2.c.(2))
Ø Material Management
§ Housekeeping
· Only needed products will be stored on-site by the contractor.
· Except for bulk materials the contractor will store all materials under cover and in appropriate containers.
· Products must be stored in original containers and labeled.
· Material mixing will be conducted in accordance with the manufacturer's recommendations.
· When possible, all products will be completely used before properly disposing of the container off site.
· The manufacturer's directions for disposal of materials and containers will be followed.
· The contractor's site superintendent will inspect materials storage areas regularly to ensure proper use and disposal.
· Dust generated will be controlled in an environmentally safe manner.
· Vegetation areas not essential to the construction project will be preserved and maintained as noted on the plans.
§ Hazardous Materials
· Products will be kept in original containers unless the container is not resealable.
· Original labels and material safety data sheets will be retained in a safe place to relay important product information.
· If surplus product must be disposed of, manufacturer's label directions for disposal will be followed.
· Maintenance and repair of all equipment and vehicles involving oil changes, hydraulic system drain down, de-greasing operations, fuel tank drain down and removal, and other activities which may result in the accidental release of contaminants will be conducted on an impervious surface and under cover during wet weather to prevent the release of contaminants onto the ground.
· Wheel wash water will be collected and allowed to settle out suspended solids prior to discharge. Wheel wash water will not be discharged directly into any storm water system or storm water treatment system.
· Potential pH-modifying materials such as: bulk cement, cement kiln dust, fly ash, new concrete washings, concrete pumping, and mixer washout waters will be collected on site and managed to prevent contamination of storm water runoff.
Ø Product Specific Practices (6.8)
§ Petroleum Products
All on-site vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers which are clearly labeled.
§ Fertilizers
Fertilizers will be applied only in the amounts specified by the
Engineer. Once applied, fertilizers will be worked into the soil to limit the exposure to storm water. Fertilizers will be stored in an enclosed area. The contents of partially used fertilizer bags will be transferred to sealable containers to avoid spills.
§ Paints
All containers will be tightly sealed and stored when not required for use. The excess will be disposed of according to the manufacturer's instructions and any applicable state and local regulations.
§ Concrete Trucks
Contractors will provide designated truck washout areas on the site.
These areas must be self contained and not connected to any storm water outlet of the site. Upon completion of construction washout areas will be properly stabilized.
Ø Spill Control Practices (4.2 2 c.(2))
In addition to the previous housekeeping and management practices, the following practices will be followed for spill prevention and cleanup if needed.
§ For all hazardous materials stored on site, the manufacturer's recommended methods for spill clean up will be clearly posted. Site personnel will be made aware of the procedures and the locations of the information and cleanup supplies.
§ Appropriate cleanup materials and equipment will be maintained by the contractor in the materials storage area on-site. As appropriate, equipment and materials may include items such as brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, sawdust, and plastic and metal trash containers specifically for clean up purposes.
§ All spills will be cleaned immediately after discovery and the materials disposed of properly.
§ The spill area will be kept well ventilated and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance.
§ After a spill a report will be prepared describing the spill, what caused it, and the cleanup measures taken. The spill prevention plan will be adjusted to include measures to prevent this type of spill from reoccurring, as well as clean up instructions in the event of reoccurrences.
§ The contractor's site superintendent, responsible for day-to-day operations, will be the spill prevention and cleanup coordinator. The contractor is responsible for ensuring that the site superintendent has had appropriate training for hazardous materials handling, spill management, and cleanup.
Ø Spill Response (4.2 2 c.(2))
The primary objective in responding to a spill is to quickly contain the material(s) and prevent or minimize migration into storm water runoff and conveyance systems. If the release has impacted on-site storm water, it is critical to contain the released materials on-site and prevent their release into receiving waters. If a spill of pollutants threatens storm water or surface water at the site, the spill response procedures outlined below must be implemented in a timely manner to prevent the release of pollutants.
§ The contractor's site superintendent will be notified immediately when a spill or the threat of a spill is observed. The superintendent will assess the situation and determine the appropriate response.
§ If spills represent an imminent threat of escaping erosion and sediment controls and entering receiving waters, personnel will be directed to respond immediately to contain the release and notify the superintendent after the situation has been stabilized.
§ Spill kits containing appropriate materials and equipment for spill response and cleanup will be maintained by the contractor at the site.
§ If oil sheen is observed on surface water (e.g. settling ponds, detention ponds, swales), action will be taken immediately to remove the material causing the sheen. The contractor will use appropriate materials to contain and absorb the spill. The source of the oil sheen will also be identified and removed or repaired as necessary to prevent further releases.
§ If a spill occurs the superintendent or the superintendent's designee will be responsible for completing the spill reporting form and for reporting the spill to SD DENR.
§ Personnel with primary responsibility for spill response and clean up will receive training by the contractor's site superintendent or designee. The training must include identifying the location of the spill kits and other spill response equipment and the use of spill response materials.
§ Spill response equipment will be inspected and maintained as necessary to replace any materials used in spill response activities.
v Spill Notification
In the event of a spill, the contractor's site superintendent will make the appropriate notification(s), consistent with the following procedures:
Ø A release or spill of a regulated substance (includes petroleum and petroleum products) must be reported to DENR immediately if any one of the following conditions exists:
§ The discharge threatens or is in a position to threaten the waters of the state (surface water or ground water).
§ The discharge causes an immediate danger to human health or safety.
§ The discharge exceeds 25 gallons.
§ The discharge causes a sheen on surface water.
§ The discharge of any substance that exceeds the ground water quality standards of ARSD (Administrative Rules of South Dakota) chapter 74:54:01.
§ The discharge of any substance that exceeds the surface water quality standards of ARSD chapter 74:54:01.
§ The discharge of any substance that harms or threatens to harm wildlife or aquatic life.
§ The discharge of crude oil in field activities under SDCL (South
Dakota Codified Laws) chapter 45-9 is greater than 1 barrel (42 gallons).
To report a release or spill, call DENR at 605-773-3296 during regular office hours (8 a.m. to 5 p.m. Central time). To report the release after hours, on weekends or holidays, call State Radio Communications at 605-773-3231.
Reporting the release to DENR does not meet any obligation for reporting to other state, local, or federal agencies.
Therefore, the responsible person must also contact local authorities to determine the local reporting requirements for releases. DENR recommends that spills also be reported to the National Response Center at (800)
424-8802.
2016-0009 v Maintenance and Inspection (4.2 3. and 4.2 4.)
Ø Maintenance and Inspection Practices
§ Inspections will be conducted at least one time per week and after a storm event of 0.50 inches or greater.
§ All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report.
§ Wattles will be inspected for depth of sediment and for tears in order to ensure the fabric is securely attached to the posts and that the posts are well anchored. Sediment buildup will be removed from the silt fence when it reaches 1/3 of the height of the silt fence.
§ Sediment basins and traps will be checked. Sediment will be removed when depth reaches approximately 50 percent of the structure's capacity, and at the conclusion of the construction.
§ Check dams will be inspected for stability. Sediment will be removed when depth reaches ½ the height of the dam.
§ All seeded areas will be checked for bare spots, washouts, and vigorous growth free of significant weed infestations.
§ The contractor's site superintendent is responsible for inspections and maintenance reports. Maintenance and repair activities are the responsibility of the contractor. The Owner or Owner's Representative will make any necessary amendments to the SWPPP during construction.
v Non-Storm Water Discharges (3.0)
The following non-storm water discharges are anticipated during the course of this project (check all that apply).
Ø þ Discharges from water line flushing.
Ø þ Pavement wash-water, where no spills or leaks of toxic or hazardous materials have occurred.
Ø þ Uncontaminated ground water associated with dewatering activities.
v Materials Inventory (4.2. 2.c.(2))
The following materials or substances are expected to be present on the site during the construction period. These materials will be handled as noted under the headings “EROSION AND SEDIMENT CONTROLS” and
“SPILL PREVENTION” (check all that apply).
Ø þ Concrete and Portland Cement
Ø o Detergents
Ø þ Paints
Ø o Metals
Ø þ Bituminous Materials
Ø þ Petroleum Based Products
Ø o Cleaning Solvents
Ø o Wood
Ø o Cure
Ø o Texture
Ø þ Chemical Fertilizer o Other
Clark Engineering : A16101.001
Pine Ridge Staff Quarters Indian Health Service East Highway 18
FD
HP
ERV
FD
HP
ERV
FD
HP
ERV
FD
HP
ERV
FD
HP
ERV
FD
HP
ERV
FD
HP
ERV
FD
HP
ERV
FD FDFD FDFDFD FD
HP
WH
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
F.E.
F.E.
ERV
HP
ERV
HPHP
ERV
HPHP
ERV
HPHP
ERV
HP
ERV
HP
FD
ERV
HP
OVERALL FLOOR PLAN1 SCALE: 1/8" = 1'-0"
276'-8"
16'-8" 10'-8" 9'-4" 6'-8" 1'-4"
8'-0" 24'-0" 8'-0" 1'-4"
8'-0" 24'-0" 8'-0" 27'-4" 8'-0" 24'-0" 8'-0" 1'-4"
8'-0" 24'-0" 8'-0" 1'-4"
10'-0" 1'-4"
0"
10'-0" 4'-8" 2'-0"
3'-4"
3'-4"
2'-0" 4'-8" 2'-8"
4'-4"3'-4"
4" 8"
5'-4"
2'-0"
4'-0" 4'-8" 20'-8"2'-8"6'-4"5'-4" 4'-8" 4'-8"4'-8"4'-8"5'-4" 4'-8" 4'-8"4'-8"4'-8"5'-4" 4'-8" 4'-8"4'-8"4'-8"5'-4" 4'-8" 4'-8"4'-8"4'-8" 10'-4" 6'-6" 10'-6"
20'-8" L
C
L
C 20'-8" L
C 20'-8" 20'-8" 26'-0" 20'-8"20'-8"20'-8"20'-8" L
C
L
C
L
C
L
C
L
C
L
C
28'-0" L
C
'-8
'-8
4'
-8
4' -8
2'
-0
'-8
'-8
'-4
5'
-4
'-0
5'
-4
'-0
6' -0
6' -0
6' -0
5'-4"
8" 3'-4" 1'-4"
2'-0"
2' -0
4' -0
4'
-8
'-4
276'-8"
23'-0"
4'-8"
7'-4"29'-0"7'-4"20'-8"7'-4"20'-8"7'-4"20'-8"7'-4"20'-8"7'-4"20'-8"7'-4"20'-8"7'-4"14'-8"10'-8"16'-8"
4'-8"10'-4"4'-8"4'-8"11'-4"4'-8"4'-8"11'-4"4'-8"4'-8"11'-4"4'-8"4'-8"11'-4"4'-8"4'-8"11'-4"4'-8"4'-8"11'-4"4'-8"4'-8"8'-0"4'-8" 2'-0"
10'-0" 4'-8" 2'-0"
3'- 4"
3'- 4"
1'-4" 4'-8"
1'-4"
5' -4
5' -4
5' -4
5' -4
5' -4
5' -4
5' -4
5' -4
28'-0" L
C28'-0" L
C28'-0" L
C28'-0" L
C28'-0" L
C28'-0" L
C
L
C35'-10" 28'-0" L
C 16'-10"
'-5
1 2"
6' -5
'-9 1 2"
1'-4" 4'-8"
1'-4" 1'-4" 4'-8"
1'-4" 1'-4" 4'-8"
1'-4" 1'-4" 4'-8"
1'-4" 1'-4" 4'-8"
1'-4" 1'-4" 4'-8"
1'-4" 1'-4" 4'-8"
1'-4"
UNIT
ACCESSIBLE
ROOM
LAUNDRY
CLOS.
SHOWER
WOMENS
WOMENS
MENS
CLOS.
SHOWER
MENS
CORRIDOR
CORRIDOR
VESTIBULE
UNIT
EFFICIENCY
UNIT
EFFICIENCY
UNIT
EFFICIENCY
UNIT
EFFICIENCY
UNIT
EFFICIENCY
UNIT
EFFICIENCY
UNIT
EFFICIENCY
UNIT
EFFICIENCY
MECH. RM.
STORAGE
UTILITY
CLEAN
UTIL.
SOILED
CORRIDOR
VESTIBULE
UNIT
TWO BEDROOM
UNIT
TWO BEDROOM
UNIT
ONE BEDROOM
UNIT
ONE BEDROOM
UNIT
ONE BEDROOM
UNIT
ONE BEDROOM
UNIT
ONE BEDROOM
UNIT
ONE BEDROOM
UNIT
ONE BEDROOM
UNIT
ONE BEDROOM
1'-0"
4 5
1A 1B 1A 1B
1A 1B
1A 1B
1A 1B
1A 1B
1D 1D
W1 W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1 W1
W1
W1
W1W1W1W1W1W1W1W1W1W1W1
LAUNDRY
CORRIDOR
KITCHEN
CORRIDOR
MENS TOILET
VESTIBULE
CORRIDOR
VESTIBULE
WOMENS TOILET
CORRIDOR
CLEAN UTILITY
SOILED UTILITY
130 CLOSET
FLOORNAMENO. REMARKS
CEILING
PAINTERS FINISH
WALLS
CEILINGWALLS CLG. HEIGHT
ROOM FINISH SCHEDULE
BASE
CLOSET133
LAUNDRY
HALL
HALL CLOSET
BEDROOM
STORAGE
BATHROOM
DINING
LIVING ROOM
LIVING RM. CLOSET
9'-0 1/2"
* ENAMEL* ENAMEL GYP. BD.
CERAMIC TILE
CERAMIC TILE
VINYL
VINYL
VINYL
C.T. / GYP. BD.
C.T. & GYP. BD.
VINYL
VINYL
* WD. TRIM
VINYL
VINYL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
VINYL
CERAMIC TILE
* ENAMEL
* ENAMEL
* WD. TRIM
* WD. TRIM
WOMENS SHOWER
* ENAMEL
* ENAMEL* WD. TRIM
MENS SHOWER
* ENAMEL
* ENAMEL
VINYL
CERAMIC TILE
CERAMIC TILE
* WD. TRIM * ENAMEL
* WD. TRIM * ENAMEL
* WD. TRIM
VINYL
CERAMIC TILE
* WD. TRIM
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
LAUNDRY
C O
M M
O N S
PA
C
ES
EF
FI
C
IE
N C
Y A
PT
. UTILITY ROOM * ENAMELVINYL
* ENAMEL
* ENAMEL
* ENAMEL
FLOORNAMENO. REMARKS
CEILING
PAINTERS FINISH
WALLS
CEILINGWALLS CLG. HEIGHT
ROOM FINISH SCHEDULE - CONTINUED
BASE
VINYL
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
VINYL
* WD. TRIM
* WD. TRIM
* WD. TRIM
B
ED
R M
A
PT
A C
C
ES
S
IB
LE
A
PT
DINING
LAUNDRY
BEDROOM ONE
KITCHEN
VANITY
LIVING ROOM
BATHROOM
UTILITY ROOM
DINING CLOSET
BATHROOM
WALK-IN CLOSET
BEDROOM TW0
CLOSET
DINING
BATHROOM
BATHROOM LINEN
KITCHEN
BEDROOM
LIVING ROOM
LAUNDRY
UTILITY ROOM
CLOSET
PANTRY
VINYL
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
B
ED
R M
A
PT
KITCHEN
BATH CLOSET
BATHROOM
LAUNDRY
BEDROOM
DINING
LIVING ROOM
UTILITY ROOM
KITCHEN CLOSET
WALK-IN CLOSET
LUXURY VINYL PLANK
9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"GYP. BD.
9'-0 1/2"GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"GYP. BD.
9'-0 1/2"GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
9'-0 1/2"
GYP. BD. 9'-0 1/2"
GYP. BD.
SEALED CONCRETE
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
CARPET
CARPET
CARPET
CARPET TILE
COMMERCIAL CARPET
SEALED CONCRETE
SEALED CONCRETE
SEALED CONCRETE
SEALED CONCRETE
SEALED CONCRETE
CARPET TILE
COMMERCIAL CARPET
COMMERCIAL CARPET
CERAMIC TILE
CERAMIC TILE
CERAMIC TILE
CERAMIC TILE
CERAMIC TILE
CERAMIC TILE
* ENAMEL* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL
* ENAMEL * ENAMEL
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
* WD. TRIM
CARPET
SEALED CONCRETE
LUXURY VINYL PLANK
CARPET
SEALED CONCRETE
CARPET
CARPET
SEALED CONCRETE
CARPET
CARPET
1 2"
'-7
4"
31 2"
'-4
4"
51 2"
CONC. STOOP, SEE STRUCTURAL
SEMI-RECESSED FIRE EXINGUISHER CABINET & F.E.
WRAP REAR, SIDES, TOP AND BOTTOM WITH GYP. BD. TO
MAINTAIN FIRE RATING OF PENETRATED WALL.
SURFACE MOUNT FIRE EXTINGUISHER AND BRACKET.
MOP SINK, SEE MECH. PROVIDE 4'-0" HIGH x 4' WIDE
GLASS BOARD ON WALLS NEXT TO SINK. PROVIDE MOP
HANGER (WITH BLOCKING) ABOVE.
1 HOUR RATED ATTIC ACCESS HATCH ABOVE
SEE EXTERIOR ELEVATIONS FOR DOWNSPOUT AND
SPLASH BLOCK LOCATIONS, TYPICAL
EFFICIENCY APARTMENTS TO HAVE FURNITURE IN
CONTRACT. SEE 2 / 2 FOR ENLARGED TYPICAL
EFFICIENCY UNIT FURNITURE PLAN, (8 UNITS W/
FURNITURE)
KEYED NOTES
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
CARPET
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
LUXURY VINYL PLANK
196 198
219218
227 230
232 237
255 258
259 260
261 264
127 126
119135
128129
263262
137155
242241
171173
229228
257256 268
CERAMIC TILE
CERAMIC TILE
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
GYP. BD.
W1
W1
* ENAMEL = SEE SPEC FOR PAINT FORMULATIONS AND GRADES
* WOOD TRIM = TALL WOOD BASE TRIM, SEE SPEC.
* ENAMEL = SEE SPEC FOR PAINT FORMULATIONS AND GRADES
* WOOD TRIM = WOOD BASE TRIM, SEE SPEC.
WD. CABS., SOLID SURFACE CTOPS
WD. CABS., SOLID SURFACE CTOPS
WD. CABS., SOLID SURFACE CTOPS
WD. CABS., SOLID SURFACE CTOPS
WD. CABS., SOLID SURFACE CTOPS
WD. CABS., SOLID SURFACE CTOPS
WD. CABS., SOLID SURFACE CTOPS
SEE ELEV FOR TILE EXTENTS
SEE ELEV FOR TILE EXTENTS
WD. CABS., SOLID SURFACE CTOPS
WD. CABS., SOLID SURFACE CTOPS
7 7 7 7 7 7 7 7
TYPICAL EFFICIENCY UNIT FURNITURE PLAN2 SCALE: 1/4" = 1'-0"
LIVING
ROOM
KITCHEN
DINING
BEDROOM
HALL
CLOSET
BATHROOM
LINEN
APARTMENT
UTILITY
ROOM
COVERED
PATIO
H A
L
C
O
S E
T
4'-4" 3'-4"
4"
6' -0
4'-4"3'-4"
4"
6' -0
4'-4"3'-4"
4"
6' -0
4'-4" 3'-4"
4"
6' -0
4'-4" 3'-4"
4"
6' -0
4'-4" 3'-4"
4"
6' -0
DESCRIPTIONNO.
FURNITURE INDEX
FD
HP
ERV
HP
270271272273274275276277
4 4
END TABLE
RECLINER
SOFA
COUNTER STOOL
TELEVISION ARMOIRE
NIGHT STAND
QUEEN BED, FRAME AND HEADBOARD
CHEST OF DRAWERS
LAMP
10 FLAT PANEL TELEVISION
11 12
DESKTOP LAMP
12 48" X 24" DESK
13 DESK CHAIR
TYPICAL EFFICIENCY UNIT FURNITURE PLAN2 SCALE: 1/4" = 1'-0"
LIVING
ROOM
KITCHEN
DINING
BEDROOM
HALL
CLOSET
BATHROOM
LINEN
APARTMENT
UTILITY
ROOM
COVERED
PATIO
H A
O
S E
T
DESCRIPTIONNO.
FURNITURE INDEX
FD
4 4
END TABLE
RECLINER
SOFA
COUNTER STOOL
TELEVISION ARMOIRE
NIGHT STAND
QUEEN BED, FRAME AND HEADBOARD
CHEST OF DRAWERS
LAMP
10 FLAT PANEL TELEVISION
11 12
DESKTOP LAMP
12 48" X 24" DESK
13 DESK CHAIR
HKG Architects, Inc. Aberdeen, S.D.
CERT. NO.
REVISED DATE
CHECKED BY ____
DM
DATE
12 -30 -16
PROJECT NO.
OF -6
TRACED BY ____
DRAWN BY ____
Plans for:
2016-0009
PINE RIDGE STAFF QUARTERS
INDIAN HEALTH SERVICE
EAST HIGHWAY 18
PINE RIDGE, SD 57770
DDDOVERALL FLOOR PLAN,
EFFICIENCY UNIT FURNITURE PLAN
& ROOM FINISH SCHEDULE 2
A. WALL TYPES FOR EXTERIOR WALLS ARE NOTED ON FLOOR PLANS.
B. ALL INTERIOR WALL TYPES WITHIN UNITS ARE TYPE " 3 " UNLESS OTHERWISE NOTED.
C. SEE
" SCALE FLOOR PLANS FOR ALL EXTERIOR DOOR AND WINDOW DIMENSIONS.
D. VERIFY WINDOW TYPES SHOWN ON UNIT PLANS WITH
EXTERIOR ELEVATIONS. (EXTERIOR ELEVATIONS
E. ALL WALLS BEHIND TUBS AND SHOWERS TO HAVE WR GYPSUM BOARD.
G. GYPSUM BOARD BEHIND TUBS ONLY ON CORRIDOR & DEMISING WALLS TO MAINTAIN FIRE
RATING.
H. ALL GYP. BD. BEHIND TILE TO BE WATER RESISTANT.
I. SEE SPEC SECTION 11451 FOR APPLIANCES PROVIDED BY CONTRACTOR.
J. SEE EXTERIOR ELEVATIONS FOR DOWNSPOUT & SPLASHBLOCK LOCATIONS
K. SEE TYPICAL ADA MOUNTING HEIGHT DETAIL ON DRAWING 6 FOR HEIGHTS AND DIMENSIONS
UNLESS NOTED OTHERWISE ON THIS DRAWING.
GENERAL NOTES
CONC. STOOP, SEE STRUCTURAL
A.D.A. COUNTER HEIGHT 34" SEE ELEVATIONS
ROD AND SHELF @ 60" A.F.F.
16" SHELVING, 5 SHELVES, KV STANDARDS @ 30" O.C. MAX SPACING
ROD AND SHELF @ 48" A.F.F.
SEMI-RECESSED FIRE EXINGUISHER CABINET & F.E. WRAP REAR,
SIDES, TOP AND BOTTOM WITH GYP. BD. TO MAINTAIN FIRE RATING
OF PENETRATED WALL.
SURFACE MOUNT FIRE EXTINGUISHER AND BRACKET.
6'-0" x 10'-0" x 4" CONCRETE PATIO SLAB.
FD
ERV
FD
FD
FD
FD
FD
FD
F.E.
TWO BEDROOM APARTMENT1 SCALE: 1/4" = 1'-0"
ACCESSIBLE ONE BEDROOM APARTMENT & R.V. RESTROOMS1 SCALE: 1/4" = 1'-0"
EFFICIENCY APARTMENT1 SCALE: 1/4" = 1'-0"
ONE BEDROOM APARTMENT1 SCALE: 1/4" = 1'-0"
APARTMENT
UTILITY
ROOM
LAUNDRY PANTRY
KITCHEN DINING
ROOM
LIVING
ROOM
BEDROOM
C L
O S
E T
LINEN
BATHROOM
LIVING
ROOM
KITCHEN
DINING
BEDROOM
HALL
C L O
S E
T
BATHROOM
LINEN
APARTMENT
UTILITY
ROOM
APARTMENT
UTILITY
ROOM
KITCHEN
BEDROOM
LAUNDRY
COVERED
ENTRY
COVERED
PATIO
COVERED
PATIO
WALK-IN
CLOSET
B A
T H
O
S E
T
CLOSET
BATHROOM
LIVING
DINING
COVERED
ENTRY
KEYED NOTES
28'-0" L
C
DE
M
IS
IN
G W
AL
L
DE
M
IS
IN
G W
AL
L
L
C
5' -4
3' -4
8"
1' -4
8" 13'-10" 31 2" 13'-21
2" 8"
8" 6'-11 4" 7'-81
2" 8"
8" 8"
4'-51 4"31
2"2'-11 4"31
2"6'-11 4"31
2"
8'-91 2"31
2"3'-81 2"31
2"2'-11 4"
6'-63 16"
6'-43 4"
4'-3 1
2 "
6'- 63 16
'-4
1 2"
1 2" 51 2"
51 2" 2'
-7 1 4"
6' -4
1 8" 31 2"
6'…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .