Amendment_003_RFP_16-100-SOL-00027.pdf

PDF 81 KB Posted

Attached to
Training, Simulation and Quarantine Services (TSQC) Federal contract opportunity
Solicitation number
16-100-SOL-00027
Issued by
Department of Health and Human Services Immediate Office of the Secretary

About this file

Amendment No. 03 to RFP No. 16-100-SOL-00027

View the file

Other files for this federal contract opportunity

Other files attached to Training, Simulation and Quarantine Services (TSQC), newest first.
File Type Posted
Amendment_002_RFP_16-100-SOL-00027.pdf PDF
Amendment_001_RFP_16-100-SOL-00027.pdf PDF
RFP_16-100-SOL-00027_-_2016-08-10.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority).

IN ITEM NO. 10A.

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable is not, is required to sign this document and return is extended, is not extended. The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offerors

1 5

003 8/26/2016

HHS/OS/ASPR/AMCG

Tip O'Neill Building 200 C Street SW Washington, DC 20024

Same as Block 6:

Attn: Quintin Hackshaw

16-100-SOL-00027

8/10/2016

This Amendment No. 003, to the referenced Request for Proposal, issued August 10, 2016, provides the following:

TSQC

Solicitation No. 16-100-SOL-00027 Amendment No. 0003

1. This is Amendment No. 0003 to Solicitation No. 16-100-SOL-00027.

2. The purpose of this Amendment is to 1); revise the proposal due date and 2); provide responses to questions received.

3. The proposal due date is hereby revised as follows:

FROM: 12:00AM ET on September 10, 2016 TO: 3:00 PM ET on September 23, 2016

4. The following are responses to questions received under this RFP:

Q1. Should a budget submission for Option Period 1 be included along with the 4 year base award budget submission?

A1. A budget submission is required for the base period and all option years.

Q2. Is the Lump Sum budget for quarantine services for 30 days for 20 individuals incorporated into the annual lump sum payment fee each year, whether or not the services are utilized?

A2. Yes

Q3. If there are some beds available and/or utilized during the base period, is it acceptable to provide for that in the proposed budget?

A3. Yes. Please provide this as a separate breakout in your proposal.

Q4. The option periods do not have a line in the model tables for simulated training for Ebola Care as it does in the Base Period. Is it acceptable to include this in the proposal for the option periods, and should it be per course?

A4. You can propose it.

Q5. If the quarantine space is activated or the use of the Simulation space is emergently requested, can other activities in same floor and other floors of the building continue? Safety controls in place will allow for this but wanted clarification.

A5. Yes. All non-contractual activities can be continued as long as they do not interfere with contracted activities and as long as safety controls remain in place.

Q6. At one point in the document it mentioned a 50 page limit to the business plan and on another a 75 page limit. Can you all please clarify which is correct?

A6. The Business Plan will have a page limit of 75 pages.

Q7. Is it allowable for a portion of a specific piece of equipment to be paid for through the RFP and the remainder paid for through other sources, or is the preference that even though a piece of equipment is being used by a variety of initiatives that the equipment is paid for entirely and owned by

TSQC?

A7. Equipment to be purchased under this solicitation shall be funded from one source only.

Q8. Can the awardee subcontract part of the quarantine and clinical care to RESPTCs that have not yet cared for a patient with Ebola virus disease?

A8. Yes. This aspect of the proposal will be evaluated in accordance with Section M.1. of the RFP.

Specifically Factor 1: Technical; Sub-factor 2: Corporate Experience/Proposed Staff.

Q9.1. Who is the target audience? It says USG healthcare providers: is this USPHS, NDMS/DMAT, etc.

A9.1. The target audience is clinicians from NDMS and PHS.

Q9.2. What are their backgrounds?

A9.2. Individuals have not been identified but will be licensed clinicians of the type needed to treat Ebola patients.

Q9.3. Do we need to teach to their protocols?

A9.3. Consideration should be given to their protocols; however, patient and worker safety and quality of care are paramount, so where curricula needs to differ from their protocols, that is ok.

Q9.4. Would the HCW participating in the courses be taking care of patients in a US healthcare environment or in a resource limited environment? The courses will look very different depending on this question.

A9.4. These responders may be caring for patients in either US facilities or austere environments, and the training should encompass both scenarios.

Q10. Are there target numbers for HCWs to be trained? For a simulation-heavy course, we could probably do 20-30 learners/course.

A10. Twenty to thirty learners/course is appropriate.

Q11. Do HCWs attend the course once during the 4 year period, or will the same provider attend more than once (thus requiring additional curriculum to build on)?

A11. Yes--once during the 4 year period; however if an actual emergency occurs, some responders may be sent for just-in-time refresher training.

Q12. The RFP lists 20 courses during the first 4 years- are these to be primarily scheduled courses, primarily courses organized in response to an outbreak, or a mixture?

A12. Without foreknowledge of what may occur, we can only say scheduled courses are the goal but that ASPR needs the right to preempt ANY scheduled course(s) in the event of an outbreak.

Q13. Is this RFP tied to global health security funding?

A13. No.

Q14. Can training and quarantine space be separate (referring to Page 12, Task 7)?

A14. Yes, however, any equipment purchased for training that may be necessary for quarantine must be moved to the quarantine space. In other words, the federal government will not purchase two sets of the same equipment.

Q15. What provision has been made for reimbursement of clinical care if those being quarantined become sick?

A15. There is a provision for reimbursing clinical care for confirmed Ebola patients; however, if a different disease presents or when the Ebola supplemental funding expires in 2019, we will no longer be able to guarantee reimbursement of clinical care unless additional funding is secured.

Q16. Can ASPR clarify exactly what level of virtual simulation lab it is envisioning? We find this term to be somewhat vague.

A16. Rather than provide specific requirements on the types and level of virtual training equipment needed, ASPR is seeking the experience and expertise of Offerors to submit a proposal that would, when completed, result in a state of the art clinical simulation training facility

Q17. What is the preferred format for the CV’s/Biosketches of personnel?

A17. There is no preferred format for the CV’s/Biosketches of personnel?

Q18. Is there a required timeline within the 4-year base period for completion of the curriculum (Task 4) and initiating training, or is the contractor expected to propose a timeline?

A18. Offeror should propose this timeline. This aspect of the proposal will be evaluated in accordance with Section M.1. of the RFP.

Q19. Can this project operate in a more collaborative manner, e.g. splitting the total scope of work between the primary awardee and other qualified (subcontracted) institutions?

A19. Yes. This aspect of the proposal will be evaluated in accordance with Section M.1. of the RFP.

Q20. Due to the 1 month response time to the RFP (publication date to submission date) and the holiday weekend immediately preceding the submission date, is the contractor open to the possibility of an extension?

A20. The submission due date of this RFP has been revised as follows:

FROM: 12:00AM ET on September 10, 2016 TO: 3:00 PM ET on September 23, 2016