This Addendum No. 1 document is issued by the Virginia Department of Transportation (VDOT) to modify the solicitation for IFB 160956, the Dillwyn AHQ Combo Building & Fuel Center project located at 147 Thomas Road, Dillwyn, VA. The project encompasses construction of a single-story prototype combination building of approximately 4,998 square feet, consisting of an administrative office area of roughly 2,416 square feet and a two-vehicle storage and maintenance bay of approximately 2,582 square feet, along with a fuel facility featuring raised concrete islands, gasoline and diesel fuel dispensers, an automated fuel management system, and a 24-by-32-foot pre-engineered metal canopy with associated underground storage tanks (2,000 gallons for gasoline and 10,000 gallons for diesel). The addendum revises the bid due date to 2:00 p.m. EST on September 3, 2026, and moves the bid opening date to 2:00 p.m. EST on September 4, 2026. The prebid conference was conducted on August 12, 2026, and acknowledgement of this addendum must occur prior to the bid submission deadline or be included with the electronic bid submission under penalty of bid rejection. The project includes building demolition, sitework, plumbing, HVAC, and electrical work.
The addendum addresses twelve clarifications and changes to the construction documents, including modifications to accessibility compliance standards (ADA90-Title II and ICC A117.1-2017), electrical panel specifications requiring single-phase configuration throughout the facility, clarification on electrical receptacle locations per Drawing E4, backup generator fuel specifications (requiring natural gas rather than diesel), interior sliding window specifications, epoxy paint system requirements for CMU walls, and solid surface countertop finish specifications. The document confirms that all electrical plan options shown on Drawing E5 (Options 1, 2, 3, and 5) are not applicable to this project and that contractors may schedule additional site visits by contacting Michael Brooks at the VDOT Dillwyn AHQ. The contract officer responsible for this solicitation is Kareem Rahman, and the A/E project manager is Brian E. Goldman, RA.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1221 E Broad Street Tel: (804) 482-5818
Commissioner Richmond, Virginia 23219
August 24, 2026
ADDENDUM NO. 1 TO ALL BIDDERS:
Reference – Invitation For Bids: 160956 Commodity: Dillwyn AHQ Combo & Fuel Center Re-Bid
Dated: July 31, 2026 For Delivery To: Commonwealth of Virginia
Department of Transportation Project Code: 501-18130-087
Bids Due: August 28, 2026 Prebid Conference: August 12, 2026
The above is hereby changed to read:
1. Reference 160956 Project Manual Vol. 1 DGS 30-256, Bid Due Date: Change to read “The deadline for submitting bids is 2:00 P.M. EST, as determined by the bid officer, on September 3, 2026.
2. Reference 160956 Project Manual Vol.1 DGS 30-256, Bid Opening Date: Changed to read “The bids will be opened publicly and read aloud beginning at 2:00 P.M EST on September 4, 2026.
3. Reference Addendum # 1 (One) sealed by Brian E. Goldman (4 pages) to include Questions and Answers and (1)
Attachment Pre-Bid Conference Signed In Sheet.
Note: Acknowledgement of this addendum or any subsequent addenda must be prior to the bid due date and time or signed and uploaded as an attachment with the electronic bid submission. Failure to acknowledge or submit the addendum may be grounds for declaring the bid non-responsive.
Sincerely, Kareem Rahman Contract Officer kareem.rahman@vdot.viginia.gov
Name of Firm
Signature Title Date
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
A d d e n d u m
PROJECT INFORMATION
OWNER NAME: VIRGINIA DEPT. OF TRANSPORTATION OWNER PROJECT MGR: JOHN DYER
PROJECT TITLE:
VDOT – DILLWYN AHQ – COMBO
BUILDING & FUEL FACILITY
OWNER PROJECT NO.: 501-18130-087
A/E PROJECT MGR.: BRIAN E. GOLDMAN, RA
PROJECT LOCATION: 147 THOMAS ROAD, DILLWYN, VA BIDS DUE: REFER TO VDOT ADDENDUM
IFB NO.: 160956 BID OPENED: SEE COVER LETTER
ADDENDUM #: 1
This addendum becomes part of the Construction Documents. The following changes, additions, and deletions shall be made to the following documents; all other conditions shall remain the same. Please attach to all copies of the Construction Documents which you are holding.
All Contractors are to state in their bid the receipt of this addendum. Instructions to Bidders:
PRE-BID SIGN-IN ATTACHED.
ADDENDUM TO THE DRAWINGS – DRAWINGS:
Number Drawing Detail No.
2E1.0 ELECTRICAL SITE PLAN The reach range compliance will be based on Chapter 3 of ICC A117.1.
ADDENDUM TO THE PROJECT MANUAL VOLUME 1 & 2
Number
Spec Section
Specification Change
The correct accesible compliance standard requirement shall be:
• ADA90-T¡tle II, as defined in CPSM Chapter 2.
o Chapter 2 Scoping Requirements of the Department of Justice's 2010
ADA Standards for Accessible Design, dated September 15, 2010.
o Chapters 1 & 3 thru 11 of Standards for Accessible and Usable Buildings and Facilities (ICCA117.1-2017) approved March 28, 2017.
o The reach range compliance will be based on Chapter 3 of ICC A117.1
QUESTIONS/ANSWERS AND CLARIFICATIONS:
Number
A1Q1 Question Will there be an opportunity for another site visit?
Answer Yes. Please let Mike Brooks know when you plan to visit the site so that he can coordinate with our Dillwyn AHQ staff. His contact information:
michael.brooks@vdot.virginia.gov (434) 363-0465 mobile http://www.architecturalpartners.com/
A1Q2 Question When is the last day and time for questions?
Answer Refer to "Instructions to Bidders, Form DGS-30-055 (CO-7a)" included in Project
Manual, Volume 1.
A1Q3 Question On sheets E4 and E5, the power plan for Option 5(0), Staff Room, shows two receptacles. On the other plan, it shows split-controlled receptacles in the same area.
Can you confirm which one is correct?
Answer Receptacles should be installed per Drawing E4. Option 5 (D/E5) was not selected. Refer to Site Adaptation Notes on Drawing 2C1.0.
A1Q4 Question On sheets E4 and E5, there is one receptacle that appears to be moved slightly between the plans in men's restrooms. Can you confirm which location is the correct/final location?
Answer Receptacles should be installed per Drawing E4. Option 1 (B/E5) was not selected.
Refer to Site Adaptation Notes on Drawing 2C1.0.
A1Q5 Question For the electrical panels, one section of the plans shows single-phase and another section shows three-phase. Can you confirm which panels are supposed to be single-phase and which are three-phase?
Answer This is a single-phase site. All panels shall be single-phase.
A1Q6 Question Specification 05 1200 pg.2 par.1.7 Can the requirement for AISC certification be waived for fabrication and erection?
Answer Fabricator is required to either comply with Section 051200 1.7.A or the Contractor may request the Owner to engage a qualified testing agency to perform special inspections of the shop and fabricated items during fabrication of the project work.
The Owner will charge the contractor for all costs incurred for such testing and inspection.
[If requested: Qualified testing agency’s special inspector will perform tests and inspections and submit reports based upon inspection required by the VCC, VUSBC
Statement of Special Inspections, and as follows. Special inspector will verify that manufacturer maintains detailed fabrication and quality-control procedures and will review the completeness and adequacy of those procedures to perform the Work.
Special inspector will test and inspect shop connections for structural steel framing according to the following: Shop-bolted connections shall be inspected according to
RCSC's "Specification for Structural Joints Using High Strength Bolts". In addition to visual inspection, shop-welded connections shall be tested and inspected according to AWS D1.1. Product will be considered defective if it does not pass tests and inspections.]
The Installer is required to either comply with Section 051200 1.7.B or may be an experienced erector who specializes in erecting and installing work similar in material, design, and extent to that indicated for this Project and who is acceptable to manufacturer. Quality Control (QC) inspection tasks for erection shall be performed by the erector’s quality control inspector (QCI) in accordance with
Chapter N of AISC 360.
A1Q7 Question For the electrical panels, one section of the plans shows single-phase and another section shows three-phase. Can you confirm which panels are supposed to be single-phase and which are three-phase?
Answer This is a single-phase site. All panels shall be single-phase.
A1Q8 Question Backup Generator: Would it be acceptable to quote a diesel fueled backup generator opposed to natural gas, which is currently specified? Based on feedback received from electricians bidding the project the first time it was out for bid, there is not a single phase natural gas generator offering suitable for generating the backup electricity specified based on the sizing calculations.
Answer A diesel fueled backup generator is not acceptable.
A1Q9 Question Please provide specifics for interior sliding window shown on sheet A9, detail A.
Answer Provide aluminum, medium-duty interior sliding service window. Refer to Drawing
A9 for size.
• Frame shall be constructed of 6063-T5 extruded aluminum, with overhead track, side jambs, and two framed window sections.
• Each window frame rolls on bottom-mounted heavy-duty ball bearing wheels that ride on aluminum lower channels recessed into solid surface shelf. Provide manufacturer’s standard catch locks.
• Aluminum finish will be selected as part of the submittal process.
• Glazing shall be 1/4" clear tempered glass.
A1Q10 Question Drawing A1 indicates epoxy paint to be used for CMU walls in Room 113. No
Specification for epoxy paint exists in project documents. Provide specification for epoxy paint.
Answer Refer to Specification Section 099123 Interior Painting for submittals, maintenance materials, mockups, delivery / storage, field conditions, and preparation information.
Part 2 PRODUCTS
2.1 BLOCK FILLERS
A. Epoxy Block Filler: Solvent-based, two-component, epoxy, high-solids coating;
formulated to bridge and fill porous surfaces of CMU substrates in preparation for specified subsequent coatings.
2.2 INTERIOR HIGH-PERFORMANCE COATING SCHEDULE, MASONRY
SUBSTRATES
A. CMU Substrates:
1. Epoxy System for Wet Environments: MPI INT 4.2G.
a. Block Filler: Epoxy block filler, MPI #116.
b. Intermediate Coat: Epoxy, matching topcoat.
c. Topcoat: Epoxy, gloss, MPI #77.
A1Q11 Question Please provide a level/class of finish for the Solid Surface Countertops. Currently finish is not specified.
Answer Refer to specification section 123661.16 2.1.
Colors and patterns are to be selected by the A/E from the manufacturer’s full range.
The solid surface material is to be Class A Finish Material and NSF/ANSI 51
Certified.
A1Q12 Question On electrical drawing E5 plan options are shown. Clarify how to deal with these options.
Answer The Contractor is directed on the inclusion of options by note 2 on sheet 2C1.0.
Therefore, Options 1, 2, 3 & 5 (as shown on E5) are not applicable to this project
END OF ADDENDUM