CHANGE_LOG.docx

DOCX document 16 KB Posted

Attached to
THE DEPARTMENT OF LABOR ENTERPRISE-WIDE 2-IN-1 TABLETS PROJECT
Solicitation number
1605DC-17-R-00001
Issued by

About this file

Change Log

View the file

Other files

File Type Posted
CHANGE_LOG.docx DOCX document
Section_B-0002.xlsx XLSX spreadsheet
1605DC-17-R-00001-0002.pdf PDF
Microsoft_Hardware_IDIQ_Requirements_Document_2017.doc DOC document
Section_B.xlsx XLSX spreadsheet
MICROSOFT_SURFACE_PRO_SERVICES_Q&As.xls XLS spreadsheet
Procurement_Activity_Enterprise-Wide_Quarterly_Reporting.xlsx XLSX spreadsheet
1605DC-17-R-00001-_0001.pdf PDF
Contractor_Quarterly_Enterprise-wide_Reporting_Template.xlsx XLSX spreadsheet
Past_Performance_Questionnaire.doc DOC document
J&A.pdf PDF
Microsoft_Hardware_IDIQ_Requirements_Document_2017.doc DOC document
RFP_1605DC-17-R-00001_.pdf PDF
Section_B.xlsx XLSX spreadsheet
Monthly_Asset-Property_Report.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP# 1605DC-17-R-00001/0001

DEPARTMENT OF LABOR ENTERPRISE-WIDE 2-IN-1 IT TABLETS PROJECT

CHANGE LOG

SF1449

EDITED: SF1449 Language Table of Contents:

1. Header Title Changed to: 2-in-1 IT Tablets Project

a. UPDATED: Page Numbers

b. UPDATED: Sections A.1.1-A.1.4 Section A:

1. ADDED: A.1.4.1-1.4.7 (NEW)

Section C:

1. CHECKED: 52.214-4 (50) (X)

2. UPDATED: C.2.3

3. UPDATED: C.2.4

4. UPDATED: C.2.5

5. UPDATED: C.2.7

6. UPDATED: C.3.8

7. UPDATED: C.3.9.1

8. UPDATED: C.3.9.2

9. UPDATED: C.3.93

Section D List of attachments:

1. ADDED: Attachment V- Contractor Quarterly Enterprise-Wide Reporting (Spreadsheet)

2. ADDED: Attachment VI- Procurement Activity Quarterly Enterprise-Wide Reporting (Spreadsheet)

Section E:

1. UPDATED: E.4.1

2. UPDATED: E.4.1.1

3. UPDATED: E.5

4. DELETED: E.8 Special Notice to Offerors

5. DELETED: E.9 Organization of Proposals

6. RENUMBERED: E.8-E.13

7. UPDATED: E.9-E.13 (PLEASE RE-READ CAREFULLY)

8. ADDED: E.13.4

ATTACHMENTS

1. PRICE SCHEDULE:

A. “OR EQUAL” LANGUAGE REMOVED

B. “Pro 4” replaced with “Pro” (All tabs)

2. REQUIREMENTS DOCUMENT

C. OR EQUAL LANGUAGE REMOVED

D. 2GB DPU REMVED AS A REQUIREMENT FOR MICROSOFT SURFACE PRO 4 CONFIGURATION 2 SPEC E. ADDED: Bullet stating all tablets and notebooks provided shall be latest models available.

F. “Pro 4” replaced with “Pro”

3. ADDED: ATTACHMENT V- CONTRACTOR QUARTERLY ENTERPRISE-WIDE REPORTING (SPREADSHEET)

File details come from the government source that posted it. Updated .