Page 1 of 55ORDER NUMBER:
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
Coll. No.
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
SICG011-22
Kimberly Schwinn 202-305-3730
COCO 1
COCO
321000101
Misc 400 First Street NW Washington DC 20534
UNICOR FPI CENTRAL ACCOUNTS PAYABLE
PO BOX 11849
LEXINGTON, KY 40578-1849
1600000294 See Section B
UNICOR FUNDS 15X4500 FUNDS SHALL BE OBLIGATED BY INDIVIDUAL DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF
Kimberly Schwinn
X
236220
05/08/2022
07/28/2022
2:00 PM
COCO
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
05/08/2022
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
05/08/2022
39.5 M Ann Rece
Page 2 of 55ORDER NUMBER:
Terms:
Section A: Optional Form 308 or SF33
Section B: Supplies or Services / Pricing or Cost (Line Items)
1. The following information pertains to the SF1442, Solicitation, Offer, and Award:
OMB Clearance Number 1103-0018
Block 8: Emailed, Hand carried or Overnight Express to:
UNICOR, FPI
ATTN: Kimberly Schwinn, Contracting Officer
400 First Street NW
Washington, DC 20534
202-305-3730
Block 17: LUMP SUM (ENTER THE AMOUNT IN SECTION B.
Block 24, and 27, See Section H.
GENERAL INTENTION: It is the intent of this request for quote to result in a Firm Fixed Price, Construction Purchase Order for a project at the
Information Technology Building, Building 3330W at NSA Crane, as outlined in the attached Statement of Work.
The solicitation is 100% set aside for Small Business. The North
American Industrial Classification System (NAICS) Code applicable to this project is 236220 Commercial and Institutional Building
Construction. Small business size standard for this solicitation is
$39.5 million commercial and institutional buildings and related structure construction.
Contract Line Item: Offerors shall enter unit price and amount for contract line item.
QUESTIONS WILL ONLY be accepted in writing and WILL NOT BE ACCEPTED
AFTER Thursday, July 14, 2022, at 10:00 AM EST. Responses to questions
Page 3 of 55ORDER NUMBER:
and site visit sign in sheet will be posted via www.sam.gov
NO PHONE CALLS PLEASE.
Proposal due date is Friday, July 28, 2022, at 2:00 PM EST. Late offers will not be accepted.
QUESTIONS PERTAINING TO THIS SOLICITATION WILL ONLY BE ADDRESSED IN
WRITING VIA EMAIL TO:Kimberly.Schwinn2@USDOJ.GOV
SITE VISIT IS MANDATORY.
Mandatory Site visit has been scheduled for Monday, June 11, 2022 at
3:00 PM EST. Participants will meet at Naval Surface Warfare Center
Crane Division, Bldg. 3330W, (main entrance on the south west side of the complex) 300 Highway 361 Crane, IN 47522.
The Contractor shall inspect the site where services are to be performed. This site review shall satisfy the Contractor's need to identify all general and local conditions that may affect the cost of the contract. Failure to inspect the site will not constitute grounds for claims after contract award.
Mandatory attendance is required for award. Company Name, Name of attendees, and phone number for attendees must be submitted with completed SECNAV Form for Base Access to Kimberly.Schwinn2@usdoj.gov by
8:00AM EST WEDNESDAY, July 06, 2022.
For block 25 “Base Sponsor”, please list Joseph Regan, phone:
812-381-1235.
Anyone driving should be prepared to provide evidence of a valid driver’s license, insurance & vehicle registration.
NOTE: If you have clearance to access the base - you are still required to submit your names for the site visit by the deadline of 8:00AM EST
WEDNESDAY, July 06, 2022 in order to attend the site visit.
Submitted on time SECNAV Forms for Base Access that are approved will have passes available for pick up the day of the site visit from the
Visitor's Center.
Page 4 of 55ORDER NUMBER:
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date
Visitor Center Address:
103 Furlong St<(>,<)>
Crane, IN 47522
Hours 6:00AM-2:30PM EST
Pick up pass and proceed to Bldg. 3330W, (main entrance on the south west side of the complex) 300 Highway 361 Crane, IN 47522.
PROJECT MUST BE COMPLETED BY 9/30/2022.
THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE OFFEROR:
VENDOR'S DUN & BRADSTREET NUMBER:_______________________________
VENDOR'S UNIQUE ENTITY NUMBER:_______________________________
VENDOR'S POINT OF CONTACT: _____________________________________
VENDOR'S TELEPHONE & FAX NUMBER: ______________________________
VENDOR'S EMAIL ADDRESS: ________________________________________
VENDOR'S BUSINESS SIZE (i.e. SMALL,LARGE,ETC.): ________________
By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database (System
Award Management) prior to award, during performance and through final payment of any contract resulting from this solicitation.
_______________________________________________ Signature
Page 5 of 55ORDER NUMBER:
00001 ICSG-0001 1 EA 09/30/2022
SCIF DEMO/CONSTRUCT WALL
1.0,,SCOPE
The scope of this project consists of converting an existing storage closet into an office for the Deputy Division Manager. This modification is required so the Deputy Division Manager can remain in the area he needs to be while gaining the ability to have meetings and phone calls in private.
2.0,,APPLICABLE DOCUMENTS
The following documents of the revision or issue in effect at the date of award, form a part of this SOW for reference. In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.
Reference ATTACHMENT 01 for Applicable Documents.
3.0,,PERFORMANCE REQUIREMENTS
The scope of this project consist of converting an existing storage closet inside of a SCIF, to an office. The requirements include removal of 2 walls, HVAC duct modifications, sprinkler modification, electrical additions, framing 2 new walls, insulate to meet sound transmission requirements, drywall, paint, flooring, acoustical ceiling, and installation of a new door. Contractor must provide Build Drawings for approval. (CDRL A014)
3.1 REQUIREMENTS
The scope of this project will be executed inside of B3330W, inside one of the SCIF’s at NSA Crane. See Figure 1
A),, Demo – 2 existing walls of room 137 shall be demolished. Acoustical ceiling inside of the storage room as well as a portion outside shall be removed. 2 Electrical grounding post shall be removed and relocated outside of the new office. Speaker in ceiling to be removed and replaced in the new overall space. Current ventilation fan above the ceiling shall be removed and saved for re-installation in the new wall.
Page 6 of 55ORDER NUMBER:
B),, Wall construction – New walls constructed shall be approximately
14’4” long and run from floor to deck (~12’ high). The 2 new walls shall consist of 3 5/8” metal studs at 16” O.C., single layer 5/8” gypsum board on the outside, double layer 5/8” gypsum board on the inside of the new office. Outside layer of double gypsum board shall be foil backed. All gypsum board shall be taped and sealed floor to deck. The 2 visible layers shall be taped, sealed, sanded, and painted floor to deck. New walls constructed shall be insulated with 3 ½” sound attenuation material from floor to deck. This material shall be fastened to avoid sliding down in the wall creating a void at the top. New wall and existing wall abutments shall be sealed with acoustical sealant from floor to deck. Top and bottom 16 gauge continuous wall track with anchors at 32” O.C. max., and shall have a continuous bead of acoustical sealant underneath each track and on both sides of the partition. 2 coats of paint shall be applied to all walls of the office inside and out. Paint color shall be egg shell white.
C) ,, Electrical – 2 grounding posts shall be relocated to be outside of the new office. 2 new quad 110VAC / 20 amp receptacles shall be installed in the office. 2 new duplex 110VAC / 20 amp receptacles shall be installed inside the new office. Power shall be re-connected to above ceiling ventilation fan. Wall switch shall be connected to 2 new lay in
2’x4’ LED fixtures.
D) ,,Data – Contractor shall install 6 metal boxes with conduit extending above the ceiling with a 90 degree bend for access to pull cables by others. 3 boxes shall be located at standard receptacle height underneath the desk and 3 boxes shall be located in the opposite corner near the conference table. Each of the 6 boxes shall be spaced 1 meter apart minimum.
E) ,,Fire Protection – Contractor shall remove / reconfigure current sprinkler head locations inside and outside of the new office. One sprinkler head will need to be added outside the office with a branch off the main line which is in the general vicinity. All sprinkler head locations shall meet or exceed current fire protection building codes regarding off the wall distances, between head distances, and sqft of
Page 7 of 55ORDER NUMBER:
head coverage.
F) ,,Acoustical ceiling – Ceiling grid and tiles shall be filled in outside of the new office walls matching existing ceiling tiles. New grid and tiles shall be installed inside of the new office to accommodate the lights, diffuser, return grate, and any other ceiling fixtures involved.
G) Flooring – New carpet tiles shall be installed to match other carpeted areas in the SCIF. New cove base in the area shall be installed to match cove base in the area. Contractor shall provide samples of carpet and cove base for approval.
H) Office door – Office door shall be a 3’ x 7’ solid wood door with a knock down metal jamb. The door jamb shall be filled will acoustical sealant for sound transmission. The door shall be sealed on all sides with sound deadening strips. Standard locking door lever handle shall be installed. A continuous bead of acoustical sealant shall be applied between the floor and low profile threshold.
J) The Contractor shall clean the worksite at the end of each work day. The Contractor shall dispose of any scrap material and clean any spills that may occur.
The following requirements listed, but not limited to, are NOT applicable to this project:
A) ,,Labor and materials for data cable installation.
B) Security measures in and near new office.
C) ,,Furniture procurement & installation.
Additional Notes:
A),,Contractor shall check-in at front desk each day upon arrival, sign in, and receive visitor’s badge.
B),,No cell phone, smart watches, tablets, or electronics of any kind will be authorized inside the building.
Page 8 of 55ORDER NUMBER:
C),,An additional sign in will be required when entering the SCIF, EVERYTIME.
D),,Each time personnel leave the SCIF, escort will be required and re-entry will follow the same process as the first time.
E),,A dust containment barrier shall be erected inside the project area to avoid dust and debris entering the rest of the room.
3.2 Installation Access
Physical access to Government’s facility at Naval Support Activity
(NSA), Crane or areas over which DoD, DoN, or U.S. Marine Corps shall be through the use of the Defense Biometric Identification System (DBIDS) and associated data processing/information services for purposes of protecting U.S./Coalition/allied government/national security areas of responsibility and information. The contractor shall obtain employee personal identity verification credentialing (badge) by submitting to the NSA Crane Visitor Center 103 Furlong St, Crane, IN 47522, form
SECNAV 5512/1 (APR 2014), for each contractor employee. Upon Base
Registrar authorization of form 5512/1 the contractor shall submit form
NSA Crane 5512/47 DBIDS Badge Application Record to the NSWC Crane
Security Division (812) 854-1213. The Contractor shall retrieve badges of employed personnel upon separation.
Each employee shall affix their badge on their person above the waste at all times while on the Activity. Badges may only be removed for safety reasons and must be reaffixed when work is completed.
DBIDS information can be found at the following website:
http://dbids.dmdc.mil/
For Contract employees or subcontractors requiring infrequent access to the Activity, one day temporary passes MAY be authorized. Requests for temporary passes shall be submitted to the COR at least 2 working days prior to base access.
Be advised that the DBIDS process and temporary pass process both involve a background check. Persons with a Felony conviction in the
Page 9 of 55ORDER NUMBER:
last 10 years will not be issued badges or passes.
Individuals supporting these efforts shall comply with the latest security regulations applicable to the government facility/installation.
a.,,Depending on the facility/installation regulations, contractor personnel shall present a proper form of identification(s) and vehicle proof of insurance or vehicle rental agreement.
b.,, All contractor persons engaged in work while on government property shall be subject to inspection of their vehicles at any time by the government, and shall report any known or suspected security violations to the local host Security Department.
Failure to obtain entry approval will not affect the contract price or the time of completion.
3.3 Program Management
The Contractor shall comply with the manufacturer’s recommendations in installation of all materials and equipment. The Contractor shall be responsible for field verification of actual conditions prior to commencement of work. The Contractor shall be responsible for quality control of all work that is performed via this task order. The
Contractor is responsible for compliance with the U.S. Army Corps of
Engineers Safety and Health Requirements Manual, EM 385-1-1, and shall maintain a safe working environment at all times during the performance of this task order. Although this document is intended to identify all significant features of work to be accomplished in the performance of this task order, it should not be considered absolutely inclusive of all minor tasks required for completion of the major work described herein.
3.3.1 Design and Construction Quality Control Plan
The Contractor shall establish and maintain a Quality Control program that is administered by a Design and Construction Quality Control organization, using Quality Control (Design and Construction) Plans, (CDRL A007) Commissioning Plans and Reports, meetings, a Coordination
Page 10 of 55ORDER NUMBER:
and Mutual Understanding Meeting, three phases of control, submittal review and approval, testing, completion inspections, and QC certifications, Inspections in accordance with Section 01 45 35.05 20
SPECIAL INSPECTIONS FOR DESIGN-BUILD or Section 01 45 35.05 10 SPECIAL
INSPECTIONS FOR DESIGN-BID-BUILD and documentation necessary to provide design, materials, equipment, workmanship, fabrication, construction and operations which comply with the requirements of this Contract. The QC program must cover on-site and off-site work. (CDRL A008) The contractor shall provide weekly status reports. No construction work or testing may be performed unless the Contractor’s QC Manager is on the work site.
The Contractor shall provide a Bill of Material (BOM) before material is purchased for approval by RTA. (CDRL A013)
3.3.2 Inspection Benchmarks
A) Periodic quality / safety checks at Government determined frequency.
B) Framing inspection prior to wall covering (including all data and electrical boxes, conduit, and insulation in place)
C) First layer of drywall (first layer of drywall is taped and sealed prior to hanging second layer)
D) Pre-Final
The Government and QC Manager will perform this inspection to verify that the facility is complete and ready to be occupied. (CDRL A008) A
Government "Pre-Final Punch List" will be documented by the QC Manager as a result of this inspection. The QC Manager will ensure that all items on this list are corrected prior to notifying the Government that a "Final" inspection with the Client can be scheduled. Any items noted on the "Pre-Final" inspection must be corrected within 5 working days and be accomplished before the contract completion date for the work or any particular increment thereof, if the project is divided into increments by separate completion dates.
E) Final (At completion)
Notify the COR at least 5 working days prior to the date a final acceptance inspection can be held. State within the notice that all items previously identified on the pre-final punch list will be
Page 11 of 55ORDER NUMBER:
corrected and acceptable, along with any other unfinished Contract work, by the date of the final acceptance inspection. The Contractor must be represented by the QC Manager, the Project Superintendent, the CA, and others deemed necessary. Attendees for the Government may include the
PCO, COR, Construction Management personnel, and personnel representing the Client.
3.4 Safety and Health
3.4.1 Activity Hazard Analysis (AHA)
Before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. Format the AHA in accordance with EM 385-1-1, Section 1 or as directed by the COR. Submit the AHA for review at least 5 working days prior to the start of construction, or DFOW (CDRL A002). The
Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
3.4.3 Accident Prevention Plan
Contractor shall provide a site-specific Accident Prevention Plan (APP), including Activity Hazard Analyses (AHA), in accordance with EM 385-1-1
Appendix A, paragraph 3.k for the design team to follow during site visits and investigations. For subsequent visits, update the form if there are changes in the personnel who will be attending, or the tasks to be performed. Submit the APP for review and acceptance by the
Government at least 5 working days prior to the start of the design field work. (CDRL A003)
3.4.4 Accident/Incident Reporting
The Contractor shall maintain an accurate record of and shall report all accidents to the COR immediately after incident occurs. (CDRL A005)
Page 12 of 55ORDER NUMBER:
For Navy Projects, complete (CDRL A005). Near miss reports are considered positive and proactive Contractor safety management actions
The Contractor shall maintain an accurate record of and shall immediately report to the COR all damages to Government Furnished
Equipment and Facilities as prescribed by OPNAVINST 5102.1. (CDRL A006)
3.5 Waste Management Plan
The Contractor shall submit a waste management plan within 5 working days after contract award. In accordance with UFGS 01 74 19
Construction and Demolition Waste Management. The plan must demonstrate how the project waste diversion goal is met and plan must include the following: (CDRL A009)
Ensure Hazardous Waste is labeled, handled and stored in accordance with the Safety Data Sheets (SDS) and regulations.
The Contractor shall contact the COR to set up a temporary hazardous waste storage area. This storage area shall not exceed 60 days.
The Contractor shall immediately (within minutes) notify the Fire department, and COR of any hazardous material spillage.
The Contractor shall be responsible for clean-up efforts in accordance with 40 CFR 300 and shall provide verbal and written notifications to the COR (CDRL A010) as required by 40 CFR 355.
Hazardous Waste shall be turned over to Government RTA.
Any unforeseen hazardous material is found or suspected to be hazardous material the contractor shall notify the COR. (CDRL A004) Stop work and wait for the government for instructions.
3.6 Waste Management Records
The Contractor shall maintain records to document the quantity of waste
Page 13 of 55ORDER NUMBER:
generated. The contractor shall make the records available to the COR during construction, and a copy of the records must be delivered to the
COR upon completion of the construction. (CDRL A012)
3.7 Environmental
3.7.1 The Contractor shall not use any asbestos containing material
(ACM) at any time during the construction. The Contractor shall verify that all materials, including those supplied by third parties, are asbestos free.
A written certification letter shall be provided by the Contractor to the Contract Officer certifying that the finished work is asbestos free.
A signed letter-head stating,” to the best of my knowledge, no ACBM was used as a building material in the building” may suffice, per 40 CFR part 763.99 (a)(7). (CDRL A015)
The Contractor shall submit SDS for any suspect materials to the
Contract Officer.
3.7.2 Provide protection of areas and spaces not to be painted. Prior to surface preparation and coating applications, remove, mask, or otherwise protect such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
3.7.3 Comply, at minimum, with manufacturer recommendations for space ventilation during and after paint application. Isolate area of application from rest of building when applying high-emission paints or coatings.
3.7.4 Do not apply coating when air or substrate conditions are:
Less than 3 degrees C 5 degrees F above dew point;
Below 10 degrees C 50 degrees F or over 35 degrees C 95 degrees F, unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Page 14 of 55ORDER NUMBER:
3.7.5 Do not use materials having a lead content over 0.6 percent by weight of nonvolatile content.
3.7.6 All coatings containers used to apply the contents therein to a surface directly from the container by pouring, siphoning, brushing, rolling, padding, ragging, or other means shall be closed when not in use.
3.7.7 Containers of any Volatile Organic Compound (VOC) containing materials used for thinning and cleanup shall be closed when not in use.
3.7.8 Compliance with the VOC content limits shall not exceed the following limits: flat coatings (0.835 lb VOC/gal), non-flat coatings
(1.25 lb VOC/gal), non-flat-high-gloss coatings (2.09 lb VOC /gal) and floor coatings (2.09 lb VOC/gal), as per coating category identified in
326 IAC 8-14-3. The Contractor shall provide chemical products Safety
Data Sheets (SDS) to show compliance with VOC content limit.
3.7.9 Do not, under any circumstances, violate the manufacturer’s application recommendations.
3.8 Closeout Submittals
As-built drawings are developed and maintained by the Contractor and depict actual conditions, including deviations from the Contract
Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to Contractor submitted Requests for Information; direction from the COR; designs which are the responsibility of the Contractor, and differing site conditions. Maintain the as-built throughout construction as red-lined hard copies on site. These files serve as the basis for the creation of the record drawings. (CDRL A017) Other closeout submittals may include, but not limited to, warranty documentation, operation & maintenance manuals, manifests, testing results, equipment training report, as applicable.
The record drawings are the final compilation of actual conditions reflected in the as-built drawings.
Page 15 of 55ORDER NUMBER:
Provide and maintain two black line print copies of the PDF contract drawings for As-Built Drawings in accordance with FC 1-300-09N. At a minimum of 5 working days prior to Beneficial Occupancy Date (BOD), certify both sets of as-built drawings as correct, sign, and submit the
As-Built Drawings for COR approval. (CRDL A017) Record Drawings on two separate CDs or DVDs.
3.9 Warranty Management Plan
Develop a warranty management plan which contains information relevant to FAR 52.246-21. At least 10 working days before the planned pre-warranty conference, submit one set of the warranty management plan.
Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, or of engineering background, not necessarily familiar with this contract. The term "status" as indicated below must include due date and whether item has been submitted or was accomplished. Warranty information made available during the construction phase must be submitted to the COR for approval prior to each pay estimate. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of project acceptance and continue for the full product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contractor, COR, and the Customer
Representative. (CDRL A012)
4.0 TECHNICAL DATA DELIVERABLES
Reference ATTACHMENT 02 for Applicable Document.
5.0 SPECIAL CONDITIONS
5.1 Contracting Officer’s Representative (COR)
Page 16 of 55ORDER NUMBER:
The COR is the point of contact for non-substantiated communications of a technical nature. Only the Contracting Officer has the authority to change the requirements of this order(s).
5.2 Requiring Technical Activity (RTA)
The RTA contacts are Functional Managers, Task Managers, and project leads. RTAs do not have the authority to direct Contractor personnel or change the requirements of this order(s) or change the requirements of any TI(s). RTA’s shall be copied on each CDRL deliverable identified.
5.3 Safety and Health
The requirements of this order may require Contractor personnel to come in contact or be exposed to hazardous conditions. The Contractor shall abide by all applicable federal, local, and state occupational safety and health requirements. The Government will provide Standard Operating
Procedures (SOP) when applicable. The Contractor must have on record a corporate safety plan and shall provide a copy to the COR when instructed. The Contractor shall ensure all employees have appropriate
Personal Protection Equipment (PPE). The Contractor shall ensure employees have all required training and certifications related to
Occupational Safety and Health Administration (OSHA) requirements.
Any Contractor employee exhibiting unsafe behavior may be removed from the NSWC Crane site. Such removal shall not relieve the Contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.
5.4 Hazardous Materials
The Contractor will provide a responsible party for the handling of the hazardous materials and the respective SDS. This responsibility includes proper training in the handling and disposal of the hazardous materials.
5.5 Control of Contractor Personnel
Contractor personnel shall physically access government facilities and
Page 17 of 55ORDER NUMBER:
installations for purposes of site visitation, meeting attendance, supervisory and work performance within government spaces (either temporary or permanent). Individuals supporting these efforts shall comply with the latest security regulations applicable to the government facility/installation.
a) Depending on the facility/installation regulations, Contractor personnel shall present a proper form of identification(s) and vehicle proof of insurance or vehicle rental agreement.
b) All Contractor persons engaged in work while on government property shall be subject to inspection of their vehicles at any time by the government, and shall report any known or suspected security violations to the local host Security Department.
c) All persons engaged in work while on Government property shall be subject to search of their persons (no bodily search) and vehicles at any time by the Government, and shall report any known or suspected security violations to the NSWC Crane Security Department.
d) Assignment, transfer, and reassignment of Contractor personnel shall be at the discretion of the Contractor. However, when the Government directs, the Contractor shall remove from contract performance any person who endangers life, property, or national security through improper conduct.
e) All Contractor personnel engaged in work while on Government property shall be subject to the Standards of Conduct contained in SECNAVINST
5370.2J (Standards of Conduct and Government Ethics).
f) Prior to conducting work under this contract, the Contractor shall provide a list of employees that will be working on site. The employee list shall contain full names, security clearance levels, social security numbers, job titles, and official birth certificates. This list shall be updated within forty-eight hours after changes occur.
g) Any photography on base is not permitted without prior approval and photography permit request submitted to the COR. Permit request must be
Page 18 of 55ORDER NUMBER:
approved and signed by the COR prior to any photos being taken. All photos taken, after approval, must be analyzed and approved prior to release.
5.7 Accident Reporting
The Contractor shall maintain an accurate record of and shall report all accidents to the COR immediately after incident occurs. (CDRL A005)
5.8 Smoking Regulations
Smoking on NSWC Crane, Crane, IN premises shall be in approved areas only in accordance with NSACRANEINST 5100.13A (NSA Crane Smoking and
Tobacco Use). Smoking in vehicles is prohibited.
5.9 Damage Reporting
The Contractor shall maintain an accurate record of and shall immediately report to the COR all damages to Government Furnished
Equipment and Facilities as prescribed by OPNAVINST 5102.1. (CDRL A006)
5.10 Investigations
Contractor employees shall cooperate with Government investigative agencies conducting criminal or administrative investigations.
5.11 Government Observations
Government personnel, such as Inspector General or higher headquarters staff, are authorized to observe Contractor operations. Efforts will be made to minimize the degree of disturbance on Contractor performance.
5.12 Hours of Operation
NSWC Crane core duty hours for on-site Contractor personnel and the
Contractor’s liaison facility personnel assigned to this effort are 0900 to 1430 hours, Monday through Friday, during regular Government workdays.
Page 19 of 55ORDER NUMBER:
Government personnel are afforded a flextime schedule that allows a starting time between the hours of 0600 and 0900, with a quitting time between the hours of 1430 and 1800 depending on the applicable work schedule. Contractors are required to work during Government work hours in accordance with company timekeeping policies. Exceptions may be approved by the COR if requested by the Contractor.
5.12.1 Closed Days
All closed days will be designated by the Commander, NSWC Crane. Closed days will be associated with holidays, National Security, and/or inclement weather/dangerous conditions. The Contractor will not be allowed to work on NSWC Crane during designated closed days.
5.12.1.1 Inclement Weather
When the Government Agency is closed by the Commander because of inclement weather conditions and/or dangerous conditions, notification of the closing will be broadcast over local radio and television stations.
5.13 Licenses, Certifications, and Training
The Contractor shall provide capable personnel with qualifications, experience levels, security clearances, and necessary licenses, certifications, and training required by Federal, State, and Local laws and regulations. Training necessary to ensure that personnel performing under this contract maintain the knowledge and skills to successfully perform the required functions is the responsibility of the Contractor.
Training necessary to maintain professional certification is the responsibility of the Contractor.
5.14 Contractor Identification
This contract is for non-personal services as defined by FAR Subpart
37.104. As such, Contractor employees shall identify themselves as
Contractor personnel by introducing themselves or being introduced as
Page 20 of 55ORDER NUMBER:
Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence. Contractor shall provide a Contractors
Personnel Roster. (CDRL A001)
5.15 Post Award Meetings
A Post Award Meeting with the successful offeror will be conducted within 15 working days after award of the contract. The meeting will be held at (to be identified at award). The Contractor will be given at least five working days’ notice prior to the date of the meeting by the
Contracting Officer. The requirement for a Post Award meeting shall, in no event, constitute grounds for excusable delay by the Contractor in performance of any provisions of the contract. A second post award meeting may, if necessary, be held after the receipt of the first invoice to assure that adequate documentation has been received to substantiate the validity of the invoice for the stated period of performance
6.0 PLACE OF PERFORMANCE
The primary work site will be Naval Surface Warfare Center Crane
Division, Bldg. B3330W, 300 Highway 361 Crane, IN 47522.
SECTION D - PACKAGING AND MARKING
PRESERVATION, PACKING AND MARKING
Preservation, packaging, and packing for all items delivered hereunder shall be in accordance with commercial practice, and shall be paid by the contractor. All packaging, postage fees and payment related to
Page 21 of 55ORDER NUMBER:
submitting information, forms and reports, etc. to the Government (i.e.
Contracting Officer, Contracting Officer's Representative) shall be paid by the Contractor.
MARKING
All information submitted to the Contracting Officer or the Contracting
Officer's Representative shall clearly indicate the contract number and task order number, if applicable, for which the information is being submitted.
Section E: Inspection and Acceptance
CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The COR is responsible, as applicable, for: receiving all deliverables, inspecting and accepting the supplies or services provided hereunder in accordance with the terms and conditions of this contract; providing direction to the contractor which clarifies the contract effort, fills in details or otherwise serves to accomplish the contractual Scope of
Work; evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payments. Also, see
Section H.3 of the solicitation.
52.236-5 Material and Workmanship (APR 1984)
52.246-12 Inspection of Construction. (Aug 1996)
Section F: Delivery & Performance
PERFORMANCE SITE
Naval Surface Warfare Center Crane Division<(>,<)>
Bldg. 3330W, 300 Highway 361
Crane, IN 47522.
CONTRACT TIME
FAR 52.211-10<(>,<)>
Page 22 of 55ORDER NUMBER:
For each building, the Contractor shall be required to (a) commence work under the awarded contract within 10 calendar days of receipt of task order, and (b) prosecute the work diligently. The time stated for completion shall include final cleanup of the premises.
(End of clause)
Alternate I (Apr1984)
CONTRACT PERIOD OF PERFORMANCE
The period of performance of this contract shall be completed by August
30, 2022, and commence from the contract award date and continue thru final completion.
Section G Contract Administration Data:
FEDERAL GOVERNMENT HOLIDAYS
The following is a list of Federal Holidays observed by the Government:
New Year's Day (JAN 1),, Martin Luther King's Birthday (3rd Monday in January)
Washington's Birthday (3rd Monday in February)
Memorial Day (last Monday in May)
Juneteenth (June 19)
Independence Day (JUL 4)
Labor Day (1st Monday in September)
Columbus Day (2nd Monday in OCT)
Veteran's Day (November 11th)
Thanksgiving (4th Thursday in November)
Christmas (DEC 25)
ADMINISTRATIVE INFORMATION
A. ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR
CONTRACT AWARD AND ADMINISTRATION
1. Administration of this contract shall be performed by:
Page 23 of 55ORDER NUMBER:
KIMBERLY SCHWINN, Contracting Officer
Telephone: 202-305-3730
E-mail: Kimberly.schwinn2@usdoj.gov
Address:
UNICOR, Federal Prison Industries
Attn: Kimberly Schwinn, Contracting Officer
400 First Street NW
Washington, DC 20534
202-305-3730
Written communications shall make reference to the contract number and shall be mailed to the above address, or sent via Email to
Kimberly.Schwinn2@usdoj.gov
Administrative Contracting Officer is Kimberly Schwinn at
Kimberly.Schwinn2@usdoj.gov
The Contracting Officer (CO) has the overall and primary responsibility for the administration of this Contract. The CO alone, without delegation, is authorized to take actions on behalf of the Government to: modify or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules; make final decisions involving deductions from contract payments or other consideration due to the Government, for nonperformance or unsatisfactory performance, whether or not in dispute; terminate the contract for convenience or default; issue final decisions regarding contract questions or matters under dispute. The CO may delegate certain other responsibilities to an authorized representative.
JAR 2852.201-70, CONTRACTING OFFICER'S REPRESENTATIVE
a),, The following are hereby designated to act as Contracting Officer's
Representative (COR) under this contract:
Joseph Regan, Program Analyst
Acquisition & Construction Management Branch
Naval Surface Warfare Center, Crane Division, (NSWC Crane)
Page 24 of 55ORDER NUMBER:
Code 1022, Bldg. 2
300 Highway 361
Crane, IN 47522-5001
Ph: 812.854.2639
DSN: 482-2639
Email: joseph.p.regan.civ@us.navy.mil
(b) The COR is responsible, as directed by the CO, for: 1. receiving all deliverables, inspecting and accepting the supplies or services provided hereunder in accordance with the terms and conditions of this contract; 2. providing direction to the contractor which clarifies the contract effort; 3. fills in details or otherwise serves to accomplish the contractual Scope of Work; 4. evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payments.
(c) The COR does not have the authority to alter the contractor's obligations under the contract, and/or modify any of the expressed terms, conditions, specifications, or cost of the agreement. If as a result of technical discussions, it is desirable to alter/change contractual obligations or the Scope of Work, the Contracting Officer shall issue such changes in writing and signed.
REQUIREMENTS FOR CORRECTION OF SUB-STANDARD PERFORMANCE
When any member of the Contract Administration Team (CO & COR) becomes aware of substandard performance in any area of the Contract, the
Contractor will be given verbal and/or written notification, depending on the circumstances of the issue. The Contractor shall resolve the performance issues consistent with the requirements specified in the SOW and/or task order. For other types of deficiencies where the corrective actions are not specifically stated, the Contractor shall submit a Plan of Action to correct the performance issue within ten (10) working days.
If it is not corrected to the satisfaction of the Contract
Administration Team member, the Contract Administration Team member shall annotate the performance files and include the observations in the
Contractor Performance Report as appropriate.
Page 25 of 55ORDER NUMBER:
Construction Progress Telecoms: Biweekly telecoms with CO/COR to discuss design issues and project progress as necessary. The Contractor shall provide call-in number, lead the discussion and provide minutes to all participants (electronic submission only); to include action items, items for clarification and information requests within three business days of the biweekly status calls.
Daily Field Reports and a two week look ahead shall be submitted to the
COR/CO by close of business each Monday for the duration of the contract.
52.236-7 Permits and Responsibilities (NOV 1991)
Section H Special Contract Requirements:
TASK ORDER AWARD
The Government intends to award a Firm Fixed-Price Construction purchase order as a result of this request for quote. Award will be made to the offeror, pursuant to an affirmative determination of responsibility, whose offer conforms to the terms of the solicitation, and is determined to be in the best interest of the Government, based upon evaluation of the factors included in this solicitation.
WAGE DETERMINATION APPLICABLE TO THIS CONTRACT
The rates referred to in the Davis-Bacon Act for Bricklayers, Laborers, Carpenters, Electricians, etc., are included in the General Wage
Determination issued by U.S. Department of Labor Employment Standards
Administration Wage and Hour Division, General Decision Number
IN20220008, dated 05/27/2022.
Payment will be made to individuals used in the performance of this contract, the rates of wages contained therein. The complete wage rate decision is incorporated as a part of this solicitation.
SUBMISSION AND PAYMENT OF INVOICES
Page 26 of 55ORDER NUMBER:
Reference Standard Contract Clause entitled "Prompt Payment For
Construction Contracts (FAR 52.232-27) of this solicitation. All invoices shall include the complete contract number and line item(s) billed. To avoid delay in payment, invoices shall be submitted in an original and one copy (if prepared by a copying process, one copy shall be marked "Original").
Pay Applications and Certified Payrolls shall be submitted to: UNICOR, Federal Prison Industries<(>,<)>
ATTN: Kimberly Schwinn
Contracting Officer
400 First Street NW
Washington, DC 20534
Joseph Regan, Program Analyst
Acquisition & Construction Management Branch
Naval Surface Warfare Center, Crane Division, (NSWC Crane)
Code 1022, Bldg. 2
300 Highway 361
Crane, IN 47522-5001
Ph: 812.854.2639
DSN: 482-2639
Email: joseph.p.regan.civ@us.navy.mil
Due to mail delays caused by security precautions, do not use U.S.
Postal Service mail. Packages from any of the messenger services
(FedEx, UPS, DHL, etc.) are accepted at this address. The preferred method of invoice submission is electronically (via email) to
Kimberly.Schiwnn2@usdoj.gov
Delay in contractor payment due to invoice submission to any address other than the physical or email address listed above shall be the fault of the contractor, and payment will be processed only upon receipt at the physical or email address noted above, and after approval by
UNICOR's Customer NSWC and the project COR.
ALL INVOICES SHALL REFERENCE THE CONTRACT NUMBER.
Page 27 of 55ORDER NUMBER:
All invoices must match the contract dollar amount and payments will only be processed upon approval by UNICOR's Customer NSWC and project
COR.
PREFERED METHOD: Submission of "Invoices by E-mail":
Payment Applications must be submitted using AIA Document G702/G703.
Please submit 1 invoice to the following individual at their business e-mail addresses listed below:
KIMBERLY SCHWINN, CONTRACTING OFFICER
KIMBERLY.SCHWINN2@USDOJ.GOV
MICHAEL COMPTON, Construction Control Representative mcompton@central.unicor.gov
LIABILITY COVERAGE / INSURANCE
52.228-5 Insurance-Work on a Government Installation
Insurance-Work on a Government Installation (Jan 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective-
(1) For such period as the laws of the State in which this contract is to be performed prescribe; or
Page 28 of 55ORDER NUMBER:
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
(End of clause)
(a) (In accordance with Standard FAR Contract Clause 52.228-5 entitled
"Insurance - Work on a Government Installation (JAN 1997) the Contractor shall procure and maintain, during the entire period of his performance under this contract, the following minimum insurance:
(1) General Liability Insurance
Bodily injury liability insurance, in the minimum limit of $500,000 per occurrence is required on the comprehensive form policy.
(2) Automobile Liability Insurance
This insurance is required on the comprehensive form policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles sued in connection with the performance of the contract. At least, the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
(3) Workmen's Compensation and Employer's Liability Insurance
Employer's liability coverage is required in the minimum amount of $100
,000 or as required by the state where the project is performed.
(b) Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of
Page 29 of 55ORDER NUMBER:
the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation of any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the state in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.
(c) The Contractor agrees to insert in all subcontracts the required insurance information provided above, including this paragraph (c).
GOVERNMENT PROPERTY
The Contractor shall be responsible for all government property in its custody if applicable. Any incidents of damage or loss shall be reported to the COR in writing within one (1) working day.
CONTRACTOR'S RESPONSIBILITY
It is the responsibility of the Contractor to follow any Special
Security Requirements of the facility where the work is performed in the performance of the contract and to consider the effects of those security requirements in the pricing of the proposal.
The Contractor is required to furnish all services, materials, labor, tools, and equipment necessary to fulfill the work as set out in the
Statement of Work.
The Contractor must be aware of standards, codes, requirements and guidelines governing the construction of Government buildings.
The Contractor shall comply with all local, state, and federal building codes and life safety codes.
The Contractor shall be responsible for all office supplies, included but limited to, pencils, pens, calculators, binders, paper, printers, fax machines, markers, whiteboards, hole punches, staples, etc. The office supplies are not provided as part of this Statement of Work.
Page 30 of 55ORDER NUMBER:
It shall be the sole responsibility of the Contractor to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .