This file contains 100% construction documents for the Town of Palm Beach Police Station renovation project located at 345 S. County Road, Palm Beach, Florida 33480. The project scope includes renovation of staff and public locker rooms and restrooms, replacement of all sanitary and domestic water piping throughout the building, and expansion of locker room facilities by enclosing portions of the existing exterior arcade. The work requires selective slab modifications, new masonry construction, exterior stucco application, and integration of new mechanical, electrical, and plumbing (MEP) infrastructure. Prior to construction, the contractor must perform video inspection of all piping located below the building's slab foundation to assess integrity and determine feasibility of pipe lining as an alternative to full replacement, thereby avoiding modifications to the existing monolithic slab foundation. The project is classified as an alteration under the Florida Building Code and must maintain existing fire ratings, egress routes, and building operations throughout construction. The contractor is responsible for coordination with the Town of Palm Beach Police Department to minimize disruption to ongoing operations, including phased demolition and construction work, temporary locker room facilities during renovation, and protection of all security and evidence storage areas.
The contract is awarded on a Design/Bid/Build basis with a single general contractor responsible for all coordination and subcontractor management. The contractor must submit a construction schedule within five working days of Notice to Proceed, with no work commencing until the schedule is approved by the Owner and Architect. All major equipment is warranted for five years minimum, with the entire project warranted for one year from final completion. The contractor is responsible for obtaining all building permits, coordinating with the City of West Palm Beach for domestic water service, and managing temporary utilities, site protection, and construction waste. Work hours are restricted to Town-approved times with no Sunday or holiday work permitted, and the contractor must provide temporary restroom facilities for displaced staff during renovation. The contractor assumes responsibility for all costs related to construction phasing, temporary facilities, coordination of MEP replacement, and repair of any damage to existing finishes or infrastructure not scheduled for demolition. Liquidated damages apply for schedule delays beyond excusable extensions, and the contract includes provisions for cost proposals on changes in scope with detailed documentation of labor, materials, and schedule impacts required.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRAZILIAN AVE.
AUSTRALIAN AVE.
J
IM
M Y
B U
F F
E T
T M
E M
H W
Y
MAYOR DANIELLE H. MOORE
COUNCIL PRESIDENT BOBBIE LINDSAY
COUNCIL PRESIDENT PRO-TEM LEW CRAMPTON
COUNCIL MEMBER JULIE ARASKOG
COUNCIL MEMBER TED COONEY
COUNCIL MEMBER BRIDGET MORAN
TOWN MANAGER KIRK BLOUIN
DIRECTOR OF PUBLICS WORKS H. PAUL BRAZIL, P.E.
TOWN ENGINEER PATRICIA STRAYER, P.E.
2 Harvard Cir, Suite 100 West Palm Beach, FL 33409
(561) 688 6575 ngineers, Inc.MUE 3440 N.E. 12th Avenue
Oakland Park, Florida 33334
(954) 324-4730
Certificate of Authorization No.29348
DATE:
REGISTERED ARCHITECT NO.
102,411
STATE OF FLORIDA
HEIDI RODRIGUEZ, A.I.A.
PCZ
4316 West Broward Boulevard
Plantation, Florida 33317
(954) 792-8525, (954) 337-0359 Fax
AA #26000685
Architects, Inc.
PCZ
SHEET:
SCALE:
DATE:
CHECKED:
DRAWN:
DRAWING TITLE:
C P
Z A
R C
H
IT
E C
T S
, I N
C
W E
S T
B R
O W
A R
D B
O U
L E
V A
R D
P L
A N
T A
T
IO
N , F
L O
R
ID
A
P H
O N
E
(9
-8
F
A X
(9
-0
A A
W
W W
.C P
Z A
R C
H
IT
E C
T S
.C O
M
CONSULTANT:
N O
T F O
R C O
N
STRU
CTIO
N
6" = 1'-0"
/5
/2
:3 :2
P
M
A u to d e s k D o c s /2
B
T O
P B
P o lic e D e p a rt m e n t
R e n o v a ti o n /2
B
T O
P B
P o lic e D e p a rt m e n t R e n o v a ti o n .r v t
CC
JQ/RP/AM/VF
11-17-2025
PROJECT NO. 2218B
COV
COVER SHEET
T O
W N
O F
P A
L M
B E
A C
H P
O L
IC
E
S T
A T
IO
N
R E
N O
V A
T
IO
N
S
. C ou nt y
R d, P al m B ea ch
, F L
TOWN OF PALM BEACH
POLICE STATION
RENOVATION
100% CONSTRUCTION DOCUMENTS
11/17/2025
11-17-2025
Sheet Number Sheet Name
GENERAL
COV COVER SHEET
G-000 GENERAL NOTES
G-001 DIVISION 1 SPECIFICATION SHEET
G-002 DIVISION 1 SPECIFICATION SHEET
G-003 DIVISION 1 SPECIFICATION SHEET
G-004 DIVISION 1 SPECIFICATION SHEET
G-005 DIVISION 1 SPECIFICATION SHEET
G-006 DIVISION 3 SPECIFICATION SHEET
G-007 DIVISION 8 SPECIFICATION SHEET
G-008 DIVISION 9 SPECIFICATION SHEET
ARCHITECTURE EXISTING (FOR REFERENCE)
AE-0.00 EXISTING ARCHIECTURAL SITE PLAN
AE-0.01 GARAGE LEVEL - EXISTING FLOOR PLAN
AE-1.00 GROUND LEVEL - EXISTING FLOOR PLAN
AE-1.20 GROUND LEVEL - EXISTING REFLECTED CEILING PLAN
AE-2.00 SECOND LEVEL - EXISTING FLOOR PLAN
AE-2.20 SECOND LEVEL - EXISTING REFLECTED CEILING PLAN
AE-3.00 EXISTING ELEVATIONS
AE-3.01 EXISTING ELEVATIONS
AE-3.02 EXISTING 3D VIEWS
0.4 DEMO
D-0.00 GARAGE LEVEL - DEMOLITION FLOOR PLAN
D-0.01 GARAGE LEVEL - DEMOLITION REFLECTED CEILING PLAN
D-1.00 GROUND LEVEL - DEMOLITION FLOOR PLAN
D-1.01 GROUND LEVEL - DEMOLITION REFLECTED CEILING PLAN
D-2.00 SECOND LEVEL - DEMOLITION FLOOR PLAN
D-2.01 SECOND LEVEL - DEMOLITION REFLECTED CEILING PLAN
TEMPORARY CONSTRUCTION
AT-0.00 TEMPORARY CONSTRUCTION - SITE PLAN
AT-1.00 PHASING PLAN
ARCHITECTURAL / LIFE SAFETY
LS-1.00 CODE ANALYSIS - LIFE SAFETY PLAN
LS-1.01 GROUND LEVEL - LIFE SAFETY PLAN
LS-1.02 SECOND LEVEL - LIFE SAFETY PLAN
ARCHITECTURE
A-0.00 GARAGE LEVEL - OVERALL PROPOSED FLOOR PLAN
A-1.00 GROUND LEVEL - OVERALL PROPOSED FLOOR PLAN
A-0.20 GARAGE LEVEL - OVERALL PROPOSED REFLECTED CEILING PLAN
A-1.20 GROUND LEVEL - OVERALL PROPOSED REFLECTED CEILING PLAN
A-2.00 SECOND LEVEL - OVERALL PROPOSED FLOOR PLAN
A-2.20 SECOND LEVEL - OVERALL PROPOSED REFLECTED CEILING PLAN
A-3.00 EXTERIOR ELEVATIONS
A-3.01 EXTERIOR ELEVATIONS
A-3.02 ENLARGED EXTERIOR ELEVATIONS
A-3.10 BUILDING SECTION
A-3.20 BUILDING SECTION
A-3.30 SECTIONS AND DETAILS
A-4.15 ADA TYPICAL DETAILS
A-4.16 ADA TYPICAL DETAILS
A-4.00 GROUND LEVEL - MEN'S & WOMEN'S RESTROOMS AND LOCKER ROOM - ENLARGED FLOOR PLAN
A-4.01 GROUND LEVEL - MEN'S & WOMEN'S RESTROOMS AND LOCKER ROO - DIMENSIONS
A-4.02 GROUND LEVEL - MEN'S & WOMEN'S RESTROOMS AND LOCKER ROOM - ENLARGED REFLECTED
CEILING PLAN
A-4.03 GROUND LEVEL - MEN'S RESTROOMS AND LOCKER ROOM - INTERIOR ELEVATIONS
A-4.04 GROUND LEVEL - WOMEN'S RESTROOMS AND LOCKER ROOM - INTERIOR ELEVATIONS
A-4.05 GROUND LEVEL - ADA RESTROOMS - ENLARGED FLOOR PLANS AND REFLECTED CEILING PLAN
A-4.06 GROUND LEVEL - ADA RESTROOMS - INTERIOR ELEVATIONS
Sheet Number Sheet Name
A-4.07 SECOND LEVEL - ADA RESTROOMS - ENLARGED PLAN
A-4.08 SECOND LEVEL - ADA RESTROOMS - INTERIOR ELEVATIONS
A-5.00 WALL TYPES
A-5.01 WALL TYPES (OLD)
A-6.00 DOOR SCHEDULE - DOOR DETAILS
A-7.00 FINISH FLOOR PLAN
A-7.01 FINISH SCHEDULE
A-8.00 PERSPECTIVE DRAWING
STRUCTURE
S-0.00 STRUCTURAL NOTES ,SYMBOLS AND INDEX
S-0.01 ABBREVIATIONS, CONCRETE TABLE DEADLINE TABLE & REPAIR NOTES
S-1.00 GROUND FLOOR DEMO AND NEW CONSTRUCTION PARTIAL PLANS
S-2.00 SECTION AND DETAILS
S-2.01 SECTION AND DETAILS
S-3.00 SCHEDULES
PLUMBING
P-001 GENERAL NOTES, LEGEND & SPECS - PLUMBING
PE-100F LOWER LEVEL FOUNDATION - OVERALL EXISTING PLAN - PLUMBING
PE-100 LOWER LEVEL - OVERALL EXISTING PLAN - PLUMBING
PE-101 GROUND FLOOR - OVERALL EXISTING PLAN - PLUMBING
PE-102 2ND FLOOR - OVERALL EXISTING PLAN - PLUMBING
PD-100F LOWER LEVEL FOUNDATION - OVERALL DEMOLITION PLAN - PLUMBING
PD-100 LOWER LEVEL - OVERALL DEMOLITION PLAN - PLUMBING
PD-101 GROUND FLOOR - OVERALL DEMOLITION PLAN - PLUMBING
PD-102 2ND FLOOR - OVERALL DEMOLITION PLAN - PLUMBING
P-100 OVERALL - LOWER PLAN - PLUMBING
P-101 OVERALL - GROUND FLOOR PLAN - PLUMBING
P-102 OVERALL - 2ND FLOOR PLAN - PLUMBING
P-401 OVERALL WASTE AND VENT RISER - PLUMBING
P-402 BUILDING NORTH HALF DOMESTIC WATER RISER - PLUMBING
P-403 BUILDING SOUTH HALF DOMESTIC WATER RISER - PLUMBING
P-501 DETAILS - PLUMBING
P-601 SCHEDULES - PLUMBING
FIRE
F-001 GENERAL NOTES - FIRE PROTECTION
FD-101 GROUND FLOOR - OVERALL DEMOLITION PLAN - FIRE PROTECTION
FD-102 2ND FLOOR - OVERALL DEMOLITION PLAN - FIRE PROTECTION
F-101 OVERALL - GROUND FLOOR PLAN - FIRE PROTECTION
F-102 OVERALL - 2ND FLOOR PLAN - FIRE PROTECTION
F-501 DETAILS - FIRE PROTECTION
MECHANICAL
M-001 GENERAL NOTES - HVAC
MD-100 PARKING GARAGE - OVERALL DEMOLITION PLAN - HVAC
MD-101 GROUND FLOOR - OVERALL DEMOLITION PLAN - HVAC
MD-102 2ND FLOOR - OVERALL DEMOLITION PLAN - HVAC
M-100 OVERALL - PARKING GARAGE FLOOR PLAN - HVAC
M-101 OVERALL - GROUND FLOOR PLAN - HVAC
M-102 OVERALL - 2ND FLOOR PLAN - HVAC
M-501 SCHEDULES & DETAILS - HVAC
ELECTRICAL
E-001 GENERAL NOTES AND SYMBOL LEGEND - ELECTRICAL
ED-101 GROUND FLOOR - OVERALL DEMOLITION PLAN - ELECTRICAL
ED-102 2ND FLOOR - OVERALL DEMOLITION PLAN - ELECTRICAL
E-101 OVERALL - GROUND FLOOR PLAN - ELECTRICAL
E-102 OVERALL - 2ND FLOOR PLAN - ELECTRICAL
E-201 PARTIAL ONE-LINE DIAGRAM - ELECTRICAL
DRAWING INDEX
LOCATION MAP
NO. REVISION DATE
100% CD 11/17/2025
TOWN OFFICIALS
PROJECT DESCRIPTION
THE PROJECT IS A RENOVATION TO THE LOCKER ROOMS AND RESTROOMS FOR TOWN OF PALM BEACH POLICE DEPARTMENT INCLUSIVE OF THE
REPLACEMENT OF THE BUILDING'S EXISTING SANITARY AND DOMESTIC WATER PIPES.
THIS PROJECT IS BEING UNDERTAKEN TO SUPPORT THE TOWN OF PALM BEACH POLICE DEPARTMENT'S ORGANIZATIONAL GROWTH AND TO ENHANCE THE FUNCTIONALITY OF ITS EXISTING FACILITIES. THE PLANNED IMPROVEMENTS WILL PROVIDE UPDATED, RELIABLE, AND APPROPRIATELY SIZED SPACES THAT
BETTER SERVE THE DEPARTMENT'S CURRENT AND FUTURE OPERATIONAL NEEDS.
THE EXISTING STRUCTURE IS CONSTRUCTED ON A THICK MONOLITHIC SLAB FOUNDATION LOCATED BELOW THE WATER TABLE WHICH SHALL NOT BE
MODIFIED AND LOAD-BEARING INTERIOR WALLS SUPPORTING THE FLOORS ABOVE.
THE PROJECT CONSISTS OF THE RENOVATION OF THE POLICE STAFF ONE (1) MEN'S AND ONE (1) WOMEN'S LOCKER ROOMS, WITH TOTAL OF TWO (2) RESTROOM SPACES, AND TWO (2) PUBLIC RESTROOM SPACES AND THE RENOVATION AND EXPANSION OF THE LOCKER ROOMS FOR THE TOWN OF PALM BEACH POLICE DEPARTMENT. THE SCOPE INCLUDES UPDATING THE RESTROOM FACILITIES AND REPLACING THE AGING SANITARY AND DOMESTIC WATER PIPING THROUGHOUT THE BUILDING. A VIDEO INSPECTION OF ALL PIPING LOCATED BELOW THE BUILDING'S SLAB FOUNDATION SHALL BE PERFORMED TO ASSESS PIPE INTEGRITY AND DETERMINE WHETHER PIPE LINING IS A FEASIBLE ALTERNATIVE TO FULL REPLACEMENT IN ORDER TO AVOID ANY
MODIFICATION TO THE EXISTING SLAB.
THE PROJECT ALSO INCLUDES ENCLOSING PORTIONS OF THE EXISTING EXTERIOR ARCADE TO ACCOMMODATE THE LOCKER ROOM EXPANSION. THIS WORK WILL REQUIRE SELECTIVE SLAB MODIFICATIONS, NEW MASONRY CONSTRUCTION, EXTERIOR STUCCO APPLICATION, AND NEW INTERIOR MEP INFRASTRUCTURE TO INTEGRATE THE EXPANDED AREA WITH THE EXISTING BUILDING SYSTEMS.
WOODWORK NOTESGENERAL NOTES GENERAL NOTES CONSTRUCTION NOTES REFLECTED CEILING NOTES POWER & COMMUNICATION NOTES FINISH NOTES
20.
19.
18.
17.
16.
15.
14.
13.
12.
11.
10.
9.
8.
7.
5.
3.
2.
1.
23.
22.
21.
20.
19.
18.
17.
16.
15.
14.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
25.
24.
23.
22.
21.
20.
19.
18.
17.
16.
15.
14.
13.
12.
11.
10.
9.
8.
6.
5.
4.
3.
2.
1.
24.
23.
22.
21.
20.
19.
18.
17.
16.
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
23.
22.
21.
20.
19.
18.
17.
16.
15.
14.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
34.
33.
32.
31.
30.
29.
28.
27.
26.
25.
24.
4.
6.
13.
THE ARCHITECT SHALL BE NOTIFIED OF ANY
DISCREPANCIES OR OMISSIONS WHICH WOULD
INTERFERE WITH THE SATISFACTORY COMPLETION
OF THE WORK, PRIOR TO THE START OF ANY AND
ALL WORK.
ALL WORK IS TO CONFORM TO ARCHITECTURAL
DRAWINGS AND SPECIFICATIONS AND SHALL BE
NEW AND BEST QUALITY OF THE KINDS SPECIFIED.
NO MATERIAL SUBSTITUTIONS SHALL BE MADE.
ARCHITECT WILL CONSIDER MATERIAL CHANGE
REQUESTS ON AN INDIVIDUAL BASIS. CONTRACTOR
SHALL SUBMIT SAMPLES AND CUTS FOR WRITTEN
APPROVAL BY ARCHITECT PRIOR TO THE START OF
ANY WORK.
ALL SUBCONTRACTORS' SHOP DRAWINGS SHALL BE
SUBMITTED TO THE ARCHITECT FOR APPROVAL
THROUGH THE GENERAL CONTRACTOR PRIOR TO
WORK BEING PERFORMED, UNLESS OTHERWISE
NOTED.
THE GENERAL CONTRACTOR SHALL MAINTAIN AND
OPERATE AN ONSITE FIELD OFFICE TELEPHONE
AND FAX MACHINE AT ALL TIMES DURING THE
COURSE OF CONSTRUCTION WORK.
WORKMEN WILL BE ASSIGNED ONE TOILET AREA
WHICH THE GENERAL CONTRACTOR WILL PROVIDE
AND BE RESPONSIBLE FOR CLEANING, MAINTAINING,
AND UPON COMPLETION OF THE WORK, RESTORING
TO ITS ORIGINAL CONDITION.
21.
22. THE GENERAL CONTRACTOR SHALL ENSURE THAT
ALL SUBCONTRACTOR PERSONNEL ARE PROPERLY
IDENTIFIED AT THE ENTRANCE TO THE WORK SITE
AND THROUGHOUT ALL WORK ACTIVITIES. EACH
INDIVIDUAL MUST DISPLAY THE REQUIRED
IDENTIFICATION AND POSSESS THE NECESSARY
SECURITY CLEARANCE AS ISSUED BY THE TOWN OF
PALM BEACH (FDLE CLEARANCE). THE TOWN OF
PALM BEACH SHALL PROVIDE THE PROCUREMENT
DOCUMENTATION OUTLINING THE STANDARD
OPERATING PROCEDURE (SOP) FOR OBTAINING
AND VERIFYING SUCH CLEARANCE.
ALL LADDERS, BAKERS, AND SCAFFOLDING SHALL BE
IN GOOD OPERATING CONDITION. ALL DAMAGED
LADDERS, BAKERS, AND ROLLING SCAFFOLDING
WILL BE IMMEDIATELY REMOVED FROM THE JOB SITE.
23.
DRYWALL AT TOILET ROOMS USED FULL HEIGHT
ONE PIECE BOARDS SHALL BE USED AROUND SINKS
AND SHOWERS TO BE CEMENT BOARD.
ALL DRYWALL PARTITIONS SHALL BE PROPERLY
BRACED.
PROVIDE ACCESS DOORS FOR PLUMBING,
ELECTRICAL, ETC. AS REQUIRED TO ACCESS
EQUIPMENT OR CONTROLS. LOCATION TO BE
APPROVED BY ARCHITECT.
ALL LOCKSETS SHALL BE MASTER KEYED AS
REQUIRED BY THE OWNER. SEE DOOR SCHEDULE &
HARDWARE SCHEDULE FOR INFORMATION.
SEE ENGINEER'S DRAWINGS FOR ALL LIGHT FIXTURE
CIRCUITING, EMERGENCY AND EXIT LIGHTING,
SMOKE DETECTORS, STROBE LIGHTING, ALARM
SPEAKERS, SWITCHING AND RELATED WORK.
CONTRACTOR IS TO VERIFY ALL LIGHT FIXTURE
WATTAGE (MAX.) AND PROVIDE PROPER NUMBER
OF SWITCHES AT THAT LOCATION TO SERVICE
INDICATED LIGHT FIXTURES.
GENERAL CONTRACTOR SHALL PROVIDE A
COMPOSITE CEILING PLAN (3/8" = 1'-0" MIN.) AND
NECESSARY SHOP DRAWINGS COORDINATING ALL
TRADES, SHOWING THE LOCATION OF SUSPENSION
MEMBERS, LIGHT FIXTURES, EMERGENCY AND EXIT
LIGHTING, HVAC FIXTURES, DRAPERY POCKETS,
FIRE DAMPERS, ACCESS DOORS, FASCIAS, SOFFITS
AND ALL OTHER ITEMS PENETRATING OR ATTACHED
TO THE CEILING.
SEE REFLECTED CEILING PLAN FOR CEILING
HEIGHTS.
MAINTAIN CEILING HEIGHT THROUGHOUT. NOTIFY
ARCHITECT OF ANY COMPLICATIONS WITH HEIGHT.
GENERAL CONTRACTOR SHALL REMOVE CEILING
TILE AS REQUIRED BY THE TELEPHONE COMPANY,
OR OTHER COMMUNICATIONS AGENCY AUTHORIZED
BY THE ARCHITECT FOR TELEPHONE AND SIGNAL
CABLE INSTALLATION, AND REPLACE TILE WHEN
WORK IS COMPLETED.
GENERAL CONTRACTOR SHALL VERIFY THE
AVAILABLE ELECTRIC SERVICE AND ADVISE THE
ARCHITECT OF HIS FINDINGS PRIOR TO SUBMITTING A
BID.
EXCEPT AS NOTED, ALL ELECTRICAL AND
TELEPHONE WALL OUTLETS ARE TO BE MOUNTED
AS INDICATED BY MEP DRAWINGS.
SHOULD JOB CONDITIONS REQUIRE RELOCATION
OF PLANNED TELEPHONE OR ELECTRICAL OUTLETS
FOR ANY REASON, THE CONTRACTOR SHALL
NOTIFY THE ARCHITECT FOR APPROVAL OF
ALTERNATE LOCATION PRIOR TO THE START OF
ANY WORK.
CARPET CONTRACTOR SHALL INSPECT THE SUB-
FLOOR PRIOR TO COMMENCEMENT OF WORK. THEY
SHALL NOTIFY THE ARCHITECT IN WRITING OF ANY
CONDITIONS WHICH WILL PREVENT HIM FROM
PRODUCING SATISFACTORY FINISH WORK.
FLOORS MUST BE FREE OF DUST, OIL AND ALL
FOREIGN MATTER. BUILDING MUST BE A MIN. OF
65°, 24 HOURS PRIOR TO INSTALLATION OF FLOOR
COVERING. CRACKS 1/16" OR MORE, HOLES, AND
OTHER UNEVENNESS MUST BE FILLED WITH A
LATEX BASE FLOOR FILLER; HIGH SPOTS MUST BE
LEVELED. FLOOR MUST BE SWEPT CLEAN, WET
MOPPED WITH WARM WATER AND SWEPT AGAIN.
IF SWEEPING LEAVES A RESIDUE, FLOORS SHALL
BE VACUUMED.
ALL WORK SHALL COMPLY WITH APPLICABLE LOCAL
AND MUNICIPAL BUILDING CODES, AS WELL AS ANY
AND ALL REGULATORY AGENCIES, INCLUDING, BUT
NOT LIMITED TO, OSHA, ETC. GENERAL NOTES
SHALL APPLY TO ALL DRAWINGS.
THE TERMS "CONSTRUCTION CONTRACTOR,"
"GENERAL CONTRACTOR," "G.C." AND
"CONTRACTOR" SHALL BE UNDERSTOOD TO BE
THE SAME UNLESS SPECIFICALLY NOTED
OTHERWISE.
THE GENERAL CONTRACTOR SHALL VERIFY ALL JOB
CONDITIONS, DIMENSIONS AND DETAILS PRIOR TO
CONSTRUCTION, AND AS ANTICIPATED OR
INFERRED PRIOR TO PRICING OR BIDDING.
THE CONTRACTOR SHALL HAVE HAD EXPERIENCE
ON AT LEAST THREE PROJECTS INVOLVING
QUALITIES AND COMPLEXITIES AT LEAST EQUAL TO
THOSE REQUIRED UNDER ALL DIVISIONS DETAILED
IN THESE DRAWINGS.
ALL WORKMEN PERFORMING UNDER THIS WORK
SHALL BE SKILLED WORKMEN IN THEIR RESPECTIVE
TRADES.
ALL WORK, WHETHER SHOWN OR IMPLIED, UNLESS
SPECIFICALLY QUESTIONED, SHALL BE CONSIDERED
FULLY UNDERSTOOD IN ALL RESPECTS BY THE
GENERAL CONTRACTOR, AND THEY WILL BE
RESPONSIBLE FOR ANY MISINTERPRETATIONS OR
CONSEQUENCES THEREOF FOR ALL WORK ON ALL
DRAWINGS.
GENERAL CONTRACTOR SHALL REVIEW AND
FAMILIARIZE THEMSELVES WITH THE GENERAL NOTES &
SPECIFICATIONS, DWG. AND DETERMINE WHICH
NOTES APPLY DIRECTLY TO HIS RESPONSIBILITY.
EACH SUBTRADE WILL BE RESPONSIBLE FOR
REVIEWING THE ENTIRE SET OF DRAWINGS AND
NOTING THEIR WORK AS APPLICABLE. ALL WORK
INDICATED OR INFERRED ON THE DRAWINGS WILL BE
DEEMED AND INCLUDED IN ALL CONTRACTORS'
COSTS.
G.C. SHALL BE RESPONSIBLE TO PICK UP THE
BUILDING PERMIT AT THE BUILDING DEPARTMENT
OFFICES.
G.C. SHALL PROVIDE ALL THE DRAWINGS,
COMPLETED PAPERWORK AND CERTIFICATES OF
INSPECTION AND SHALL PERFORM ALL THE
CONTROLLED INSPECTIONS AS REQUIRED FOR
BUILDING DEPARTMENT APPROVAL.
UPON COMPLETION OF THE JOB, THE GENERAL
CONTRACTOR SHALL SUBMIT CERTIFICATES OF
INSPECTION AND A CERTIFICATE OF SUBSTANTIAL
COMPLETION (A.I.A. DOCUMENT #G-704).
THE GENERAL CONTRACTOR SHALL SUBMIT IN
WRITING ALL PROPOSALS FOR ADDITIONAL WORK
TO THE ARCHITECT'S OFFICE FOR REVIEW AND
APPROVAL. NO WORK IS TO PROCEED UNTIL A
SIGNED AUTHORIZATION TO PROCEED IS RETURNED
TO THE GENERAL CONTRACTOR.
THE ARCHITECT RESERVES THE RIGHT TO LET OTHER
CONTRACTS IN CONNECTION WITH THE WORK OF
THE PROJECT. THE GENERAL CONTRACTOR SHALL
BE RESPONSIBLE FOR COORDINATION OF WORK AND
ESTABLISHING SCHEDULES FOR ALL TRADES; THEY
SHALL AFFORD OTHER CONTRACTORS REASONABLE
OPPORTUNITY FOR THE INTRODUCTION AND
STORAGE OF THEIR MATERIALS AND EQUIPMENT
AND THE EXECUTION OF THEIR WORK.
CONTRACTOR SHALL SCHEDULE ALL WORK TO
CONFORM TO THE GENERAL CONSTRUCTION
SCHEDULE AND SHALL COOPERATE WITH OTHER
CONTRACTORS IN THE REQUIRED SEQUENTIAL
INSTALLATION SCHEDULE AS APPROVED BY THE
ARCHITECT.
DRAWINGS ARE NOT TO BE SCALED;
DIMENSIONS SHALL GOVERN. AND SHALL BE
COORDINATED WITH EXISTING CONDITIONS.
THE GENERAL CONTRACTOR SHALL HAVE A
COMPETENT SUPERINTENDENT ON THE PREMISES
AT ALL TIMES WHEN WORK IS IN PROGRESS.
THE GENERAL CONTRACTOR WILL BE RESPONSIBLE
FOR ALL COSTS INCURRED FOR DAMAGES CAUSED
BY HIS SUBCONTRACTORS.
GENERAL CONTRACTOR IS RESPONSIBLE TO
PROTECT AS REQUIRED ALL OWNER OCCUPIED
AREAS WHERE FINISH WORK OR GENERAL
CONSTRUCTION IS TO BE PERFORMED. GENERAL
CONTRACTOR TO INSTALL ADEQUATE PROTECTION
OF BUILDING PAPER, MASONRIES, OR OTHER
APPROVED MATERIAL ON ALL FINISHED SURFACES
AS DIRECTED BY THE ARCHITECT PRIOR TO THE
OWNER'S MOVING DATE, AND SHALL REMOVE SAME
FOLLOWING COMPLETION OF THE MOVE.
GENERAL CONTRACTOR IS RESPONSIBLE TO
THOROUGHLY VACUUM CLEAN ALL CARPETED
AREAS, CLEAN ALL FLOORING, MILLWORK, ETC,
AND UNCOVER AND VACUUM OUT ALL CONVECTOR
UNITS AFTER THE INSTALLATION IS COMPLETED,
AND MAINTAIN CONDITION THROUGH THE TENANT'S
MOVE-IN.
GENERAL CONTRACTOR IS RESPONSIBLE TO CLEAN
UP AND REMOVE FROM THE PREMISES ALL WASTE
MATERIALS, RUBBISH, WRAPPINGS, AND SELVAGES
AS GENERATED BY THE CONSTRUCTION,
DEMOLITION AND/OR THE DELIVERY AND
INSTALLATION OF ANY PRODUCTS, MATERIALS, OR
EQUIPMENT WHICH IS PART OF HIS CONTRACT.
THE GENERAL CONTRACTOR SHALL BE
RESPONSIBLE FOR MAINTAINING THE CLEANLINESS
OF THE WORK AREA AND THE AREAS INVOLVED IN
THE DELIVERY OF HIS MATERIALS.
FIRE EXTINGUISHERS MUST BE KEPT ON THE JOB
SITE DURING CONSTRUCTION.
ALL FIRE EXITS SHALL BE KEPT CLEAR AND
ACCESSIBLE AT ALL TIMES.
ALL WINDOWS SHALL BE KEPT CLOSED IN THE
WORK AREAS.
PROTECTIVE EYE GOGGLE WILL BE WORN DURING
ANY CUTTING, WHETHER BY HAND OR BY
MECHANICAL MEANS, OF FLOORS, WALLS, AND
ARCHES.
ALL ELECTRIC HAND TOOLS MUST BE GROUNDED
PROPERLY.
FINAL PLACEMENT OF ALL PARTITIONS TO BE
APPROVED IN THE FIELD BY ARCHITECTS'
REPRESENTATIVE PRIOR TO COMMENCEMENT OF
ANY WORK.
THE GENERAL CONTRACTOR SHALL LAYOUT
PARTITIONS STARTING FROM CONDITIONS WHERE
ALIGNMENT WITH EXISTING CONSTRUCTION IS
SHOWN.
ALL PARTITION DIMENSIONS ARE FROM FINISHED
SURFACE OR FROM FACE OF CONCRETE BLOCK
WALL, UNLESS OTHERWISE NOTED.
WHERE A PARTITION MEETS THE WINDOW MULLION,
PROVIDE A CONTINUOUS COMPRESSIBLE FILLER
STRIP. A SOUNDPROOFING FILLER PANEL SHALL
BE USED INSIDE THE METAL CONVECTOR
ENCLOSURE TO PREVENT SOUND TRANSMISSION
BETWEEN OFFICES.
ALL METAL TRIMS ON GYPSUM BOARD PARTITIONS
SHALL BE TYPE #200 SERIES AS MANUFACTURED
BY U.S. GYPSUM OR EQUAL.
ALL DRYWALL SHALL BE INSTALLED VERTICALLY IN
FULL LENGTH SECTIONS.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR TAPING AND SPACKLING OF GYPSUM BOARD
INSTALLED, AS WELL AS PATCHING AND REPAIRING
ALL WALLS, CEILINGS, AND COLUMNS TO REMAIN AS
EXISTING.
GENERAL CONTRACTOR SHALL CAP ALL EXPOSED
EXISTING PIPING NOT BEING USED BEHIND FINISH
SURFACE.
ALL FIREPROOFING ON STEEL MUST BE REPLACED
IF DAMAGED OR MISSING AT CONTRACTOR'S
EXPENSE.
THE GENERAL CONTRACTOR SHALL FAMILIARIZE
THEMSELF WITH ALL EXISTING CONDITIONS ON THE
SITE WHICH MIGHT REQUIRE ACCESS DOORS, AND
SHALL INCLUDE IN HIS BID AS A SEPARATE PRICE
THE COST OF FURNISHING AND INSTALLING THESE
ACCESS DOORS, STATING QUANTITY AND UNIT COST.
ALL EXISTING DOORS, DOOR FRAMES OR
HARDWARE TO REMAIN OR BE REUSED SHALL BE
PATCHED, REPAIRED, UNDERCUT, OR ADJUSTED AS
REQUIRED FOR A PROPER INSTALLATION.
ALL DOORS WITHIN SCOPE, EXISTING AND NEW, TO BE
UNDERCUT TO 5/8" A.F.F UNLESS OTHERWISE NOTED.
ALL DOORS (NEW AND EXISTING) SHALL HAVE
DOOR STOPS AND BUMPERS OR SILENCERS. DOOR
STOPS TO BE FLOOR MOUNTED TYPE, UNLESS
OTHERWISE NOTED.
CONTRACTOR SHALL FURNISH AND INSTALL
FIREPROOF BLOCKING IN CEILINGS OR PARTITIONS
AS REQUIRED, OR WHERE WALL-MOUNTED
EQUIPMENT OR CABINETRY IS INDICATED, FOR A
COMPLETE INSTALLATION.
THE GENERAL CONTRACTOR IS RESPONSIBLE TO
PROVIDE AND INSTALL ALL BLOCKING AND
GROUNDS AS REQUIRED FOR THE INSTALLATION OF
WINDOW BLINDS, DRAPERIES, AND CURTAINS, AS
REQUIRED, USING FIRE-RETARDANT WOOD.
ALL MATERIALS AND EQUIPMENT SPECIFIED SHALL
BE SUPPLIED, INSTALLED, CONNECTED, ERECTED,
CLEANED, AND CONDITIONED AS DIRECTED BY THE
SUPPLIER/MANUFACTURER, IN ACCORDANCE WITH
ACCEPTED INDUSTRY STANDARD PRACTICE.
G.C. IS RESPONSIBLE TO BALANCE THE HVAC
SYSTEM AFTER THE INSTALLATION IS COMPLETED
AND SUBMIT A WRITTEN REPORT TO THE
ARCHITECT'S OFFICE FOR REVIEW AND APPROVAL.
ALL EXHAUST FAN EQUIPMENT TO BE LOCATED
OUTSIDE THE SPECIFIED ROOM AND DUCTED INTO
THE SPACE TO THE CEILING REGISTER. ALL
EXHAUST FANS TO BE CONTROLLED BY A (RED)
PILOT LIGHT WALL MOUNTED SWITCH.
SPRINKLER SUBCONTRACTOR TO SUBMIT A LAYOUT
SHOP DRAWING TO ARCHITECT'S OFFICE FOR
REVIEW AND APPROVAL OF ALL SPRINKLER HEAD
LOCATIONS PRIOR TO FABRICATION OF ANY WORK.
INSTALL DIRECTIONAL ACOUSTICAL TILE WITH THE
GRAIN IN ONE DIRECTION ONLY IN ANY SINGLE
SPACE, AS DIRECTED BY THE ARCHITECT.
ALL SPRINKLER HEADS AT GYPSUM OR ACT
CEILINGS SHALL BE REINSTALLED AS REQUIRED TO
MATCH EXISTING. SPRINKLER HEADS SHALL BE
CENTERED IN TILES.
SEE ENGINEER'S DRAWINGS FOR ALL SPRINKLER
HEADS AND RELATED WORK. ARCHITECT'S
DRAWINGS INDICATE SPRINKLER HEADS FOR
LOCATION ONLY. WHERE DISCREPANCIES OCCUR
BETWEEN ARCHITECTURAL AND ENGINEERING
DRAWINGS REGARDING LOCATIONS,
ARCHITECTURAL DRAWINGS SHALL GOVERN.
ALL EXISTING THERMOSTATS LOCATED ON
PARTITIONS TO BE DEMOLISHED SHALL BE
RELOCATED WITHIN GENERAL AREA AS PER PJG
APPROVAL. ALL THERMOSTATS, NEW AND EXISTING,
TO BE INSTALLED AT 54" A.F.F. IN LOCATIONS
APPROVED BY ARCHITECT, UNLESS OTHERWISE
NOTED.
G.C. TO PROVIDE APPROPRIATE SIZED CUT-OUT
ABOVE CEILING WHERE PARTITION WALLS EXTEND
TO SLAB ABOVE, AS REQUIRED FOR CIRCULATION
OF RETURN AIR TO H.V.A.C. SYSTEM. FURNISH AND
INSTALL FIRE DAMPERS AS REQUIRED TO MAINTAIN
THE INTEGRITY OF RATED WALLS.
GENERAL CONTRACTOR TO THOROUGHLY CLEAN
ALL EXISTING HVAC CEILING DIFFUSERS AND
RETURN AIR GRILLES.
ALL HVAC RETURN AIR GRILLES SHALL BE LOCATED
IN THE CEILING UNLESS OTHERWISE NOTED.
LOCATION SUBJECT TO ARCHITECT'S APPROVAL.
GENERAL CONTRACTOR SHALL PROVIDE AND
INSTALL SHALLOW DEPTH FIXTURES AS FIELD
CONDITIONS NECESSITATE WITH ARCHITECT'S
APPROVAL.
GENERAL CONTRACTOR TO CLEAN, RELAMP, AND
REPLACE ALL FAULTY BALLASTS AND/OR BALLASTS
NOT CONFORMING TO THE LATEST LOCAL BUILDING
CODE.
GENERAL CONTRACTOR TO PROVIDE INITIAL
LAMPING OF ALL FIXTURES AND INSTALL
APPROPRIATE LAMPS AS REQUIRED BY SPECIFIED
LIGHT FIXTURE.
ALL SWITCHES/DIMMERS TO BE MOUNTED AS
INDICATED BY MEP DRAWINGS.
MULTIPLE SWITCHES AND/OR DIMMERS TO BE
GANGED AND PROVIDED WITH SINGLE GANG PLATE.
G.C. SHALL BE RESPONSIBLE FOR VERIFYING
COMPATIBILITY OF LIGHTING FIXTURES WITH THE
SPECIFIED CEILING SYSTEM.
NO CEILING BREAKS WILL BE PERMITTED WITHIN A
ROOM, UNLESS OTHERWISE NOTED.
ACCESS DOOR LOCATIONS TO BE REVIEWED IN THE
FIELD PRIOR TO INSTALLATIONS, AND THEIR
LOCATIONS TO BE APPROVED BY THE ARCHITECT.
H.V.A.C. SUBCONTRACTOR TO SUBMIT A LAYOUT
SHOP DRAWING INDICATING ALL DIFFUSER
LOCATIONS AND DUCTWORK LAYOUTS TO
ARCHITECTS OFFICE FOR REVIEW AND APPROVAL
PRIOR TO FABRICATION OF ANY WORK.
SEE ENGINEER'S DRAWINGS FOR ALL CEILING
DIFFUSERS, DUCTWORK LAYOUTS, TRANSFER
DUCTS, FUSIBLE LINK DAMPERS, ETC. ARCHITECTS'
DRAWINGS INDICATE DIFFUSERS FOR LOCATION
ONLY. WHERE DISCREPANCIES OCCUR BETWEEN
ENGINEERING AND ARCHITECTURAL DRAWINGS
REGARDING LOCATIONS, ARCHITECTURAL
DRAWINGS SHALL GOVERN.
SEE ENGINEER'S DRAWINGS FOR ADDITIONAL
NOTES AND GENERAL INFORMATION.
SEE ENGINEER'S DRAWING FOR ALL CIRCUITING
AND RELATED WORK.
ELECTRICAL CONTRACTOR SHALL DISCONNECT,
CONNECT, AND PROVIDE NECESSARY ELECTRIC
RUNS IN ORDER TO CONFORM WITH NEW PLAN.
SWITCHES, DUPLEX OUTLETS, COVER PLATES AND
FLOOR MOUNTED OUTLETS SHALL BE INSTALLED
BY COMPETENT MECHANICS IN A FIRST CLASS
MANNER.
THE ELECTRICAL CONTRACTOR SHALL INCLUDE AND
COORDINATE ELECTRICAL REQUIREMENTS FOR ALL
HVAC EQUIPMENT, EXHAUST FANS, WATER
HEATERS, AND SPECIAL EQUIPMENT, ETC.
CENTERLINE-TO-CENTERLINE DIMENSIONS OF ANY
OUTLET PAIR SHALL NOT EXCEED 6".
ALL BACK-TO-BACK OUTLETS IN ADJOINING
ROOMS TO BE STAGGERED.
ALL EXISTING TO REMAIN ELECTRICAL OUTLETS
WITHIN SCOPE OF WORK SHALL BE REFITTED WITH
A NEW RECEPTACLE AND A NEW COVER PLATE.
ALL NEW TELEPHONE AND ELECTRICAL OUTLETS
TO BE INSTALLED ON AN EXISTING WALL SHOULD
BE FLUSH MOUNTED WITH THE FINISHED WALL
SURFACE. CHOP OUT THE WALL AS REQUIRED TO
RECESS THE JUNCTION BOX AND CONDUIT, AND
PATCH THE WALL AS REQUIRED.
ALL EXISTING ELECTRICAL OUTLETS TO BE CAPPED
SHALL HAVE THE ELECTRICAL DEVICE AND ALL THE
WIRING REMOVED. PATCH HOLE AS REQUIRED.
GENERAL CONTRACTOR SHALL REMOVE ALL
UNUSED CONDUIT, COAXIAL CABLE AND TELEPHONE
WIRING COMPLETELY FROM AREAS IN SCOPE OF
THIS CONTRACT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL WORK NECESSARY TO COMPLETE CORE
DRILLING AND ELECTRICAL HOOK-UP, PATCHING,
ETC., INCLUDING WORK IN LANDLORD'S OR OTHER
TENANT'S SPACE. ALL CORE DRILLING SHALL BE
ACCOMPLISHED DURING STATED BUILDING
APPROVED WORKING HOURS. CONTRACTOR SHALL
VERIFY AND CONFORM TO THOSE HOURS WHEN
WORK IS REQUIRED.
ALL EXISTING WALL OUTLETS WHICH DO NOT
INTERFERE WITH NEW CONSTRUCTION SHALL
REMAIN.
ANY EXISTING FIRE ALARM SOUNDERS OR PULL
BOXES WHICH INTERFERE WITH NEW PARTITION
WORK SHALL BE RELOCATED TO AN APPROVED
LOCATION.
GENERAL CONTRACTOR IS RESPONSIBLE FOR THE
INSTALLATION AND HOOK-UP OF ALL ELECTRIFIED
RACEWAYS THROUGH THE SYSTEMS FURNITURE AS
SPECIFIED. IT WILL BE THE GENERAL CONTRACTOR'S
RESPONSIBILITY TO FAMILIARIZE THEMSELF WITH THE
SYSTEMS FURNITURE SPECIFIED AND ALL
ELECTRICAL WORK RELATED TO THAT SYSTEM.
NO FLOOR OR WALL POWER OUTLETS SHALL BE
CONNECTED TO LIGHTING CIRCUITS.
PROVIDE TAMPER-PROOF CIRCUIT BREAKER
CLAMPS ON ALL DEDICATED CIRCUIT BREAKERS.
GENERAL CONTRACTOR SHALL REVISE AND UPDATE
LABELS FOR ALL CIRCUIT BREAKERS AT ALL
ELECTRICAL CLOSETS ON THE JOB.
TELEPHONE FLOOR AND WALL OUTLET BOXES
SHALL BE CAPABLE OF FULLY HOUSING THE
TELEPHONE COMPANY'S PRE-WIRED AMPHENOL
CONNECTORS, BOTH FOR SINGLE-LINE EXTENSIONS
AND FOR CALL DIRECTORS.
WHERE EXPOSED CONDUIT OR SURFACE-MOUNTED
WIREMOLD CONDUIT HAS BEEN SPECIFIED, THE
CONDUIT SHALL BE RUN IN CORNERS OR ON SIDE OF
COLUMNS IN A NEAT AND ORDERLY WAY USING 90*
CORNERS RUNNING PARALLEL TO WALLS, COLUMNS,
BEAMS AND OTHER CONDUITS TO ABOVE HIGHEST
POINT OF BASEBOARD CONVECTOR, AT WHICH POINT
CONDUIT IS TO RUN HORIZONTALLY TO ACTUAL
LOCATION OF OUTLET AS DIMENSIONED ON PLAN.
G.C. SHALL COORDINATE WITH THE ELECTRICAL &
WOODWORK CONTRACTORS TO PROVIDE CUT-
OUTS IN FIELD, AS REQUIRED, FOR EXTENSION OF
ELECTRIC OUTLETS, CABLES, ETC. INTO
CABINETWORK AS SPECIFIED.
ALL ELECTRICAL WORK PERFORMED IN
CONNECTION WITH THE INSTALLATION OF THE
TELEPHONE COMMUNICATIONS SYSTEM SHALL BE
IN ACCORDANCE WITH THE BUILDING
MANAGEMENT AND TELEPHONE COMPANY'S
RECOMMENDATIONS AND REQUIREMENTS
INCLUDING THE INSTALLATION OF REQUIRED
CONDUIT FROM THE BUILDING TELEPHONE
EQUIPMENT ROOM TO THE OWNER'S SPACE.
WOODWORK CONTRACTOR IS RESPONSIBLE TO
CLEAN AND POLISH AND TOUCH-UP AS REQUIRED ALL
WOODWORK AFTER THE INSTALLATION IS
COMPLETED.
FIELD VERIFY LOCATION OF ALL HOLES THROUGH
ALL NEW COUNTERTOPS AND PROVIDE A PLASTIC
GROMMET INSERT AT EACH LOCATION. SEE
DETAILS FOR SIZES AND LOCATIONS.
WOODWORK CONTRACTOR SHALL PROVIDE ALL
HARDWARE REQUIRED FOR FINISHED
INSTALLATION OF CABINETS.
WHERE ELECTRICAL WORK IS SPECIFIED IN
CABINETS, LAMPS AND FIXTURES ARE TO BE
PROVIDED BY THE GENERAL CONTRACTOR. CUT-OUTS
FOR SWITCHES, OUTLETS, AND WIRING DEVICES TO
BE INSTALLED IN CABINETRY IN THE FIELD ARE BY THE
WOODWORK CONTRACTOR AND ARE TO BE
COORDINATED BY THE GENERAL CONTRACTOR.
WOODWORK CONTRACTOR SHALL COORDINATE
WITH THE GENERAL CONTRACTOR ON THE
LOCATION AND INSTALLATION OF ALL GROUNDS
AND BLOCKING INSIDE THE WALL CONSTRUCTION
RELATED TO CABINETWORK.
DOORS HAVING PLASTIC LAMINATE FACES SHALL
ALSO HAVE BACKS AND EDGES OF THE SAME
PLASTIC LAMINATE AS THE FACE. DRAWERS
HAVING PLASTIC LAMINATE FACES SHALL HAVE
BIRCH VENEER SOLID-CORE INTERIOR
CONSTRUCTION (BOTTOM AND SIDES) WITH CLEAR
LACQUER FINISH. DRAWER FRONT AND SIDES TO
BE GROOVED TO RECEIVE (3) PLY BOTTOM PIECE.
ALL SURFACES TO BE LAMINATED (PL. LAM. OR
VENEERED) SHALL BE LAMINATED WITH THE SAME
TYPE OF MATERIAL ON THE BOTH SIDES (BACKING)
WHETHER VISIBLE OR NOT. PANEL AND PLYWOOD
BACKS NOT EXPOSED TO VIEW SHALL BE
VENEERED WITH THE SAME SPECIES AND
THICKNESS OF VENEER USED FOR THE FACES,
FOR BALANCED CONSTRUCTION. HOWEVER, THE
VENEERED SURFACES NOT EXPOSED TO VIEW
NEED NOT BE MATCHED.
ALL HIGH-PRESSURE PLASTIC LAMINATE WORK
SHALL BE SOLID, IN ONE PIECE AND WITHOUT
SPLICE JOINTS (EXCEPT WHERE PROHIBITED BY
THE MAXIMUM AVAILABLE SIZE OF THE
MANUFACTURED PLASTIC LAMINATE MATERIALS)
AND SHALL BE BONDED TO THE CORESTOCK USING
THE "HOT PLATE" PRESS METHOD. ALL EDGES AND
EXPOSED CORNERS TO BE FINELY JOINED;
UNSIGHTLY JOINTS, NICKS, SCRATCHES, CHOPS,
DEFECTS, WAVY OR UNEVEN LAMINATION WILL BE
REJECTED. IF JOINTS ARE REQUIRED DUE TO
LENGTH OF UNIT, JOINTS TO BE CENTERED
SYMMETRICALLY OVER THE LENGTH OF THE UNIT.
GENERAL CONTRACTOR TO PROVIDE
FIRE-RETARDANT BLOCKING FOR
BLINDS ON EXTERIOR WINDOWS
THROUGHOUT.
CARPET CONTRACTOR SHALL COORDINATE WITH
THE ELECTRICIANS REGARDING FLOOR OUTLETS
FOR ELECTRICAL AND COMMUNICATION
REQUIREMENTS. ALL CUTTING OF CARPET FOR
FLOOR OUTLETS AND JUNCTION BOXES SHALL
BE THE RESPONSIBILITY OF THE CARPET
CONTRACTOR.
ALL EXCESS PIECES OF USABLE CARPET SHALL BE
ROLLED, TAGGED, AND LEFT WITH THE OWNER
FOR FUTURE USE.
SPOTS AND/OR SMEARS OF CARPET CEMENT SHALL
PROMPTLY BE REMOVED WITH APPROVEDSOLVENT.
SEAMS SHALL BE TRIMMED AND SEAMED IN
ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS.
CROSS JOINTS NECESSARY DUE TO LENGTH OF
ROLLS RECEIVED, SHALL BE PLACED TO AVOID
OCCURRENCE AT CONSPICUOUS LOCATIONS NEAR
DOOR OR AT DOORWAYS AND ENTRIES
PERPENDICULAR TO DOORS OR ENTRIES. SEAMS
OCCURRING PARALLEL TO DOORS SHALL BE
CENTERED DIRECTLY UNDER THE DOOR.
CONTRACTOR TO SUBMIT SEAMING DIAGRAM FOR
ARCHITECT'S REVIEW.
WHEN A GLUE-DOWN INSTALLATION IS SPECIFIED,
CARPETS SHALL BE LAID WITH TIGHT BUTT SEAMS
LAID TRUE WITH AN APPROVED BRAND OF WATER-
PROOF QUICK RELEASE CEMENT IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS.
FLOOR COVERING IN CLOSETS SHALL BE THE SAME
AS THAT OF THE SPACE ONTO WHICH THE CLOSET
OPENS UNLESS OTHERWISE NOTED.
CARPET CONTRACTOR TO PROVIDE AND INSTALL
ALL NECESSARY VINYL REDUCING STRIPS AND/OR
METAL SADDLES AS REQUIRED AT ALL
CARPET/MATERIAL TRANSITION POINTS. COLOR
SPECIFICATION BY ARCHITECT.
ALL VINYL OR RUBBER BASE TO BE CONTINUOUS
ROLL TYPE WITH SEAMING TO OCCUR ONLY ON
INSIDE CORNERS OR AT LEAST 24" FROM WRAPPED
OUTSIDE CORNER.
CARPET CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR ANY UNACCEPTABLE FINISH
WORK CAUSED BY SUB-FLOOR CONDITIONS.
GENERAL CONTRACTOR SHALL FLASH PATCH AND
PREPARE ALL FLOORS AS REQUIRED TO RECEIVE
SPECIFIED FLOORING MATERIAL.
ALL EXISTING GYPSUM BOARD CEILINGS THAT ARE
PATCHED SHALL BE PAINTED IN THEIR ENTIRETY.
ALL WALLS WHICH HAVE BEEN PAINTED MUST BE
TOUCHED UP AS A PUNCHLIST ITEM SHALL BE
REPAINTED ENTIRELY BETWEEN THE (2) CLOSEST
BREAK POINTS.
ALL DOORS AND FRAMES TO BE PAINTED THE SAME
COLOR AND TYPE OF PAINT ON BOTH SIDES,
UNLESS OTHERWISE NOTED.
ALL WALLS TO BE PAINTED SHALL BE PAINTED WITH
A LATEX BASE EGGSHELL FINISH PAINT UNLESS
OTHERWISE NOTED. ALL DOORS, DOOR FRAMES,
WINDOW FRAMES, AND SHALL BE PAINTED
WITH AN ALKYD BASE SEMI-GLOSS FINISH PAINT
UNLESS OTHERWISE NOTED.
ALL SURFACES WHICH ARE TO BE PAINTED SHALL
RECEIVE (1) COAT OF PRIMER AND (2) COATS OF
FINISH PAINT. (3) COATS TOTAL.
ALL PAINTS SHALL BE APPLIED IN ACCORDANCE
WITH MANUFACTURER'S SPECIFICATIONS FOR THE
PARTICULAR SURFACE.
ALL WALLS (NEW AND EXISTING) SHALL BE
PROPERLY PREPARED (SPACKLED, SANDED, ETC.)
FOR PAINTING AND/OR WALLCOVERING AS PER
FINISH PLAN AND MANUFACTURER'S
SPECIFICATIONS.
SAMPLES OF ALL FINISHES SPECIFIED SHALL BE
SUBMITTED TO ARCHITECT FOR APPROVAL, IN
TRIPLICATE, PRIOR TO COMMENCEMENT OF THE
WORK. CARPET, WALLCOVERING, AND WOOD
FINISH SAMPLES TO BE A MIN. 12" X 12". PAINT
SAMPLES FOR GYP. BD. SURFACES TO BE
PROVIDED ON 12" X 12" PIECES OF GYP. BD.
WOODWORK CONTRACTOR SHALL USE ONLY FIRE-
RETARDANT WOOD BLOCKING.
SCREW AND GLUE ALL JOINTS AND
CONNECTIONS. NO NAILING PERMITTED.
ALL WOODWORK SHALL HAVE A FINE, SMOOTH
FINISH, FREE FROM MACHINE OR TOOL MARKS,
ABRASIONS OR RAISED GRAIN ON EXPOSED
SURFACES. JOINTS SHALL BE TIGHT AND SO
FORMED AS TO CONCEAL SHRINKAGE.
WOODWORK CONTRACTOR SHOULD INSPECT THE
ALIGNMENT OF ALL GYP. BD. CONSTRUCTION AND
SHOULD NOTIFY THE ARCHITECT OF ANY
CONDITION THAT WOULD PREVENT HIM FROM
COMPLETING HIS WORK.
WOODWORK CONTRACTOR IS RESPONSIBLE FOR
COORDINATING AND SCHEDULING HIS WORK WITH
THE GENERAL CONTRACTOR.
WOODWORK CONTRACTOR TO SUBMIT
SHOP DRAWINGS TO THE ARCHITECTS'S
FABRICATION OF ANY WORK.
ALL ITEMS OF WOODWORK INDICATED ON THE
DRAWINGS AND/OR SPECIFICATIONS SHALL BE
PERFORMED BY SKILLED MECHANICS USING THE
BEST TECHNIQUES KNOWN TO THE TRADE AND IN
CONFORMANCE WITH ALL TRADE STANDARDS,
SPECIFICALLY THE "PREMIUM GRADE" QUALITY
STANDARDS AND THE GUIDELINES FOR "HIGH
PRESSURE LAMINATE" OF THE ARCHITECTURAL
WOODWORK INSTITUTE.
ALL SURFACES OR FINISHES TO REMAIN, IF
DAMAGED DURING DEMOLITION OR ANY STAGE
OF THE WORK, SHALL BE REPAIRED BY THE
GENERAL CONTRACTOR AT HIS EXPENSE TO
"LIKE NEW" CONDITION. IT SHALL BE THE
GENERAL CONTRACTOR'S RESPONSIBILITY TO
DOCUMENT ANY PRE-EXISTING DAMAGE AND,
RELATIVE TO GENERAL NOTE #3, NOTIFY
ARCHITECT OF ANY SUCH DAMAGE PRIOR TO
PRICING OR BIDDING.
ALL EXISTING CONSTRUCTION TO REMAIN SHALL
BE PATCHED AND REPAIRED AS REQUIRED AND
PREPARED TO RECEIVE NEW FINISHES PER
FINISH PLAN.
WHERE METAL AND GLASS PARTITION IS
SPECIFIED, G.C. SHALL BE RESPONSIBLE TO
PROVIDE FOR ANY LEVELING OF FLOOR SLAB
AS MAY BE REQUIRED FOR A PLUMB, LEVEL
INSTALLATION.
GENERAL CONTRACTOR IS RESPONSIBLE FOR
THE REMOVAL OF EXISTING FLOORING DOWN TO
THE SLAB IN ALL AREAS WHERE NEW FLOORING
IS SPECIFIED.
24. CONTRACTOR SHALL MAINTAIN ALL WALL,
CEILING AND FLOOR FIRE RATINGS IN THE
ENTIRE BUILDING AND REPLACE ANY FIRE
PROOFING AS REQUIRED FOR RENOVATION OF
RESTROOM OR REPLACEMENT OF ALL DOMESTIC
& SANITARY PLUMBING.
35. THE GENERAL CONTRACTOR SHALL DOCUMENT AND
RECORD THE EXISTING CONDITIONS OF THE BUILDING
PRIOR TO COMMENCEMENT OF WORK AND TO
SUBMIT A COMPLETE DOCUMENTATION PACKAGE
WITH PHOTOS.
36. THE GENERAL CONTRACTOR SHALL MAINTAIN
CONFIDENTIALITY AND ENSURE SECURE
MANAGEMENT AND DISTRIBUTION OF ALL PROJECT
DOCUMENTS.
13. GENERAL CONTRACTOR SHALL REFER TO THE
FINISH PLAN FOR WALL BASE. IF NO WALL BASE IS
SPECIFIED TERMINATE DRYWALL TO THE FLOOR AND
CAULK.
OFFICE FOR REVIEW AND APPROVAL PRIOR TO
DATE:
REGISTERED ARCHITECT NO.
102,411
STATE OF FLORIDA
HEIDI RODRIGUEZ, A.I.A.
PCZ
SHEET:
SCALE:
DATE:
CHECKED:
DRAWN:
DRAWING TITLE:
CONSULTANT:
C P
Z A
R C
H
IT
E C
T S
, I N
C
W E
S T
B R
O W
A R
D B
O U
L E
V A
R D
P L
A N
T A
T
IO
N , F
L O
R
ID
A
P H
O N
E
(9
-8
F
A X
(9
-0
A A
W
W W
.C P
Z A
R C
H
IT
E C
T S
.C O
M
12" = 1'-0"
/5
/2
:3 :2
P
M
A u to d e s k D o c s /2
B
T O
P B
P o lic e D e p a rt m e n t
R e n o v a ti o n /2
B
T O
P B
P o lic e D e p a rt m e n t R e n o v a ti o n .r v t
CC
JQ/RP/AM/VF
11-17-2025
PROJECT NO. 2218B
G-000
GENERAL NOTES
T O
W N
O F
P A
L M
B E
A C
H P
O L
IC
E
S T
A T
IO
N
R E
N O
V A
T
IO
N
S
. C ou nt y
R d, P al m B ea ch
, F L
11-17-2025
NO. REVISION DATE
100% CD 11/17/2025
TECHNICAL SPECIFICATIONS
DIVISION 00 PROCUREMENT & CONTRACTING REQUIREMENTS
INVITATION TO BID
Terms and Conditions - Construction (Attached to contract Documents By Owner)
PART 1 - GENERAL
1.2 SUMMARY
A. This Section includes the following:
1. Project Information
2. Work covered in Construction Documents and Specifications Project Manual
3. Type of Contract
4. Required Vendors
5. Work Restrictions
6. Limits of Construction
7. Products Supplied By Others
8. Coordination of Work
9. Town of Palm Beach Occupancy
10. Time of Performance
11. Discrepancies, Interpretation and Omissions
12. Permits and Fees
13. Job Site Visitation
14. Extended Warranty
1.3 PROJECT INFORMATION
A. Project Identification: Town of Palm Beach Police Department B. Project Location: 345 S County Rd, Palm Beach, FL 33480 C. Owner: Town of Palm Beach
1.4 WORK COVERED BY THE CONSTRUCTION DOCUMENTS
A. The work generally includes Design, Permitting, and Construction of the following items:
1. Renovation to the existing Locker room and restroom.
2. Full building plumbing replacement for all domestic & sanitary pipes.
3. All items noted in the Construction Documents.
4. All items required to meet Specified Codes, References, and Standards.
1.5 TYPE OF CONTRACT
A. A project will be constructed under a single Design/ Bid/ Build contract.
1.6 REQUIRED VENDORS
General Contractor will be required to hire and coordinate work with Owner's preferred vendors as needed for performance of work.
1.7 WORK RESTRICTIONS
A. Work shall only be performed during the authorized construction hours as specified by the Town of Palm Beach. No work shall be performed on Sundays or during Town observed holidays. Work hours outside of the Town specified hours will require specific approval by the Town staff and/or Town Council. Work hours and days shall be discussed and agreed to during pre-construction.
B. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes any time during the construction phase.
1.8 LIMITS OF CONSTRUCTION
A. The work set forth in the Construction Documents will be performed within the limits established in the site plan and construction staging drawings. Refer to the temporary construction site plan for reference. General Contractor shall not work outside of the limits without requesting authorization in writing and receiving written approval. In the event that work is performed outside the designated project limits, the Contractor shall be fully responsible for the maintenance and control of traffic when operating within public rights-o-way.
B. The Contractor shall maintain vehicular and pedestrian access to driveway entrances to the greatest extent practicable.
Whenever possible, a minimum of one traffic lane shall remain open to traffic at all times.
1.9 PRODUCTS SUPPLIED BY OTHERS
A. Town of Palm Beach reserves the right to direct purchase selected items directly from manufacturer or vendor.
B. Items furnished by Town of Palm Beach for installation by Town of Palm Beach:
1. The Town of Palm Beach may award various contracts for purchasing and installing specific materials. The General Contractor shall cooperate with the Town of Palm Beach independent contractors and provide access to the work areas as necessary.
C. Items furnished by Town of Palm Beach for installation by General Contractor:
1. The Town of Palm Beach may award various contracts for purchasing and installing specific materials. Materials lists from those purchase contracts will be provided to the General Contractor. The General Contractor shall receive, inspect, unload specified materials from the transporter, transport to secure storage, and load, deliver the materials to the site for installation / incorporation into the project.
1.10 COORDINATION OF WORK
A. The General Contractor shall be responsible for the planning and scheduling, and coordination of all Work performed under the
Construction Documents and Specs, so the materials will arrive on schedule and installation will proceed without delay.
B. Coordinate scheduling, construction documents, submittals, and Work of the various specification sections to assure efficient and orderly sequence and installation of interdependent construction elements.
C. Coordinate space requirements and installation of work, which are indicated diagrammatically on drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable, place runs parallel with line of runway. Utilize spaces efficiently to maximize for others installations, for maintenance, and for repairs.
D. In finished areas except as otherwise indicated, conceal pipe, ducts, and wiring within construction. Coordinate locations of fixtures and outlets with finish elements.
E. Coordinate completion and clean up of work of separate Sections in preparation for Substantial Completion.
F. After Town of Palm Beach occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with the contract Documents, to minimize disruption of Town of Palm Beach's activities.
DIVISION 01 GENERAL REQUIREMENTS
SECTION 01 10 00 - SUMMARY
1.11 Town of Palm Beach OCCUPANCY
A. The Town of Palm Beach will occupy the facility and limited areas adjacent to the site including front entrance parking and roadways during the entire period of construction.
B. The surrounding properties are in use 24 hour / day, 7 days / week. The General Contractor is required to perform the needed work for his construction effort in a way that does not disturb the function or interrupt ongoing operations. All work must be coordinated and schedule with approval from Town of Palm Beach staff. The areas not covered by the work must be protected. Any areas damaged or disturbed by the construction effort in any way must be repaired and brought to the condition it was found prior to the construction. All repairs must be done by the General Contractor as part of this contract and to the complete satisfaction of the Town of Palm Beach.
1.12 TIME FOR PERFORMANCE
A. The work to be performed under this Contract shall be commenced upon issuance of the Notice to Proceed.
B. The time limits stated in the Construction Documents & Specs are the essence of the Contract. By executing the Agreement, the General Contractor confirms that the time for Completion is a reasonable period for performing the work. The General Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion within the time for completion.
C. The General Contractor, having vast experience in the construction of Improvements in South Florida, recognizes that unforeseen conditions occur and that as a normal course of construction here may be rain days, difficulties in obtaining materials and labor, requests for information from the General Contractor to the Town of Palm Beach, submittals, shortages and inefficiencies in operations. These will not be considered excusable delays.
D. Time is of the essence for this Contract. General Contractor shall strictly adhere to the following project schedule:
1. Final Completion shall be within thirty (30) calendar day from Substantial Completion, unless noted.
E. Town of Palm Beach will impose Liquidated Damages, per the contract terms and conditions, for any delays, beyond excusable extensions, to the project schedule specified above.
1.13 DISCREPANCIES, INTERPRETATION AND OMISSIONS
A. General Contractor shall bring any apparent discrepancies to the attention of the Town of Palm Beach Representative and Design Team Professional for resolution prior to commencing with the Work. General Contractor shall use a Request for Information (RFI) form to communicate discrepancies and receive direction.
1.14 PERMITS AND FEES
A. General Contractor shall prepare, submit, and obtain all the building permits from the Town of Palm Beach building department.
1. The Town will reimburse for the permit fees in the Pay App under the permitting line item or other relevant task. The City permit fees to be paid by the contractor during the permitting process coordinated by the contractor. Review / Permit fees for all other agencies and all re-inspection fees will be paid by the General Contractor. Additionally, a coordination meeting between the Contractor and the City of West Palm Beach shall be scheduled for domestic water service, as the City is the sole provider of this utility.
2. All impact fees to the County or the agencies will be paid by the General Contractor and reimbursed by Town of Palm Beach.
3. The Contractor is required to notify the Owner, Architect, and any applicable permitting agency with a minimum of 48 hours prior to initiating construction.
1.15 JOB SITE VISITATION
A. Job site visitation is mandatory; submission of a Proposal will be constructed that the General Contractor is intimately familiar with the work to be performed.
1.16 EXTENDED WARRANTY
A. General Contractor shall fully warrant the entire project for a period not less than one (1) year from date of the Final Completion.
All major equipment, as defined below, shall be warranted in the base bid for a period not less than five (5) years or as specifically noted in Construction Documents.
SECTION 01 11 00 - BASIC REQUIREMENTS
PART I. GENERAL
1.1 SCOPE
The scope of this Section is to provide the labor, materials, and equipment noted herein and as required to provide the basic administration requirements of this Project including, but not limited to the items listed below.
A. Allowances B. Coordination of work C. Coordination drawings D. Submittal procedures E. As built drawings F. Protection of site and material G. Progress cleaning and waste removal H. Starting systems I. Certificates and warranties J. Project closeout
1.2 ALLOWANCES
A. Allowances are to include the actual cost of the raw material. The fabrication, delivery, uncrating, protection, taxes, subcontractor mark-up, and installation are to be part of the bid.
B. Allowances, if required, are noted on the Drawings.
1.4 COORDINATION OF WORK
A. The Contractor is responsible for coordinating all of the Work and all of the Subcontracts of this project.
B. Contractor is responsible for coordinating scheduling, submittals, and Work of the various specification sections to ensure efficient and orderly sequence of interdependent construction elements.
C. Contractor shall coordinate and verify space requirements and installation of mechanical, plumbing and electrical work, which are shown on the Plans diagrammatically. Follow routing of ducts and pipes as shown on plans as closely as possible.
D. Coordination drawings of mechanical work are required for this project. See Section 01 30 00 for these requirements.
E. Coordinate layout of outlets, switches, lights, HVAC registers, thermostats, plumbing fixtures, and like items with framing plans and interior finishes to achieve indicated or implied alignments.
1.5 SUBMITTAL PROCEDURES
A. Contractor shall submit a Submittal Schedule prior to signing contract.
B. Submittals shall be made in a timely manner in accordance with the Construction Schedule.
C. Submittals shall be sent with an electronic transmittal noting the Project, Contractor, Subcontractor, Supplier and the type of response needed.
D. Revise and re-submit submittals as required by Architect. Note changes made from prior submittals.
E. Keep one copy of all reviewed submittals on site for reference throughout job.
F. Architect will review shop drawings and other submittals within 21 calendar days from date of receiving shop drawings. Any submittal with a disposition of "Rejected" or "Revise and Resubmit" automatically restarts the clock and an additional 21 calendar days shall be allowed for review of resubmital.
G. Contractor shall allow 25 working days in the Critical Path Schedule for complete review and approval process for each submittal.
H. All work done for which submittals have been made and reviewed shall conform to the reviewed submittals or manufacturer's recommendations.
I. Shop drawing procedure:
1. Contractor shall submit all shop drawings in electronic format (PDF) via email to Project Architect or Project Manager. If shop drawings are required to be signed and sealed by an independent/specialty engineer, then the Contractor shall submit one (1) print to the Architect of each shop drawing. GC to deliver and pick up all shop drawings to and from the Architect’s office. Architect/ Engineer will review shop drawings for compliance with design intent only. Contractor is responsible for coordinating Work on shop drawings with field conditions.
J. Product literature and data:
1. Submit in electronic PDF format of product literature required by individual specification sections.
2. Literature shall be from the manufacturer's catalogues or other printed literature and shall include the information to confirm that the product or material described conforms to the specifications for this project.
3. Include manufacturer's warranties in all submittals.
4. Where the printed literature contains more than one product on a page, highlight the product being submitted for review.
5. All options shall be chosen and clearly marked on all submittals.
K. Samples and Mock-ups:
1. Submit samples as required by the individual specification sections.
2. Samples and mock-ups used for the approval of installation of material shall remain intact and visible during installation and shall be the standard by which the installation of that material is judged.
3. Submit at least two samples for each submittal required. The architect will keep one and the other approved sample will be kept on the job for reference.
4. Samples shall be labeled as follows:
a. Labels shall be affixed to back of samples.
b. Labels shall include the date of submittal.
c. Labels shall include the project name and address.
d. Labels shall note the specifics of the finish applied.
5. Mock-ups shall be provided as required of individual Spec Sections.
6. Contractor to deliver and pick up samples or drawings from Architects office.
1.6 AS BUILT RECORD DRAWINGS
A. The Contractor shall provide the Owner with (1) Latest Version of Auto CAD format file and (1) PDF of Marked Up As Built Drawings showing all electrical, plumbing, fire alarm, fire sprinkler, structural, and mechanical systems as they are installed. These drawings shall show plans and section of all systems, riser diagrams, and locations of all valves, dampers, access points to wiring, other service access points and other information required by Owner.
1.7 PROTECTION OF SITE AND OF STORED AND INSTALLED WORK
A. Contractor shall have on site at all times an adequate means for keeping excavated areas free of standing water.
B. Contractor is responsible for adequate protection of all installed work.
C. Protection requirements for each finish are noted in the Sections herein. Provide materials and installation for the protection of finish surfaces and shall maintain that protection throughout course of the job.
D. Installed Work shall be protected from extreme heat and cold.
E. Contractor is responsible for repairing damage to any installed Work.
F. Material shall be stored in a neat and orderly manner and adequately protected from damage.
G. Each type of material shall be stored in accordance with the requirements of each specification Section and the manufacturer’s requirements.
H. Materials used for protection shall be new and clean.
1.8 PROGRESS CLEANING AND WASTE REMOVAL
A. Contractor shall keep the site and structures clean and free of debris at all times.
B. Debris shall be picked up and site cleaned daily. Work areas shall be broom cleaned daily and all debris removed.
1.9 STARTING SYSTEMS
A. Qualified technicians trained to install and operate the equipment shall do start-up.
B. Provide start up testing and balancing of mechanical systems as noted in each Section.
C. Testing and commissioning of mechanical equipment shall follow the following general procedure. Specific tests required are noted in the Mechanical and Electrical Sections.
1. The testing shall be performed in at least two phases:
a. The first tests shall be performed at completion of rough in of equipment, piping, and ductwork. Preliminary tests shall be performed to ensure that system is roughed in properly, that the proper amount of air (CFMs) is being delivered to each register and grille and that all piping is installed and sealed properly.