16-10 Schuylkill Rd-Nutt Rd Signal System Permit I-0053.pdf

PDF 1 MB Posted

Attached to
Traffic Signal Maintenance Contract
Solicitation number
Not on record
Issued by
Schuylkill County, Pennsylvania

About this file

This document is a comprehensive Traffic Signal System Interconnect Permit for the Pennsylvania Department of Transportation (PennDOT), Engineering District 6-0, covering Phoenixville Borough, East Pikeland Township, and Schuylkill Township in Chester County. The permit details a traffic signal system spanning multiple intersections along various state routes (SR 0023, SR 0029, SR 0113, SR 1005, SR 1018, SR 1036) with a total of 23 intersections organized into six subsystems. The system is designed using Siemens TACTICS software and utilizes fiber optic primary coordination with TBC (Time Base Coordination) as a backup. The interconnect permit was originally issued on December 8, 2010, and has undergone multiple revisions through 2025, including lane configuration adjustments, timing modifications, and the addition of new intersections.

The traffic signal system employs sophisticated timing programs that vary based on day and time, including weekday AM, mid-day, PM, and weekend configurations. Each intersection is equipped with loop and video detection systems, and the master controller is located strategically to optimize traffic flow. The system supports multiple phases at each intersection, with detailed offset and cycle length specifications. Primary communication is via fiber optic networks, with provisions for maintaining master controller communication and implementing system revisions. The document includes extensive technical notes requiring precise installation standards, utility coordination, and adherence to PennDOT traffic signal standards, ensuring a comprehensive and flexible traffic management approach across the specified municipal areas.

View the file

Other files

File Type Posted
10-04 Valley Forge Rd Pawlings Rd File 3366.pdf PDF
5-05 Pothouse Rd Phoenixville Area Elementary School Driveway File S-6251-02.pdf PDF
2-02 Pothouse Rd Valley Forge Fire Company Driveway File F-6251-01.PDF PDF
13-07 Pothouse Rd Phantom Way-Trotter File 3884.pdf PDF
20-00 Non-Collusion Affidavit.pdf PDF
8-02 Pothouse Rd Charlestown Rd-Bridge St File 0175.pdf PDF
19-00 Form of Guaranty.pdf PDF
9-03 Valley Forge Rd White Horse Rd File 0929.pdf PDF
22-00 Worker Protection Form.pdf PDF
6-06 Pothouse Rd Phoenixville YMCA File W-49.pdf PDF
14-08 White Horse Rd Valley Park Rd-Creek Rd File 2966.pdf PDF
4-04 State Rd Phoenixville Area Middle School Driveway File S-288.pdf PDF
21-00 Contractors Qualification.pdf PDF
11-05 Valley Forge Rd Country Club Rd-Ferry Ln File 0252.pdf PDF
7-01 Valley Park Rd Country Club Rd File 3237.pdf PDF
3-03 White Horse Rd Schuylkill Township Elementary School Driveway File S-148.pdf PDF
1-01 Charlestown Rd Center of Arts Technology, Pickering Campus File S-6251-01.pdf PDF
17-11 White Horse Rd Signal System Permit I-0351.pdf PDF
12-06 Pothouse Rd State Rd-Hallowell Ave File 2270.pdf PDF
18-00 Schuykill Twp Maintenance Bid Doc-2025-11.pdf PDF
15-09 White Horse Rd Pothouse Rd File 2852.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

INTERCONNECT PERMIT #

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATE

NO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

GENERAL NOTES

SHEET 1 OF 9

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

I-0053

1a

(SR 0023)

RIDGE ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

E A

S T

P

IK

E L

A N

D

T O

W N

S H

IP

S C

H U

Y L

K

IL

L

W N

S H

IP

S C

H U

Y L K

IL

L

T O

W N S H

IP

B O R

O U

G H

O F

P

H O E N

IX

V

IL

L E

E A

S T

P

IK

E L

A

W N

S H

IP

B O

R O

U G

H

F

P

H O

E N

IX

V

IL

L E

ROADKIM

BERTON

S R

ROAD/

SR

KIM

BERTON

D R

IV

E P

R

IV

A

E

R

A D

R A

P P

S

A

M

A D

R A

P

1036)

(SR

ROAD

POTHOUSE

A C

C E S S

S H

O P P

IN

C

N T

W N

S

IP

A D

S

R

R O

A D

T O

W N

S

2,1

0'

NOT-TO-SCALE

GENERAL MAP

M A

N A

V O

N

S

T R

E E

T

(S R

S T A

R R

S T R E E T

,8

FI

FT

H

A

V E N

U E

S T R E E T

S T A R R

1, 5'

JA

C

O B S

TR

EET

A T

W A

LN

U T

STR

EET/

N

EA

R

ES

T

SI

G N

A L

2, 2'

B R

ID

G E

STR

EET

(S R

9)

B R

ID

G E

STR

EET

0'

STREET

STARR

S T R E E T

M A

IN

(S R

G A

Y

S T R E E T

SCHUYLKI

LL

T

OWNSHI

P

BOROUGH

OF

PHOENI

XVI

LL

E

S C

H U

Y L

K

W N

S H

IP

B O

R O

U

P

H O

E N

IX

V

IL

L E

N A

V O

N

S T R E E T

N E A

R E S T

S

IG

N A L

,2

S

R

S T

R E

E T

M A

N A

V

S

R

F E

R R

Y

L

A N

E

R O

A D

S

R

C O

U N

T

Y

U B

(SR 0023)

VALLEY FORGE ROAD

AT

FE

RRY

LANE

NEARES

T

SIG

NAL

3,5

2,560'

(S R

PAWLIN

GS

ROAD

(S R

VALL

EY

FORGE

ROAD

R O

A

W

IT

R S

E

S

R

W H

R

A D

1,650'9

S T R E E T

S T A R R

1,280'

M A

IN

S T R E E T

S

R

M A

IN

S

T R

E E

T

1,026'

S T

R E

E T

G A

Y

S T R E E T

G A

Y

676'

A V

E N

U E

L

IN

C O

L N

A V

EN

U E

FO

U R

THA

V E N

U E

L

IN

C O L N

(SR 0

)NUTT

ROAD

W

IT

E

N O

S

IG

N A

L

STR

EET

C H

U R C

H

B R

ID

G E

S

T R

E E T

(S R

B R

ID

G E

S T R E E T

S T

R E

E T

M E

L L

O N

K

IM

B E

R T

A D S

R

660'

C E

N T

IV

E W

A Y

P H

O E

N

IX

V

IL

W N

697'

C E

N T

IV

E W

A Y

P H

O E

N

IX

V

IL

W N

S Q

U A

R E

K

IM

B E

R T

O N

M A

IV

E

V A

L L E

Y

F

O R

G E

(SR

0724)

R O

A D

SC

H

U

YLK

ILL

1,700'

ROADMOWERE

R O

A D

R A P

M

M A

T C

H L

A

M A

T C

H L

A

2,750'

,2

G A

Y

S T R E E T

S T R E E T

M A

IN

3,5

4,705'

L

A D

T O

W N

S

2a 1,323' f5 f8 f6 f4

P H

A N

T

Y

1535' f4 f8 f6

T R

O T

T E

W POTHOUSE RD

(S.R. 1036)

W POTHOUSE RD

(S.R. 1036)

S T

A

A D

S .R

E POTHOUSE RD

(S.R. 1036)

H A

LLO

W E

LL

A V E f

AT CHARLESTOWN ROAD

NEAREST SIGNAL 2990'

AT WHITE HORSE ROAD

NEAREST SIGNAL 3259'

W

IT

E

IG

N

23 22 f2

W

IT

E

N

E

N O

S

IG

N

(SR 0023)

SCHUYLKILL ROAD

1,420'

BLVD

CROSS

OVER

LUTZ 6/13/16 APatel 6/13/16 f7 f1 f5 f2

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

1a SCHUYLKILL RD (SR 0724) AND RIDGE RD (SR 0023)/CROSSOVER BLVD 3903 110 100 110

NUTT RD (SR 0023) AND BRIDGE ST*

SCHUYLKILL RD (SR 0023) AND PHOENIXVILLE TOWN CTR DRIVEWAY

NUTT RD (SR 0023) AND KIMBERTON RD/SR 0113/PHOENIXVILLE TOWN CTR

SCHUYLKILL RD (SR 0023) AND KIMBERTON SQ/VALLEY FORGE MALL DR

1 SCHUYLKILL RD (SR 0023) AND RAPPS DAM RD/MOWERE RD

FILE # 32

PROGRAM CYCLE LENGTHSUBSYSTEM 1

INTERSECTION

INTERSECTION

SUBSYSTEM 2

2FILE # 1 3

STARR ST (SR 0029) AND MANAVON ST/FIFTH AVE

VALLEY FORGE RD (SR 0023) AND WHITE HORSE ROAD

NUTT RD (SR 0023) AND STARR ST/JAMES DR

NUTT RD (SR 0023) AND MAIN ST/MANAVON ST*

NUTT RD (SR 0023) AND GAY ST

NUTT RD (SR 0023) AND LINCOLN AVE/FOURTH AVE

6 0587

FILE #

VALLEY FORGE RD (SR 0023) AND FERRY LN/COUNTRY CLUB RD*

VALLEY FORGE RD (SR 0023) AND PAWLINGS RD

INTERSECTION

SUBSYSTEM 3

21 KIMBERTON RD/SR 0113 AND TOWNSHIP LINE RD*

KIMBERTON RD/SR 0113 AND POTHOUSE RD

KIMBERTON RD/SR 0113 AND RAPPS DAM RD

KIMBERTON RD/SR 0113 AND PRIVATE DR

INTERSECTION

FILE #

SUBSYSTEM 4

17 BRIDGE ST AND STARR ST*

BRIDGE ST AND MAIN ST

BRIDGE ST AND GAY ST

BRIDGE ST AND CHURCH ST

INTERSECTION FILE #

SUBSYSTEM 5

110 100 110

110 60

60110

* DENOTES MASTER INTERSECTION

SCHUYLKILL RD (SR 0023) AND TOWNSHIP LINE ROAD2a 2614

INTERSECTION FILE #

SUBSYSTEM 6

2270W POTHOUSE RD & STATE RD/HALLOWELL AVE

W POTHOUSE RD & PHANTOM WAY/TROTTERS DR 3884

110 100 110 100 100

110 100 110 100 100

110 100 110 100 100

110 100 110 100 100

110 100 110 100 100

110 100 110 100 100

100 100

100 100

100 100

100 100

100 100

110 100 110

110 100 110

110 100 110

110 100 110

110 100 110

PROGRAM CYCLE LENGTH

60 60

60 60

4 5

PROGRAM CYCLE LENGTH

PROGRAM CYCLE LENGTH

PROGRAM CYCLE LENGTH

PROGRAM CYCLE LENGTH

120 100

100 100120

100120 100 100

120 100 100 100120

70 7060 70 80

321 4 5

321 4 5

321 4

70 7060 70 80

70 7060 70 80

70 70120 70 80

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM

D R

IV

E

J A

M

4/22/22

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CHANGES IN INTERSECTION GEOMETRY REGARDING EXCAVATION.

PERMITTEE SHALL OBTAIN A HIGHWAY OCCUPANCY PERMIT FOR ANY

FOR REVIEW PRIOR TO BIDDING.

SPECIFICATIONS MUST BE SUBMITTED TO THE DISTRICT TRAFFIC UNIT

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

9 REVISE AND RETIME INT. #10 TPD

10 REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

,2

2,125'

MEW

Digitally signed by

MEW

Date: 2025.10.09 16:04:32 -04'00'

SM Digitally signed by SM Date: 2025.10.10 11:00:11 -04'00'

NOT TO SCALE

ROAD

RAPPS

DAM

ROAD

MOWERE

,7

(S R

S C

H U

Y L K

IL

L

R

O A

D

R

A D

N E

A R

E S

T

S

IG

N A

L

,4

WI

THI

N

ONE

MI

LE

NO

SI

GNAL

WITHIN ONE MILE

NO SIGNAL

M A

LL

D

R

IV

E

VA

LL

EY

FO

R G E

S Q

U A R E

K

IM

B E R T O

N

C E

N T

IV

E W

A Y

P H

O E

N

IX

V

IL

L E

T

O W

N

1,323'

C E

N T

IV

E W

A Y

P H

O E

N

IX

V

IL

L E

T

O W

N

660'

(S R

3)

K

IM

B

ER

TO

N R

O A

D

5- 15-

5 5-7

5-3

5-4

S T R

E E T

M E L L O

N

STREETBRID

GE

S

TR

EET

B R

ID

G E

AT

HALL

S

TREET

NEARES

T

SIG

NAL

1,9

W

IT

H

IN

O

N E

M

IL

E

N O S

IG

N A L

AT LINCOLN AVENUE

NEAREST SIGNAL 2,750'

(SR 0023)

NUTT ROAD

W

IT

E

N O

S

IG

N A

L

3-

3-1

3-12

SCHUYLKILL TOWNSHIP

BOROUGH OF PHOENIXVILLE

3-11

3-3, 3-4

3-5, 3-6

3-7, 3-8

3-9, 3-10

2a

' 2 a a

R O

A D

T O

W N S H

IP

L

IN

E

4-6 4-5

4-4

4-1 4-2

4-3

1a

(S R

R

ID

G E R

O A

D

1a- 31a- 41a-

1a- 81a- 71a-a a

WITHIN ONE MILE

NO SIGNAL

W

ITH

IN

O

N E M

ILE

N O S

IG

N A L

SUBSYSTEM #1

,4

BLVD

CROSSOVER

1-2

1-3

1-

1-

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 2 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

LEGEND

PHASE

DETECTOR,

INTERSECTION X - LOOP NO. Y

O

X-Y

ZONE OF DETECTION

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

R A

D A R

R A

D A R

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

2,125'

MEW Digitally signed by MEW Date: 2025.10.09 16:04:50 -04'00' SM Digitally signed by SM

11:00:39 -04'00'

SYSTEM NOTES

SECONDARY COORDINATION: TBC (DEFAULT TO BACKUP TBC)

PRIMARY COORDINATION: FIBER OPTIC

ROAD TO BRIDGE STREET

SCHUYLKILL ROAD/NUTT ROAD (SR 0724/0023) (7 INTERSECTIONS) - RIDGE ROAD/MOWERE

SYSTEM LIMITS :

ACTUAL GREEN TIME DETERMINED BY CYCLE LENGTH.

AND BRIDGE STREET.

ROAD/NUTT ROAD (SR 0023). THE MASTER CONTROLLER IS LOCATED AT NUTT ROAD (SR 0023)

OFFSETS ARE REFERENCED TO THE BEGINNING OF TS2 - GREEN (FIRST GREEN) ON SCHUYLKILL

PROGRAM TO BE SELECTED BY CLOSED LOOP SYSTEM (TIME OF DAY) OR TBC BACKUP. 1.

2.

3.

4.

5.

66(LAG)

76(LAG)

13(LEAD)

NUTT RD (SR 0023) AND BRIDGE ST

SCHUYLKILL RD (SR 0023) AND PHOENIXVILLE TOWN CTR DRIVEWAY

NUTT RD (SR 0023) AND KIMBERTON RD/SR 0113/PHOENIXVILLE TOWN CTR

SCHUYLKILL RD (SR 0023) AND KIMBERTON SQ/VALLEY FORGE MALL DR 13(LEAD)

40(LAG)

40(LEAD)5

65(LAG)

29(LAG)

1 SCHUYLKILL RD (SR 0023) AND RAPPS DAM RD/MOWERE RD

2441 28 97

OFFSET 1

FILE #

CYCLE

8765432

PHASEPROGRAM 1 = WEEKDAY AM

INTERSECTION

15(LEAD)

28(LEAD) 13(LEAD) 13(LEAD)

14(LEAD)

40(LAG)

55(LAG)

62(LAG)

66(LAG)

85 28

29(LAG)13(LEAD)

26(LEAD)

19(LEAD)

INTERSECTION

PROGRAM 2 = WEEKDAY MID/EVENING

2FILE #

SCHUYLKILL RD (SR 0023) AND RAPPS DAM RD/MOWERE RD1

51(LAG)

32(LAG)

SCHUYLKILL RD (SR 0023) AND KIMBERTON SQ/VALLEY FORGE MALL DR

NUTT RD (SR 0023) AND KIMBERTON RD/SR 0113/PHOENIXVILLE TOWN CTR

SCHUYLKILL RD (SR 0023) AND PHOENIXVILLE TOWN CTR DRIVEWAY

NUTT RD (SR 0023) AND BRIDGE ST

15(LEAD)

68(LAG)

54(LAG)

13(LEAD) 29(LAG)

54(LAG)

56(LAG)

45(LAG)

39(LAG)

13(LEAD)

PHASE

3 4 5 6 7 8

CYCLE OFFSET 1

29(LAG)

31(LEAD)

13(LEAD)

12(LEAD)

15(LEAD)

SCHUYLKILL RD (SR 0023) AND RAPPS DAM RD/MOWERE RD1

SCHUYLKILL RD (SR 0023) AND KIMBERTON SQ/VALLEY FORGE MALL DR

NUTT RD (SR 0023) AND KIMBERTON RD/SR 0113/PHOENIXVILLE TOWN CTR

SCHUYLKILL RD (SR 0023) AND PHOENIXVILLE TOWN CTR DRIVEWAY

NUTT RD (SR 0023) AND BRIDGE ST

INTERSECTION

PROGRAM 3 = WEEKDAY PM

17(LEAD)26(LEAD)

15(LEAD)

2FILE #

70(LAG)

42(LAG)

9(LEAD)

78(LAG)

80(LAG)

13(LEAD) 29(LAG)

80(LAG)

64(LAG)

55(LAG)

50(LAG)

14(LEAD)

13(LEAD)

PHASE

3 4 5 6 7 8

CYCLE OFFSET 1

25(LAG)

35(LEAD)

9(LEAD)21

2a SCHUYLKILL RD (SR 0023) AND TOWNSHIP LINE ROAD 2614

2a 2614SCHUYLKILL RD (SR 0023) AND TOWNSHIP LINE ROAD

2a 2614SCHUYLKILL RD (SR 0023) AND TOWNSHIP LINE ROAD

74 1101a SCHUYLKILL RD (SR 0724) AND RIDGE RD (SR 0023)/CROSSOVER BLVD 3903 8874 22

3903 43 2956 3329 100

3903 51110

1a SCHUYLKILL RD (SR 0724) AND RIDGE RD (SR 0023)/CROSSOVER BLVD

1a SCHUYLKILL RD (SR 0724) AND RIDGE RD (SR 0023)/CROSSOVER BLVD

14(LEAD) 14(LEAD)22

28(LEAD) 15(LEAD)

62 26692622(LEAD) 15(LEAD)

70 40

MONDAY = DAY 1

WEEKLY PROGRAM CHART

REMARKSPROGRAMDAY TIMEEVENT

6,7 08:001

WEEKEND

6 3

19:00

22:00

1-5 06:00

10:001-5

15:00

1-5

1-5

1-5

6,7

6,7

19:00

22:00

WEEKEND

FREE

WEEKDAY AM

WEEKDAY MID

WEEKDAY PM

WEEKDAY EVENING

FREE

SUBSYSTEM 1

SCHUYLKILL RD (SR 0023) AND RAPPS DAM RD/MOWERE RD1

SCHUYLKILL RD (SR 0023) AND KIMBERTON SQ/VALLEY FORGE MALL DR

NUTT RD (SR 0023) AND KIMBERTON RD/SR 0113/PHOENIXVILLE TOWN CTR

SCHUYLKILL RD (SR 0023) AND PHOENIXVILLE TOWN CTR DRIVEWAY

NUTT RD (SR 0023) AND BRIDGE ST

INTERSECTION

PROGRAM 4 = WEEKEND

13(LEAD)26(LEAD)

19(LEAD)

2FILE #

51(LAG)

32(LAG)

9(LEAD)

68(LAG)

68(LAG)

13(LEAD) 29(LAG)

68(LAG)

56(LAG)

45(LAG)

39(LAG)

12(LEAD)

13(LEAD)

PHASE

3 4 5 6 7 8

CYCLE OFFSET 1

29(LAG)

31(LEAD)

9(LEAD)

2a SCHUYLKILL RD (SR 0023) AND TOWNSHIP LINE ROAD 2614

3903 331001a SCHUYLKILL RD (SR 0724) AND RIDGE RD (SR 0023)/CROSSOVER BLVD 43 29562928(LEAD) 15(LEAD)

73 27 73 100 53

14(LEAD)

16(LEAD)

14(LEAD)

15(LEAD)

6.

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 3 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

SYSTEM IS DESIGNED FOR THE SYSTEM SOFTWARE: SIEMENS TACTICS

MEW

Digitally signed by

MEW

Date: 2025.10.09 16:05:06 -04'00'

SM Digitally signed by SM

11:01:10 -04'00'

AT LINCOLN AVENUE

NEAREST SIGNAL 2,750'

(SR 0023)

NUTT ROAD

A V E N

U E

L

IN

C O L N

A V

EN

U E

FO

U R

TH

A V

E N

U E

L

IN

C O

L N

676'

6-2

6-3

6-1

7-7

7-8

7-1

7-2

S T R E E T

G A

Y

S T

R E

E T

G A

Y

1,026'

7-12

7-11

S

R

M A

IN

S

T R

E E

T

8-1

8-2

8-5

8-7

8-17

8-14

8-13

8-15

S T R E E T

M A

IN

S

R

M A

N A

V O

N

S

T R

E E

T

7-4

7-3

8-6

N

H

IN

O

E

N E

A R

E S

T

S

IG

N A

L

U

A D

W

IT

H

IN

O

ILE

N O

S

IG

N A L

NOT TO SCALE

INTERSECTION

PROGRAM 1 = WEEKDAY AM PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

SYSTEM NOTES

OFFSET 1

58150587

31(SPLIT)

6214(LEAD)

1.

2.

3.

29 29

14(SPLIT)

NUTT RD (SR 0023) AND LINCOLN AVE/FOURTH AVE

NUTT RD (SR 0023) AND GAY ST

NUTT RD (SR 0023) AND STARR ST/JAMES DR

NUTT RD (SR 0023) AND MAIN ST/MANAVON ST

VALLEY FORGE RD (SR 0023) AND WHITE HORSE ROAD

STARR ST (SR 0029) AND MANAVON ST/FIFTH AVE

STARR ST (SR 0029) AND MANAVON ST/FIFTH AVE

VALLEY FORGE RD (SR 0023) AND WHITE HORSE ROAD

NUTT RD (SR 0023) AND MAIN ST/MANAVON ST

NUTT RD (SR 0023) AND STARR ST/JAMES DR

NUTT RD (SR 0023) AND GAY ST

NUTT RD (SR 0023) AND LINCOLN AVE/FOURTH AVE 100

1 9

0279 94

0587 9

OFFSET 1

FILE #

CYCLE

8765432

PHASEPROGRAM 2 = WEEKDAY MID/EVENING

INTERSECTION

INTERSECTION

PROGRAM 3 = WEEKDAY PM PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

610587

1090279

110NUTT RD (SR 0023) AND LINCOLN AVE/FOURTH AVE

NUTT RD (SR 0023) AND GAY ST

NUTT RD (SR 0023) AND STARR ST/JAMES DR

NUTT RD (SR 0023) AND MAIN ST/MANAVON ST

VALLEY FORGE RD (SR 0023) AND WHITE HORSE ROAD

STARR ST (SR 0029) AND MANAVON ST/FIFTH AVE

7.

6.

5.

4.

PROGRAM TO BE SELECTED BY CLOSED LOOP SYSTEM (TIME OF

DAY) OR TBC BACKUP.

OFFSETS ARE REFERENCED TO THE BEGINNING OF TS2 - GREEN

(FIRST GREEN)ON NUTT ROAD/VALLEY FORGE ROAD (SR 0023).

THE MASTER CONTROLLER IS LOCATED AT VALLEY FORGE ROAD

(SR 0023) AND WHITE HORSE ROAD.

ACTUAL GREEN TIME DETERMINED BY CYCLE LENGTH.

SYSTEM LIMITS :

NUTT ROAD/VALLEY FORGE ROAD (SR 0023) (6

INTERSECTIONS) - LINCOLN AVENUE TO WHITE HORSE ROAD

PRIMARY COORDINATION: FIBER OPTIC

SECONDARY COORDINATION: TBC (DEFAULT TO BACKUP TBC)

ALL SPLIT TIMES INCLUDE YELLOW AND RED TIMES FOR A GIVEN

PHASE. REFER TO SIGNAL PERMIT PLAN FOR MAX 1,

CLEARANCE AND PEDESTRIAN TIMES.

M A

T C

H L

A

MATCHLINE B-B

MONDAY = DAY 1

WEEKLY PROGRAM CHART

REMARKSPROGRAMDAY TIMEEVENT

6,7 09:001

WEEKEND

6 3

19:00

22:00

1-5 06:00

10:001-5

15:00

1-5

1-5

1-5

6,7

6,7

19:00

22:00

WEEKEND

FREE

WEEKDAY AM

WEEKDAY MID

WEEKDAY PM

WEEKDAY EVENING

FREE

SUBSYSTEM 2

INTERSECTION

PROGRAM 4 = WEEKEND PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

90587

940279

100NUTT RD (SR 0023) AND LINCOLN AVE/FOURTH AVE

NUTT RD (SR 0023) AND GAY ST

NUTT RD (SR 0023) AND STARR ST/JAMES DR

NUTT RD (SR 0023) AND MAIN ST/MANAVON ST

VALLEY FORGE RD (SR 0023) AND WHITE HORSE ROAD

STARR ST (SR 0029) AND MANAVON ST/FIFTH AVE

11(LEAD)

355015(LEAD)

32 32

11(LEAD)

336215(LEAD)

35 35

11(LEAD)

285814(LEAD)

32 32

11LEAD)

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 4 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

27(SPLIT) 14(SPLIT)

32(SPLIT) 14(SPLIT)

27(SPLIT) 14(SPLIT)

14(LEAD)

14(LEAD)

14(LEAD)

14(LEAD)

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

SYSTEM IS DESIGNED FOR THE SYSTEM SOFTWARE: SIEMENS TACTICS

MEW Digitally signed by MEW Date: 2025.10.09 16:06:07 -04'00' SM Digitally signed by SM

11:01:41 -04'00'

1,280'

T R E E T

S T A R R

9-2

9-1

1,650'

R O

A D

S

R

W H

R S

E

R O

A

R S

E

(S R

VALL

EY

FORGE

ROAD

AT

PAW

LI

NGS

ROAD

NEARES

T

SI

GNAL

4, 5'

W

IT

E

N O

S

IG

N A

L

W

IT

E

N O

S

IG

N A

L

N A

V O

N

S T R E E T

N E A

R E S T

S

IG

N A L

1,2

B O

R O

U

P

H O

E N

IX

V

IL

L E

S C

H U

Y L

K

W N

S H

IP

J A

M E S

D

R

IV

E

NUTT RD

(SR 0023)

RADAR

RADAR

RADAR

RADAR

M A

N A

V O

N

S

T R

E E

T

(S R

S T A R R

S T R E E T

,8

A V E N

U E

FI

FT

H

S T R E E T

S T A R R

A T

B R

ID

G E

S T R E E T

N E A

R E S T

S

IG

N A L

,2

W

IT

E

N O

S

IG

N A

L

A T

N

U T T

R

O A

D

N E A

R E S T

S

IG

N A L

1,2

W

IT

H

IN

O

E

N O

S

IG

N A L

N E

A R

E S

T

S

IG

N A

L

NOT TO SCALE

T C

H L

A

MATCHLINE B-B

SYSTEM NOTES

1.

2.

3.

7.

6.

5.

4.

PROGRAM TO BE SELECTED BY CLOSED LOOP SYSTEM (TIME OF

DAY) OR TBC BACKUP.

OFFSETS ARE REFERENCED TO THE BEGINNING OF TS2 - GREEN

(FIRST GREEN)ON NUTT ROAD/VALLEY FORGE ROAD (SR 0023).

THE MASTER CONTROLLER IS LOCATED AT VALLEY FORGE ROAD

(SR 0023) AND WHITE HORSE ROAD.

ACTUAL GREEN TIME DETERMINED BY CYCLE LENGTH.

SYSTEM LIMITS :

NUTT ROAD/VALLEY FORGE ROAD (SR 0023) (6

INTERSECTIONS) - LINCOLN AVENUE TO WHITE HORSE ROAD

PRIMARY COORDINATION: FIBER OPTIC

SECONDARY COORDINATION: TBC (DEFAULT TO BACKUP TBC)

ALL SPLIT TIMES INCLUDE YELLOW AND RED TIMES FOR A GIVEN

PHASE. REFER TO SIGNAL PERMIT PLAN FOR MAX 1,

CLEARANCE AND PEDESTRIAN TIMES.

SUBSYSTEM 2

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 5 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

SYSTEM IS DESIGNED FOR THE SYSTEM SOFTWARE: SIEMENS TACTICS

MEW

Digitally signed by

MEW

Date: 2025.10.09 16:06:27 -04'00'

SM Digitally signed by SM

11:02:18 -04'00'

AT WHITE HORSE ROAD

NEAREST SIGNAL 4,705'

(SR 0023)

VALLEY FORGE ROAD

(S R

PAWLIN

GS

ROAD

2,560'

AT

FE

RRY

LANE

NEARES

T

SIG

NAL

3,5

(SR 0023)

VALLEY FORGE ROAD

R O

A D

S

R

C O

U N

T

Y

U B

S

R

F E

R R

Y

L

A N

E

WITHIN ONE MILE

NO SIGNAL

W

IT

E

N O

S

IG

N A

L

NOT TO SCALE

INTERSECTION

PROGRAM 1 = WEEKDAY AM PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

SYSTEM NOTES

CLEARANCE AND PEDESTRIAN TIMES.

PHASE. REFER TO SIGNAL PERMIT PLAN FOR MAX 1,

ALL SPLIT TIMES INCLUDE YELLOW AND RED TIMES FOR A GIVEN

OFFSET 1

1722VALLEY FORGE RD (SR 0023) AND PAWLINGS RD11

SECONDARY COORDINATION: TBC (DEFAULT TO BACKUP TBC)

PRIMARY COORDINATION: FIBER OPTIC

PAWLINGS ROAD TO FERRY LANE/COUNTRY CLUB ROAD

VALLEY FORGE ROAD (SR 0023) (2 INTERSECTIONS) -

SYSTEM LIMITS :

ACTUAL GREEN TIME DETERMINED BY CYCLE LENGTH.

0023) AND FERRY LANE/COUNTRY CLUB ROAD.

MASTER CONTROLLER IS LOCATED AT VALLEY FORGE ROAD (SR

(FIRST GREEN) ON VALLEY FORGE ROAD (SR 0023). THE

OFFSETS ARE REFERENCED TO THE BEGINNING OF TS2- GREEN

DAY) OR TBC BACKUP.

PROGRAM TO BE SELECTED BY CLOSED LOOP SYSTEM (TIME OF 1.

2.

3.

4.

5.

6.

7.

9 1

20(LEAD) 68(LAG)

VALLEY FORGE RD (SR 0023) AND FERRY LN/COUNTRY CLUB RD

11077

33 77 33

283228

32 60

VALLEY FORGE RD (SR 0023) AND FERRY LN/COUNTRY CLUB RD

26(LAG)14(LEAD)

1 9

11 VALLEY FORGE RD (SR 0023) AND PAWLINGS RD 20 8

OFFSET 1

FILE #

CYCLE

8765432

PHASEPROGRAM 2 = WEEKDAY MID/EVENING

INTERSECTION

INTERSECTION

PROGRAM 3 = WEEKDAY PM PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

10520VALLEY FORGE RD (SR 0023) AND PAWLINGS RD11

21(LEAD) 69(LAG)

VALLEY FORGE RD (SR 0023) AND FERRY LN/COUNTRY CLUB RD

11070

40 70 40

SUBSYSTEM 3

MONDAY = DAY 1

WEEKLY PROGRAM CHART

REMARKSPROGRAMDAY TIMEEVENT

6,7 09:001

WEEKEND

6 3

19:00

22:00

1-5 06:00

10:001-5

15:00

1-5

1-5

1-5

6,7

6,7

19:00

22:00

WEEKEND

FREE

WEEKDAY AM

WEEKDAY MID

WEEKDAY PM

WEEKDAY EVENING

FREE

INTERSECTION

PROGRAM 4 = WEEKEND PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

8VALLEY FORGE RD (SR 0023) AND PAWLINGS RD11

18(LEAD) 62(LAG)

VALLEY FORGE RD (SR 0023) AND FERRY LN/COUNTRY CLUB RD

600252

283228

26(LAG)20

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 6 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

SYSTEM IS DESIGNED FOR THE SYSTEM SOFTWARE: SIEMENS TACTICS

MEW Digitally signed by MEW Date: 2025.10.09 16:06:43 -04'00' SM Digitally signed by SM

11:02:56 -04'00'

6 AT

SCHUYLKIL

L

ROAD

NEARES

T

SIG

NAL

3,5

W

IT

E

N O

S

IG

N A

L

W

IT

E

N O

S

IG

N A

L

E A

S T

P

IK

E L

A

W N

S H

IP

S C

H U

Y L

K

W N

S H

IP

S C

H U

Y L K

IL

L

T O

W N S H

IP

B O R

O U

G H

O F

P

H O E N

IX

V

IL

L E

E A

S T

P

IK

E L

A

W N

S H

IP

B O

R O

U

P

H O

E N

IX

V

IL

L E

KIM

BERTON

ROAD

S R

KIM

BERTON

ROAD/

SR

SR

KIM

BERTON

ROAD/

WIT

HIN

O

NE

MIL

E

NO

SIG

NAL

W

IT

H

IN

O

N E

M

IL

E

N O S

IG

N A L

P R

IV

A

IV

E

R A

P

A D

R A

P

A D

(SR 1036)

POTHOUSE ROAD

A C

C E S S

S H

O P P

N T

R

T O

W N

S

W N

S

A D

2,1

0'

Z O

N E

D E T E C T

IO

N

20-5

-2

-1

-7

-8

21-4

21-3

21-2

21-1

-1

-6

NOT TO SCALE

SYSTEM NOTES

CLEARANCE AND PEDESTRIAN TIMES.

PHASE. REFER TO SIGNAL PERMIT PLAN FOR MAX 1,

ALL SPLIT TIMES INCLUDE YELLOW AND RED TIMES FOR A GIVEN

SECONDARY COORDINATION: TBC (DEFAULT TO BACKUP TBC)

PRIMARY COORDINATION: FIBER OPTIC

ROAD/SR 0113 TO TOWNSHIP LINE ROAD

KIMBERTON ROAD/SR 0113 (4 INTERSECTIONS) - KIMBERTON

SYSTEM LIMITS :

ACTUAL GREEN TIME DETERMINED BY CYCLE LENGTH.

TOWNSHIP LINE ROAD.

CONTROLLER IS LOCATED AT KIMBERTON ROAD/SR 0113 AND

(FIRST GREEN) ON KIMBERTON ROAD/SR 0113. THE MASTER

OFFSETS ARE REFERENCED TO THE BEGINNING OF TS2 - GREEN

DAY) OR TBC BACKUP.

PROGRAM TO BE SELECTED BY CLOSED LOOP SYSTEM (TIME OF 1.

2.

3.

4.

5.

6.

7.

29(LAG)

66(LAG)79 120

12(LEAD)

21 2449 43 64120

18 KIMBERTON RD/SR 0113 AND PRIVATE DR

2748 62

OFFSET 1

FILE #

CYCLE

8765432

PHASEPROGRAM 1 = WEEKDAY AM

INTERSECTION

KIMBERTON RD/SR 0113 AND RAPPS DAM RD

KIMBERTON RD/SR 0113 AND TOWNSHIP LINE RD

KIMBERTON RD/SR 0113 AND POTHOUSE RD 13(LEAD)

KIMBERTON RD/SR 0113 AND POTHOUSE RD

KIMBERTON RD/SR 0113 AND TOWNSHIP LINE RD

KIMBERTON RD/SR 0113 AND RAPPS DAM RD

INTERSECTION

PROGRAM 3 = WEEKDAY PM PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

KIMBERTON RD/SR 0113 AND PRIVATE DR

642449

1 9

2449 85

KIMBERTON RD/SR 0113 AND PRIVATE DR

OFFSET 1

FILE #

CYCLE

8765432

PHASEPROGRAM 2 = WEEKDAY MID/EVENING

INTERSECTION

KIMBERTON RD/SR 0113 AND RAPPS DAM RD

KIMBERTON RD/SR 0113 AND TOWNSHIP LINE RD

KIMBERTON RD/SR 0113 AND POTHOUSE RD

SUBSYSTEM 4

MONDAY = DAY 1

WEEKLY PROGRAM CHART

REMARKSPROGRAMDAY TIMEEVENT

6,7 09:001

WEEKEND

6 3

19:00

22:00

1-5 06:00

10:001-5

15:00

1-5

1-5

1-5

6,7

6,7

19:00

22:00

WEEKEND

FREE

WEEKDAY AM

WEEKDAY MID

WEEKDAY PM

WEEKDAY EVENING

FREE

KIMBERTON RD/SR 0113 AND POTHOUSE RD

KIMBERTON RD/SR 0113 AND TOWNSHIP LINE RD

KIMBERTON RD/SR 0113 AND RAPPS DAM RD

INTERSECTION

PROGRAM 4 = WEEKEND PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

KIMBERTON RD/SR 0113 AND PRIVATE DR

100 852449

2058 1205822 1020 20

29(LAG)

46(LAG)59 100

12(LEAD)

33 100

13(LEAD)

2040 100402020 20

29(LAG)

63(LAG)76 120

15(LEAD)

45 120

13(LEAD)

1858 120582222 22

29(LAG)

46(LAG)59

12(LEAD)

13(LEAD)

2040 402020 20

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 7 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

SYSTEM IS DESIGNED FOR THE SYSTEM SOFTWARE: SIEMENS TACTICS

MEW

Digitally signed by

MEW

Date: 2025.10.09 16:07:04 -04'00'

SM Digitally signed by SM

11:03:27 -04'00'

STREET

CHURCH

(S R

B R

ID

G E

S T R

E E T

14-5

15 16

15-1

15-2

16-3

16-1

S T

R E

E T

G A

Y S

R

G A

Y

S

T R

E E

T

S T

R E

E T

M A

IN

S T

R E

E T

M A

IN

BRIDGE STREET

15-3 16-2

16-4

9'

620' 1,085'

A D

S

R

N E

A R

E S T

S

IG

N A

L

,2

S

R

S T

A R

R

S

T R

E E

T

0029)

BRIDGE STREET (SR BRIDGE STREET

JACOB STREET

AT WALNUT STREET/

NEAREST SIGNAL 1,700

N A

V O

N

S

T R

E E

T

N E

A R

E S

T

S

IG

N A

L

,0

17-1

17-2

17-3

17-4

S T

A R

R

S

T R

E E

T

NOT TO SCALE

SYSTEM NOTES

CLEARANCE AND PEDESTRIAN TIMES.

PHASE. REFER TO SIGNAL PERMIT PLAN FOR MAX 1,

ALL SPLIT TIMES INCLUDE YELLOW AND RED TIMES FOR A GIVEN

SECONDARY COORDINATION: TBC (DEFAULT TO BACKUP TBC)

PRIMARY COORDINATION: FIBER OPTIC

STARR STREET

BRIDGE STREET (4 INTERSECTIONS) - CHURCH STREET TO

SYSTEM LIMITS :

ACTUAL GREEN TIME DETERMINED BY CYCLE LENGTH.

IS LOCATED AT BRIDGE STREET AND STARR STREET.

FIRST GREEN) ON BRIDGE STREET. THE MASTER CONTROLLER

OFFSETS ARE REFERENCED TO THE BEGINNING OF TS2 - GREEN

DAY) OR TBC BACKUP.

PROGRAM TO BE SELECTED BY CLOSED LOOP SYSTEM (TIME OF 1.

2.

3.

4.

5.

6.

7.

44(LEAD)

17 0054 58120

14 BRIDGE ST AND CHURCH ST

0055 0

OFFSET 1

FILE #

CYCLE

8765432

PHASE

INTERSECTION

BRIDGE ST AND GAY ST

BRIDGE ST AND STARR ST

BRIDGE ST AND MAIN ST

BRIDGE ST AND MAIN ST

BRIDGE ST AND STARR ST

BRIDGE ST AND GAY ST

INTERSECTION

PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

160055

BRIDGE ST AND CHURCH ST

70 670054

22(LEAD)

29 41

28(LEAD)

0054 3080

BRIDGE ST AND CHURCH ST

0055 46

OFFSET 1

FILE #

CYCLE

8765432

PHASE

INTERSECTION

BRIDGE ST AND GAY ST

BRIDGE ST AND STARR ST

BRIDGE ST AND MAIN ST

M A

T C

H L

A

M A

T C

H L

A

1 9

0054 6770

BRIDGE ST AND CHURCH ST

0055 16

OFFSET 1

FILE #

CYCLE

8765432

PHASE

INTERSECTION

BRIDGE ST AND GAY ST

BRIDGE ST AND STARR ST

BRIDGE ST AND MAIN ST

MONDAY = DAY 1

WEEKLY PROGRAM CHART

REMARKSPROGRAMDAY TIMEEVENT

6,7 09:001

WEEKEND

6 3

19:00

22:00

1-5 06:00

10:001-5

15:00

1-5

1-5

1-5

6,7

6,7

19:00

22:00

WEEKEND

FREE

WEEKDAY AM

WEEKDAY MID

WEEKDAY PM

WEEKDAY EVENING

FREE

SUBSYSTEM 5

4922(LEAD)

29 41

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 8 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

PROGRAM 1 = WEEKDAY AM

PROGRAM 2 = WEEKDAY MID/EVENING

PROGRAM 3 = WEEKDAY PM

PROGRAM 4 = WEEKEND

SYSTEM IS DESIGNED FOR THE SYSTEM SOFTWARE: SIEMENS TACTICS

MEW Digitally signed by MEW Date: 2025.10.09 16:07:22 -04'00' SM Digitally signed by SM

11:04:00 -04'00' f5 f8 f6 f4

P H

A N

T

Y

1535' f4

2f f8 f6

NEAREST SIGNAL 2990'

AT CHARLESTOWN ROAD

NEAREST SIGNAL 3259'

AT WHITE HORSE ROAD

N O

S

IG

N

H

IN

O

E

T R

O T

T E

W POTHOUSE RD

(S.R. 1036)

W POTHOUSE RD

(S.R. 1036)

S T

A

A D

S .R

N

H

IN

O

E

N

H

IN

O

E

E POTHOUSE RD

(S.R. 1036)

H A

LLO

W E

LL

A V E f

23-1 f2

N E

A R

E S

T

S

IG

N A

L

A D

W

IT

H

IN

O

ILE

N O

S

IG

N A L

22-5 f7

5f f1

CLEARANCE AND PEDESTRIAN TIMES.

PHASE. REFER TO SIGNAL PERMIT PLAN FOR MAX 1,

ALL SPLIT TIMES INCLUDE YELLOW AND RED TIMES FOR A GIVEN

SECONDARY COORDINATION: TBC (DEFAULT TO BACKUP TBC)

PRIMARY COORDINATION: FIBER OPTIC

SYSTEM LIMITS :

ACTUAL GREEN TIME DETERMINED BY CYCLE LENGTH.

(SR 0023) AND WHITE HORSE ROAD.

THE MASTER CONTROLLER IS LOCATED AT VALLEY FORGE ROAD

(PHASE 2+6) ON NUTT ROAD/VALLEY FORGE ROAD (SR 0023).

OFFSETS ARE REFERENCED TO THE BEGINNING OF GREEN

DAY) OR TBC BACKUP.

PROGRAM TO BE SELECTED BY CLOSED LOOP SYSTEM (TIME OF

4.

5.

6.

7.

3.

2.

1.

SYSTEM NOTES

INTERSECTIONS 22-23

WEEKLY PROGRAM CHART

REMARKSPROGRAMDAY TIMEEVENT

1-5 06:001

1 AM PEAK

1-5 07:00

1-5 08:45

14:151-5

15:451-5

19:001-5

00:006-7

FREE

FREE

FREE

AM SCHOOL

MIDDAY

PM SCHOOL

PM PEAK

EVENINGS

WEEKENDS

MONDAY = DAY 1

SCALE: NOT TO SCALE

LEGEND

PHASE1

VIDEO DETECTION ZONE

INTERSECTION

PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

INTERVAL 1

REFERENCE

INTERVAL 2

REFERENCE

OFFSET 2

W. POTHOUSE RD & STATE RD/HALLOWELL AVE

W. POTHOUSE RD & PHANTOM WAY/TROTTERS DR 22

061 140

STATE RD/MAIN STREET (S.R. 0029) TO TROTTERS DR/PHANTOM WAY

W. POTHOUSE RD (SR 1036) (2 INTERSECTIONS) -

INTERSECTION

PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

INTERVAL 1

REFERENCE

INTERVAL 2

REFERENCE

OFFSET 2

W. POTHOUSE RD & STATE RD/HALLOWELL AVE

W. POTHOUSE RD & PHANTOM WAY/TROTTERS DR 22

042 105

10574

INTERSECTION

PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

INTERVAL 1

REFERENCE

INTERVAL 2

REFERENCE

OFFSET 2

W. POTHOUSE RD & STATE RD/HALLOWELL AVE

W. POTHOUSE RD & PHANTOM WAY/TROTTERS DR 30

052 130

13094

INTERSECTION

PHASE

2 3 4 5 6 7 8

CYCLE

FILE #

OFFSET 1

INTERVAL 1

REFERENCE

INTERVAL 2

REFERENCE

OFFSET 2

W. POTHOUSE RD & STATE RD/HALLOWELL AVE

W. POTHOUSE RD & PHANTOM WAY/TROTTERS DR 24

052 130

13086

14 14

14 14

SUBSYSTEM 6

INTERCONNECT PERMIT #

GENERAL NOTES

SHEET 9 OF 9I-0053

TRAFFIC SIGNAL STANDARDS TC-8800 SERIES.

OR JACKED UNDER THE ROADWAY. INSTALL IN ACCORDANCE WITH

OLD, OR CONCRETE ROADWAY REGARDLESS OF AGE, MUST BE BORED

CONDUIT INSTALLED IN BITUMINOUS ROADWAY LESS THAN 5 YEARS

CONFORM TO FORM 408 AND A COPY OF THE PROPOSED

WHEN LIQUID FUELS MONEY IS USED, SIGNAL INSTALLATION MUST

EFFECTIVE DATE DECEMBER 20, 1974.

ACT 287, PREVENTION OF DAMAGE TO UNDERGROUND UTILITIES

UNLESS THE PERMITTEE COMPLIES WITH THE LATEST PROVISIONS OF

THIS DRAWING CANNOT BE USED AS A CONSTRUCTION DRAWING

WHICH MAY BE CREATED DUE TO THE LOCATION OF UTILITIES.

LOCAL OFFICIALS AND UTILITY COMPANIES TO RESOLVE ANY PROBLEMS

PRIOR TO INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE

DROPS.

MAINTAIN MASTER CONTROLLER COMMUNICATION SUCH AS PHONE

INSTALLATION.

OBTAIN POLE ATTACHMENT PERMIT FOR AERIAL FIBER OPTIC

INSTALLATION BY A REPRESENTATIVE OF PENNDOT.

EXACT LOCATION OF DETECTORS SHALL BE DETERMINED PRIOR TO

GATHER TRAFFIC VOLUMES IN 15 MINUTE INTERVAL, WHERE APPLICABLE.

ASSIGN LOOP DETECTORS AND PROGRAM THE CONTROLLERS TO

SYSTEMS REVISIONS.

DATABASE AND GRAPHICS. MODIFY THE DATABASE AND GRAPHICS FOR

SET UP PENNDOT DISTRICT 6-0 COMPUTER WITH THE SYSTEM

ARCHIVE THEM WHERE APPLICABLE.

GATHER THE SYSTEM FAILURE CRITICAL ALARMS REPORT AND

UP LEVEL.

MASTER CONTROLLER LEVEL AND PERSONAL COMPUTER REMOTE DIAL

TEST THE SYSTEM AT LOCAL INTERSECTION LEVEL, SUBSYSTEM LEVEL

ALWAYS BE ACCOMPANIED WITH TRAFFIC SIGNAL PERMIT DRAWING.

FOR CONSTRUCTION AND INSPECTION THE SYSTEM PERMIT SHOULD

INTERSECTION OPERATION, GEOMETRY, PHASING AND CRITICAL TIMES.

REFER TO TRAFFIC SIGNAL PERMIT DRAWING FOR INDIVIDUAL

THE DEPARTMENT OF TRANSPORTATION.

PRIOR APPROVAL IS GRANTED IN WRITING BY A REPRESENTATIVE OF

NO MODIFICATIONS OF THIS INSTALLATION ARE PERMITTED UNLESS

(SR 0023) TRAFFIC SIGNAL SYSTEM

PHOENIXVILLE BOROUGH,

CHESTER

DATE

DATE

REVIEWED:

COUNTY:

INTERSECTION:

MUNICIPALITY:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

MUNICIPAL OFFICIAL

ENGINEERING DISTRICT 6-0

REVISION

DES./

REVW. DATE

DATE

DATE

DATEREVW. RECOM. DATENO.

DISTRICT TRAFFIC ENGINEER

RECOMMENDED:

MUNICIPAL SIGNALS ENGINEER

EAST PIKELAND TOWNSHIP & SCHUYLKILL TOWNSHIP

SCHUYLKILL ROAD/NUTT ROAD

PAUL LUTZ 12/8/2010

L.R. BELMONTE, P.E. 12/8/2010

REV INT #1 LANE CONFIG & TIMINGS McM

ADDITION OF INTER. #22, 23 McM 3/4/16

ADD. INTERSECTION 1a BURNS 4/19/16

LUTZ 3/4/16 APatel 3/7/16

LUTZ 6/13/16 APatel 6/13/16

REV. INT. #22 FOR PHASES 1,5,7 McM 1/18/17 LUTZ 4/9/18 APatel 4/11/18

AS-BUILT RETIMING, ADD PHASE FOR INT #1 McM 11/8/19 LUTZ APatel11/25/19 11/25/19

REVISE INTERSECTION #9 McM 4/22/22 LUTZ 7/19/22

AS-BUILT, PHASE 5 ADDED TO INT. #9 BWMN 3/26/24

AECOM 11/18/22 MEW 3/29/23CHANGE DETECTION AT INT #11 & 12

LUTZ 7/19/22

APB 4/3/23

MEW 5/14/24 KPL 5/14/24

REVISE AND RETIME INT. #10 TPD

REVISE SIGNAL TIMING TO INT. #2 DTRAFF

3/13/25

2/12/25

REVISE & RETIME INT. #17 TPD 8/14/25

MEW 6/17/25 KPL 6/17/25

MEW 7/23/25 KPL 7/23/25

PROGRAM 3 = PM SCHOOL

PROGRAM 4 = PM PEAK

PROGRAM 1 = AM PEAK

PROGRAM 2 = AM SCHOOL

SYSTEM IS DESIGNED FOR THE SYSTEM SOFTWARE: SIEMENS TACTICS

MEW Digitally signed by MEW Date: 2025.10.09 16:07:41 -04'00' SM Digitally signed by SM

11:04:34 -04'00'