15M300-21-Q-A370-0016-0002.pdf
PDF 125 KB Posted
- Attached to
- Aircraft Heavy Maintenance Check Federal contract opportunity
- Solicitation number
- 15M300-21-Q-A370-0016
About this file
This document contains a revised attachment to a request for quote for an aircraft heavy maintenance check. The RFQ is issued by the Department of Justice US Marshals Service for maintenance requirements and tasks to be performed on a Boeing 737 aircraft registered as N639CS. The revised attachment provides 76 specific maintenance tasks to be performed including compliance with 38 airworthiness directives. Pricing is requested as firm fixed prices for each task. The closing date for responses is March 22, 2021 at 12:00 pm Eastern Time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15M300-21-Q-A370-0016-0001.pdf | ||
| 15M300-21-Q-A370-0016 - Request for Quote - JPATS Heavy Maintenance Check.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. MARSHALS SERVICE
JUSTICE PRISONER AND ALIEN TRANSPORTATION SYSTEM (SYSTEM)
AIRCRAFT HEAVY MAINTENANCE CHECK
RFQ # 15M300-21-Q-A370-0016
Amendment 0002:
a. The purpose of this Amendment is to correct the maintenance event - Task #32 on Attachment #1 – N639CS Maintenance Requirements. A Revised Attachment #1 (with highlighted changes) is attached.
b. The closing date/time remains March 22, 2021, at 12:00 pm (noon) ET.
c. All other terms and conditions remain the same and in full force and effect.
Revised Attachment #1 - N639CS Maintenance Requirements
Task
Sub- Task
Service Firm Fixed Price
1 Perform Service Check
2 Perform 1A Check
3 Perform 2A Check
4 Perform 1C Check
5 Perform 2C Check
6 Perform 4C Check
7 Perform Aircraft Wash
8 Remove and replace 4 each heat exchangers JPATS will provide heat exchangers
9 Remove and replace 2 each air cycle machines JPATS will provide air cycle machines
10 Perform Engine Gas Path Cleaning
11 28-AWL-27
11 a Perform an electrical bonding resistance check between the fuel boost pump motor impeller housing and the tank structure. Refer to AMM 28-22-41.
N/A
12 AD 2008-09-15 Paragraph (f)
12 a Perform SB 737-56A1023 Accomplishment Instructions 3.B Part 1, Part 2, and Part 3
N/A
13 AD 2013-09-08 Paragraph (g) N639CS (PM557) is a Group 1 airplane
13 a Perform SB 737-28A1307 N/A
Sub- Task
Service Firm Fixed Price
14 AD 2014-18-02 Paragraph (k)(l)
14 a Perform SB 737-53A1075 Revision 3 Accomplishment Instructions 3.B. Work Instructions and Figure 1.
N/A
15 AD 2017-02-12 Paragraph (g)(1)
15 a Perform SB 737-55A1092 Accomplishment Instruction 3.B. Part 1
N/A
16 AD 2009-07-11 Paragraph (f)
16 a Perform Boeing Message Number 1-QXO35, dated October 13, 2004.
N/A
17 AD 2017-25-10 Paragraph (h)(6).
N639CS (PM557) is a Group 3 airplane
17 a Perform SB 737-55A1099 Revision 1 Table 6;
Accomplishment Instructions 3.B. Work Package 4
N/A
18 AD 2017-25-10 Paragraph (h)(7).
18 a Perform SB 737-55A1099 Revision 1 Table 7;
Accomplishment Instructions 3.B. Work Package 5
N/A
19 AD 2014-25-09 Paragraph (j) N639CS (PM557) is a group 5 airplane.
19 a Perform SB 737-53-1058 Revision 4 Table 2 Accomplishment Instructions 3.B Part 2 Table 3
N/A
20 AD 2015-06-07 (g)(1) N639CS (PM557) is a Group 4 airplane
20 a Perform SB 737-53-1083 Revision 5 Table 1;
Accomplishment Instructions 3.B.1 Part 1 - Inspection
N/A
21 AD 2014-25-03 Paragraph (g)
21 a Perform SB 737-53A116 Revision 4 Table 3 Accomplishment Instructions 3.B Step 2.c.(1)
N/A
Sub- Task
Service Firm Fixed Price
21 b Perform SB 737-53A116 Revision 4 Table 6 Accomplishment Instructions 3.B.3.a and 3.B.3.b
N/A
21 c Perform SB 737-53A116 Revision 4 Table 8 Accomplishment Instructions 3.B Step 4.b.(1)
N/A
21 d Perform SB 737-53A116 Revision 4 Table 10 Accomplishment Instructions 3.B Step 5.b.(1)
N/A
22 AD 2015-23-08 Paragraph (j)(1) N639CS (PM557) is a Group 4 airplane.
22 a Perform SB 737-53A1323 Table 4 Option 1: (b);
Accomplishment Instructions 3.B.3.b
N/A
22 b Perform SB 737-53A1323 Table 7 Option 1: (b);
Accomplishment Instructions 3.B.3.e
N/A
22 c Perform SB 737-53A1323 Table 8 Option 1: (b);
Accomplishment Instructions 3.B.3.f
N/A
23 AD 2004-19-10 Paragraph (f)(g)
23 a Perform SB 737-55A1077 Accomplishment Instructions
3. Work Instructions Part 2 Note: Must use BMS 3-27 grease (Mastinox 6856K)
N/A
24 AD 2006-12-23 Paragraph (i) N639CS (PM557) is a Group 10 airplane
24 a Perform SB 737-55A1070 Revision 2 Table 3 N/A
24 a(i) Perform SB 737-55A1070 Revision 2 Accomplishment Instructions 3.B. Part 10, followed by
N/A
24 a(ii) Perform SB 737-55A1070 Revision 2 Accomplishment Instructions 3.B. Part 1
N/A
24 a(iii) Perform SB 737-55A1070 Revision 2 Accomplishment Instructions 3.B. Part 2
N/A
24 a(iv) Perform SB 737-55A1070 Revision 2 Accomplishment Instructions 3.B. Part 3
Sub- Task
Service Firm Fixed Price
25 AD 2007-16-05 Paragraph (f) N639CS (PM557) is a Group 3 airplane.
25 a Perform SB 737-27A1266 Revision 1 Accomplishment Instructions 3.B. Part 1 - Inspection
N/A
26 AD 2011-24-12 Paragraph (j)(2) N639CS (PM557) is a Group 7 airplane
26 a Perform SB 737-53A1301 Revision 2 Table 2 Option 2;
Accomplishment instructions 3.B.7
N/A
27 AD 2012-18-13 R1 Paragraph (g)(h)(i)
27 a Perform NDT Manual D6-37239, Part 6 Section 53-10- 54, BS 1016 Aft Pressure Bulkhead Web at the “Y” Chord.
N/A
28 AD 2012-18-13 R1 Paragraph (k)
28 a Perform SB 737-53A1214 Revision 4 Accomplishment Instructions 3.B. Part 1 LFEC Inspection
N/A
29 AD 2012-23-14 Paragraph (g)(1)
29 a Perform SB 737-53A1318 Table 1; Accomplishment Instructions 3.B.1.c, 3.B.1.d, 3.B.1.e and 3.B.1.f.
N/A
30 AD 2013-09-01 Paragraph (g) N639CS (PM557) is a Group 12 airplane.
30 a Perform SB 737-53A1255 Revision 2 Accomplishment instructions 3.B.1 Part 1 External Crown Lap Joint Inspection Group 12
N/A
31 AD 2020-26-04 paragraph (g) N639CS (PM557) is group 16 configuration 1 airplane
31 a Perform SB 737-53A1346 Table 1; Accomplishment instructions 3.B.1.c Part 1 inspection.
N/A
31 b Perform SB 737-53A1346 Table 5; Accomplishment instructions 3.B.5.b Part 2 inspection
N/A
31 c Perform SB 737-53A1346 Table 9; Accomplishment instructions 3.B.9.d Part 3 inspection
Sub- Task
Service Firm Fixed Price
31 d Perform SB 737-53A1346 Table 11; Accomplishment instructions 3.B.11.b Part 4 inspection.
N/A
31 e Perform SB 737-53A1346 Table 13; Accomplishment instructions 3.B.13.b Part 5 inspection.
N/A
31 f Perform SB 737-53A1346 Table 17; Accomplishment instructions 3.B.17.b Part 6 inspection.
N/A
32 AD 2014-12-13 Paragraph (h).
N639CS (PM557) is a Group 7 airplane
32 a Perform SB 737-57-1318 Table 5 Option 2;
Accomplishment Instructions 3.B Part 3, Step 3.a.(2)(a) and 3.B Part 3, Step 3.a.(2)(b)
N/A
33 AD 2018-10-12 Paragraph (h) N639CS (PM557) is a Group 2 Configuration 1 airplane
33 a Perform SB 737-57A1339 Table 1; Surface HFEC and detailed inspection of the aft vertical stiffeners for any crack.
N/A
34 AD 2018-18-13 Paragraph (h) N639CS (PM557) is a Group 3 Configuration 1 airplane
34 a Perform SB 737-57A1338 Table 1 Inspection 1; Perform Inspection 1 on #1 and #8 flap tracks.
N/A
35 AD 2018-18-13 Paragraph (h) N639CS (PM557) is a Group 3 Configuration 1 airplane
35 a Perform SB 737-57A1338 Table 3 Inspection 5 and Inspection 6; Perform Inspection 5 and Inspection 6 on #2 and #7 flap tracks.
N/A
36 AD 2018-19-20 Paragraph (g)
36 a Perform SB 737-53A1254 Revision 3 Table 1 Option 1;
Accomplishment Instructions 3.B.1.b.1
N/A
37 AD 2019-10-03 Paragraph (h) N639CS (PM557) is a Group 5 airplane.
37 a Perform SB 737-53-1246 Revision 1 Table 5 Part 17 Accomplishment Instructions 3.B. Group 4-5 Part 17
N/A
37 b Perform SB 737-53-1246 Revision 1 Table 6 Part 18 Accomplishment Instructions 3.B Group 4-5 Part 18
Sub- Task
Service Firm Fixed Price
38 AD 2013-09-10 Paragraph (k)(1) N639CS (PM557) is a Group 5 airplane
38 a Perform SB 737-52A1100 Revision 5 Table 2;
Accomplishment Instructions 3.B. Work Instructions Part 1
N/A
39 Perform AD 2004-06-18 Paragraph (a)(1)(i)
40 Perform AD 2004-06-18 Paragraph (a)(2)
41 Perform AD 2004-06-18 Paragraph (a)(5)
42 AD 1999-10-12 Paragraph (b)(c)
42 a Perform SB 737-32A1314. N/A
43 AD 2006-21-01 Paragraph (g)(2) N639CS (PM557) is a Group 2 airplane
43 a Perform SB 737-27-1272 Accomplishment Instructions 3.B. Group 2 Part 1
N/A
44 AD 2012-23-04 Paragraph (l) N639CS (PM557) is a Group 7 Configuration 4 airplane
44 a Perform SB 737-53A1166 Revision 2 Accomplishment Instructions 3.B.2.c
N/A
45 AD 2012-23-04 Paragraph (m)(1)(i)
45 a Perform SB 737-53A1166 Revision 2 Table 2 Accomplishment Instructions 3.B.3.a and 3.B.3.c
N/A
46 AD 2012-23-04 Paragraph (m)(1)(ii)
46 a Perform SB 737-53A1166 Revision 2 Table 2 Accomplishment Instructions 3.B.3.d
N/A
Non-routine work cards for discrepancies identified in accomplishing above checks and inspections. Hourly Labor Rate:
| Amendment 0002 |
| Revised Attachment #1 - N639CS Maintenance Requirements |
File details come from the government source that posted it. Updated .