Questions_Answered 220706.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
FBI CJIS Division, Lighting Replacement, Bldg 9
Solicitation number
15F06722Q0000043
Issued by

About this file

This document contains questions and answers regarding a federal solicitation for lighting replacement at an FBI facility. The solicitation requests LED lighting fixtures and modular wiring components from the RELOC system to replace existing fixtures and power the new lights as well as lighting controls cabling. Bidders must ensure any equivalent components proposed will be compatible with the existing Lutron lighting control system. Emergency power for the fixtures will be provided by a generator. Delivery is required to 1000 Custer Hollow Road, Clarksburg, WV by the quote due date of June 30, 2022. Questions were due by June 17, 2022.

View the file

Other files

File Type Posted
FBI_Lutron Driver Allotment Letter_QTY 607.pdf PDF
REVISED 22-0627_Building 9 Lighting PRICING TEMPLATE.xlsx XLSX spreadsheet
20220726 Questions_Answered - LUTRON LETTER.xlsx XLSX spreadsheet
UPDATED Questions_Answered 220701.xlsx XLSX spreadsheet
REVISED 22-0627_Building 9 Lighting PRICING TEMPLATE.xlsx XLSX spreadsheet
Questions_Answered 22-0616.xlsx XLSX spreadsheet
OEM Legacy Pricing Letter (FBI BTC L2 SW).pdf PDF
i. New RELOC OnePass Splitter Splice – OSS Series (Basis of Design).pdf PDF
b. RELOC-Ready Luminaire Universal Fixture Connector for Basis of Design Modular Wiring System.pdf PDF
f. New RELOC OnePass Converter - OC Series (Basis of Design).pdf PDF
j. Building 9 BTC Lighting with Basis of Design Modular Wiring.pdf PDF
k. Krueger Ceiling Adapters.pdf PDF
c. BLDG 9’s BTC Photometric w.Basis of Design Light Fixture – Normal LGT.pdf PDF
e. BTC Approx 300 Light Fixtures Drawing PDF - Please Request DWG File.pdf PDF
d. BLDG 9’s BTC Photometric w.Basis of Design Light Fixture – Emergency LGT.pdf PDF
g. New RELOC OnePass Cables – Cable – OC1 Series (Basis of Design).pdf PDF
a. New Recessed 2’ x 2’ LED Light Fixture (Basis of Design).pdf PDF
RFQ 15F06722Q0000043 FBI CJIS Lighting Bldg 9.docx DOCX document
h. New RELOC OnePass Cables - Fixture Cable – OFC Series (Basis of Design).pdf PDF
PRICING TEMPLATE Building 9 Lighting 06152022.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionFBI Reponse:AMENDMENT
1. The 2nd tab on the excel sheet, states there is an existing Lutron system already in place. However, I see a pdf with an Acuity design. Is the Acuity system needed as well?Yes, the Acuity design is for the modular wiring. The modular wiring shall be utilized to not only power the lights, but also for the lighting controls cabling to each fixture. The lighting controls cabling in the modular wiring components is specified with the addition of the C12S in the part number. The C12S is not included in the PDF design, but is included in the final parts list requested under this solicatation.No Change

2. In relation to the question above, is it safe to assume all the Lutron material required to operate a fully functional system is already existing and all needed from our end would be the light fixtures and drivers as specified, which is already assumed to be compatible with the existing Lutron system? Yes, if all items in the solication are provided and not changed. This also includes the modular wiring. If any or equal parts are proposed then it is up to the bidder to show that everything shall be compatible to work with the existing Lutron Lighting Control System. No Change

3. It appears there may be a generator on-site or provision already made for how emergency power will be transferred to the fixtures but I would like to confirm explicitly. No EM adders will be required, correct? Correct. Emergency power will be provided by generator backup. Light fixtures do not require EM adders. No Change

4. Can you confirm the following about the reloc system. Are these being used in conjunction with a Lutron system? Yes. The RELOC modular wiring system shall be utilized to not only power the lights, but also for the lighting controls cabling to each fixture. The lighting controls cabling in the modular wiring components is specified with the addition of the C12S in the part number. The C12S is not included in the PDF design, but is included in the final parts list requested under this solicitation. No Change

5. Can you confirm the following about the reloc system. Can they be used by drivers other than the Lutron driver? The RELOC modular wiring system itself is utilized to provide power and controls cabling to each light fixture in a manner that makes future renovations less labor intense. At our facility today in different buildings RELOC is utilized with different light fixtures that have different drivers. However, if an or equal component is being proposed, deviating from the basis of design, then it is the offerors job to verify functionality with the Lutron Lighting Control System. No Change

6. As we discussed we can not provide fixtures with lutron drivers w/o having a Lutron order #. Please reference the attachment to solicitation titled, "OEM Legacy Pricing Letter (FBI BTC L2 SW)." No Change

7. Is there anyway we can confirm that they Lutron System is compatible with standard 0-10v dimming drivers that dim to 1%? If an or equal component is being proposed, deviating from the basis of design, then it is the offerors job to verify functionality. No Change

8. Is it possible to get a copy of the "as built" plans for the Lutron system? Speaking with my lighting representative, the "as-builts" will have the Lutron sales order number on them, so we can purchase from Lutron. As-built drawings cannot be distributed due to security reasons. However, the drawings provide a Project Number of 165278, which is the same number on the OEM Legacy Pricing Letter (FBI BTC L2 SW) attachment already provided in this solicitation. On this attachment it is just labeled as the Lutron Project Quote Number (Commercial) instead of Project Number. No Change