Questions_Answered 22-0616.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- FBI CJIS Division, Lighting Replacement, Bldg 9
- Solicitation number
- 15F06722Q0000043
About this file
This document contains a federal contract opportunity solicitation and related questions and answers. The FBI CJIS Division is seeking to purchase LED lighting fixtures and modular wiring components from the attached specifications list to replace lighting at its facility in Clarksburg, West Virginia. Bids are due by June 30, 2022 and must include an anticipated delivery date to the specified address. The solicitation is set aside 100% for small businesses as an open market procurement allowing for brand name or equal products. Emergency power for the fixtures will be provided by an on-site generator so light fixture emergency adders are not required.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | FBI Reponse: | AMENDMENT |
| 1. The 2nd tab on the excel sheet, states there is an existing Lutron system already in place. However, I see a pdf with an Acuity design. Is the Acuity system needed as well? | Yes, the Acuity design is for the modular wiring. The modular wiring shall be utilized to not only power the lights, but also for the lighting controls cabling to each fixture. The lighting controls cabling in the modular wiring components is specified with the addition of the C12S in the part number. The C12S is not included in the PDF design, but is included in the final parts list requested under this solicatation. | No Change |
2. In relation to the question above, is it safe to assume all the Lutron material required to operate a fully functional system is already existing and all needed from our end would be the light fixtures and drivers as specified, which is already assumed to be compatible with the existing Lutron system? Yes, if all items in the solication are provided and not changed. This also includes the modular wiring. If any or equal parts are proposed then it is up to the bidder to show that everything shall be compatible to work with the existing Lutron Lighting Control System. No Change
3. It appears there may be a generator on-site or provision already made for how emergency power will be transferred to the fixtures but I would like to confirm explicitly. No EM adders will be required, correct? Correct. Emergency power will be provided by generator backup. Light fixtures do not require EM adders. No Change