OF1419 Bid Abstract.pdf
PDF 227 KB Posted
- Solicitation number
- 15BFA024B00000026
About this file
This document is an Abstract of Offers for a construction solicitation issued by the Federal Bureau of Prisons (BOP) Field Acquisition Office. The solicitation, number 15BFA024B00000026, is for the repair of Powerhouse Boilers 2 & 3 at the Federal Correctional Institution (FCI) in Herlong, California.
The solicitation requires the successful contractor to provide labor, equipment, parts, materials and supplies to rebuild and repair two hot water boilers in the facility's Central Utility Plant. The government estimate for the work is between $250,000 and $500,000. Three offers were received, with the lowest bid of $148,925 from Grainger Contracting and Services and the highest bid of $489,628 from Reagent World Inc. The solicitation is a 100% small business set-aside, and a pre-bid site visit is scheduled for October 29, 2024. Bids were due by November 15, 2024.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
15BFA024B00000026
2. DATE ISSUED
10/15/2024
3. DATE OPENED
11/15/2024
PAGE OF
1 2 PAGES
4. ISSUING OFFICE
Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Krista Sua, Contracting Officer
SIGNATURE DATE SIGNED
11/15/2024
5. PROJECT TITLE
FCI HERLONG
Repair Powerhouse Boilers 2 & 3
PROJECT 24Z6AN7
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
NBT Construction and Supply
A. OFFEROR
Grainger Contracting and Services A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount)
20% B. BID SECURITY (Type and amount)
20%
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
7A.
ITEMNO.
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
1 Repair Powerhouse Boilers 2 & 3 1 JB 0.00 274,260.00 274,260.00 148,925.00 148,925.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER
15BFA024B00000026
PAGE OF
2 2 PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
FCI HERLONG
Repair Powerhouse Boilers 2 &
PROJECT 24Z6AN7
4. OFFERS (Continued)
NO.: 3 NO.: 4 NO.: NO.:
A. OFFEROR
Reagent World Inc.
A. OFFEROR
GCB Worldwide
A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount)
20% B. BID SECURITY (Type and amount)
No Bid Bond B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
None
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
1 1 JB 489,628.00 114,911.16
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
| 2024-11-15T11:55:52-0800 | |
| Krista Sua |
File details come from the government source that posted it. Updated .