AMEND 00001 TAF.pdf
PDF 746 KB Posted
- Attached to
- Building Demolition at Taft CI Federal contract opportunity
- Solicitation number
- 15BFA024B00000002
About this file
This is an amendment to a solicitation for building demolition services at the Taft Correctional Institution in Taft, California. The Bureau of Prisons Field Acquisition Office issued the amendment to provide meeting minutes and answers to questions from a site visit, additional photos, record drawings, and revised specifications. The amendment requires demolition of several buildings and installation of a new septic holding tank. It provides updated drawings showing details of the required signage, demolition plans, and septic tank. The specifications were revised to remove unnecessary project management and fire protection requirements and clarify responsibilities for utilities. The construction wage determination was replaced, and no other changes were made.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| AMEND 00003 TAF.pdf | ||
| Additional Questions and Answer Final.pdf | ||
| AMEND 00002 TAF.pdf | ||
| 6 - Bid Bond SF24 (Updated).pdf | ||
| Pre Bid Site Visit Meeting Minutes and sign in sheet.pdf | ||
| DOJ 05 Security of Department Information and Systems (OCT 2023).pdf | ||
| 5 - Construction Wage Rate CA20230020 11 17 23.pdf | ||
| Questions and Answer Final.pdf | ||
| 7 - Criminal History Check Form.pdf | ||
| 2 - Solicitation.pdf | ||
| 6 - Bid Bond SF24.pdf | ||
| 5 - Construction Wage Rate.pdf | ||
| 1 - Instructions to Bidders.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour a nd date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date sp ecified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by Elite Federal Forms, Inc.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
1 2
00001 11/17/2023 15B70023PR001169 23Z7AA9
FAO
Federal Bureau of Prisons US Armed Forces Reserve Complex/FAO 346 Marine forces Drive Grand Prairie, TX 75051
FAO
Federal Bureau of Prisons US Armed Forces Reserve Complex/FAO 346 Marine forces Drive Grand Prairie, TX 75051
15BFA024B00000002
10/16/2023
FAO
See Block 14 Continuation Sheet(s)
Martin Guidry
15BFA024B00000002
BUILDING DEMOLITION
FCI TAFT
The following changes are made to the Solicitation:
A. SITE VIST MEETING MINUTES (SEE ATTACHED).
B. QUESTIONS AND ANSWERS (SEE ATTACHED).
C. PHOTOS (SEE ATTACHED)
D. RECORD DRAWINGS (AS-BUILTS) (SEE ATTACHED)
E. SOLICITATION SF1442 ADD CLAUSE - DOJ 05 SECURITY OF DEPARTMENT INFORMATION AND SYSTEMS (OCT
2023) (SEE ATTACHED)
F. ADDENDUM #1 DRAWINGS (SEE ATTACHED)
• T0.1 – Removed Kern County Fire Department from Authority Having Jurisdiction and added new septic holding tank to Scope of Work.
• C2.8 – Added new septic holding for GL/CP.
• C4.1 – Added detail for septic holding tank.
• D2.1.1 – Revised General Notes and added Keynote to clarify building signage requirements.
• D2.1.2 – Revised General Notes and added Keynote to clarify building signage requirements.
• D2.2.1 – Revised General Notes and added Keynote to clarify building signage requirements.
• D2.3.1 – Revised General Notes and added Keynote to clarify building signage requirements.
• D2.4.1 – Revised General Notes and added Keynote to clarify building signage requirements.
• D2.5.1 – Revised General Notes and added Keynote to clarify building signage requirements.
• D2.6.1 – Removed general notes regarding clearing material from the building.
• D2.7.1 – Revised General Notes and added Keynote to clarify building signage requirements.
• D2.8.1 – Revised General Notes and added Keynote to clarify building signage requirements.
• D3.1. – Revised detail notes to reference Record Drawings
• E2.3 – Revised demolition plan to include transformers.
• E2.5 – Revised demolition plan to include transformers.
• E2.8 – Revised demolition plan to include transformers.
• E3.0 – Revised demolition plan to include transformers.
G. ADDENDUM #1 SPECIFICATION (SEE ATTACHED)
SECTION # SECTION NAME DESCRIPTION OF CHANGE
00 00 00 TABLE OF CONTENTS Revised to include 101423 PANEL SIGNAGE 01 11 00 SUMMARY OF WORK Revised to remove the requirement for Constructware
Project Management Systems:
Item 3.1 – Removed
01 41 00 REGULATORY REQUIREMENTS Revised to remove requirement for Fire Protection Engineer (FPE) and FPE Inspections:
Item 1.3 - Removed 01 50 00 CONSTRUCTION FACILITIES AND Revised to remove the requirement for temporary
TEMPORARY CONTROLS metering, clarify that the FBOP will not provide heating and ventilating, and remove the requirements for FBOP offices:
Item 1.2, A – Replaced language “metered and backcharged to” with “installed by” Item 1.2, A, 2. – Removed
15BFA024B00000002
BUILDING DEMOLITION
FCI TAFT
Item 1.2, B – Added item 1, “Temporary heating and ventilating” Item 2.1, A – Removed language “, arrange provisions with utility company, and pay costs for service and energy consumed will be metered and backcharged to Contractor by FBOP” Item 2.1, A – Removed language “, arrange provisions with utility company, and pay costs for service and energy consumed will be metered and backcharged to Contractor by FBOP” Item 2.3, A – Removed Item 2.11 – Removed
10 14 23 PANEL SIGNAGE Added to specifications.
H. REMOVE EXISTING CONSTRUCTION WAGE RATE AND REPLACE WITH CA20230020 DATED 11/17/2023. (SEE ATTACHED)
NO OTHER CHANGES ARE MADE AT THIS TIME.
File details come from the government source that posted it. Updated .