Questions and Answer VIX.pdf
PDF 62 KB Posted
- Attached to
- REPAIR BOILER REFRACTORY AT FCC VICTORVILLE
- Solicitation number
- 15B61620B00000001
About this file
This document contains a questions and answers file and a federal contract opportunity solicitation. The federal contract opportunity solicitation is for repair of boiler refractory at the Federal Correctional Complex in Victorville, California. The Federal Bureau of Prisons is seeking a firm-fixed-price construction contract to provide all necessary labor, equipment, and materials for repair of boiler refractory. An optional line item is included to furnish and install six ultra-low NOx burner assemblies. The performance period is 295 calendar days from notice to proceed. The NAICS code is 238220 with a small business size standard of $16.5 million. The estimated value is between $1 million to $5 million. The solicitation is distributed through beta.SAM.gov and is a 100% small business set-aside. The closing date is not provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCC VICTORVILLE – REPAIR BOILER REFRACTORY
PROJECT 6D7A QUESTIONS & ANSWERS
SOLICITATION 15B61620B00000001
SUBMITTED BY F.M THOMAS AIR CONDITIONING:
1) Can you confirm whether or not the bricks in the refractory were treated with asbestos? If so, is there a preferred vendor for abatement?
CLARIFICATION: Per Manufacture there was zero asbestos used in the production of refractory. No abatement is required.
2) We had a discussion with the manufacturer today. They are not recommending the mesh burners due to a compatibility issue with the oil. It would take replacing the entire head to complete this. We can use an alternate system to achieve the same PPM result with using the existing burner technology. Can you confirm if you are open to a design modification, so long as we meet the NOx emissions requirements?
CLARIFICATION: Per Scope of Work entire burner assembly needs to be replaced.
This will require separate head for oil.
SUBMITTED BY PORTER BOILER SERVICE, INC:
3) The Base Bid scope of work calls for refractory repair on the boiler side walls, back walls, and floors. Are there pictures available of the existing condition of the refractory for the boiler side walls, back walls, and floors?
What is the extent of the repair for these sections of refractory?
CLARIFICATION: Please see attached photos.
SUBMITTED AT SITE VISIT:
4) Vendor requested a Wide angle picture to be taken of Header Front Pipe of the FCI #2 Boiler.
CLARIFICATION: Please see attached photos
5) Vendor requested a Wide angle picture to be taken of Header Front Pipe of the USP Boiler.
CLARIFICATION: Please see attached photos
| FCC VICTORVILLE – REPAIR BOILER REFRACTORY PROJECT 6D7A QUESTIONS & ANSWERS SOLICITATION 15B61620B00000001 |
| CLARIFICATION: Per Manufacture there was zero asbestos used in the production of refractory. No abatement is required. |