This is a request for quotation (RFQ) soliciting offers to replace boilers at the Federal Correctional Institution in Safford, Arizona. The successful contractor will provide all materials, labor, and equipment to replace two commercial natural gas water heaters, four storage tanks, two expansion tanks, and two recirculating pumps. Offers are due by 2:00PM local time on March 29, 2024. The contract will be a firm fixed-price agreement awarded to the responsible offeror submitting a responsive offer at the lowest price. The work must begin within 10 calendar days of award and be completed within 90 calendar days. Liquidated damages will be assessed at $724.91 per day for delays beyond the completion date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Attachment 006 Wage Rates az25.pdf | ||
| RFQ Attachment 005 Site Visit Questions and Answers.pdf | ||
| RFQ Attachment 004 Site Visit Meeting Minutes.pdf | ||
| 15B60924Q00000001 0002 AMENDED RFQ Ocotillo Boilers.pdf | ||
| Site Visit Information.pdf | ||
| Questions Boilers.pdf | ||
| 15B60924Q00000001 RFQ Ocotillo Boilers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15B60924Q00000001 Page 1 of 34
SOLICITATION,OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
15B60924Q00000001
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
2. TYPE OF SOLICITATION 3. DATE ISSUED
02/12/2024
PAGE OF PAGES
1 34
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
24Z6AP7
CODE 15B609
Federal Bureau of Prisons FCI Safford
1529 W. US HWY 366
Safford, AZ 85546
7. ISSUED BY
Federal Bureau of Prisons FCI Safford
1529 W. US HWY 366
Safford, AZ 85546
Nicasio Garcia
(O) 928-348-1368 ngarcia@bop.gov
8. ADDRESS OFFER TO
9. FOR
INFORMATION CALL:
a. NAME
Nicasio Garcia ngarcia@bop.gov
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
928-348-1368
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
The contractor receiving award shall provide all materials, labor, and equipment to Replace boilers at FCI Safford in accordance with the requirements of solicitation 15B60924Q00000001. *INCLUDE THE FOLLOWING INFORMATION* Unique Entity Identifier (formerly DUNS#): ________________ TIN NUMBER: ________________ CAGE CODE: ________________ EMAIL: ________________
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving10 90 award, X notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
X YES NO
12b. CALENDAR DAYS
Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
02:00US/
Arizona a.
03/29/2024
b. An offer guarantee is, X is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.
60d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
15B60924Q00000001 Page 2 of 34
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified) 27
ITEM
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE
UNITED STATES CODE AT
26. ADMINISTERED BY 15B609
Federal Bureau of Prisons FCI Safford
1529 W. US HWY 366
Safford, AZ 85546
Nicasio Garcia
(O) 928-348-1368 ngarcia@bop.gov
Federal Bureau of Prisons FCI Safford
1529 W. US HWY 366
Safford, AZ 85546
Stephanie Trammell
(O) 928-428-6600 x1288 strammell@bop.gov
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
Nicasio Garcia
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY 02/12/2024
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
15B60924Q00000001 Page 3 of 34
Table of Contents
Section Description Page Number
1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements
FAO-0002 Magnitude FAO-0006 Contractor Use of Premises FAO-0007 Payment Services FAO-0008 Request for Final Inspection FAO-0012 Progress Meetings FAO-0014 Contract Closeout Procedures (for construction contracts $150,000 or less) 2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (NOV 2020)
4 Contract Clauses DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.204-27 Prohibition on a ByteDance Covered Application (Jun 2023) 52.222-3 Convict Labor (June 2003) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sept 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
15B60924Q00000001 Page 4 of 34
52.236-5 Material and Workmanship (Apr 1984) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.242-14 Suspension of Work (Apr 1984) 52.243-5 Changes and Changed Conditions (Apr 1984) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.252-4 Alterations in Contract (Apr 1984) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 52.253-1 Computer Generated Forms (Jan 1991) DOJ-02 Contractor Privacy Requirements (JAN 2022) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-12 Liquidated Damages-Construction (Sept 2000) 2852.201-70 Contracting Officer's Representative (COR) (NOV 2020) 52.225-9 Buy American-Construction Materials (Oct 2022) DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021) DOJ-08 Continuing Contract Performance During a Pandemic Influenza or other National Emergency (OCT 2007) FAO-0015 Changes FAO-0016 Equitable Adjustments: Waiver and Release of Claims 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021)
5 Attachments 6 Solicitation Provisions
52.252-5 Authorized Deviations in Provisions (Nov 2020) 52.204-7 System for Award Management (Oct 2018) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.252-3 Alterations in Solicitation (Apr 1984) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.201-1 Acquisition 360: Voluntary Survey (Sep 2023) 52.236-27 Site Visit (Construction) (Feb 1995)
7 Representations and Certifications 52.204-8 Annual Representations and Certifications (Mar 2023) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)
15B60924Q00000001 Page 5 of 34
Section 2 - Commodity or Services Schedule
Firm Fixed Price
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Make Necessary Repairs at FCI Safford in accordance with solicitation 15B60924Q00000001.
PSC: Z1NE
1 JB $________ $_________________
The successful contractor shall be responsible for all applicable federal, state, and local taxes. THE TOTAL PRICE SHALL BE
WRITTEN IN BLOCK 17 OF THE STANDARD FORM 1442.
15B60924Q00000001 Page 6 of 34
Section 3 - Special Contract Requirements
Clauses By Full Text
FAO-0002 Magnitude
The magnitude of this project is between $100,000.00 and $250,000.00.
FAO-0006 Contractor Use of Premises
Work Hours The project schedule is based on a normal forty (40) hour work week, eight (8) hours per day, Monday through Friday, excluding Federal holidays. The Contracting Officer’s Representative (COR) shall establish the work hour time frames for the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advance approval of the Contracting Officer.
NOTE: Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight hour day. The Government assumes no responsibility to the Contractor, nor to any of his subcontractors, for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. The procedures and institutional entrance/ exit routines applicable to this project will be explained at both the pre-bid conference/site visit and the pre-construction meeting.
Contraband The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791.
Explosives The use of explosives is absolutely forbidden without written authorization from the Contracting Officer.
Parking and Temporary Office Parking will be available at the site to the extent it does not interfere with construction activities. Otherwise, parking shall be provided for by the Contractor, at his expense, off the site for workmen employed on the project. Any temporary field office used by the Contractor shall be located in an area approved by the COR.
Safety and Accident Prevention In performing work under this contract the contractor shall:
(a) Conform to the specific safety requirements established by this contract;
(b) Comply with the safety rules of the Government institution that concern related activities not directly addressed in this contract;
(c) Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(d) Take such additional immediate precautions as the Contracting Officer and/or COR may reasonably require for safety and accident prevention purposes.
FAO-0007 Payment Services
15B60924Q00000001 Page 7 of 34
(a) Original application for payment shall be prepared on AIA (American Institute of Architects) Form G-702 "Application and Certificate for Payment" and submitted to the Contracting Officer. The contractor may use another form;
however, it shall contain similar information as the AIA Form G-702. The Contracting Officer’s Representative (COR) will approve the amount of payment by signing. The approved application for payment shall be forwarded as follows: Original to Accounting; Copy for Contract Award File.
(b) All small business contractors are required to self-certify on all invoices their small business status.
(c) The following information is required with each application for payment:
• Name and address of contractor
• Contract number
• Contractor invoice/application for payment number
• Description, price, and quantity of construction completed/rendered
• Payment terms (reference the contract payment clause)
• Other substantiating documentation or information required by the contract
• Name, title, and phone number of official to be notified in the event of a defective invoice
• Contractor TIN (Tax ID Number)
FAO-0008 Request for Final Inspection
The Contractor shall give the Contracting Officer’s Representative (COR) a minimum of ten (10) working days advanced written notice of the date on which the work will be fully completed and ready for the Government’s final inspection.
FAO-0012 Progress Meetings
The Administrative Contracting Officer (ACO) shall conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the ACO.
(a) At a minimum, the attendees shall include but is not limited to:
(1) FBOP: Administrative Contracting Officer, Contracting Officer’s Representative (COR), Facility Administrator/Manager, Architect/Engineer (if applicable), Other Personnel (Executive Staff, Captain, Safety Manager, etc.).
(2) Contractor: Project Manager, Superintendent, and technical support disciplines as appropriate (Subcontractors, Manufacturers, Suppliers, etc.).
(b) The meeting should include, but is not limited to issues such as:
Administrative Contracting Officer:
(1) Old business from previous progress meeting(s);
(2) Status of modifications, certified payrolls, submittals, requests for information (RFI);
(3) Review of payments made to date and review/approve current payment request;
(4) Status of modification proposal requests;
(5) Discuss new business.
COR:
(1) Status of escort coverage;
(2) Review gate or sallyport entrance/exit issues;
(3) Discuss other delays contractor may be experiencing;
15B60924Q00000001 Page 8 of 34
(4) Discuss performance/quality issues.
Contractor:
(1) Review/discuss updated progress schedule;
(2) Provide 30 day outlook;
(3) Discuss other issues affecting performance.
FAO-0014 Contract Closeout Procedures (for construction contracts $150,000 or less)
Contract Closeout must be completed upon receipt of property and final payment.
Prior to payment of final invoice:
The Contractor shall submit the following documentation:
(1) Guarantees and warranties;
(2) All operation/maintenance manuals;
(3) Consent of Surety to Final Payment (AIA Document G707), if the contractor furnished a bond;
(4) Release of Claims (GSA Form 1142);
(5) Evidence of no pending labor disputes;
(6) As-built drawings/shop drawings, (if applicable);
(7) Contractor’s final invoice.
AIA forms can be obtained from The American Institute of Architects at www.aiabookstore.com.
GSA forms can be obtained from the General Services Administration at www.gsa.gov (click on the “Forms Library” link).
2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (NOV 2020)
(a) “Unsafe condition” as used in this clause means the actual or potential exposure of Contractor or Government employees to a hazardous material.
(b) “Hazardous Material” as used in this clause includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract), any other potentially hazardous material requiring safety controls, or any other material or working condition designated as hazardous by the Contracting Officer's Representative (COR).
(c) The Occupational Safety and Health Administration (OSHA) is responsible for issuing and administering regulations that require Contractors to apprise its employees of all hazards to which they may be exposed in the course of their employment; proper conditions and precautions for safe use and exposure; and related symptoms and emergency treatment in the event of exposure.
(d) Prior to commencement of work, Contractors are required to inspect for and report to the Contracting Officer the presence of, or suspected presence of, any unsafe condition including asbestos or other hazardous materials or working conditions in areas in which they will be working.
(e) If during the performance of the work under this contract, the Contractor or any of its employees, or subcontractor employees, discovers the existence of an unsafe condition, the Contractor shall immediately notify the Contracting Officer, or designee (with written notice provided not later than three (3) working days thereafter), of the existence of an unsafe condition. Such notice shall include the Contractor's recommendations for the protection and the safety of Government, Contractor and subcontractor personnel and property that may be exposed to the unsafe condition.
15B60924Q00000001 Page 9 of 34
(f) When the Government receives notice of an unsafe condition from the Contractor, the parties will agree on a course of action to mitigate the effects of that condition and, if necessary, the contract will be amended. Failure to agree on a course of action will constitute a dispute under the Disputes clause of this contract.
(g) Nothing contained in this clause shall relieve the Contractor or subcontractors from complying with applicable Federal, State, and local laws, codes, ordinances and regulations (including the obtaining of licenses and permits) in connection with hazardous material including but not limited to the use, disturbance, or disposal of such material.
(End of Clause)
15B60924Q00000001 Page 10 of 34
Section 4 - Contract Clauses
Clauses By Reference
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov
Clause Title Fill-ins (if applicable)
DOJ-05 Security of Department Information and Systems
DOJ-05 (OCT 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements (Jan 2017)
52.204-13 System for Award Management Maintenance (Oct 2018)
52.204-19 Incorporation by Reference of Representations and
Certifications (Dec 2014)
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and
Other Covered Entities (Nov 2021)
52.204-25 Prohibition on Contracting for Certain
Telecommunications and Video Surveillance Services or
Equipment (Nov 2021)
52.204-27 Prohibition on a ByteDance Covered Application (Jun
2023)
52.222-3 Convict Labor (June 2003)
52.222-6 Construction Wage Rate Requirements (Aug 2018)
52.222-7 Withholding of Funds (May 2014)
52.222-8 Payrolls and Basic Records (Jul 2021)
52.222-9 Apprentices and Trainees (July 2005)
52.222-10 Compliance with Copeland Act Requirements (Feb
1988)
15B60924Q00000001 Page 11 of 34
Clause Title Fill-ins (if applicable)
52.222-11 Subcontracts (Labor Standards) (May 2014)
52.222-12 Contract Termination - Debarment (May 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014)
52.222-14 Disputes Concerning Labor Standards (Feb 1988)
52.222-15 Certification of Eligibility (May 2014)
52.222-21 Prohibition of Segregated Facilities (Apr 2015)
52.222-26 Equal Opportunity (Sept 2016)
52.222-27 Affirmative Action Compliance Requirements for
Construction (Apr 2015)
52.222-36 Equal Opportunity for Workers with Disabilities (Jun
2020)
52.222-50 Combating Trafficking in Persons (Nov 2021)
52.222-55 Minimum Wages for Contractor Workers Under
Executive Order 14026 (Jan 2022)
52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan
2022)
52.223-2 Affirmative Procurement of Biobased Products Under
Service and Construction Contracts (Sep 2013)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging
While Driving (Jun 2020)
52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021)
52.232-5 Payments under Fixed-Price Construction Contracts
(May 2014)
52.232-27 Prompt Payment for Construction Contracts (Jan 2017)
52.232-33 Payment by Electronic Funds Transfer-System for
Award Management (Oct 2018)
52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors (Mar 2023)
15B60924Q00000001 Page 12 of 34
Clause Title Fill-ins (if applicable)
52.233-1 Disputes (May 2014)
52.233-3 Protest after Award (Aug 1996)
52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
52.236-5 Material and Workmanship (Apr 1984)
52.236-8 Other Contracts (Apr 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
52.236-10 Operations and Storage Areas (Apr 1984)
52.236-11 Use and Possession Prior to Completion (Apr 1984)
52.236-12 Cleaning Up (Apr 1984)
52.236-13 Accident Prevention (Nov 1991)
52.242-14 Suspension of Work (Apr 1984)
52.243-5 Changes and Changed Conditions (Apr 1984)
52.249-1 Termination for Convenience of the Government (Fixed-
Price) (Short Form) (Apr 1984)
52.252-4 Alterations in Contract (Apr 1984)
52.252-6 Authorized Deviations in Clauses (Nov 2020)
52.253-1 Computer Generated Forms (Jan 1991)
DOJ-02 Contractor Privacy Requirements (JAN 2022)
52.222-23 Notice of Requirement for Affirmative Action to Ensure
Equal Employment Opportunity for Construction (Feb
1999)
Minority Goals: "3.1"
Female Goals: "6.9"
3: "Safford, Arizona, Graham
County"
Clauses By Full Text
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 [Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45.* The time stated for completion shall include final cleanup of the premises.
15B60924Q00000001 Page 13 of 34
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
52.211-12 Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $724.91 [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
2852.201-70 Contracting Officer's Representative (COR) (NOV 2020)
(a) Mr./Ms. TUCKER LUCAS, GENERAL FOREMAN of FACILITIES DEPARTMENT , FCI SAFFORD , 928-348-1353 , is hereby designated to act as Contracting Officer's Representative (COR) under[Contract Number] , for the period of CONTRACT DURATION (specify the performance period of the contract that the designation covers).
(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or another representative designated in writing by the Contracting Officer. The term “technical direction” includes, without limitation, the following:
(i) Receiving all deliverables;
(ii) Inspecting and accepting the supplies or services provided in accordance with the terms and conditions of this contract;
(iii) Clarifying, directing, or redirecting the contract effort, including shifting work between work areas and locations, filling in details, or otherwise serving to accomplish the contractual statement of work to ensure the work is accomplished satisfactorily;
(iv) Evaluating performance of the Contractor; and
(v) Certifying all invoices/vouchers for acceptance of the supplies or services furnished for payment.
(c) The COR does not have the authority to issue direction that:
(i) Constitutes a change of assignment or work outside the contract specification/work statement/scope of work.
(ii) Constitutes a change as defined in the clause entitled “Changes” or other similar contract term.
(iii) Causes, in any manner, an increase or decrease in the contract price or the time required for contract performance;
(iv) Causes, in any manner, any change in a term, condition, or specification or the work statement/scope of work of the contract;
(v) Causes, in any manner, any change or commitment that affects price, quality, quantity, delivery, or other term or condition of the contract or that, in any way, directs the contractor or its subcontractors to operate in conflict with the contract terms and conditions;
(vi) Interferes with the contractor's right to perform under the terms and conditions of the contract;
(vii) Directs, supervises, or otherwise controls the actions of the Contractor's employees or a Subcontractor's employees.
(d) The Contractor shall proceed promptly with performance resulting from the technical direction of the COR. If, in the opinion of the Contractor, any direction by the COR or the designated representative falls outside the authority of (b) above and/or within the limitations of (c) above, the Contractor shall immediately notify the Contracting Officer.
(e) Failure of the Contractor and Contracting Officer to agree that technical direction is within the scope of the contract is a dispute that shall be subject to the “Disputes” clause and/or other similar contract term.
(f) COR authority is not re-delegable.
(End of Clause)
52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.bop.gov/policy/progstat/4100_005.pdf
15B60924Q00000001 Page 14 of 34
[Insert one or more Internet addresses]
(End of clause)
52.225-9 Buy American-Construction Materials (Oct 2022)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item--
(1) Means any item of supply (including construction material) that is--
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101;
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means--
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both--
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if--
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind
15B60924Q00000001 Page 15 of 34 for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is
15B60924Q00000001 Page 16 of 34 no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before
15B60924Q00000001 Page 17 of 34 contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction material description
Unit of measure Quantity Cost (dollars)*
Item 1:
Foreign construction material.
Domestic construction material.
Item 2:
Foreign construction material.
Domestic construction material.
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
(End of clause)
DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021)
Work performed under this contract will involve any one or more of the following: access to DOJ Information, which may include Controlled Unclassified Information (CUI), i.e., unclassified, sensitive DOJ information, and/or access to DOJ Information Technology (IT) systems, and/or unescorted access to DOJ space or facilities. Contractor employees will occupy Public Trust Positions, unless clause alternates are applied.
1. General Requirements
(a) (1) All references to “contract(or) personnel” and “contract(or) employee” in this clause means all individuals, without limitation, to include individuals employed by the contractor, team member, subcontractor, consultant, and/or independent contractor, who will have access to information of the Department of Justice (DOJ) or information that is within the custody and control of the DOJ, access to DOJ IT systems, and/or unescorted access to DOJ facilities/space in connection with the performance of this contract. “Employment” as used herein does not create nor imply an employer/employee relationship between the DOJ and contractor employees.
(b) (1) The type of security investigation required for each contractor employee will be governed by the type and risk level of information made available to the contractor employee. The contractor will not be permitted to commence performance under this contract until a sufficient number of its personnel, as determined by the Security Programs Manager (SPM), in consultation with the Contracting Officer’s Representative if one is appointed, have received the requisite security
15B60924Q00000001 Page 18 of 34
(c) Except where specifically noted otherwise, the federal government will be responsible for the cost and conduct of the investigation.
(d) The contractor shall ensure that no contractor employee commences performance prior to receipt of a written authorization from the contracting officer, COR, or the SPM that performance by the respective contractor employee is authorized.
(e) The data and other information to which the contractor may have access as a result of this contract is the property of, and/or within the custody and control of, the Department, and its disclosure to third parties is governed by various statutes and regulations, the violation of which may subject the discloser to criminal
2. Citizenship and Residency Requirements
(a) Residency Requirement. (1) Contractor employees in Public Trust positions, both U.S. citizens and non-U.S.
citizens, must meet the Department’s residency requirement if they will require access to DOJ information, IT systems, or unescorted access to facilities. For three years (not necessarily consecutive years) out of the last five years immediately prior to employment under the Department contract the contractor employee must have: (i) resided in the U.S.; (ii) worked for the U.S. in a foreign country as either an employee or contractor in a federal civilian or military capacity; or, (iii) been a dependent of a federal civilian or military employee or contractor working for the U.S. in a foreign country. At the Department’s sole discretion, the residency requirement may be waived by the Department Security Officer (DSO) for contractor employees on a case-by-case basis where justified by extenuating circumstances. The residency requirement does not apply to contractor employees residing in foreign countries that are hired to work in American embassies/ consulates/missions located outside of the United States and who require access to DOJ information, IT systems, or unescorted access provided that an adequate background investigation can be conducted, with favorable adjudication, as determined by the DSO.
(b) Citizenship. (1) Aside from the specific exceptions set forth in Section 1.2(b)(2), for Public Trust positions, the DOJ requires that contractor employees be U.S. citizens and nationals, or lawful permanent residents seeking U.S. citizenship.
Any prospective non-U.S. citizen contractor employee who requires access to DOJ information systems, DOJ information, and/or unescorted facilities access must also have been granted a waiver as described below in paragraphs 1.2(d) and/or (e). The contractor is responsible for verifying that the non-U.S. citizens working under this contract are lawful permanent residents seeking U.S.
(2) Exception for Certain Non-U.S. Citizen Contractor Employees: (i) Non-U.S. citizen expert witnesses, litigative consultants, and interpreters in rare foreign languages are not required to be lawful permanent residents seeking U.S. citizenship. However, they must be granted a waiver for access to unclassified DOJ information, whether CUI or not, DOJ IT systems, and/or unescorted facility access, as described below in paragraph 1.2(d) and (e), regardless of the duration of their duties. (ii) Non-U.S. Citizen contractor employees residing in foreign countries who are hired to work for the Department of Justice in American embassies/consulates/missions outside of the United States are not required to be lawful permanent residents seeking U.S. citizenship.
(c) Dual Citizenship. (1) S. citizens who hold dual citizenship with a foreign country are considered U.S. citizens within the meaning of this clause, and may be considered for, but are not entitled to, contract employment as U.S. citizens consistent with this clause. The means by which the contractor employee obtained or exercises his or her dual citizenship status will be a consideration in the Public Trust Investigation (PTI) adjudication, and/or waiver approval processes discussed in this clause.
(d) Access to DOJ Information Technology Systems. Non-U.S citizens are not authorized to access DOJ information technology (IT) systems or assist in the development, operation, management, or maintenance of DOJ IT systems, including providing IT system support, unless a waiver has been granted by the Head of the DOJ component or designee, with the prior concurrence of both the DSO and the DOJ Chief Information Officer, allowing computer access by the non-U.S. citizen. Such a waiver will be granted only in exceptional and unique circumstances on a case-by-case basis. It should be noted that the Justice Consolidated Office Network (JCON) is a sensitive DOJ IT system and any contractor employee who will need access to JCON must be a U.S. citizen or have received a In order for a waiver to be considered for approval: (1) There must be a compelling reason for using this individual as opposed to a U.S. citizen; (2) The type of personnel security vetting that has been conducted on the individual, and vetting results, that would mitigate risk; and (3) The waiver must be in the best interest of the federal government.
15B60924Q00000001 Page 19 of 34
(e) Access to Unclassified DOJ Information and Unescorted Access to DOJ Facilities or Space. (1) Except as provided under 1.2(b)(2), non-U.S. citizens are not authorized to access DOJ information and/or unescorted access to DOJ facilities or space, unless a waiver has been granted by the DSO, allowing access by the non-U.S. citizen. Such a waiver will be granted on a case-by-case basis where justified at the discretion of the DSO.
3. Background Investigation Requirements
(a) (1) Unless otherwise stated below, all contractor personnel are subject to a Public Trust Investigation (PTI). The SPM will determine the type of investigation for each contractor employee based on the risk category (i.e., the nature of the position and degree of harm that could be caused by the individual in that position) and whether the position is long-term or short-term. The PTI risk categories are listed
(i) High Risk Positions. The minimum background investigation required is a Tier 4 (T4) investigation, and the five-year reinvestigation required is a Tier 4R (T4R) investigation. The 2017 version of the Standard Form (SF) 85P, Questionnaire for Public Trust Positions, is required.
(ii) Moderate Risk Positions. The minimum background investigation required is a Tier 2 (T2) investigation. The five-year reinvestigation required is a Tier 2R (T2R) investigation. The 2017 version of the SF-85P is
(iii) Low Risk/Non-Sensitive Positions. The minimum background investigation required for Low Risk/Non- Sensitive positions is a Tier 1 (T1) investigation and the required five-year reinvestigation is also a Tier 1 (T1) investigation. The SF 85, Questionnaire for Non-Sensitive Positions, is
(b) Exception for Expert Witnesses. Expert Witnesses, litigative…