Questions.docx
DOCX document 13 KB Posted
- Attached to
- FEDERAL PRISON CAMP ASBESTOS REMOVAL HVAC OFFICE; VACANT FARM BUILDING; BARN STORAGE AREA
- Solicitation number
- 15B41824Q00000016
About this file
The document provided contains a question and the government's response regarding an asbestos removal project at a federal prison complex in Terre Haute, Indiana. The related federal contract opportunity synopsis indicates that the Bureau of Prisons (BOP) plans to issue a solicitation for a firm-fixed-price construction contract to remove approximately 831 linear feet of asbestos-containing pipe insulation, 20 square feet of asbestos-containing duct wrap insulation, and 81 pipe fittings at the Federal Correctional Complex. The project has an estimated value between $25,000 and $100,000 and a performance period of 91 calendar days. This is a 100% small business set-aside with the NAICS code 562910 and a corresponding $20.5 million small business size standard. The solicitation is expected to be posted on or about May 1, 2024 and will be distributed solely through the SAM.gov website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_0369.JPG | JPG image | |
| IMG_0392.JPG | JPG image | |
| IMG_0397.JPG | JPG image | |
| site meeting minutes.pdf | ||
| INSTRUCTIONS TO OFFERERS TEMPLATE.doc | DOC document | |
| IMG_0387.JPG | JPG image | |
| IMG_0370.JPG | JPG image | |
| WAGE DETERMINATION.pdf | ||
| IMG_0388.JPG | JPG image | |
| SITE VISIT PRE BID .docx | DOCX document | |
| IMG_0395.JPG | JPG image | |
| Asbestos report - Federal Bureau of Prison.pdf | ||
| Contractor Whistleblower Rights - EACI.pdf | ||
| IMG_0371.JPG | JPG image | |
| IMG_0375.JPG | JPG image | |
| IMG_0384.JPG | JPG image | |
| IMG_0394.JPG | JPG image | |
| IMG_0372.JPG | JPG image | |
| IMG_0393.JPG | JPG image | |
| IMG_0399.JPG | JPG image | |
| IMG_0391.JPG | JPG image | |
| RFQ.pdf | ||
| IMG_0398.JPG | JPG image | |
| IMG_0386.JPG | JPG image | |
| SOW UPDATED.pdf | ||
| IMG_0396.JPG | JPG image | |
| IMG_0373.JPG | JPG image | |
| IMG_0390.JPG | JPG image | |
| IMG_0374.JPG | JPG image | |
| IMG_0385.JPG | JPG image | |
| IMG_0389.JPG | JPG image |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions/clarifications
Question #1.
Goodmorning Scott, Can you please specify the quantity of asbestos that is needed to be removed. We have the survey and attended the walk through but still don't have a direct clarification. It was mentioned at the walk through that the government didn't want all the asbestos out of the building.
Are the updated images specifying the exact areas that the asbestos are needed to removed ?
My contractor is also attached to this email.
GOVERNMENT RESPONSE: ALL LINEAR FOOTAGE TO BE REMOVED IS LISTED IN SCOPE OF WORK IN SECTION 1.3.3
ALL IMAGES PICS HAVE BEEN UPLOADED FROM THE SITE VISIT WALK-THRU
THE GOVERNMENT WANTS/NEEDS ALL ASBESTOS REMOVED ACCORDING TO OUR LINEAR FOOTAGE PROVIDED IN SECTION 1.3.3
File details come from the government source that posted it. Updated .