2 - Solicitation - SF-1442.pdf
PDF 588 KB Posted
- Solicitation number
- 15B31024Q00000006
About this file
This document is a solicitation (Request for Proposals) for a firm-fixed-price construction contract to perform the Chaille Roof Repair project at the Federal Detention Center (FDC) in Miami, Florida. The work includes roof overlay, re-roofing of existing overhangs, replacement of sheathing, and painting. The estimated magnitude of the project is between $100,000 and $250,000. The performance period is 168 calendar days from the notice to proceed. This is a 100% Total Small Business Set-Aside, with a NAICS code of 238160 and a corresponding size standard of $19,000,000. Offers are due by 12:00 PM US Eastern on June 14, 2024 via email to the Contracting Officer. An organized site visit is scheduled for May 30, 2024. The contract will be awarded based on the Lowest Price Technically Acceptable approach, evaluating price and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2 - Abstract of Offers.pdf | ||
| 5 - SECTION 3 (MIDDLE AREA) (Photo).JPG | JPG image | |
| 5 - Overhang Soffit 2 (Photo).JPG | JPG image | |
| 5 - SECTION - 1.2 (Photo).JPG | JPG image | |
| 4 - Roof Drawing.pdf | ||
| 5 - Overhang 2 (Photo).JPG | JPG image | |
| 5 - Overhang 1 (Photo).JPG | JPG image | |
| 5 - Overhang Soffit 4 (Photo).JPG | JPG image | |
| 5 - SECTION 4 (Photo).JPG | JPG image | |
| 5 - Overhang Soffit 3 (Photo).JPG | JPG image | |
| 5 - Overhang Soffit 1 (Photo).JPG | JPG image | |
| 5 - SECTION 2(MIDDLE AREA) (Photo).JPG | JPG image | |
| 3 - Statement of Work (SOW) - Chaille Roof.pdf | ||
| 5 - SECTION - 1.1 (Photo).JPG | JPG image | |
| 6 - Bid Bond.pdf | ||
| 1 - Instructions to Offerors.pdf | ||
| 7 - Criminal History Check.pdf | ||
| 8 - Construction Wage Rate - WD FL20240215.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15B31024Q00000006 Page 1 of 42
SOLICITATION,OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
15B31024Q00000006
X SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
2. TYPE OF SOLICITATION 3. DATE ISSUED
05/16/2024
PAGE OF PAGES
1 42
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER
15B31024PR000204
6. PROJECT NUMBER
3D6J
CODE 15B310
Federal Bureau of Prisons FDC Miami 33 NE 4th St Miami, FL 33132
7. ISSUED BY
Elton Clarke
8. ADDRESS OFFER TO
9. FOR
INFORMATION CALL:
a. NAME
Elton Clarke eclarke@bop.gov
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
(305) 982-1238
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
The selected contractor shall provide all materials, labor, and equipment to complete the project Chaille Roof Repair at the Federal Detention Center located in Miami, FL. in accordance with the attached Specifications and Drawings. PLEASE COMPLETE THE FOLLOWING ITEMS:
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving10 168 award, X notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
X YES NO
12b. CALENDAR DAYS
Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
12:00US/
Eastern a.
06/14/2024
b. An offer guarantee is, is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.
60d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) eclarke@bop.gov
UNIQUE ENTITY IDENTIFIER (FORMALLY DUNS):________________________________
TAX IDENTIFICATION NUMBER:_______________________________________________
CAGE CODE:_______________________________________________________________
CONTRACTOR E-MAIL:_______________________________________________________
(See FAO-0001 Bonds, on page 5 for bid bond applicability) bop31577 Highlight bop31577 Highlight bop31577 Highlight bop31577 Highlight
15B31024Q00000006 Page 2 of 42
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE
UNITED STATES CODE AT
26. ADMINISTERED BY
Federal Bureau of Prisons FDC Miami 33 NE 4th St Miami, FL 33132
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
Elton Clarke
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
TOTAL FIRM-FIXED PRICE OFFER AMOUNT: $_______________________________
bop31577 Highlight
15B31024Q00000006 Page 3 of 42
Table of Contents
Section Description Page Number
1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements 4 Contract Clauses 5 Attachments 6 Solicitation Provisions 7 Representations and Certifications
15B31024Q00000006 Page 4 of 42
Section 2 - Commodity or Services Schedule
Firm Fixed Price
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Chaille Roof Repair - Project 3D6J
The selected contractor shall provide all materials, labor, and equipment to complete the project "Chaille Roof Repair" at FDC Miami, FL. in accordance with the attached Specifications and Drawings.
PSC: Z2FF
1 JB $________ $_________________
The successful contractor shall be responsible for all applicable federal, state, and local taxes. THE TOTAL PRICE SHALL BE WRITTEN in BLOCK 17 OF THE STANDARD FORM 1442.
One award will be made. Quotes will be evaluated using the Lowest Price Tecnically Acceptable (LPTA) approach. This award will be made by evaluating price in combination with past performance as the evaluation factors. When combined, Price is more important than Past Performance.
Evaluation Factors for Award
15B31024Q00000006 Page 5 of 42
Section 3 - Special Contract Requirements
Clauses By Full Text
FAO-0001 Bonds
(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)
(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows;
a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)
(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(c) For construction contracts greater than $35,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):
(1) A Payment Bond;
(2) An irrevocable letter of credit (ILC);
(3) A tripartite escrow agreement;
(4) A Certificate of Deposit; or
(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(d) Individual Sureties.
(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.
(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.
FAO-0002 Magnitude
The magnitude of this project is between $100,000.00 and $250,000.00.
15B31024Q00000006 Page 6 of 42
FAO-0004 Pre-Construction Conference
(a) Prior to the start of construction, Contracting Officers shall call a conference with the contractor, subcontractor(s), Warden, Controller/Business Administrator, Safety Manager, Facilities Administrator, Project Representative, A&E firm, Captain and other interested personnel to discuss the statutory labor standards, prevailing wage requirements, submission of the contractor's payrolls, subcontractor's responsibilities, institution work schedules, local policies, contraband, parking, storage of vehicles and equipment, etc.
Minutes of the conference shall be recorded, listing the names and titles of all attendees, and the subject matter of all items covered. The minutes shall be signed by the contractor and the Contracting Officer, and a signed copy placed in the contract file.
(b) The Contractor shall familiarize himself/herself with all procedures involved in normal institution routines. Any requirements which may constitute a problem or result in conflict, will be brought to the attention of the Contracting Officer or his representative for determination.
FAO-0005 Submittals
Within 10 calendar days after commencement of work or as otherwise established by the Contracting Officer, all materials and articles requiring approval, as contemplated by the Materials and Workmanship clause, shall be submitted by the contractor.
The submittal process is in place to allow the Government the opportunity to determine whether materials or procedures used by the contractor are in accordance with contract requirements. It is ultimately the Contractor's responsibility via the quality control process to ensure submittal items installed under the contract and work performed on site are in accordance with industry standards and general practices.
(a) The types of submittal requirements specified in this contract may include, but is not limited to; shop drawings, product data, samples, certificates of conformance or compliance, certified test or inspection reports, equipment, materials, and miscellaneous work related submittals for construction. Individual submittal requirements are generally specified in applicable sections for each unit of work in the specifications and/or as a whole in one section in the statement of work.
(b) The Bureau of Prisons (BOP) Contracting Officer’s Representative (COR) shall act for the Contracting Officer in the review and acceptance of all submittals. The Contractor shall submit submittals as required by the contract/ specifications to the COR for transmittal to the Contracting Officer. Fabrication of any work or purchase or use of any submittals (such as materials for which samples are required or equipment, etc.) shall not take place until written acceptance is given by the COR, except at the Contractor's own risk.
(c) The Contractor shall submit all shop drawings and submittals sufficiently in advance (unless otherwise specified in the specifications) of the construction requirements to allow ample time for checking, re-submitting, and re-checking.
(d) Failure of any materials to pass their specified tests shall be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which has previously proven unsatisfactory in service.
(e) The Contracting Officer’s or designee’s approval or acceptance of submittals is not to be construed as a complete check. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor is responsible for the satisfactory construction of all work. The Contractor is responsible for delivering a final product/system that is operational as intended by the contract requirements, regardless of any Government approvals or acceptance of submittals. The Government assumes no liability during the submittal approval/acceptance process. It is the sole responsibility of the Contractor to deliver a properly functioning product or system.
FAO-0006 Contractor Use of Premises
Work Hours The project schedule is based on a normal forty (40) hour work week, eight (8) hours per day, Monday through Friday, excluding Federal holidays. The Contracting Officer’s Representative (COR) shall establish the work hour time frames for
15B31024Q00000006 Page 7 of 42 the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advance approval of the Contracting Officer.
NOTE: Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight hour day. The Government assumes no responsibility to the Contractor, nor to any of his subcontractors, for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. The procedures and institutional entrance/ exit routines applicable to this project will be explained at both the pre-bid conference/site visit and the pre-construction meeting.
Contraband The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791.
Explosives The use of explosives is absolutely forbidden without written authorization from the Contracting Officer.
Parking and Temporary Office Parking will be available at the site to the extent it does not interfere with construction activities. Otherwise, parking shall be provided for by the Contractor, at his expense, off the site for workmen employed on the project. Any temporary field office used by the Contractor shall be located in an area approved by the COR.
Safety and Accident Prevention In performing work under this contract the contractor shall:
(a) Conform to the specific safety requirements established by this contract;
(b) Comply with the safety rules of the Government institution that concern related activities not directly addressed in this contract;
(c) Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(d) Take such additional immediate precautions as the Contracting Officer and/or COR may reasonably require for safety and accident prevention purposes.
FAO-0007 Payment Services
(a) Original application for payment shall be prepared on AIA (American Institute of Architects) Form G-702 "Application and Certificate for Payment" and submitted to the Contracting Officer. The contractor may use another form;
however, it shall contain similar information as the AIA Form G-702. The Contracting Officer’s Representative (COR) will approve the amount of payment by signing. The approved application for payment shall be forwarded as follows: Original to Accounting; Copy for Contract Award File.
(b) All small business contractors are required to self-certify on all invoices their small business status.
(c) The following information is required with each application for payment:
• Name and address of contractor
• Contract number
• Contractor invoice/application for payment number
• Description, price, and quantity of construction completed/rendered
• Payment terms (reference the contract payment clause)
• Other substantiating documentation or information required by the contract
• Name, title, and phone number of official to be notified in the event of a defective invoice
• Contractor TIN (Tax ID Number)
15B31024Q00000006 Page 8 of 42
FAO-0008 Request for Final Inspection
The Contractor shall give the Contracting Officer’s Representative (COR) a minimum of ten (10) working days advanced written notice of the date on which the work will be fully completed and ready for the Government’s final inspection.
FAO-0010 Assignment of Contract Administration Office and Functions
Pursuant to FAR 42.201 and 42.202, the assigned Contract Administration Office is listed in Block 26 of the Standard Form 1442 Back. This assignment carries with it the authority to perform all of the contract administration functions listed in FAR 42.302(a) and 42.302(b) to the extent that those functions apply to the contract.
FAO-0012 Progress Meetings
The Administrative Contracting Officer (ACO) shall conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the ACO.
(a) At a minimum, the attendees shall include but is not limited to:
(1) FBOP: Administrative Contracting Officer, Contracting Officer’s Representative (COR), Facility Administrator/Manager, Architect/Engineer (if applicable), Other Personnel (Executive Staff, Captain, Safety Manager, etc.).
(2) Contractor: Project Manager, Superintendent, and technical support disciplines as appropriate (Subcontractors, Manufacturers, Suppliers, etc.).
(b) The meeting should include, but is not limited to issues such as:
Administrative Contracting Officer:
(1) Old business from previous progress meeting(s);
(2) Status of modifications, certified payrolls, submittals, requests for information (RFI);
(3) Review of payments made to date and review/approve current payment request;
(4) Status of modification proposal requests;
(5) Discuss new business.
COR:
(1) Status of escort coverage;
(2) Review gate or sallyport entrance/exit issues;
(3) Discuss other delays contractor may be experiencing;
(4) Discuss performance/quality issues.
Contractor:
(1) Review/discuss updated progress schedule;
(2) Provide 30 day outlook;
(3) Discuss other issues affecting performance.
FAO-0014 Contract Closeout Procedures (for construction contracts $150,000 or less)
15B31024Q00000006 Page 9 of 42
Contract Closeout must be completed upon receipt of property and final payment.
Prior to payment of final invoice:
The Contractor shall submit the following documentation:
(1) Guarantees and warranties;
(2) All operation/maintenance manuals;
(3) Consent of Surety to Final Payment (AIA Document G707), if the contractor furnished a bond;
(4) Release of Claims (GSA Form 1142);
(5) Evidence of no pending labor disputes;
(6) As-built drawings/shop drawings, (if applicable);
(7) Contractor’s final invoice.
AIA forms can be obtained from The American Institute of Architects at www.aiabookstore.com.
GSA forms can be obtained from the General Services Administration at www.gsa.gov (click on the “Forms Library” link).
DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023)
I. Applicability to Contractors and Subcontractors Section 2839.102 of the Justice Acquisition Regulation (JAR), (48 C.F.R. § 2839.102), applies to this contract. Accordingly, all contractors are obligated to comply with all applicable DOJ security policies, directives, or guidance documents, including the security requirements in the provisions in this contract clause. This contract clause applies to all contractors and subcontractors, including cloud service providers (“CSPs”), and personnel of the contractors and subcontractors (hereinafter collectively, “Contractor”) that may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information. The security requirements set forth herein are in addition to those required by the Federal Acquisition Regulation (“FAR”), and any other applicable laws, mandates, contract clauses, DOJ policies, directives or guidance documents and Executive Orders pertaining to the development and operation of Information Systems and/or the protection of Government Information. This clause does not alter or diminish any existing rights, obligations, or liability under any other civil and/or criminal law, rule, regulation, or mandate.
II. General Definitions The following general definitions apply to this clause. Specific definitions also apply as set forth in other paragraphs.
A. Authorization to Operate (“ATO”), as defined in National Institute of Standards and Technology (“NIST”) Special Publication (“SP”) 800-37 Revision 2, is the official management decision given by a senior Federal official or officials to authorize operation of an information system and to explicitly accept the risk to agency operations (including mission, functions, image, or reputation), agency assets, individuals, other organizations, and the Nation based on the implementation of an agreed-upon set of security and privacy controls.
B. Cloud Computing, as defined in DOJ Order 0904 Cybersecurity Program, is a model for enabling ubiquitous, convenient, on-demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, and services) that can be rapidly provisioned and released with minimal management effort or service provider interaction. This cloud model is composed of five essential characteristics, three service models, and four deployment models in accordance with NIST SP 800-145.
C. Covered Contract is any contract, order or other agreement under which the contractor, or a subcontractor at any tier, including a cloud service provider, may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information (as defined below) in the course of providing a product or service to the Department, with the exception of acquisitions under the micro-purchase threshold.
15B31024Q00000006 Page 10 of 42
D. Covered Information System means any information system used for, involved with, or allowing, the processing, storing, or transmitting of DOJ Information under a Covered Contract.
E. Data means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data, computer software, and personally identifiable information (PII) (defined below). The term does not include information incidental to contract administration, such as financial, administrative, cost or pricing, or management information.
F. DOJ Information, as defined in DOJ Order 0904, means any Information that is owned, produced, controlled, protected by, or otherwise within the custody or responsibility of the DOJ, including, without limitation, information related to DOJ programs or personnel. It includes, without limitation, Information (1) provided by or generated for the DOJ, (2) managed or acquired by the Contractor for the DOJ in connection with the performance of the contract, and/or (3) acquired to perform the contract.
G. Information, as defined in DOJ Order 0904, is any communication or representation of knowledge such as facts, data, or opinions, in any form or medium, including textual, numerical, graphic, cartographic, narrative, or audiovisual. This includes any communication or representation of knowledge in an electronic format that allows it to be stored, retrieved, or transmitted.
H. Information System, means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502(8)).
I. Personally Identifiable Information (“PII”), as defined in the FAR 24.101, means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual. It includes but is not limited to common data elements such as names, addresses, dates of birth, and places of employment, to identity documents, Social Security numbers or other government-issued identifiers, precise location information, medical history, and biometric records.
This definition covers all PII that is created by or becomes available to the contractor, including its employees, subcontractors, or affiliates, as a result of performing under this contract. PII, as supplementally defined in DOJ Order 0904, also includes information about an individual maintained by an agency, including, but not limited to, information related to education, financial transactions, medical history, and criminal or employment history and information, which can be used to distinguish or trace an individual’s identity.
J. Private Cloud, as defined in NIST SP 800-145, is the deployment model for cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the organization, a third party, or some combination of them, and it may exist on or off premises.
K. Security Breach means any security incident (as defined below) that directly relates to the loss of control, compromise, exfiltration, manipulation, unauthorized disclosure, unauthorized acquisition, unauthorized exposure or unauthorized access or any similar occurrence of any Covered Information System or any DOJ Information or any PII accessed by, retrievable from, processed by, stored on, or transmitted within, to or from any such system. This includes incidents where (1) a person other than an authorized user accesses or potentially accesses PII or DOJ Information or (2) an authorized user accesses or potentially accesses PII or DOJ Information for an unauthorized purpose.
a. Potential Security Breach (hereinafter, “Potential Breach”) means any suspected, but unconfirmed security breach (as defined above).
b. Confirmed Security Breach (hereinafter, “Confirmed Breach”) means any confirmed security breach (as defined above).
L. Security Incident means any occurrence that (1) may actually or imminently jeopardize, without lawful authority, the availability, integrity, authentication, confidentiality, or nonrepudiation of DOJ Information or a Covered Information System; or (2) may constitute a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies.
a. Potential Security Incident means any suspected, but unconfirmed security incident (as defined above).
b. Confirmed Security Incident means any confirmed security incident (as defined above).
15B31024Q00000006 Page 11 of 42
M. Vulnerability, as defined in DOJ Vulnerability Management Plan, and the OCIO Information Security Management Procedure, means a weakness or flaw discovered in the design of a system that, when exploited, may result in a loss of confidentially, integrity, or availability of DOJ Information or an Information System.
III. Confidentiality and Non-Disclosure of DOJ Information A. Preliminary and final contract deliverables and all associated working papers and material generated by the Contractor developed using DOJ Information, product, source code, and/or methods of operations, are the property of the U.S. Government and must be submitted to the Contracting Officer (“CO”) or the CO’s Representative (“COR”) at the conclusion of the contract. The U.S. Government has unlimited data rights to all such deliverables and associated working papers and materials in accordance with FAR 52.227-14 (Rights in Data-General). The Contractor will define a method of monitoring the development activity to include any activity associated with DOJ Information, product, source code, and methods of operations. The data rights and development details shall be defined within the Contract.
If the Contractor intends to utilize its existing data, for which it has a patent or copyright, to develop a contract deliverable, it is incumbent upon the Contractor to negotiate with the CO the proper FAR Part 27 clauses in the contract to protect its existing data.
B. Pursuant to FAR 52.227-14(d)(2), all documents and data produced in the performance of this contract containing DOJ Information, product code, source code, and/or methods of operations are the property of the U.S. Government and, without the prior written permission of the CO, the Contractor shall neither reproduce nor release such information to any third-party at any time, including during performance or following expiration and/ or termination of the contract.
C. Any DOJ Information made available to the Contractor under this contract shall be used only for the purpose of performance of this contract and shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of this contract. In performance of this contract, the Contractor assumes responsibility for the protection of the confidentiality of all DOJ Information processed, stored, or transmitted by the Contractor. The Contractor shall comply with information security responsibilities and duties throughout the contract and after expiration/termination as appropriate per contract close-out activities. When requested by the CO (typically no more than annually), the Contractor shall provide a report to the CO identifying, to the best of the Contractor’s knowledge and belief, the type, amount, and level of sensitivity of the DOJ Information processed, stored, or transmitted under the Contract, including an estimate of the number of individuals for whom PII has been processed, stored or transmitted under the Contract and whether such information includes social security numbers (in whole or in part).
IV. Compliance with Information Technology Security Policies, Procedures and Requirements A. For all Covered Information Systems, in addition to any other applicable requirements, as set forth in Part I, the Contractor shall comply with the security requirements of the Federal Information Security Modernization Act of 2014 (“FISMA”), Privacy Act of 1974, E-Government Act of 2002, National Institute of Standards and Technology (“NIST”) Special Publications (“SP”), including NIST SP 800-37, 800-53, and 800-60 Volumes I and II, Federal Information Processing Standards (“FIPS”) Publications 140-2, 199, and 200, Federal Risk and Authorization Management Program (“FedRAMP”), DOJ IT Security Standards as amended, and OMB Memoranda relating to the security of information and/or Federal Information Systems.
B. In addition, for all Covered Information Systems, the Contractor shall comply with the following requirements, which are listed here only to highlight certain specific applicable requirements from one of the sources identified in the first paragraph of this Section. This is not an exhaustive list of all such requirements with which the Contractor is obligated to comply, and the omission of a requirement from this list should not be construed as negating the materiality of that requirement. These requirements and those in the authorities in the prior paragraph should be read together.
1. Limiting access to DOJ Information and Covered Information Systems to authorized users and to transactions and functions that authorized users are permitted to exercise.
2. Providing security awareness training at least annually to all Contractor employees and contractors involved with the Covered Contract. Such training shall include, but not be limited to, recognizing and
15B31024Q00000006 Page 12 of 42 reporting potential indicators of insider threats to users and managers of DOJ Information and Covered Information Systems.
3. Creating, protecting, and retaining, in accordance with applicable requirements but in any event at least until the expiration of the contract, Covered Information System audit records, reports, and supporting documentation to enable reviewing, monitoring, analysis, investigation, reconstruction, and reporting of unlawful, unauthorized, or inappropriate activity related to such Covered Information Systems and/or DOJ Information.
4. Maintaining authorizations to operate any Covered Information System.
5. Performing continuous monitoring on all Covered Information Systems, to include but not be limited to, collecting, reviewing, and analyzing appropriate logs and timely investigating security alerts and potential security incidents.
6. Establishing and maintaining baseline configurations and current inventories of Covered Information Systems, including hardware, software, firmware, and documentation, throughout the Information System Development Lifecycle, and establishing and enforcing security configuration settings for IT products employed in Covered Information Systems.
7. Ensuring appropriate contingency planning has been performed, including DOJ Information and Covered Information System backups.
8. Identifying Covered Information System users, processes acting on behalf of users, or devices, and authenticating and verifying the identities of such users, processes, or devices, using multifactor authentication or HSPD-12 compliant authentication methods as defined by NIST 800-63-3, Digital Identity Guidelines or current revision.
9. Establishing and maintaining an operational incident handling capability for Covered Information Systems that includes adequate and timely development, logging, detection, analysis, containment, recovery, and user response activities, and tracking, documenting, and timely reporting incidents to appropriate officials and authorities within the Contractor’s organization and the DOJ.
10. Performing periodic and timely maintenance on Covered Information Systems, and providing effective controls on tools, techniques, mechanisms, and personnel used to conduct such maintenance.
11. Protecting Covered Information System media containing DOJ Information, including paper, digital and electronic media, and DOJ assets under Contractor control; protecting them from environmental impacts, access, and equipment positioning requirements defined; limiting access to DOJ Information to authorized users; and sanitizing or destroying Covered Information System media containing DOJ Information before disposal, release or reuse of such media.
12. Limiting physical access to Covered Information Systems, equipment, and physical facilities housing such Covered Information Systems to authorized personnel according to DOJ 03.
13. Screening individuals prior to authorizing access to Covered Information Systems to ensure compliance with DOJ Security standards including personnel background checks.
14. Continuously assessing the risk to DOJ Information in Covered Information Systems, including scanning and remediating vulnerabilities, or implementing appropriate mitigation in accordance with DOJ policy, and ensuring the timely removal of assets no longer supported by the Contractor.
15. Continuously monitoring the application of security controls of Covered Information Systems, assessing the efficacy of such controls, and developing and implementing plans of action designed to correct deficiencies and eliminate or reduce vulnerabilities in such Covered Information Systems.
16. Monitoring, controlling, and protecting information transmitted or received by Covered Information Systems at the external boundaries and key internal boundaries of such Covered Information Systems, and employing architectural designs, software development techniques, and systems engineering principles that promote effective security.
15B31024Q00000006 Page 13 of 42
17. Identifying, reporting, and correcting Covered Information System security flaws in a timely manner, providing protection from malicious code at appropriate locations, monitoring security alerts and advisories and taking appropriate and timely action in response.
18. Ensuring return of Government Furnished Equipment (“GFE”) and/or PIV card assets within 10 business days of notification for end of use (contract end, staff change, etc.).
19. Complying with rights in data (FAR 52.227-14) as to the development, management, and protection of DOJ Information.
20. Reporting on risks or known issues impacting DOJ Services (staffing, hardware, process, changes, etc.) through the Contractor’s CO or COR, DOJ Service Owner (“SO”), and Government Technical Manager (“GTM”) including risk mitigation activities.
21. Reporting through the Contractor’s CO or COR on any projected or planned changes in corporate ownership, covered information system design, and/or any technical changes that could impact the confidentiality, integrity or availability of DOJ Information, data, or systems. Changes to system design must be updated through the authorization process per NIST SP 800-37 Revision 2, Step 6 (‘Continuous Monitoring”) or current NIST revision.
22. When, as part of operating within the DOJ environment, the Contractor’s covered information system is subject to review, audit, or assessment by third parties, facilitating DOJ access to information system resources, facilities, personnel, and documentation in a timely manner as required by the auditors. Should a third-party organization conduct a review of any Covered Information System, the Contractor must provide a copy of the report to DOJ, through the CO and COR.
23. Completing an attestation that meets OMB Memorandum M-22-18 for software procurements following the template attestation form developed by NIST. The attestation form must be returned to the CO and COR for sharing with the component Chief Information Officer (CIO).
24. Reporting on outages impacting DOJ Services through the Contractor’s CO, COR, and DOJ Service Owner (SO) to include event and mitigation details.
C. The Contractor shall not process, store, or transmit DOJ Information using a Covered Information System without first obtaining an ATO for each Covered Information System. The ATO shall be signed by the Authorizing Official for the DOJ component responsible for maintaining the security, confidentiality, integrity, and availability of the DOJ Information under this contract. (For Cloud Computing Systems, see Section V, below.)
D. The Contractor shall ensure compliance with DOJ-03 (Personnel Security Requirements for Contractor Employees) as to all Covered Information Systems.
E. When requested by the DOJ CO or COR as described below, the Contractor shall provide DOJ, including the Office of Inspector General (“OIG”) and Federal law enforcement components, (1) access to any and all information and records, including electronic information, regarding a Covered Information System, and
(2) physical access to the Contractor’s facilities, installations, systems, operations, documents, records, and databases. Such access may include independent validation testing of controls, system penetration testing, and FISMA data reviews by DOJ or agents acting on behalf of DOJ, and such access shall be provided within 72 hours of the request. Additionally, the Contractor shall cooperate with DOJ’s efforts to ensure, maintain, and safeguard the security, confidentiality, integrity, and availability of DOJ Information.
F. The use of Contractor-owned laptops or other portable digital or electronic media to process or store DOJ Information covered by this clause or access a Covered Information System is prohibited unless the CO approves it in writing after the Contractor has provided a letter certifying compliance with the following requirements. For any requirements which include the use or storage of PII, the Senior Component Official for Privacy must also approve. Any additional requirements set forth for the use or storage of PII under DOJ-02, Contractor Privacy Requirements, are in addition to, not superseded by, the requirements set forth here.
1. Media must be encrypted using a NIST FIPS 140-2 approved product.
15B31024Q00000006 Page 14 of 42
2. The Contractor must develop and implement a process to ensure that security and other applications software is kept up to date.
3. Where applicable, media must utilize antivirus software and a host-based firewall mechanism.
4. The Contractor must log all computer-readable data extracts from databases holding DOJ Information and verify that each extract including such data has been erased within 90 days of extraction or that its use is still required. All DOJ Information should be treated by the Contractor as sensitive information unless specifically designated as non-sensitive by the DOJ.
5. A Rules of Behavior (ROB) form must be signed and acknowledged annually by users. These rules must address, at a minimum, authorized, and official use, prohibition against unauthorized users and use, and the protection of DOJ Information. The form also must notify the users that they have no reasonable expectation of privacy regarding any communications transmitted through or data stored on Contractor-owned laptops or other portable digital or electronic media.
6. Cybersecurity Awareness Training (CSAT) shall be provided annually by Contractor for all users of Covered Information System. This training must be submitted to, and approved by, the CO or COR in advance of being provided to users. Users must complete and acknowledge having received CSAT each year. At a minimum, CSAT provided by contractors must include:
a. Insider Threat Detection and Reporting – Importance of detecting, methodologies, indicators, and reporting
b. Privacy Awareness – Privacy Act and PII
c. General Cybersecurity – Information security, trends in advance persistent threats, social engineering/phishing, appropriate use, mobile devices, remote access, basic security best practices
G. Contractors shall not store DOJ information on Contractor-owned removable IT (e.g., media such as a thumb drive or external hard drive) unless expressly authorized in writing by the DOJ CO or COR in the performance of their contract.
H. When no longer needed, all media must be processed (sanitized, degaussed, or destroyed) in accordance with NIST SP 900-88, Guidelines for Media Sanitization.
I. The Contractor must keep an accurate inventory of digital or electronic media used in the performance of DOJ contracts.
J. The Contractor must remove all DOJ Information from Contractor media and return all such information to the DOJ within 10 days of the expiration or termination of the contract, unless otherwise extended by the CO, or waived (in part or whole) by the CO, and all such information shall be returned in a format and form acceptable to DOJ. The Contractor shall provide a written certification certifying the removal and return of all such information to the CO within 10 business days of the removal and return of all DOJ Information.
K. DOJ, at its discretion, may suspend the Contractor’s access to any DOJ Information, or terminate the contract, when DOJ suspects that the Contractor has failed to comply with any security requirement, or in the event of an Information System Security Incident or Security Breach (see definitions above), where the Department determines that either event gives cause for such action. The suspension of access to DOJ Information may last until such time as DOJ, in its sole discretion, determines that the situation giving rise to such action has been corrected or no longer exists. Any termination action taken because of the Contractor’s suspected failure to comply with any security requirement will be conducted in accordance with the applicable termination clause governing the awarded contract. The Contractor understands that any suspension or termination in accordance with this provision shall be at no cost to DOJ, and that upon request by the CO, the Contractor must immediately return all DOJ Information to DOJ, as well as any media upon which DOJ Information resides, at the Contractor’s expense. The Contractor must comply with FAR 52.227-14 (Rights in Data), FAR 52.245-1 (Government Property), DOJ 2400.3A Chapter 1 (component property procedures), and FAR 4.804-5(a)(6) (Procedures for closing out contract files).
V. Cloud Computing A. The Contractor may not utilize the Cloud system of any Cloud Service Provider (“CSP”) unless:
15B31024Q00000006 Page 15 of 42
1. All of the following has occurred: (a) the Cloud system and CSP have been evaluated by a Third Party Assessing Organization (“3PAO”) certified under FedRAMP; (b) the Cloud system received FedRAMP authorization; (c) the Contractor has provided the most current System Security Plan (“SSP”) and Security Assessment Report (“SAR”) to the DOJ CO for consideration, and provides any subsequent SSPs and SARs within 30 days of issuance; and, (d) the Authorizing Official for the DOJ component responsible for maintaining the security confidentiality, integrity, and availability of the DOJ Information under the Covered Contract has issued an ATO; or,
2. In cases where the CSP or its offering is not FedRAMP authorized, the COR approves utilization of the Cloud System after the CSP has worked with the authorizing official, the DOJ OCIO, and the FedRAMP Program Management Office to determine that the CSP is likely to seek and receive Agency/ FedRAMP authorization within 1 year, or DOJ has authorized use as a Private Cloud or Contractor Owned, Contractor Operated system.
B. The Contractor must ensure that the CSP allows DOJ to access and retrieve any DOJ Information processed, stored, or transmitted in a Cloud system under this Contract within a reasonable time of any such request, but in no event less than 48 hours from the request. To ensure that the DOJ can fully and appropriately search and retrieve DOJ Information from the Cloud system, access shall include any schemas, meta-data, and other associated data artifacts.
C. The Contractor must ensure that the CSP provides access and information to support and enable DOJ’s cloud security posture management, to include the current inventory of security management configuration data for services and information to confirm the Contractor has been monitoring accounts for compliance with security requirements. The DOJ Justice Security Operations Center (JSOC) must be able to access logs and events to investigate potential security breaches and perform security posture assessments associated with the Security Audit Identity Credential Access Management (ICAM) policies.
D. The Contractor must ensure that the CSP provides evidence of annual recertification of privileged user access management.
E. A Supply Chain Risk Management (SCRM) review is mandatory for specified acquisitions in accordance with established process in EO 14028 and NIST SP 800-161, Cybersecurity Supply Chain Risk Management Practices for Systems and Organizations, or superseding document. All vendor products and solutions to be used on DOJ national security systems, enterprise-wide systems, or new FIPS-199 High and Moderate systems for the purpose of accessing, collecting, storing, processing, maintaining, using, sharing, retrieving, disseminating, transmitting, or disposing of DOJ Information must be submitted to DOJ OCIO for a Supply Chain Risk Management review prior to contract award or ATO signature. Changes in corporate ownership or structure shall be reported to the CO for referral to SCRM. The Contractor shall notify the CO of any confirmed Supply Chain compromise affecting the Contractor’s products or services within 1 hour of discovery.
__ The following SCRM requirements for acquisition of systems, hardware, or software which will be used in systems that are mission critical or process sensitive data apply to this award. (CO check as appropriate in coordination with the Program Manager and/or System Owner)
1. The Contractor shall develop and deliver a SCRM Plan. The SCRM Plan shall meet the format described in NIST SP 800-161, Appendix E. The SCRM plan shall address the following security controls from NIST SP 800-53 Rev 5: SR-2, SR-3, SR-4, SR-5, SR-6, SR-7, SR-8, SR-9, SR-10, and SR-11. Equivalent ISO 27000 series controls may be used if they are mapped to the NIST control(s).
2. The Contractor shall implement the required security controls as documented in the SCRM Plan.
The requirements of the SCRM plan shall flow down to all subcontractors. Evidence of the certification and compliance is required.
3. The Contractor shall provide evidence of compliance with the documented SCRM Plan. (CO select which applies)
__ Self-assessment by a contractor security team __ External assessment by an independent auditor
VI.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .