About this file
This is Addendum No. 1 from the Virginia Department of Transportation (VDOT) for the Gretna Area Headquarters Combo Building project (IFB 159187, Project Code 501-18130-078). The addendum changes the bid submission deadline to December 26, 2024, at 3:00 PM, with a public bid opening via teleconference scheduled for December 27, 2024, at 3:00 PM. The document includes multiple technical modifications to the original specifications, including changes to the vehicle exhaust extraction system operations, door hardware requirements, and electrical specifications.
The addendum contains detailed technical amendments to various building specifications, including modifications to door hardware sets, compressed air piping system warranty requirements (extended to 10 years), and updates to electrical receptacle requirements for weather-resistant installations. The document also includes revisions to maintenance bay intake louver operations and removes certain specifications related to heavy-duty floor drains and tracer wire connections.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street (804) 786-2701 Commissioner Richmond, Virginia 23219 Fax: (804) 786-2940
December 11, 2024
ADDENDUM No. 1 TO ALL BIDDERS:
Reference-IFB: 159187 Commodity Gretna Area Headquarters Combo Building
Project Code: 501-18130-078 Dated: November 26, 2024
For Delivery To: Virginia Department of Transportation (VDOT) Attention: Joshua Saunders
Bids Due: December 17, 2024 @ 11:30AM Prebid Conference December 10, 2024
The above is hereby changed to read:
1. In Reference to Addendum #1 (one) sealed by Bill Allen of Virginia A&E. (3 pages) to include changes to specifications and changes to drawings.
2. In reference to Bid Due Date: Change to read “The deadline for submitting bids is 3:00 P.M. sharp, as determined by the Bid Officer, on December 26, 2024”
3. In reference Page 8, Bid Opening Date: Change to read “A public bid opening via teleconference will be hosted by a VDOT representative. The bids will be opened publicly and read aloud beginning 3:00 PM on December 27, 2024.”
Note:
Acknowledgement of this addendum or any subsequent addenda must be prior to the bid due date and time or signed and uploaded as an attachment with the electronic bid submission. Failure to acknowledge or submit the addendum may be grounds for declaring the bid non-responsive.
Sincerely, Joshua Saunders Joshua Saunders, VCCO, VCO, Senior Procurement Officer
Name of Firm
Signature Title Date
December 6, 2024, Addendum No. 1 VDOT Gretna AHQ Combo Building IFB No. 159187 Project Code No. 501-18130-078 VAE Project No. 23017
8. Prototype Combo Building Drawing M6, Sequence of Operations for vehicle exhaust extraction system is revised to read as follows: “Vehicle exhaust extraction fan (F-3) shall operate and the maintenance bay intake louver damper (L-4) shall open whenever either of the hose reels is uncoiled. When the damper opens, the damper end switch shall activate the fan. Once the damper closes, the fan will be disabled.
Vehicle exhaust system shall not be tied into the central controller.”
9. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Parts 3.8.B:
Replace Note with the following:
NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit device. Omit weatherstrip, threshold, and sweep from Door 104A.
10. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Parts 3.8.C:
Replace Note with the following:
NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit device.
11. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Part 3.8.F Hardware Set F: Add the following
Note: For Door 112B, see electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit device.
12. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Parts 3.8.G:
Replace with the following:
G. Hardware Set G – Doors 103, 104B, and 106 (Door 113 if Option 1 is selected) Hardware Qty BHMA Finish Code Hinges 3 652 Passage Latch (F75) 1 626 Closer with Stop 1 689 Kick Plate 1 630
NOTE: Provide two (2) kick plates on Doors 104B and 106. Provide 180-degree hinges, 180-degree closer without a stop, and a wall stop on Door 106.
13. Project Manual Appendix A - Prototype Combo Building Specification Section 221319.13: Delete 1.2.A.2 “Heavy Duty Floor Drains.”
14. Project Manual Appendix A - Prototype Combo Building Specification Section 221513: 2.1.A is revised to read as follows: “Aluminum Pipe: ASTM B241, seamless extruded, 6060 or 6063.”
15. Project Manual Appendix A - Prototype Combo Building Specification Section 221513: Add the following items 1.5: “Special Warranty: compressed air piping system warranty shall be 10 years.”
16. Project Manual Appendix A - Prototype Combo Building Specification Section 231126: Delete 2.1.B.3.e “Tracer wire connection.”
December 6, 2024, Addendum No. 1 VDOT Gretna AHQ Combo Building IFB No. 159187 Project Code No. 501-18130-078 VAE Project No. 23017
17. Project Manual Appendix A - Prototype Combo Building Specification Section 262726 Part 2.2.C: Add the following:
2. WR Marking: All receptacles that have a weather-resistant or weatherproof-while-in-use cover shall have a “WR” or “weather-resistant” marking that remains visible when the receptacle is installed.
18. Project Manual Appendix A - Prototype Combo Building Specification Section 262726 Part 2.2.D: Add the following:
2. WR Marking: All GFCI receptacles that have a weather-resistant or weatherproof-while-in-use cover shall have a “WR” or “weather-resistant” marking that remains visible when the receptacle is installed.
| IFB 159297 Addendum No. 1 2024-12-06.pdf |
| Signature |
| IFB 159297 Addendum No. 1 2024-12-06 |
| NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exi... |
| NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit ... |
| G. Hardware Set G – Doors 103, 104B, and 106 (Door 113 if Option 1 is selected) |
| PC 501-18130-050 CB REVISION SK1 SK2 2024-12-06.pdf |
| Sheets and Views |
| CB 23021SK01-A PORTRAIT |
| CB 23021SK02-A PORTRAIT |
| IFB 159187 Addendum No. 1 2024-12-06 (002).pdf |
| Gretna Page 1 Signed |
| IFB 159187 Addendum No. 1 2024-12-06 |
| NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exi... |
| NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit ... |
| G. Hardware Set G – Doors 103, 104B, and 106 (Door 113 if Option 1 is selected) |