155 addition plans.pdf
PDF 7 MB Posted
- Attached to
- ITB - Ashland Acres, Smith/Winningham, Fire District #4 New Communications Site Construction
- Solicitation number
- S-X15022-00005576
- Issued by
- Jackson County, Oregon
About this file
Summary of 155 Addition Plans and Related ITB
This architectural drawing set comprises 38 pages of construction plans for Building 155 Addition, prepared for Emergency Communications of Southern Oregon (ECSO) in support of a communications site construction project in Josephine County, Oregon. The plans include comprehensive design documentation spanning general information and notes, building elevations, sections, details, site and utility plans, civil details, electrical systems, and structural framing specifications. The project involves construction at three locations: Ashland Acres, Smith/Winningham, and Fire District #4, requiring site preparation, foundation construction, communications towers ranging from 80 to 150 feet in height, modular communications shelters, access roads, perimeter fencing, emergency generators, and ground equipment installations. A mandatory pre-bid conference was held on February 2, 2023, with the date for submitting clarifications, changes, questions, and substitution requests extended to February 13, 2023. Original bid submissions were due February 21, 2023, subsequently extended to March 2, 2023, at 12:00 PM Pacific Time. The contract will be awarded to a single bidder for the entire project with separate line items for each communications site location.
Bidders must be licensed Oregon contractors and comply with the state's prevailing wage requirements and non-discrimination laws. The procurement prohibits markups on materials and supplies, focusing procurement on direct construction costs. Detailed geotechnical reports for each site provide specific foundation and site preparation recommendations. Bidders are required to submit detailed pricing using a specified rate sheet template and disclose first-tier subcontractors. The project requires coordination with utility providers and adherence to local permitting processes, with contractors responsible for comprehensive site work including road construction, power infrastructure, grubbing, and grading. No specific set-aside designations for disadvantaged enterprises were explicitly mentioned, and no incumbent vendors or existing contractors were referenced in the documentation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A001 - General Information and Notes (9 of 38)
| A301 - Building Elevations (17 of 38) |
| A501 - Sections (18 of 38) |
| A601 - Details (19 of 38) |
| C004 - Building 155 - Site and Utility Plan (6 of 38) |
| C005 - Civil Notes and Details (7 of 38) |
| C006 - Civil Details (8 of 38) |
| E001 - Legend and Panel Schedules (24 of 38) |
| E002 - Lighting Fixture Schedule (35 of 38) |
| E003 - Electrical Details and Diagrams (36 of 38) |
| E102 - Electrical Floor Plans (38 0f 38) |
| S001 - General Notes |
| S1.1 - Foundation and Roof Framing Plans |
| S1.2 - General Notes, Foundation and Roof Framing Details |
| S1.3 - New Opening Elevation and Roof Framing Details |
| S102 - Building 155 Addition - Foundation and Framing Plans (23 of 38) |
| S201 - Details Sheet 1 of 4 (24 of 38) |
| S202 - Details Sheet 2 of 4 (25 of 38) |
| S203 - Details Sheet 3 of 4 (26 of 38) |
| S204 - Details Sheet 4 of 4 (27 of 38) |
| T001 - Title Sheet (1 of 38) |