This is a Facility Condition Assessment (FCA) report prepared by Bureau Veritas for the City of Palo Alto regarding the Ventura Community Center, a 21,481 square-foot, single-story wood-framed facility located at 3990 Ventura Court in Palo Alto, California. The facility, originally constructed in 1957 as an elementary school and converted to a community child care center in 1983, houses multiple tenants including Country Day Little School, Heffalump Preschool, and Youth Community Services across its 4.1-acre site with 31 parking spaces. The assessment, conducted on March 16, 2023, and completed April 4, 2024, evaluates the building's structural integrity, mechanical, electrical, and plumbing systems, identifying significant deferred maintenance issues and providing opinions of probable costs for remediation. Key immediate needs identified include replacement of a water heater in poor condition (estimated cost $3,400), replacement of the fire alarm panel at the end of its expected life (estimated cost $39,200), and comprehensive ADA barrier removal across multiple facility zones with total estimated costs exceeding $4.8 million. The assessment incorporates an electrification analysis aligned with the City of Palo Alto's sustainability goals, identifying replacement costs and timelines for converting gas-fired equipment to electrical alternatives, with particular focus on boilers, furnaces, and water heaters scheduled for replacement between 2024 and 2041.
The Facility Condition Index (FCI) and Extended Facility Condition Index (EFCI) analyses indicate the facility requires ongoing capital investment to prevent deterioration, with replacement reserves needed across multiple building systems and site improvements over the next 20 years. Total estimated costs for identified deficiencies and capital renewal needs reach approximately $16.4 million (escalated at 3.0% annually), with costs categorized as deferred maintenance (catch-up), scheduled maintenance (keep-up), capital renewal, energy and sustainability improvements, and accessibility upgrades. The assessment identifies that no renovations have been planned since a 2020 initiative was postponed due to the COVID-19 pandemic, and the fire alarm control panel and water heater upgrades are currently being addressed by facility management. The report establishes a comprehensive 20-year capital planning framework, with the most urgent needs clustered in fiscal years 2024-2026, and provides detailed cost breakdowns by trade and building system to support the City's budgeting and prioritization decisions for facility upgrades and compliance with ADA requirements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ventura Community Center 3990 Ventura Court Palo Alto, California 94306
FACILITY CONDITION ASSESSMENT
prepared for
City of Palo Alto 250 Hamilton Avenue Palo Alto, California 94301
PREPARED BY:
Bureau Veritas
6021 University Boulevard, Suite 200
Ellicott City, Maryland 21043
800.733.0660 www.us.bureauveritas.com
BV CONTACT:
Anas Sadkhi
Program Manager
800.733.0660 x7296568
Anas.Sadkhi@bureauveritas.com
BV PROJECT #:
150140.22R000-047.354
DATE OF REPORT:
April 4, 2024
ON SITE DATE:
March 16, 2023
Bureau Veritas
6021 University Boulevard, Suite 200 | Ellicott City, MD 21043 | www.us.bureauveritas.com | p 800.733.0660 http://www.us.bureauveritascom/ http://www.emgcorp.com/
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
www.us.bureauveritas.com | p 800.733.0660
TABLE OF CONTENTS
1. Executive Summary
Property Overview and Assessment Details Significant/Systemic Findings and Deficiencies Facility Condition Index (FCI) Extended Facility Condition Index (EFCI) Facility Needs Index (FNI) Immediate Needs Key Findings Deficiency Categories
2. Building and Site Information
3. Electrification
4. Property Space Use and Observed Areas
5. ADA Accessibility
6. Purpose and Scope
7. Opinions of Probable Costs
Methodology Definitions
8. Certification
9. Appendices
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
1 . Ex e c u t i v e Su m m a r y
Property Overview and Assessment Details
General Information
Property Type Daycare and Community Center
Main Address 3990 Ventura Court, Palo Alto, California 94306
Site Developed 1957
Site Area 4.1 acres (estimated)
Parking Spaces 31 total spaces all in open lots; two of which are accessible
Building Area 21,481 SF
Number of Stories 1 above grade
Outside Occupants/Leased Spaces Country Day Little School
Heffalump Preschool
Youth Community Services
Date(s) of Visit March 16, 2023
Management Point of Contact Mr. Murdo Nicolson Jr., Project Manager, Public Works
650.617.3154
Murdo.nicolson@cityofpaloalto.org
On-site Point of Contact (POC) Eduardo Gella
Assessment and Report Prepared By Aren Hofland
Reviewed By Daniel White
Technical Report Reviewer for
Anas Sadkhi
Program Manager
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Signif icant/Systemic Findings and Deficiencies
Historical Summary
Ventura Community Center was constructed in 1957. The facility was an elementary school until 1979. Palo Alto Community Child Care took over the site in 1983 and changed the name at that time. A renovation was planned for 2020, but the COVID-19 pandemic prevented the renovation from occurring. No renovations are planned at this time.
Architectural
The building structure is wood-framed with a wood framed flat roof. Exterior finishes are painted stucco and wood-framed windows. The roof was updated to a TPO/PVC finish in 2018. Interior finishes are the responsibility of the various tenants and are updated as needed.
Mechanical, Electrical, Plumbing and Fire (MEPF)
The facility has heating only, with supplemental cooling provided by a PTAC for one room only. One wing is served by underfloor radiant heating. The other wing has suspended hydronic heaters. Each system has a dedicated boiler supplying heating hot water to the system. The multipurpose room has a suspended gas furnace for heating. The electrical system is generally original to construction with portions modernized as new equipment is installed. Electrical distribution is copper wiring and switches. The plumbing system is also original to the construction of the building. Plumbing supply piping is copper and the waste piping is cast-iron. Fire suppression is provided by fire extinguishers. A fire alarm system communicates with a fire alarm control panel. The panel and sensors are at the end of their expected life and Palo Alto Community Child Care is in the process of updating the system.
Site
The site has asphalt lots and play surfaces around the school. In addition, play structures with wood chips and rubberized flooring are present. The site has moderate landscaping. No irrigation was identified at the time of site visit.
Recommended Additional Studies
No additional studies recommended at this time.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Facil i ty Condit ion Index (FCI)
One of the major goals of the FCA is to calculate each building’s Facility Condition Index (FCI), which provides a theoretical objective indication of a building’s overall condition. By definition, the FCI is defined as the ratio of the cost of current needs divided by current replacement value (CRV) of the facility. The chart below presents the industry standard ranges and cut-off points.
FCI Ranges and Description
0 – 5% In new or well-maintained condition, with little or no visual evidence of wear or deficiencies.
5 – 10% Subjected to wear but is still in a serviceable and functioning condition.
10 – 30% Subjected to hard or long-term wear. Nearing the end of its useful or serviceable life.
30% and above Has reached the end of its useful or serviceable life. Renewal is now necessary.
The deficiencies and lifecycle needs identified in this assessment provide the basis for a portfolio-wide capital improvement funding strategy. In addition to the current FCI, extended FCI’s (EFCI) have been developed to provide owners the intelligence needed to plan and budget for the “keep-up costs” for their facilities. As such the 3-year, 5-year, and 10-year FCI’s are calculated by dividing the anticipated needs of those respective time periods by current replacement value. As a final point, the FCI’s ultimately provide more value when used to relatively compare facilities across a portfolio instead of being over-analyzed and scrutinized as stand-alone values.
Extended Facil ity Condit ion Index (EFCI)
The table below summarizes the individual findings for each building included in this FCA:
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Facil i ty Needs Index (FNI)
Lastly, the Facility Needs Index (FNI) combines the EFCI with energy conservation measure costs, regulatory compliance costs, and all other upgrade and adaptation costs required to plan and budget for their facilities. The FNI allows for the planned obsolescence of equipment and systems, as well as costs for adapting to current/future technologies. The electrification costs identified for the facility are included in the FNI but not the FCI or EFCI.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Facility Level FCI:
The vertical bars below represent the year-by-year needs identified for the prop n building. The orange line in the graph below forecasts what would happen to the campus FCI (left Y axis) over time, assuming zero capital expenditures over the next ten years. The dollar amounts allocated for each year (blue bars) are associated with the values along the right Y axis.
Where appropriate individual bar graphs for each of the buildings is included in later report sections that focus on each building at this campus.
Needs by Year with Unaddressed FCI Over Time
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
The table below shows the anticipated costs by trade or building system over the next 20 years.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Immediate Needs
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Key Findings
Water Heater in Poor condition.
Gas, Residential Ventura Community Center Ventura Community Center Boiler room
Uniformat Code: D2010 Recommendation: Replace in 2024
Priority Score: 83.9
Plan Type: Deferred Maintenance (Catch-Up)
Cost Estimate: $3,400
Shut off, but not disconnected - AssetCALC ID: 5650915
Exterior Walls in Fair condition.
any painted surface Ventura Community Center Ventura Community Center Building Exterior
Uniformat Code: B2010 Recommendation: Prep & Paint in 2028
Priority Score: 75.5
Plan Type: Scheduled Maintenance ( Keep-Up)
Cost Estimate: $130,900
- AssetCALC ID: 5650885
Fire Alarm Panel in Poor condition.
Fully Addressable Ventura Community Center Ventura Community Center Admin Office
Uniformat Code: D7050 Recommendation: Replace in 2024
Priority Score: 67.9
Plan Type: Scheduled
Cost Estimate: $39,200
In discussions with fire alarm company to update system - AssetCALC ID: 5650931
Wall Finishes in Fair condition.
any surface Ventura Community Center Ventura Community Center Throughout building
Uniformat Code: C2010 Recommendation: Prep & Paint in 2028
Priority Score: 67.5
Plan Type: Scheduled
Cost Estimate: $168,300
- AssetCALC ID: 5650894
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
ADA Barrier Removal in Poor condition.
Priority 3 Ventura Community Center ADA Costs Ventura Community Center Restrooms
Uniformat Code: Y1010 Recommendation: Resolve in 2033
Priority Score: 63.1
Plan Type: Accessibility
Cost Estimate: $1,386,200
RUL based on Palo Alto Transition Plan. Half the cost of the total barrier removal from the client Transition Plan.
- AssetCALC ID: 5271812
Priority 1 Ventura Community Center ADA Costs Ventura Community Center Site
Uniformat Code: Y1010 Recommendation: Resolve in 2033
Priority Score: 63.1
Cost Estimate: $976,900
RUL based on Palo Alto Transition Plan. Half the cost of the total barrier removal from the client Transition Plan.
- AssetCALC ID: 5271810
Priority 4 Ventura Community Center ADA Costs Ventura Community Center Interior
Uniformat Code: Y1010 Recommendation: Resolve in 2033
Priority Score: 63.1
Cost Estimate: $115,600
RUL based on Palo Alto Transition Plan. Half the cost of the total barrier removal from the client Transition Plan.
- AssetCALC ID: 5271813
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Priority 2 Ventura Community Center ADA Costs Ventura Community Center Intrerior
Uniformat Code: Y1010 Recommendation: Resolve in 2033
Priority Score: 63.1
Cost Estimate: $2,356,100
RUL based on Palo Alto Transition Plan. Half the cost of the total barrier removal from the client Transition Plan.
- AssetCALC ID: 5271811
Furnace
Electric, 21 to 25 KW Ventura Electrification Ventura Community Center MPR
Uniformat Code: D3020 Recommendation: Replace in 2028
Priority Score: 59.6
Plan Type: Energy & Sustainability
Cost Estimate: $14,900
Replace natural gas furnace with electrical equivalent for electrification - AssetCALC ID: 5703055
Boiler
Electric, HVAC, 201 to 250 KW Ventura Electrification Ventura Community Center Boiler room
Uniformat Code: D3020 Recommendation: Replace in 2041
Priority Score: 59.0
Plan Type: Energy &
Cost Estimate: $115,400
Replace natural gas boiler with electrical equivalent for electrification - AssetCALC ID: 5703053
Boiler
Electric, HVAC, 201 to 250 KW Ventura Electrification Ventura Community Center Boiler room
Uniformat Code: D3020 Recommendation: Replace in 2039
Priority Score: 59.0
Plan Type: Energy &
Cost Estimate: $115,400
Replace natural gas boiler with electrical equivalent for electrification - AssetCALC ID: 5703054
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Water Heater
Electric, Residential, 30 to 52 GAL Ventura Electrification Ventura Community Center Boiler room
Uniformat Code: D2010 Recommendation: Replace in 2024
Priority Score: 56.9
Plan Type: Energy &
Cost Estimate: $2,400
Replace natural gas water heater with electrical equivalent for electrification - AssetCALC ID: 5703052
Deficiency Categories
Each line item in the cost database is assigned a Deficiency Category This allows for a breakdown of the current and future costs along with identification of the urgency of the repair need. Security and Safety are the most important while Energy and Sustainability work could be delayed if funding constraints are present.
Category Descriptions
Security/Safety When a system requires replacement due to a security or safety risk.
Deferred Maintenance (Catch-up)
Maintenance that was not performed when it was scheduled or is past its useful life resulting in immediate repair or replacement.
Scheduled Maintenance (Keep-Up)
Maintenance that is planned and performed on a routine basis to preserve the condition.
Capital Renewal Planned replacement of building systems that have reached the end of their useful life.
Energy and Sustainability When the repair or replacement of equipment or systems are recommended to improve energy and sustainability performance.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Category Distribution (by Cost)
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
2 . Bu i l d i n g a n d S i t e I n f o r m a t i o n
Systems Summary
System Description Condition
Structure
Conventional wood frame structure over concrete slab foundation
Fair
Façade
Primary Wall Finish: Stucco
Windows: Wood
Roof
Primary: Flat construction with single-ply TPO/PVC membrane Good
Interiors
Walls: Painted gypsum board
Floors: Carpet, VCT
Ceilings: Hard tile
Elevators
None --
Plumbing
Distribution: Copper supply and cast-iron waste and venting
Hot Water: Gas and electric water heaters with integral tanks
Fixtures: Toilets, urinals, and sinks in all restrooms
HVAC
Central System: Boilers feeding hydronic terminal units and underfloor radiant heating
Supplemental components: PTAC
Fire Suppression
Fire extinguishers only
Good
Electrical
Source and Distribution: Main switchboard with copper wiring
Interior Lighting: Linear fluorescent, CFL
Emergency Power: None
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Systems Summary
Fire Alarm
Alarm panel with smoke detectors, heat detectors, alarms, strobes, pull stations, and exit signs
Poor
Equipment/Special
Commercial kitchen equipment Fair
Site Pavement
Asphalt lots with limited areas of concrete aprons and pavement and adjacent concrete sidewalks, curbs, ramps, and stairs
Site Development
Property entrance signage; chain link fencing; No dumpster enclosures
Playgrounds and courts
Limited park benches, picnic tables, trash receptacles
Landscaping and Topography
Significant landscaping features including lawns, trees, bushes, and planters
Irrigation not present (not confirmed)
No retaining walls
Low to moderate site slopes throughout
Utilities
Municipal water and sewer
Local utility-provided electric and natural gas
Site Lighting
Building-mounted: LED, HPS Fair
Ancillary Structures None --
Accessibility
Presently it does not appear an accessibility study is needed for this property. See Appendix D.
Key Issues and Findings
The fire alarm control panel is at the end of expected life, water heater for one wing is exceedingly aged and abandoned in place.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
3 . E l e c t r i f i c a t i o n
This Electrification analysis investigates replacing all fossil fuel consuming equipment within the buildings with electric alternatives. These improvements are identified as Energy and Sustainability replacements instead of traditional “like and in kind” replacements that are generally included in a FCA report. These replacements may not have an overall cost savings due the initial investment and the cost of solar panels to generate electricity. There is expected to be a reduction in greenhouse gas emissions as a result of these improvements.
The tables below lists all of the gas-fired equipment currently in use at the Ventura Community Center building.
A cost and timing estimate for the “Electrification” of fossil fuel consuming system has been prepared based on the expected remaining useful life (RUL) of the gas-fired equipment. This initial table identifies when the equipment is expected to be replaced. This provides a logical sequence for replacement at this facility. When the replacement is considered on a city-wide basis there may need to be changes to the schedule shown in this report.
Part of this contract includes access to an online database that can be used to generate various scenarios for replacement toward the City’s goal of an 80 percent reduction in current natural gas usage by 2030. A 40 percent reduction in current natural gas usage by 2030 and a 80 percent reduction in current natural gas usage by 2040 can also be generated using the software.
In order to convert the gas-fired equipment to electrical usage, an increase in electrical demand at the building will occur. This will require ensuring that the electrical service equipment is of adequate size to manage the increased load.
There are several things to consider before replacing the gas-fired equipment with electrical equipment.
1. Updating your present infrastructure will be required for the replacement of larger equipment. Depending on the type of equipment proposed (e.g. gas-fired water heater to heat pump water heater or wall-mounted heater to heat pump), a complete system re-design may be required to accommodate refrigerant piping. Generally, replacement of a single gas-fired water heater can be accomplished with the existing electrical system, as long as 240 volt service is present in the building. Updating your present electrical wiring may be required, based on the age and condition of your wiring.
2. For the purposes of this report and capital planning estimate we have assumed an increase in the service to be required for the new electrical equipment. In addition, the new boilers and other larger equipment will require separate wiring from the new electrical panels or service noted below to the equipment.
a. 800 amps for Ventura CC
3. Any changes made to your electrical system should be evaluated by an Electrical Engineer and the Utility Company to ensure that the facility electrical system and the public electrical service to the property will meet the new load requirements and for compliance with all electrical codes. A cost for that study has been included in this evaluation.
4. The scope of this assessment is visual only and the wire size, type, age and condition are concealed and were not reviewed. If your wiring is at the end of its useful life replacement of all or part may be required. Things to consider beside the cost of a new electrical system, is the cost of shutdown of your present electrical system during the changeover and remodeling.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
4 . P r o p e r t y Sp a c e U s e a n d Ob s e r v e d A r e a s
Areas Observed
The interior spaces were observed in order to gain a clear understanding of the property’s overall condition. Other areas accessed included the site within the property boundaries, the exterior of the property, and the roofs.
Key Spaces Not Observed
All key areas of the property were accessible and observed.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
5 . A D A Ac c e s s i b i l i t y
A prior ADA study was completed by SZS. A cost summary of the study is included in the appendices. Cost summaries for the work are included in the cost charts and tables where appropriate.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
6 . Pu r p o s e a n d Sc o p e
Purpose
Bureau Veritas was retained by the client to render an opinion as to the Property’s current general physical condition on the day of the site visit.
Based on the observations, interviews and document review outlined below, this report identifies significant deferred maintenance issues, existing deficiencies, and material code violations of record, which affect the Property’s use. Opinions are rendered as to its structural integrity, building system condition and the Property’s overall condition. The report also notes building systems or components that have realized or exceeded their typical expected useful lives.
The physical condition of building systems and related components are typically defined as being in one of five condition ratings. For the purposes of this report, the following definitions are used:
Condition Ratings
Excellent New or very close to new; component or system typically has been installed within the past year, sound and performing its function. Eventual repair or replacement will be required when the component or system either reaches the end of its useful life or fails in service.
Good Satisfactory as-is. Component or system is sound and performing its function, typically within the first third of its lifecycle. However, it may show minor signs of normal wear and tear. Repair or replacement will be required when the component or system either reaches the end of its useful life or fails in service.
Fair Showing signs of wear and use but still satisfactory as-is, typically near the median of its estimated useful life. Component or system is performing adequately at this time but may exhibit some signs of wear, deferred maintenance, or evidence of previous repairs. Repair or replacement will be required due to the component or system’s condition and/or its estimated remaining useful life.
Poor Component or system is significantly aged, flawed, functioning intermittently or unreliably;
displays obvious signs of deferred maintenance; shows evidence of previous repair or workmanship not in compliance with commonly accepted standards; has become obsolete;
or exhibits an inherent deficiency. The present condition could contribute to or cause the deterioration of contiguous elements or systems. Either full component replacement is needed or repairs are required to restore to good condition, prevent premature failure, and/or prolong useful life.
Failed Component or system has ceased functioning or performing as intended. Replacement, repair, or other significant corrective action is recommended or required.
Not Applicable Assigning a condition does not apply or make logical sense, most commonly due to the item in question not being present.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Scope
The standard scope of the Facility Condition Assessment includes the following:
▪ Visit the Property to evaluate the general condition of the building and site improvements, review available construction documents in order to familiarize ourselves with, and be able to comment on, the in-place construction systems, life safety, mechanical, electrical, and plumbing systems, and the general built environment.
▪ Identify those components that are exhibiting deferred maintenance issues and provide cost estimates for Immediate Costs and Replacement Reserves based on observed conditions, maintenance history and industry standard useful life estimates. This will include the review of documented capital improvements completed within the last five-year period and work currently contracted for, if applicable.
▪ Provide a full description of the Property with descriptions of in-place systems and commentary on observed conditions.
▪ Provide a high-level categorical general statement regarding the subject Property’s compliance to Title III of the Americans with Disabilities Act. This will not constitute a full ADA survey, but will help identify exposure to issues and the need for further review.
▪ Obtain background and historical information about the facility from a building engineer, property manager, maintenance staff, or other knowledgeable source. The preferred methodology is to have the client representative or building occupant complete a Pre-Survey Questionnaire (PSQ) in advance of the site visit. For these properties a verbal interview was conducted just prior to or during the walk-through portion of the assessment. Review maintenance records and procedures with the in-place maintenance personnel.
▪ Observe a representative sample of the interior spaces/units, including vacant spaces/units, to gain a clear understanding of the property’s overall condition. Other areas to be observed include the exterior of the property, the roofs, interior common areas, and the significant mechanical, electrical and elevator equipment rooms.
▪ Provide recommendations for additional studies, if required, with related budgetary information.
▪ Provide an Executive Summary at the beginning of this report, which highlights key findings and includes a Facility Condition Index as a basis for comparing the relative conditions of the buildings within the portfolio.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
7 . Op i n i o n s o f P r o b a b l e C o s t s
Cost estimates are attached throughout this report, with the Replacement Reserves in the appendix.
These estimates are based on Invoice or Bid Document/s provided either by the Owner/facility and construction costs developed by construction resources such as R.S. Means, CBRE Whitestone, and Marshall & Swift, Bureau Veritas’s experience with past costs for similar properties, city cost indexes, and assumptions regarding future economic conditions.
Opinions of probable costs should only be construed as preliminary, order of magnitude budgets. Actual costs most probably will vary from the consultant’s opinions of probable costs depending on such matters as type and design of suggested remedy, quality of materials and installation, manufacturer and type of equipment or system selected, field conditions, whether a physical deficiency is repaired or replaced in whole, phasing or bundling of the work (if applicable), quality of contractor, quality of project management exercised, market conditions, use of subcontractors, and whether competitive pricing is solicited, etc. Certain opinions of probable costs cannot be developed within the scope of this guide without further study. Opinions of probable cost for further study should be included in the FCA.
Methodology
Based upon site observations, research, and judgment, along with referencing Expected Useful Life (EUL) tables from various industry sources, Bureau Veritas opines as to when a system or component will most probably necessitate replacement. Accurate historical replacement records, if provided, are typically the best source of information. Exposure to the elements, initial quality and installation, extent of use, the quality and amount of preventive maintenance exercised, etc., are all factors that impact the effective age of a system or component. As a result, a system or component may have an effective age that is greater or less than its actual chronological age. The Remaining Useful Life (RUL) of a component or system equals the EUL less its effective age, whether explicitly or implicitly stated. Projections of Remaining Useful Life (RUL) are based primarily on age and condition with the presumption of continued use and maintenance of the Property similar to the observed and reported past use and maintenance practices, in conjunction with the professional judgment of Bureau Veritas’s assessors. Significant changes in occupants and/or usage may affect the service life of some systems or components.
Where quantities could not be or were not derived from an actual construction document take-off or facility walk-through, and/or where systemic costs are more applicable or provide more intrinsic value, budgetary square foot and gross square foot costs are used. Estimated costs are based on professional judgment and the probable or actual extent of the observed defect, inclusive of the cost to design, procure, construct and manage the corrections.
Definit ions
Immediate Needs
Immediate Needs are line items that require immediate action as a result of: (1) material existing or potential unsafe conditions, (2) failed or imminent failure of mission critical building systems or components, or (3) conditions that, if not addressed, have the potential to result in, or contribute to, critical element or system failure within one year or will most probably result in a significant escalation of its remedial cost.
For database and reporting purposes the line items with RUL=0, and commonly associated with Safety or Performance/Integrity Plan Types, are considered Immediate Needs.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Replacement Reserves
Cost line items traditionally called Replacement Reserves (equivalently referred to as Lifecycle/Renewals) are for recurring probable renewals or expenditures, which are not classified as operation or maintenance expenses. The replacement reserves should be budgeted for in advance on an annual basis. Replacement Reserves are reasonably predictable both in terms of frequency and cost. However, Replacement Reserves may also include components or systems that have an indeterminable life but, nonetheless, have a potential for failure within an estimated time period.
Replacement Reserves generally exclude systems or components that are estimated to expire after the reserve term and are not considered material to the structural and mechanical integrity of the subject property. Furthermore, systems and components that are not deemed to have a material effect on the use of the Property are also excluded. Costs that are caused by acts of God, accidents, or other occurrences that are typically covered by insurance, rather than reserved for, are also excluded.
Replacement costs are solicited from ownership/property management, Bureau Veritas’s discussions with service companies, manufacturers' representatives, and previous experience in preparing such schedules for other similar facilities.
Costs for work performed by the ownership’s or property management’s maintenance staff are also considered.
Bureau Veritas’s reserve methodology involves identification and quantification of those systems or components requiring capital reserve funds within the assessment period. The assessment period is defined as the effective age plus the reserve term. Additional information concerning system’s or component’s respective replacement costs (in today's dollars), typical expected useful lives, and remaining useful lives were estimated so that a funding schedule could be prepared. The Replacement Reserves Schedule presupposes that all required remedial work has been performed or that monies for remediation have been budgeted for items defined as Immediate Needs.
For the purposes of ‘bucketizing’ the System Expenditure Forecasts in this report, the Replacement Reserves have been subdivided and grouped as follows: Short Term (years 1-3), Near Term (years 4-5), Medium Term (years 6-10), and Long Term (years 11-20).
Key Findings
In an effort to highlight the most significant cost items and not be overwhelmed by the Replacement Reserves report in its totality, a subsection of Key Findings is included within the Executive Summary section of this report. Key Findings typically include repairs or replacements of deficient items within the first five-year window, as well as the most significant high-dollar line items that fall anywhere within the ten-year term. Note that while there is some subjectivity associated with identifying the Key Findings, the Immediate Needs are always included as a subset.
Exceedingly Aged
A fairly common scenario encountered during the assessment process, and a frequent source of debate, occurs when classifying and describing “very old” systems or components that are still functioning adequately and do not appear nor were reported to be in any way deficient. To help provide some additional intelligence on these items, such components will be tagged in the database as Exceedingly Aged. This designation will be reserved for mechanical or electrical systems or components that have aged well beyond their industry standard lifecycles, typically at least 15 years beyond and/or twice their Estimated Useful Life (EUL). In tandem with this designation, these items will be assigned a Remaining Useful Life (RUL) not less than two years but not greater than 1/3 of their standard EUL. As such the recommended replacement time for these components will reside outside the typical Short Term window but will not be pushed ‘irresponsibly’ (too far) into the future.
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
8 . C e r t i f i c a t i o n
City of Palo Alto (the Client) retained Bureau Veritas to perform this Facility Condition Assessment in connection with its continued operation of Ventura Community Center, 3990 Ventura Court, Palo Alto, California 94306, the “Property”. It is our understanding that the primary interest of the Client is to locate and evaluate materials and building system defects that might significantly affect the value of the property and to determine if the present Property has conditions that will have a significant impact on its continued operations.
The conclusions and recommendations presented in this report are based on the brief review of the plans and records made available to our Project Manager during the site visit, interviews of available property management personnel and maintenance contractors familiar with the Property, appropriate inquiry of municipal authorities, our Project Manager’s walk-through observations during the site visit, and our experience with similar properties.
No testing, exploratory probing, dismantling or operating of equipment or in-depth studies were performed unless specifically required under the Purpose and Scope section of this report. This assessment did not include engineering calculations to determine the adequacy of the Property’s original design or existing systems. Although walk-through observations were performed, not all areas may have been observed (see Section 1 for specific details). There may be defects in the Property, which were in areas not observed or readily accessible, may not have been visible, or were not disclosed by management personnel when questioned. The report describes property conditions at the time that the observations and research were conducted.
This report has been prepared for and is exclusively for the use and benefit of the Client identified on the cover page of this report. The purpose for which this report shall be used shall be limited to the use as stated in the contract between the client and Bureau Veritas.
This report, or any of the information contained therein, is not for the use or benefit of, nor may it be relied upon by any other person or entity, for any purpose without the advance written consent of Bureau Veritas. Any reuse or distribution without such consent shall be at the client's or recipient's sole risk, without liability to Bureau Veritas.
Prepared by: Aren Hofland, Project Manager
Reviewed by:
Daniel White, Technical Report Reviewer for Anas Sadkhi, Program Manager
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
9 . Ap p e n d i c e s
Appendix A: Photographic Record
Appendix B: Site Plan
Appendix C: Prior ADA Report
Appendix D: Component Condition Report
Appendix E: Deficiency by Priority
Appendix F: Costs by Category
Appendix G: Multi-Year Expense Forecast
Appendix H: Equipment Inventory List
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Appendix A:
Ph o t o g r a p h i c R e c o r d
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Photographic Overview
1 - FRONT ELEVATION
2 - LEFT ELEVATION
3 - REAR ELEVATION
4 - RIGHT ELEVATION
5 - ROOFING
6 - DAYCARE
7 - RESTROOM
8 – MULTI PURPOSE ROOM
9 - KITCHEN
10 - WATER HEATER
11 - PUMP
12 - BACKFLOW PREVENTER
13 - SINK/LAVATORY
14 - TOILET
15 - SINK/LAVATORY
16 - SINK/LAVATORY
17 - TOILET
18 - FURNACE
19 - UNIT HEATER
20 - PUMP
21 - SWITCHBOARD
22 - FIRE ALARM PANEL
23 – FOOD SERVICE EQUIPMENT
24 – FOOD SERVICE EQUIPMENT
25 – FOOD SERVICE EQUIPMENT
26 - HEALTHCARE EQUIPMENT
27 - PLAYFIELD SURFACES
28 - PLAYFIELD SURFACES
29 - FENCES AND GATES
30 - SIGNAGE
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Appendix B:
S i t e P l a n
Aerial Site Plan
Project Number Project Name
150140.22R000-047.354 Ventura Community Center
Source On-Site Date
Google March 16, 2023
VENTURA COMMUNITY CENTER BUREAU VERITAS PROJECT: 150140.22R000-047.354
Appendix C:
P r i o r A D A R e p o r t
BarrierNumber Text211 Location Description AsBuiltDesc Solution AsBuiltMeas Quantity CostEst Severity
1A Ventura Community Center Parking Lot ‐ Stall 1 No tow‐away sign provided at lot entry or accessible stalls No sign provided Provide compliant sign 1 EACH $250.00 1 Necessary
1B Ventura Community Center Parking Lot ‐ Stall 1 No reflectorized ISA sign posted at front of stall Required sign not provided Provide sign at a minimum of 60" high at head of stall 1 EACH $250.00 1 Necessary
1C Ventura Community Center Parking Lot ‐ Stall 1 An additional sign or info below the ISA does not state "Minimum Fine $250." No fine sign provided Provide required sign 1 EACH $150.00 1 Necessary
1D Ventura Community Center Parking Lot ‐ Stall 1 Accessible stall & aisle not max. 2.0% in all directions (5.0% or more) Surface uneven and appears to be breaking apart Repair stall surface to make level and restripe 1 EACH $12,600.00 1 Necessary
1E Ventura Community Center Parking Lot ‐ Stall 1 Accessible stall not min. 9' x 18' or 14' x 18' including standard access aisle 7' wide X 14' long Restripe to provide compliant stall and access aisle 1 EACH $0.00 1 Necessary
1F Ventura Community Center Parking Lot ‐ Stall 1 No 3' x 3' (white/blue) ISA pavement sign provided centered and within 6" of end ISA in center of stall where it could be obscured by vehicles Reposition required pavement signs 1 EACH $0.00 1 Necessary
2A Ventura Community Center Parking Lot ‐ Shared Access Aisle Accessible stall & aisle not max. 2.0% in all directions (4.1% to 4.9%) Head of stall sloped at 4.8% to meet existing asphalt curb ramp Regrade stall to make level and restripe 1 EACH $12,600.00 1 Necessary
2B Ventura Community Center Parking Lot ‐ Shared Access Aisle Change in level greater than 1/2" in accessible stall 1" high abrupt change in level at transition to curb ramp Repair stall surface to remove trip hazard 4 LF $1,000.00 1 Necessary
2C Ventura Community Center Parking Lot ‐ Shared Access Aisle Access aisle lacks sign stating "NO PARKING" with min. 12" high letters contrastingAccess aisle lacks contrasting lettering min. 12" high stating "NO PARKING" Provide required pavement sign at bottom of access aisle 1 EACH $150.00 1 Necessary
3A Ventura Community Center Parking Lot ‐ Stall 2 No reflectorized ISA sign posted at front of stall Required sign not provided Provide required sign 1 EACH $250.00 1 Necessary
3B Ventura Community Center Parking Lot ‐ Stall 2 An additional sign or info below the ISA does not state "Minimum Fine $250." No fine sign provided Provide required sign 1 EACH $150.00 1 Necessary
3C Ventura Community Center Parking Lot ‐ Stall 2 Accessible stall & aisle not max. 2.0% in all directions (5.0% or more) Surface uneven Regrade stall to make level and restripe 1 EACH $12,600.00 1 Necessary
3D Ventura Community Center Parking Lot ‐ Stall 2 Accessible stall not min. 9' x 18' or 14' x 18' including standard access aisle 8' wide X 14' long Restripe to provide compliant stall and access aisle 1 EACH $0.00 1 Necessary
3E Ventura Community Center Parking Lot ‐ Stall 2 Reflectorized ISA sign is not posted at min. 60" high No ISA sign at head of stall Provide sign at a minimum of 60" high at head of stall 1 EACH $0.00 1 Necessary
4A Ventura Community Center Walkway at Parking Curb ramp top landing not level (4.1% to 4.9%) 4.5% landing slope Demolish existing and construct new transition 1 EACH $250.00 1 Necessary
4B Ventura Community Center Walkway at Parking Cross slope exceeds 2.0% (3.1% to 4.0%) 3.7% cross slope Demolish existing and construct new route 5 LF $625.00 1 Necessary
5A Ventura Community Center Walkway to Activity Center Cross slope exceeds 2.0% (5.0% or more) 7.6% cross slope Demolish existing and construct new route 65 LF $8,125.00 1 Necessary
5B Ventura Community Center Walkway to Activity Center Walkway surface is not firm and stable (cracked, broken or loose soil, etc.) Concrete broken in multiple locations along path from parking to auditorium Repair surface to make firm and stable 12 LF $1,500.00 1 Necessary
5C Ventura Community Center Walkway to Activity Center Fire pulls not between 42" and 48" high 58" high Replace fire pull when remodeling 1 EACH $3,500.00 1 Necessary
5D Ventura Community Center Walkway to Activity Center Object protrudes more than 4" into accessible route between 27" and 80" high Fire pull protrudes 5‐1/2" at 49" high Remove object or provide detectable warning 1 JOB $550.00 1 Necessary
6A Ventura Community Center Activity Center Room ID sign provided for sighted people lacks tactile info for the visually impaire No tactile information provided where visual sign exists Provide room ID sign with tactile information at wall at latch side of door 1 EACH $250.00 1 Necessary
6B Ventura Community Center Activity Center Door/Gate landing is not level on both sides of door (> 5.0%) 8.2% slope in door landing Demolish and reconstruct level landing 40 SF $5,000.00 1 Necessary
6C Ventura Community Center Activity Center Change in level greater than 1/2" leading to door Broken concrete at landing and within path to office and classrooms Repair to remove trip hazard 22 LF $5,500.00 1 Necessary
6D Ventura Community Center Activity Center Door opening force exceeds 5 lbf 16 lbf Provide automatic door opening device 1 EACH $5,000.00 1 Necessary
6E Ventura Community Center Activity Center Door/Gate threshold height exceeds 1/2" with a bevel 1/2" high metal threshold without bevel Provide new door threshold 2 EACH $550.00 1 Necessary
6F Ventura Community Center Activity Center Ground floor doors that exit to exterior not provided with signs stating “EXIT” No tactile sign provided where required Provide compliant sign at exit side of door 1 EACH $250.00 1 Necessary
6G Ventura Community Center Activity Center Light switch control box top edge at max. 54" high Switches 51‐1/2" high No remediation required. Control or mechanism complied with prior code and is g1 EACH $0.00 1 Necessary
6H Ventura Community Center Activity Center Fire extinguisher high reach exceeds 48" Relocate fire extinguisher hardware or provide alternate location for extinguisher Relocate fire extinguisher 1 JOB $1,500.00 1 Necessary
6I Ventura Community Center Activity Center Fire pulls not between 42" and 48" high 62" high Replace fire pull when remodeling 1 EACH $3,500.00 1 Necessary
6J Ventura Community Center Activity Center Knee clearance not min. 27" high, 19" deep or 30" wide 26‐1/2" high knee clearance at 9 tables Provide min. 1 accessible table and 5% overall. Avoid pedestal base tables. 1 EACH $450.00 1 Necessary
6K Ventura Community Center Activity Center Use of outlet requires low reach of less than 15" above floor or higher than 48" 11" ‐ 12" high Relocate outlet to area with min. 15" low reach or max. 48" high reach 1 EACH $750.00 1 Necessary
6L Ventura Community Center Activity Center Ground floor doors that exit to exterior not provided with signs stating “EXIT” No tactile sign provided where required at two doors Provide compliant sign at exit side of door 2 EACH $500.00 1 Necessary
6M Ventura Community Center Activity Center Door/Gate threshold height exceeds 1/2" with a bevel 1/2" high threshold without bevel Provide new door threshold 1 EACH $275.00 1 Necessary
6N Ventura Community Center Activity Center No assistive listening system for room with more than 50 seats No permanent assistive listening system provided Provide compliant system 1 EACH $1,500.00 1 Necessary
6O Ventura Community Center Activity Center Stage No form of vertical access provided at stairway to reach upper floors No vertical access provided Provide a wheelchair lift to reach upper floors 1 JOB $16,500.00 1 Necessary
6P Ventura Community Center Activity Center Stage No handrail provided at both sides of stairway No handrail provided at both sides Provide handrails at both sides of stairway 12 LF $2,700.00 1 Necessary
6Q Ventura Community Center Activity Center Stage Extension does not extend horizontally above landing for min. 12" from first riser Extension not sloped for the length of one tread long Provide handrails at both sides of stairway 0 LF $0.00 1 Necessary
6R Ventura Community Center Activity Center Stage Extension does not extend for length of one tread + 12" beyond the last riser nosi Extension not sloped for the length of one tread long Provide handrails at both sides of stairway 0 LF $0.00 1 Necessary
6S Ventura Community Center Activity Center Stage No contrasting color on each tread of exterior stairway Treads lack contrasting color defined as 70% contrast Provide contrasting color on each tread 6 LF or TREAD $210.00 1 Necessary
6T Ventura Community Center Activity Center Stage Use of outlet requires low reach of less than 15" above floor or higher than 48" Outlets on stage 11" high Relocate outlet to area with min. 15" low reach or max. 48" high reach 1 EACH $750.00 1 Necessary
6U Ventura Community Center Activity Center Stage No handrail provided at both sides of stairway Exit stairway has no handrail provided at both sides Provide handrails at both sides of stairway 12 LF $2,700.00 1 Necessary
6V Ventura Community Center Activity Center Stage Extension does not extend horizontally above landing for min. 12" from first riser Extension not sloped for the length of one tread long Provide handrails at both sides of stairway 0 LF $0.00 1 Necessary
6W Ventura Community Center Activity Center Stage Extension does not extend for length of one tread + 12" beyond the last riser nosi Extension not sloped for the length of one tread long Provide handrails at both sides of stairway 0 LF $0.00 1 Necessary
6X Ventura Community Center Activity Center Stage Guard or handrail have openings that allow passage of a 4" sphere Guardrail at exit stairway has openings of more than 4" Replace handrails at both sides of stairway 0 LF $0.00 1 Necessary
6Y Ventura Community Center Activity Center Stage No contrasting color on each tread of exterior stairway Treads lack contrasting color defined as 70% contrast Provide contrasting color on min. top and bottom tread 2 LF or TREAD $84.00 1 Necessary
6Z Ventura Community Center Activity Center Stage No strobe provided with existing horn Device not provided Provide strobe device 2 EACH $11,000.00 1 Necessary
7A Ventura Community Center Walkway to Facility Change in level greater than 1/2" in walkway 1" lip in walkway surface Grind or repair to remove trip hazard 8 LF $2,000.00 1 Necessary
8A Ventura Community Center Walkway to Facility Change in level greater than 1/2" in walkway 1‐1/2" lip in walkway surface Grind or repair to remove trip hazard 14 LF $3,500.00 1 Necessary
8B Ventura Community Center Walkway to Facility Cross slope exceeds 2.0% (3.1% to 4.0%) 3.2% cross slope in walkway leading to office and other areas Demolish existing and construct new route 16 LF $2,000.00 1 Necessary
8C Ventura Community Center Walkway to Facility Change in level greater than 1/2" in walkway 1" lip in walkway surface Grind or repair to remove trip hazard 1 LF $250.00 1 Necessary
8D Ventura Community Center Walkway to Facility Cross slope exceeds 2.0% (3.1% to 4.0%) 3.6% cross slope in walkway leading to building entrances Demolish existing and construct new route 8 LF $1,000.00 1 Necessary
8E Ventura Community Center Walkway to Facility Door/Gate lacks min. 10" smooth uninterrupted bottom surface Gate to playground has no smooth bottom 10” Provide kick plate at push side of gate 2 EACH $450.00 1 Necessary
8F Ventura Community Center Walkway to Facility Hardware not operable with a closed fist Gate hardware not accessible Provide compliant hardware 1 EACH $300.00 1 Necessary
9A Ventura Community Center Office Building Door/Gate landing is not level on both sides of door (> 5.0%) 6.2% slope at build‐up in landing area Demolish and reconstruct level landing 20 SF $2,500.00 1 Necessary
9B Ventura Community Center Office Building Room ID sign provided for sighted people lacks tactile info for the visually impaire No tactile information provided where visual sign exists Provide room ID sign with tactile information at wall at latch side of door 1 EACH $250.00 1 Necessary
9C Ventura Community Center Office Building Door opening force exceeds 5 lbf 11 lbf Provide automatic door opening device 1 EACH $5,000.00 1 Necessary
9D Ventura Community Center Office Building Door closer lacks min. 5 second sweep period/back check 3 second sweep Provide automatic door opening device 0 EACH $0.00 1 Necessary
9E Ventura Community Center Office Building Doormat not anchored to floor (trip hazard) Existing door mat not recessed or secured Secure door mat or remove 1 EACH $500.00 1 Necessary
9F Ventura Community Center Office Building Ground floor doors that exit to exterior not provided with signs stating “EXIT” No tactile sign provided where required Provide compliant sign at exit side of door 1 EACH $250.00 1 Necessary
9G Ventura Community Center Office Building No section at least 3 feet long between 28" and 34" provided at existing counter 42‐3/4" high Provide min. 3 ft long section of counter at max. 34" high 1 EACH $875.00 1 Necessary
9H Ventura Community Center Office Building Counter or table in route of travel protrudes more than 4" above 27" high 6" protrusion at 42" high Provide cane‐detectable warning that reaches below 27" high for the visually impa1 EACH $550.00 1 Necessary
9I Ventura Community Center Office Building No horn/strobes in common use areas Device not provided in lobby area Provide strobes in common use area 1 EACH $5,500.00 1 Necessary
10A Ventura Community Center Office at Lobby Hardware not operable with a closed fist Door knob not accessible Provide compliant hardware 1 EACH $300.00 1 Necessary
10B Ventura Community Center Office at Lobby Use of outlet requires low reach of less than 15" above floor or higher than 48" 11" high behind desk Relocate outlet to area with min. 15" low reach or max. 48" high reach 1 EACH $750.00 1 Necessary
10C Ventura Community Center Office at Lobby Clear floor space of min. 60" in diameter not provided where 360 degree turn is mNo accessible turning space in room where staff meets with the public Rearrange furniture to provide min. 60" turning space 0 SF $0.00 1 Necessary
10D Ventura Community Center Office at Lobby Door/Gate at push side lacks min.
This is the start of the file's text. The full file is on GovTribe.