15-Drawing.pdf
PDF 41 MB Posted
- Solicitation number
- 26/0035
- Issued by
- Harris County, Texas
About this file
This is a technical drawing document prepared for Harris County Precinct 2 in collaboration with the Metropolitan Transit Authority of Harris County, detailing construction standards and specifications for an on-call contract to construct sidewalks, trails, and related items. The project, identified as CMI Project No. 06-040 under UPIN 25102MF3XV01, is scheduled to begin approximately May 1, 2026, and will operate for a twelve-month contract term with potential renewal options available. The scope encompasses multiple construction locations within Precinct 2, with work coordinated through Road and Bridge Camps, though the Precinct may authorize work in additional areas as needed based on workload and crew availability. The contract requires contractor mobility to avoid long-term traffic control plans such as overnight lane closures or extensive Storm Water Pollution Prevention Plans.
The drawing package provides comprehensive technical specifications and guidelines covering typical roadway sections, sidewalk construction details, curb ramp requirements, median designs, trench drain details, tree protection protocols, and ADA compliance standards. Special provisions address temporary traffic control and temporary erosion and sedimentation controls, with contractors required to hand excavate near communication and power lines and coordinate with METRO regarding bus stop impacts, accessibility requirements, and potential inspection oversight. The document includes standard details from TxDOT, METRO passenger shelter standards, and Harris County General Mobility Program requirements. All work must comply with current American Disability Act requirements and local, state, and federal codes, with contractors responsible for any damage to METRO facilities and required to provide temporary bus stop facilities at no cost to METRO when construction impacts existing stops.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January/2026
FO T EE XTA AT SS
MOHAMED SAYED
142032
1/14/2026
On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025
2 / 69
SHEET INDEX
1/12/2026
FO T EE XTA AT SS
MOHAMED SAYED
PRECINCT 2 - 2025
On-Call - Construction of Sidewalks,Trails, & Related Items
3 / 69
FO T EE XTA AT SS
MOHAMED SAYED
4 / 69
17. Special Provision to Item 694 Temporary Traffic Control and Item 591 Temporary Erosion, Sedimentation, and Environmental Controls.
3. Project Duration - The scope of these projects requires the mobility of the contractor and his crews, so that long term Traffic Control Plans (TCP), such as overnight lane closures, or Storm Water Pollution Plan (SWPPP) will not be required. The contract shall be in effect for period of twelve (12 months). Prior to expiration of the term, the contract may be renewed as provided for in the Contract.
2. Location of Work Areas - This contract covers multiple locations within Precinct 2 and identifies the Road and Bridge Camps that will typically perform work under this contract. Depending on workload and crew availability, the Precinct may authorize work in other areas as needed. All work tasks shall be coordinated to remain within the general areas described in the Construction Notes
1/12/2026
CONSTRUCTION NOTES
FO T EE XTA AT SS
MOHAMED SAYED
5 / 69
9/27/2023
CONSTRUCTION NOTES
FO T EE XTA AT SS
MOHAMED SAYED
6 / 69
9/27/2023
TYPICAL R.O.W. SECTION DIVIDED ROADWAY
9.5'9.5' 31'
4 ft 4 ft
FO T EE XTA AT SS
MOHAMED SAYED
7 / 69
9/27/2023
TYPICAL DIVIDED ROADWAY
FO T EE XTA AT SS
MOHAMED SAYED
SHT. 9
Precinct 2 - 2025
8 / 69
9/27/2023
GENERAL SIDEWALK GUIDELINES
FO T EE XTA AT SS
MOHAMED SAYED
- A
Precinct 2 - 2025
9 / 69
9/27/2023
GENERAL SIDEWALK GUIDELINES
FO T EE XTA AT SS
MOHAMED SAYED
10 / 69
9/27/2023
TYPICAL SIDEWALK SECTIONS AND DETAILS
FO T EE XTA AT SS
MOHAMED SAYED
11 / 69
9/27/2023
RETAINING CURB DETAILS
FO T EE XTA AT SS
MOHAMED SAYED
12 / 69
9/27/2023
PRECINCT 2 SLOTTED CURB
FO T EE XTA AT SS
MOHAMED SAYED
On-call - construction of Sidewalks, Trails & Related Items
Precinct 2 - 2025
13 / 69
FO T EE XTA AT SS
MOHAMED SAYED
14 / 69
FO T EE XTA AT SS
MOHAMED SAYED
15 / 69
FO T EE XTA AT SS
MOHAMED SAYED
16 / 69
FO T EE XTA AT SS
MOHAMED SAYED
VARIES
VA
R
IE
S
(M
IN
.0
0'
VARIES
VA
R
IE
S
(M
IN
.0
0'
1.50' VARIES
VARIES 1.00'1.00'
4- 1/
2"
6"
VARIES 1.00'1.00'
4- 1/
2"
6"
VARIES1.50'
6"
1-1/8"
6"
1-1/8"
6"
1-1/8"
18"
On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025
17 / 69
3/23/2023
STEEL CHECKERPLATE SIDEWALK DETAIL
NOT TO SCALE
FO T EE XTA AT SS
MOHAMED SAYED
18 / 69
9/27/2023
TYPICAL CURB RAMP GUIDELINES
FO T EE XTA AT SS
MOHAMED SAYED
SEE SHT. 20 FOR MEDIAN
NOSE DIMENSIONS
On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025
19 / 69
9/27/2023
MEDIAN NOSE MODIFICATIONS PAVINGS JOINT DETAILS
FO T EE XTA AT SS
MOHAMED SAYED
20 / 69
1/12/2026
MEDIAN DESIGN - MEDIAN NOSE AND LEFT TURN BAY
FO T EE XTA AT SS
MOHAMED SAYED
21 / 69
FO T EE XTA AT SS
MOHAMED SAYED
22 / 69
9/27/2023
TEMPORARY CONSTRUCTION FENCING
FO T EE XTA AT SS
MOHAMED SAYED
SIDEWALK
Precinct 2 - 2025
23 / 69
9/27/2023
SWPPP GUIDELINES
FO T EE XTA AT SS
MOHAMED SAYED
24 / 69
FO T EE XTA AT SS
MOHAMED SAYED
25 / 69
FO T EE XTA AT SS
MOHAMED SAYED
26 / 69
1/12/2026
STANDARD PLASTIC METER BOX FOR 5/8" AND 1" METERS
FO T EE XTA AT SS
MOHAMED SAYED
27 / 69
1/12/2026
LOCATION OF WATER METER BOX FOR 2" DIAMETER OR LESS
FO T EE XTA AT SS
MOHAMED SAYED
28 / 69
1/12/2026
VALVE BOX DETAIL
FO T EE XTA AT SS
MOHAMED SAYED
29 / 69
FO T EE XTA AT SS
MOHAMED SAYED
30 / 69
FO T EE XTA AT SS
MOHAMED SAYED
31 / 69
FO T EE XTA AT SS
MOHAMED SAYED
32 / 69
FO T EE XTA AT SS
MOHAMED SAYED
33 / 69
FO T EE XTA AT SS
MOHAMED SAYED
34 / 69
FO T EE XTA AT SS
MOHAMED SAYED
35 / 69
FO T EE XTA AT SS
MOHAMED SAYED
36 / 69
FO T EE XTA AT SS
MOHAMED SAYED
37 / 69
1/12/2026
TRENCH DRAIN DETAIL
- Must Be ADA Compliant
FO T EE XTA AT SS
MOHAMED SAYED
38 / 69
FO T EE XTA AT SS
MOHAMED SAYED
39 / 69
FO T EE XTA AT SS
MOHAMED SAYED
40 / 69
FO T EE XTA AT SS
MOHAMED SAYED
41 / 69
FO T EE XTA AT SS
MOHAMED SAYED
42 / 69
FO T EE XTA AT SS
MOHAMED SAYED
43 / 69
FO T EE XTA AT SS
MOHAMED SAYED
44 / 69
Traffic Safety Division Standard
TxDOT STD - DELINEATOR & OBJECT MARKER
1/12/2026(1 OF 2)
FO T EE XTA AT SS
MOHAMED SAYED
45 / 69
TxDOT STD - DELINEATOR & OBJECT MARKER
1/12/2026(2 OF 2)
Traffic Safety Division Standard
FO T EE XTA AT SS
MOHAMED SAYED
46 / 69
FO T EE XTA AT SS
MOHAMED SAYED
47 / 69
FO T EE XTA AT SS
MOHAMED SAYED
48 69
FO T EE XTA AT SS
MOHAMED SAYED
49 / 69
FO T EE XTA AT SS
MOHAMED SAYED
50 / 69
FO T EE XTA AT SS
MOHAMED SAYED
51 / 69
FO T EE XTA AT SS
MOHAMED SAYED
52 / 69
FO T EE XTA AT SS
MOHAMED SAYED
53 / 69
FO T EE XTA AT SS
MOHAMED SAYED
54 / 69
FO T EE XTA AT SS
MOHAMED SAYED
55 / 69
1/12/2026
TREE PROTECTION GENERAL REQUIREMENTS
FO T EE XTA AT SS
MOHAMED SAYED
56 / 69
1/12/2026
TREE PROTECTION AND TREE ROOT PRUNING
FO T EE XTA AT SS
MOHAMED SAYED
57 / 69
1/12/2026
TREE PROTECTION IN SIDEWALK REPAIRS IN PARKWAY AREAS
FO T EE XTA AT SS
MOHAMED SAYED
58 / 69
1/12/2026
TREE ROOT BARRIERS
FO T EE XTA AT SS
MOHAMED SAYED
59 / 69
1/12/2026
METRO - GENERAL NOTE -STANDARD PASSENGER SHELTERS
FO T EE XTA AT SS
MOHAMED SAYED
60 / 69
1/12/2026
METRO - GENERAL NOTE FOR WORK ADJACENT TO BUS STOPS
METRO’s Notes for Work Adjacent to Bus Stops
1.The Contractor shall be responsible for repairs to any METRO facilities damaged during construction.
If the Contractor cannot immediately make the repairs to METRO’s satisfaction, METRO will make the repairs and bill the cost to the Contractor.
2.Prior to construction the Contractor shall verify in the field that there are no conflicts with our electrical power, fiber optics, communication, signaling, high voltage cables or any other METRO infrastructure.
3.The Contractor shall “hand excavate” in the vicinity of communication and power lines feeding the METRO system.
4.The Contractor shall contact the Director of Universal Accessibility, Tim Mills by email at TM14@ridemetro.org or by phone 713-739-6861 one week prior to construction. METRO may assign an inspector to assure no damages are made to METRO’s facilities. Universal Accessibility will coordinate any permanent or temporary impact on bus stops, shelters and sidewalk to maintain accessibility.
5.The Contractor shall contact METRO Bus Operations a minimum of ten (10) working days prior to construction impacting bus stops and bus routes. The contact information is Julio Rivera, julio.rivera@ridemetro.org 713-615-7219.
6.The Contractor shall provide any temporary bus stop facilities needed, except for bus stop signs, at no cost to METRO and shall restore any affected bus stops per COH IDM and meet current American Disability Act (ADA) requirements as required by local, state and federal code and requirements. No bus stop shall be permanently removed without approval from METRO.
FO T EE XTA AT SS
MOHAMED SAYED
61 / 69
1/12/2026
METRO - STANDARD PASSENGER SHELTERS
NOTE:
THE VALUE OF "X" IS USED AS
BASIS FOR DETERMINING WHEN
ADDITIONAL SPACE ON THE SIDE OF THE
SHELTER IS REQUIRED TO PLACE THE
WHEEL CHAIR CARRIAGE & THEREBY
ALLOWING ACCESS FOR THE
HANDICAPPED.
FO T EE XTA AT SS
MOHAMED SAYED
62 / 69
1/12/2026
METRO - STANDARD PASSENGER SHELTERS
FO T EE XTA AT SS
MOHAMED SAYED
63 / 69
1/12/2026
TXDOT - PSET - SC
FO T EE XTA AT SS
MOHAMED SAYED
64 / 69
1/12/2026
TXDOT - PSET - RP
FO T EE XTA AT SS
MOHAMED SAYED
65 / 69
1/12/2026
TXDOT - CLF - RO (1 OF 2)
FO T EE XTA AT SS
MOHAMED SAYED
66 / 69
1/12/2026
TXDOT - CLF - RO (2 OF 2)
45/46
FO T EE XTA AT SS
MOHAMED SAYED
67 / 69
1/12/2026
TXDOT - RW (SF)
46/46
FO T EE XTA AT SS
MOHAMED SAYED
68 / 69
FO T EE XTA AT SS
MOHAMED SAYED
METRO
HARRIS COUNTY
GENERAL MOBILITY PROGRAM
PROJECT NAME
(DESCRIPTION)
IMPROVEMENTS SPONSORED BY
METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY
AND
HARRIS COUNTY PRECINCT #
CMI PROJECT No. 06-040
On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025
69 69
FO T EE XTA AT SS
MOHAMED SAYED
File details come from the government source that posted it. Updated .