15-Drawing.pdf

PDF 41 MB Posted

Attached to
ITB - Construction of Sidewalks, Trails, and Related Items for Harris County Precinct 2
Solicitation number
26/0035
Issued by
Harris County, Texas

About this file

This is a technical drawing document prepared for Harris County Precinct 2 in collaboration with the Metropolitan Transit Authority of Harris County, detailing construction standards and specifications for an on-call contract to construct sidewalks, trails, and related items. The project, identified as CMI Project No. 06-040 under UPIN 25102MF3XV01, is scheduled to begin approximately May 1, 2026, and will operate for a twelve-month contract term with potential renewal options available. The scope encompasses multiple construction locations within Precinct 2, with work coordinated through Road and Bridge Camps, though the Precinct may authorize work in additional areas as needed based on workload and crew availability. The contract requires contractor mobility to avoid long-term traffic control plans such as overnight lane closures or extensive Storm Water Pollution Prevention Plans.

The drawing package provides comprehensive technical specifications and guidelines covering typical roadway sections, sidewalk construction details, curb ramp requirements, median designs, trench drain details, tree protection protocols, and ADA compliance standards. Special provisions address temporary traffic control and temporary erosion and sedimentation controls, with contractors required to hand excavate near communication and power lines and coordinate with METRO regarding bus stop impacts, accessibility requirements, and potential inspection oversight. The document includes standard details from TxDOT, METRO passenger shelter standards, and Harris County General Mobility Program requirements. All work must comply with current American Disability Act requirements and local, state, and federal codes, with contractors responsible for any damage to METRO facilities and required to provide temporary bus stop facilities at no cost to METRO when construction impacts existing stops.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January/2026

FO T EE XTA AT SS

MOHAMED SAYED

142032

1/14/2026

On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025

2 / 69

SHEET INDEX

1/12/2026

FO T EE XTA AT SS

MOHAMED SAYED

PRECINCT 2 - 2025

On-Call - Construction of Sidewalks,Trails, & Related Items

3 / 69

FO T EE XTA AT SS

MOHAMED SAYED

4 / 69

17. Special Provision to Item 694 Temporary Traffic Control and Item 591 Temporary Erosion, Sedimentation, and Environmental Controls.

3. Project Duration - The scope of these projects requires the mobility of the contractor and his crews, so that long term Traffic Control Plans (TCP), such as overnight lane closures, or Storm Water Pollution Plan (SWPPP) will not be required. The contract shall be in effect for period of twelve (12 months). Prior to expiration of the term, the contract may be renewed as provided for in the Contract.

2. Location of Work Areas - This contract covers multiple locations within Precinct 2 and identifies the Road and Bridge Camps that will typically perform work under this contract. Depending on workload and crew availability, the Precinct may authorize work in other areas as needed. All work tasks shall be coordinated to remain within the general areas described in the Construction Notes

1/12/2026

CONSTRUCTION NOTES

FO T EE XTA AT SS

MOHAMED SAYED

5 / 69

9/27/2023

CONSTRUCTION NOTES

FO T EE XTA AT SS

MOHAMED SAYED

6 / 69

9/27/2023

TYPICAL R.O.W. SECTION DIVIDED ROADWAY

9.5'9.5' 31'

4 ft 4 ft

FO T EE XTA AT SS

MOHAMED SAYED

7 / 69

9/27/2023

TYPICAL DIVIDED ROADWAY

FO T EE XTA AT SS

MOHAMED SAYED

SHT. 9

Precinct 2 - 2025

8 / 69

9/27/2023

GENERAL SIDEWALK GUIDELINES

FO T EE XTA AT SS

MOHAMED SAYED

- A

Precinct 2 - 2025

9 / 69

9/27/2023

GENERAL SIDEWALK GUIDELINES

FO T EE XTA AT SS

MOHAMED SAYED

10 / 69

9/27/2023

TYPICAL SIDEWALK SECTIONS AND DETAILS

FO T EE XTA AT SS

MOHAMED SAYED

11 / 69

9/27/2023

RETAINING CURB DETAILS

FO T EE XTA AT SS

MOHAMED SAYED

12 / 69

9/27/2023

PRECINCT 2 SLOTTED CURB

FO T EE XTA AT SS

MOHAMED SAYED

On-call - construction of Sidewalks, Trails & Related Items

Precinct 2 - 2025

13 / 69

FO T EE XTA AT SS

MOHAMED SAYED

14 / 69

FO T EE XTA AT SS

MOHAMED SAYED

15 / 69

FO T EE XTA AT SS

MOHAMED SAYED

16 / 69

FO T EE XTA AT SS

MOHAMED SAYED

VARIES

VA

R

IE

S

(M

IN

.0

0'

VARIES

VA

R

IE

S

(M

IN

.0

0'

1.50' VARIES

VARIES 1.00'1.00'

4- 1/

2"

6"

VARIES 1.00'1.00'

4- 1/

2"

6"

VARIES1.50'

6"

1-1/8"

6"

1-1/8"

6"

1-1/8"

18"

On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025

17 / 69

3/23/2023

STEEL CHECKERPLATE SIDEWALK DETAIL

NOT TO SCALE

FO T EE XTA AT SS

MOHAMED SAYED

18 / 69

9/27/2023

TYPICAL CURB RAMP GUIDELINES

FO T EE XTA AT SS

MOHAMED SAYED

SEE SHT. 20 FOR MEDIAN

NOSE DIMENSIONS

On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025

19 / 69

9/27/2023

MEDIAN NOSE MODIFICATIONS PAVINGS JOINT DETAILS

FO T EE XTA AT SS

MOHAMED SAYED

20 / 69

1/12/2026

MEDIAN DESIGN - MEDIAN NOSE AND LEFT TURN BAY

FO T EE XTA AT SS

MOHAMED SAYED

21 / 69

FO T EE XTA AT SS

MOHAMED SAYED

22 / 69

9/27/2023

TEMPORARY CONSTRUCTION FENCING

FO T EE XTA AT SS

MOHAMED SAYED

SIDEWALK

Precinct 2 - 2025

23 / 69

9/27/2023

SWPPP GUIDELINES

FO T EE XTA AT SS

MOHAMED SAYED

24 / 69

FO T EE XTA AT SS

MOHAMED SAYED

25 / 69

FO T EE XTA AT SS

MOHAMED SAYED

26 / 69

1/12/2026

STANDARD PLASTIC METER BOX FOR 5/8" AND 1" METERS

FO T EE XTA AT SS

MOHAMED SAYED

27 / 69

1/12/2026

LOCATION OF WATER METER BOX FOR 2" DIAMETER OR LESS

FO T EE XTA AT SS

MOHAMED SAYED

28 / 69

1/12/2026

VALVE BOX DETAIL

FO T EE XTA AT SS

MOHAMED SAYED

29 / 69

FO T EE XTA AT SS

MOHAMED SAYED

30 / 69

FO T EE XTA AT SS

MOHAMED SAYED

31 / 69

FO T EE XTA AT SS

MOHAMED SAYED

32 / 69

FO T EE XTA AT SS

MOHAMED SAYED

33 / 69

FO T EE XTA AT SS

MOHAMED SAYED

34 / 69

FO T EE XTA AT SS

MOHAMED SAYED

35 / 69

FO T EE XTA AT SS

MOHAMED SAYED

36 / 69

FO T EE XTA AT SS

MOHAMED SAYED

37 / 69

1/12/2026

TRENCH DRAIN DETAIL

- Must Be ADA Compliant

FO T EE XTA AT SS

MOHAMED SAYED

38 / 69

FO T EE XTA AT SS

MOHAMED SAYED

39 / 69

FO T EE XTA AT SS

MOHAMED SAYED

40 / 69

FO T EE XTA AT SS

MOHAMED SAYED

41 / 69

FO T EE XTA AT SS

MOHAMED SAYED

42 / 69

FO T EE XTA AT SS

MOHAMED SAYED

43 / 69

FO T EE XTA AT SS

MOHAMED SAYED

44 / 69

Traffic Safety Division Standard

TxDOT STD - DELINEATOR & OBJECT MARKER

1/12/2026(1 OF 2)

FO T EE XTA AT SS

MOHAMED SAYED

45 / 69

TxDOT STD - DELINEATOR & OBJECT MARKER

1/12/2026(2 OF 2)

Traffic Safety Division Standard

FO T EE XTA AT SS

MOHAMED SAYED

46 / 69

FO T EE XTA AT SS

MOHAMED SAYED

47 / 69

FO T EE XTA AT SS

MOHAMED SAYED

48 69

FO T EE XTA AT SS

MOHAMED SAYED

49 / 69

FO T EE XTA AT SS

MOHAMED SAYED

50 / 69

FO T EE XTA AT SS

MOHAMED SAYED

51 / 69

FO T EE XTA AT SS

MOHAMED SAYED

52 / 69

FO T EE XTA AT SS

MOHAMED SAYED

53 / 69

FO T EE XTA AT SS

MOHAMED SAYED

54 / 69

FO T EE XTA AT SS

MOHAMED SAYED

55 / 69

1/12/2026

TREE PROTECTION GENERAL REQUIREMENTS

FO T EE XTA AT SS

MOHAMED SAYED

56 / 69

1/12/2026

TREE PROTECTION AND TREE ROOT PRUNING

FO T EE XTA AT SS

MOHAMED SAYED

57 / 69

1/12/2026

TREE PROTECTION IN SIDEWALK REPAIRS IN PARKWAY AREAS

FO T EE XTA AT SS

MOHAMED SAYED

58 / 69

1/12/2026

TREE ROOT BARRIERS

FO T EE XTA AT SS

MOHAMED SAYED

59 / 69

1/12/2026

METRO - GENERAL NOTE -STANDARD PASSENGER SHELTERS

FO T EE XTA AT SS

MOHAMED SAYED

60 / 69

1/12/2026

METRO - GENERAL NOTE FOR WORK ADJACENT TO BUS STOPS

METRO’s Notes for Work Adjacent to Bus Stops

1.The Contractor shall be responsible for repairs to any METRO facilities damaged during construction.

If the Contractor cannot immediately make the repairs to METRO’s satisfaction, METRO will make the repairs and bill the cost to the Contractor.

2.Prior to construction the Contractor shall verify in the field that there are no conflicts with our electrical power, fiber optics, communication, signaling, high voltage cables or any other METRO infrastructure.

3.The Contractor shall “hand excavate” in the vicinity of communication and power lines feeding the METRO system.

4.The Contractor shall contact the Director of Universal Accessibility, Tim Mills by email at TM14@ridemetro.org or by phone 713-739-6861 one week prior to construction. METRO may assign an inspector to assure no damages are made to METRO’s facilities. Universal Accessibility will coordinate any permanent or temporary impact on bus stops, shelters and sidewalk to maintain accessibility.

5.The Contractor shall contact METRO Bus Operations a minimum of ten (10) working days prior to construction impacting bus stops and bus routes. The contact information is Julio Rivera, julio.rivera@ridemetro.org 713-615-7219.

6.The Contractor shall provide any temporary bus stop facilities needed, except for bus stop signs, at no cost to METRO and shall restore any affected bus stops per COH IDM and meet current American Disability Act (ADA) requirements as required by local, state and federal code and requirements. No bus stop shall be permanently removed without approval from METRO.

FO T EE XTA AT SS

MOHAMED SAYED

61 / 69

1/12/2026

METRO - STANDARD PASSENGER SHELTERS

NOTE:

THE VALUE OF "X" IS USED AS

BASIS FOR DETERMINING WHEN

ADDITIONAL SPACE ON THE SIDE OF THE

SHELTER IS REQUIRED TO PLACE THE

WHEEL CHAIR CARRIAGE & THEREBY

ALLOWING ACCESS FOR THE

HANDICAPPED.

FO T EE XTA AT SS

MOHAMED SAYED

62 / 69

1/12/2026

METRO - STANDARD PASSENGER SHELTERS

FO T EE XTA AT SS

MOHAMED SAYED

63 / 69

1/12/2026

TXDOT - PSET - SC

FO T EE XTA AT SS

MOHAMED SAYED

64 / 69

1/12/2026

TXDOT - PSET - RP

FO T EE XTA AT SS

MOHAMED SAYED

65 / 69

1/12/2026

TXDOT - CLF - RO (1 OF 2)

FO T EE XTA AT SS

MOHAMED SAYED

66 / 69

1/12/2026

TXDOT - CLF - RO (2 OF 2)

45/46

FO T EE XTA AT SS

MOHAMED SAYED

67 / 69

1/12/2026

TXDOT - RW (SF)

46/46

FO T EE XTA AT SS

MOHAMED SAYED

68 / 69

FO T EE XTA AT SS

MOHAMED SAYED

METRO

HARRIS COUNTY

GENERAL MOBILITY PROGRAM

PROJECT NAME

(DESCRIPTION)

IMPROVEMENTS SPONSORED BY

METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY

AND

HARRIS COUNTY PRECINCT #

CMI PROJECT No. 06-040

On-call - construction of Sidewalks, Trails & Related Items Precinct 2 - 2025

69 69

FO T EE XTA AT SS

MOHAMED SAYED

File details come from the government source that posted it. Updated .