About this file

This is a Bidder Qualification Statement document required for Montgomery Township's solicitation for the supply and installation of front power take-off (PTO), front 3-point hitch, and an 11-foot or 12-foot plow for a John Deere 6120M tractor. The statement must be completed and submitted as part of all bid packages; failure to provide a fully executed document may result in bid rejection. Sealed bids are due online via PennBid by June 30, 2026 at 10:30 A.M., with public opening and reading at Montgomery Township offices located at 1001 Stump Road, Montgomeryville, Pennsylvania 18936. The contract scope requires all labor and materials to transport the tractor off-site, supply and install the specified PTO and hitch system along with a hydraulic angle snowplow and associated adapter kits, and return the tractor to the Township. All bids must remain subject to acceptance for sixty days following bid opening, and bids may be withdrawn only within two business days after opening in strict compliance with Pennsylvania statute 73 P.S. Section 1602.

Each bidder must submit a bid bond or certified check equal to ten percent of the maximum bid amount. The successful contractor will be required to furnish Performance and Payment Bonds each in the amount of 100 percent of the contract amount. The project is subject to Pennsylvania Public Works Employment Verification Act (Act 127) requirements. PennBid assesses a nominal fee of 0.33 percent of the bid amount (minimum $150 and maximum $6,000) only to awarded bidders. The Bidder Qualification Statement requests comprehensive information including organizational background, work history on similar projects completed in the past five years, references for bonding and banking, a recent audited financial statement, and certification by an authorized officer under oath regarding the accuracy of all submitted information.

View the file

Other files

File Type Posted
7-DOC 00 62 16 CERTIFICATE OF INSURANCE.pdf PDF
17-02 ADVERTISEMENT FOR BIDS TRACTOR UPFIT.pdf PDF
8-99 e-verify compliance form pdf fill-in.pdf PDF
10-DOC 00 45 53 AGREEMENT OF SURETY COMPANY.pdf PDF
2-01 TABLE OF CONTENTS.pdf PDF
5-00 COVER.pdf PDF
3-DOC 00 45 19 NON-COLLUSION AFFIDAVIT.pdf PDF
9-DOC 00 61 13.13 PERFORMANCE BOND.pdf PDF
18-DOC 00 43 13 BID BOND (PENAL SUM FORM).pdf PDF
12-DOC 00 65 19.13 CONTRACTORS AFFIDAVIT.pdf PDF
14-DOC 00 52 00 AGREEMENT.pdf PDF
16-DOC 00 61 13.16 PAYMENT BOND.pdf PDF
11-DOC 00 45 10 BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
6-DOC 00 65 19.16 CONTRACTORS RELEASE OF LIENS.pdf PDF
13-DOC 00 65 19.19 CONSENT OF SURETY.pdf PDF
4-10 BIDDER REQURIEMENTS AND INSTRUCTIONS.pdf PDF
19-000 Project Manual Tractor Upfit 2026-07-06.pdf PDF
10-File 2090 Rev 5 North Wales Knapp Construction.pdf PDF
9-File 3657 Rev 2 Connector A 202 Construction.pdf PDF
12-Doc 00 43 00 Bidders Acknowledgement Form.pdf PDF
8-File 3394 Rev 1 Dekalb Cheswick Construction.pdf PDF
2-Doc 00 45 53 Agreement of Surety Company.pdf PDF
13-Project Manual.pdf PDF
7-File 3658 Rev 3 Costco 202 Construction.pdf PDF
11-File 1985 Rev 5 Dekalb Mall Construction.pdf PDF
1-Doc 00 43 13 Bid Bond.pdf PDF
5-Appendix B - Public Works Employment Verification.pdf PDF
13-DOC 00 45 10 BIDDERS ACKNOWLEDGEMENT FORM.pdf PDF
7-000 Project Manual Tractor Upfit 2026-06-10.pdf PDF
6-00 COVER.pdf PDF
10-99 e-verify compliance form pdf fill-in.pdf PDF
8-DOC 00 65 19.16 CONTRACTORS RELEASE OF LIENS.pdf PDF
18-DOC 00 45 13 BIDDER QUALIFICATION STATEMENT 2024.pdf PDF
1-TECHNICAL SPECIFICATIONS.pdf PDF
2-02 ADVERTISEMENT FOR BIDS TRACTOR UPFIT.pdf PDF
5-10 BIDDER REQURIEMENTS AND INSTRUCTIONS.pdf PDF
3-01 TABLE OF CONTENTS.pdf PDF
16-DOC 00 65 19.19 CONSENT OF SURETY.pdf PDF
15-DOC 00 65 19.13 CONTRACTORS AFFIDAVIT.pdf PDF
12-DOC 00 45 53 AGREEMENT OF SURETY COMPANY.pdf PDF
4-DOC 00 45 19 NON-COLLUSION AFFIDAVIT.pdf PDF
14-DOC 00 43 13 BID BOND (PENAL SUM FORM).pdf PDF
9-DOC 00 62 16 CERTIFICATE OF INSURANCE.pdf PDF
11-DOC 00 61 13.13 PERFORMANCE BOND.pdf PDF
19-DOC 00 61 13.16 PAYMENT BOND.pdf PDF
17-DOC 00 52 00 AGREEMENT.pdf PDF
13-Doc 00 43 13 - Bid Bond (penal sum form).pdf PDF
50-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
54-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
48-Sec 32 18 23.13-Natural Grass Sports Field Construction.pdf PDF
Show 40 more

Latest 50 of 154 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDER QUALIFICATION STATEMENT

00 45 13-1

DOCUMENT 00 45 13

1. INTRODUCTION

1.1 This document must be included as part of the Bid submission. Failure to submit a fully completed and executed Bidder Qualification Statement may be considered justification for rejection of the bid.

1.2 This Bidder Qualification Statement is submitted with respect to the following project:

Contract For: Supply and Installation of Front PTO, Front 3-Point Hitch, and 11- Foot or 12-Foot Plow for John Deere 6120M Tractor

2. GENERAL INFORMATION

2.1 Name of Bidder:

2.2 Address of Bidder:

2.3 Telephone No. of Bidder:

3. ORGANIZATIONAL BACKGROUND

3.1 Type of Organization:

Corporation Individual

Partnership Joint Venture

Other:

3.2 How long has your organization been in business

a. As a Contractor? years

b. As a Contractor engaged in construction work of the type proposed under this Contract:______ years

c. Under your current business name? ______ years

3.3 If the bidder is a corporation, complete this section:

a. Date & State of Incorporation:

b. Names & Titles of Officers:

00 45 13-2

3.4 If the Bidder is other than a corporation, describe the structure of your organization including date of initiation as a business and list the principals involved:

3.5 What portions of the work (i.e. trades work items, etc.) included in the proposed contract will be performed by subcontractors?

4. WORK HISTORY

4.1 Attach or list the following information on similar projects which your organization has completed in the past five (5) years. Name and type of project, owner, engineer, contract amount, date of completion.

4.2 Attach or list the following information on similar project which your organization now has in progress. Name and type of project, owner, engineer, contract amount, scheduled date of completion.

00 45 13-3

4.3 Has your organization ever defaulted on or otherwise failed to complete any work under contract? If so, note the circumstances:

4.4 Has any officer, partner or principal of your organization ever been an officer, partner or principal of another organization which defaulted on or otherwise failed to complete any work under contract? If so, note the circumstances:

4.5 Provide the construction experience (length, type) of the principal individuals of your organization which would be assigned to perform the proposed work under this Contract:

4.6 Are there any actively filed claims resulting in pending litigation by any municipality? If so, provide the docket number(s) associated with the claim(s):

5. REFERENCES

5.1 Bonding Company

and Agent

5.2 Bank

5.3 Trade

00 45 13-4

6. FINANCIAL STATEMENT

6.1 Attach a copy of a recent financial statement as prepared by your auditor.

7. CERTIFICATION

7.1 This Bidder Qualification Statement has been prepared on behalf of the following organization:

Name of Organization:

Name of Preparer:

Title of Preparer:

Date:

7.2 AFFIDAVIT

State of , County of

I, , being duly sworn, according to (Name of Official) law, depose and say that I am the ___, (position) of the above organization, and that the responses provided in the Bidder Qualification

Statement, including any attachments thereto are true and correct to the best of my knowledge and belief.

Sworn and Subscribed _________________________ (Signature of Official) to before me this day of , 20 .

Notary Public

END OF DOCUMENT