15-Attachment S - Plans Drawings.pdf
PDF 40 MB Posted
- Solicitation number
- 25/0332
- Issued by
- Harris County, Texas
About this file
This document is a comprehensive set of engineering and construction plans and details for the Forest Green Regional Stormwater Detention Basin - Phase 1 project, issued by the Harris County Flood Control District (HCFCD) in Texas. The project, identified by HCFCD Project ID Q534-01-00-E002, involves constructing a regional stormwater detention basin in Precinct 3, with associated access roads, structures, and environmental mitigation measures. The project scope includes demolition, removal of existing infrastructure, site preparation, construction of detention basin layouts, inflow and outfall structures, erosion control, and environmental protection measures. The estimated quantities include 5,154 linear feet of construction fence, 50 cubic yards of debris removal, 2,212 linear feet of pipe removal, and various other site preparation and construction activities.
The project appears to be funded by Harris County and potentially includes Environmental Protection Agency (EPA) involvement, as noted in the related contract opportunity description. The plans include detailed technical specifications for utility protection, environmental considerations (such as migratory bird habitat surveys), stormwater pollution prevention, and specific construction requirements. Specialized details cover areas like utility coordination, underground facility protection, tree preservation, and environmental mitigation strategies. The comprehensive documentation suggests a complex infrastructure project with significant environmental and engineering considerations, designed to improve regional stormwater management and flood control capabilities in Harris County, Texas.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXECUTIVE DIRECTOR CHRISTINA (TINA) PETERSEN, PHD, P.E.
LESLEY BRIONES
TOM S. RAMSEY, P.E.
ADRIAN GARCIA
RODNEY ELLISPCT . 1
PCT . 2 PCT . 4
PCT . 3
COUNTY JUDGE LINA HIDALGO
C :\U
SE
R
S\
JG
O
TT
LI
EB
\D C
\A C
C D
O C
S\
AR
D U
R R
A, IN
C \2
-0 2\
PR
O
JE
C
T
FI
LE
S\
-P
R O
D \0
3- D
W G
S\
5-
C O
VE
R
.D W
G
R O
ZU
N
A
S
AV
ED
W ed ne sd ay , O ct ob er
6, 6:
:3
PM
H C
FC
D
.C
TB
P
LO
TT
ED
Tu es da y, M ay
7, :0 0:
A
M
KEY MAP PG. 339 L, N, P, Q
VICINITY MAP
PCT. 3
HCFCD PROJECT ID# Q534-01-00-E002
FOREST GREEN
REGIONAL STORMWATER DETENTION BASIN - PHASE 1
N.T.S.
PROJECT LOCATION
PRECINCT 3
PRECINCT
PRECINCT 2
PRECINCT
PRECINCT
PRECINCT
PRECINCT
CORPORATION
GUNDA
N.T.S.
LOCATION MAP
PROJECT LOCATION
Q534-01-00-E002
UNIT Q134-00-00
U N
IT Q
100-00-00
UNIT Q134-01-00
UNIT Q136-00-00
05/27/2025
Erik Verduzco Stamp
Houston, Texas 77092 9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
-IN
DE
X.
DW
G
J
GO
TT
LI
EB
S
AV
ED
: M on da y, M ay
2, :1 1:
A
M
GC
-B W
-F
UL
L.
CT
B |
LO
TT
ED
: Tu es da y, M ay
7, :0
3:
A M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q5
-0 1-
-E
FO
R
ES
T
G R
EE
N
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
SH
EE
T
IN
D
EX
C T
D K
R O
05/27/2025
02 62
N/A
SHEET INDEX
SHEET
NUMBER SHEET TITLE REV. #
01 COVER
02 SHEET INDEX
03 HARRIS COUNTY ENGINEERING REVIEW SHEET
04 GENERAL NOTES
05 ESTIMATE OF QUANTITY
06 SYMBOLS & ABBREVIATIONS
07 OVERALL LAYOUT
08 DRAINAGE AREA MAP
09 CONTROL LAYOUT SHEET 1 OF 3
10 CONTROL LAYOUT SHEET 2 OF 3
11 CONTROL LAYOUT SHEET 3 OF 3
12 HORIZONTAL AND VERTICAL CONTROL SHEET 1 OF 3
13 HORIZONTAL AND VERTICAL CONTROL SHEET 2 OF 3
14 HORIZONTAL AND VERTICAL CONTROL SHEET 3 OF 3
15 ACCESS ROAD - TYPICAL SECTION
16 ACCESS ROAD OVERALL LAYOUT
17 ALL WEATHER ACCESS ROAD PLAN & PROFILE - BEGINNING TO STA. 15+00
18 ALL WEATHER ACCESS ROAD PLAN & PROFILE - STA. 15+00 TO STA. 20+00
19 ALL WEATHER ACCESS ROAD PLAN & PROFILE - STA. 20+00 TO STA. 25+00
20 ALL WEATHER ACCESS ROAD PLAN & PROFILE - STA. 25+00 TO STA. 30+00
21 ALL WEATHER ACCESS ROAD PLAN & PROFILE - STA. 30+00 TO STA. 35+00
22 ALL WEATHER ACCESS ROAD PLAN & PROFILE - STA. 35+00 TO STA. 38+50
23 ALL WEATHER ACCESS ROAD PLAN & PROFILE - STA. 38+50 TO END
24 ALL WEATHER ACCESS ROAD STORM WATER POLLUTION PREVENTION PLAN
25 DETENTION BASIN LAYOUT 1 OF 5
26 DETENTION BASIN LAYOUT 2 OF 5
27 DETENTION BASIN LAYOUT 3 OF 5
28 DETENTION BASIN LAYOUT 4 OF 5
29 DETENTION BASIN LAYOUT 5 OF 5
30 GEOMETRY POINT TABLES
31 DETENTION BASIN TYPICAL SECTIONS
32 DETENTION BASIN CROSS SECTIONS 1 OF 9
33 DETENTION BASIN CROSS SECTIONS 2 OF 9
34 DETENTION BASIN CROSS SECTIONS 3 OF 9
SHEET INDEX
SHEET
NUMBER SHEET TITLE REV. #
35 DETENTION BASIN CROSS SECTIONS 4 OF 9
36 DETENTION BASIN CROSS SECTIONS 5 OF 9
37 DETENTION BASIN CROSS SECTIONS 6 OF 9
38 DETENTION BASIN CROSS SECTIONS 7 OF 9
39 DETENTION BASIN CROSS SECTIONS 8 OF 9
40 DETENTION BASIN CROSS SECTIONS 9 OF 9
41 INFLOW STRUCTURE 1
42 INFLOW STRUCTURE 2
43 SIDE-WEIR STRUCTURE 1
44 SIDE-WEIR STRUCTURE 2
45 OUTFALL STRUCTURE (SHEET 1 OF 2)
46 OUTFALL STRUCTURE (SHEET 2 OF 2)
47 EMERGENCY OVERFLOW STRUCTURE
48 DEMOLITION
49 TREE PROTECTION, CLEARING, & GRUBBING
50 CONSTRUCTION & LOW-USE ACCESS
51 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
52 CONSTRUCTION ACCESS DETAIL TXDOT EC(3)-16
53 TRAFFIC CONTROL DETAIL TXDOT TCP (5-1)-18
54 HCFCD CONCRETE CHANNEL LINING DETAILS
55 HCFCD INTERCEPTOR STRUCTURE AND CONCRETE PILOT CHANNEL DETAILS
56 HCFCD STORM SEWER AND RIPRAP DETAILS
57 HCFCD STANDARD SWPPP DETAILS
57A HCFCD SWING GATE DOUBLE LEAF 30' WIDE
58 SINGLE BOX CULVERTS PRECAST TXDOT SCP-8
59 BOX CULVERTS PRECAST MISCELLANEOUS DETAILS SCP-MD
60 EXTENDED CURB DETAILS TXDOT ECD
61 CONCRETE WINGWALL DETAIL TXDOT FW-S
62 SAFETY END TREATMENT - TYPE II TXDOT SETP-CD
05/27/2025
VC
CORPORATION
GUNDA
Houston, Texas 77092 9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
- G
EN
ER
AL
N
OT
ES
.D W
G
J
GO
TT
LI
EB
S
AV
ED
: W ed ne sd ay
, M ay
8, :1 9:
A
M
GC
-B W
-F
UL
L.
LO
TT
ED
: W ed ne sd ay
, M ay
8, :2 3:
A
M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q
4-
-0 0-
E0
FO
RE
ST
G
RE
EN
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
G
EN
ER
AL
N
O
TE
S
C T
D K
R O
05/27/2025
04 62
N/A
CENTERPOINT ENERGY
CAUTION: UNDERGROUND GAS FACILITIES
WARNING: OVERHEAD ELECTRICAL FACILITIES
ACTIVITIES ON/OR ACROSS CENTERPOINT ENERGY FEE
OR EASEMENT PROPERTY
NO APPROVAL TO USE, CROSS OR OCCUPY CENTERPOINT FEE OR EASEMENT PROPERTY IS GIVEN. IF YOU NEED TO USE CENTERPOINT PROPERTY, PLEASE CONTACT OUR SURVEYING & RIGHT OF WAY DIVISION AT (713)
207-6348 OR (713) 207-5769.
AT&T TEXAS/SWBT FACILITIES
1. THE LOCATIONS OF AT&T TEXAS/SWBT FACILITIES ARE SHOWN IN AN
APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION BEFORE COMMENCING WORK. HE AGREES TO BE FULLY
RESPONSIBLE FOR ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THIS
FAILURE TO EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND
UTILITIES.
2. THE CONTRACTOR SHALL CALL 1-800-344-8377 (TEXAS 811) A MINIMUM OF 48
HOURS PRIOR TO CONSTRUCTION TO HAVE UNDERGROUND LINES FIELD
LOCATED.
3. WHEN EXCAVATING WITHIN EIGHTEEN INCHES (18”) OF THE INDICATED
LOCATION OF AT&T TEXAS/SWBT FACILITIES, ALL EXCAVATIONS MUST BE
ACCOMPLISHED USING NON-MECHANIZED EXCAVATION PROCEDURES. WHEN
BORING, THE CONTRACTOR SHALL EXPOSE THE AT&T TEXAS/SWBT FACILITIES.
4. WHEN AT&T TEXAS/SWBT FACILITIES ARE EXPOSED, THE CONTRACTOR WILL
PROVIDE SUPPORT TO PREVENT DAMAGE TO THE CONDUIT DUCTS OR
CABLES. WHEN EXCAVATING NEAR TELEPHONE POLES THE CONTRACTOR
SHALL BRACE THE POLE FOR SUPPORT.
5. THE PRESENCE OR ABSENCE OF AT&T TEXAS/SWBT UNDERGROUND CONDUIT
FACILITIES OR BURIED CABLE FACILITIES SHOWN ON THESE PLANS DOES NOT
MEAN THAT THERE ARE NO DIRECT BURIED CABLES OR OTHER CABLES IN
CONDUIT IN THE AREA.
6. PLEASE CONTACT THE AT&T TEXAS DAMAGE PREVENTION MANAGER KEVIN
RAY AT (713) 614-1983 OR E-MAIL HIM AT KR7896@ATT.COM, IF CABLE LOCATE
REQUESTS ARE NOT COMPLETED FOR OUR AT&T TEXAS/SWBT FACILITIES.
THE CONTRACTOR SHALL CONTACT THE UTILITY COORDINATING COMMITTEE
AT 1-800-545-6005 OR 811 A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION
TO HAVE MAIN AND SERVICE LINES FIELD LOCATED.
WHEN CENTERPOINT ENERGY PIPE LINE MARKINGS ARE NOT VISIBLE,
CALL (713) 207-5463 OR (713) 945-8037 (7:00 A.M. TO 4:30 P.M.) FOR STATUS
OF LINE LOCATION REQUEST BEFORE EXCAVATION BEGINS.
· WHEN EXCAVATING WITHIN EIGHTEEN INCHES (18”) OF THE INDICATED
LOCATION OF CENTERPOINT ENERGY FACILITIES, ALL EXCAVATION MUST
BE ACCOMPLISHED USING NON-MECHANIZED EXCAVATION PROCEDURES.
· WHEN CENTERPOINT ENERGY FACILITIES ARE EXPOSED, SUFFICIENT
SUPPORT MUST BE PROVIDED TO THE FACILITIES TO PREVENT
EXCESSIVE STRESS ON THE PIPING.
· FOR EMERGENCIES REGARDING GAS LINES CALL (713) 659-2111 OR (713)
207-4200.
THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY DAMAGES CAUSED BY HIS
FAILURE TO EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND
FACILITIES.
OVERHEAD LINES MAY EXIST ON THE PROPERTY. THE LOCATION OF OVERHEAD LINES HAS NOT BEEN SHOWN ON THESE DRAWINGS AS THE LINES ARE CLEARLY VISIBLE, BUT YOU SHOULD LOCATE THEM PRIOR TO BEGINNING ANY CONSTRUCTION. TEXAS LAW, SECTION 752, HEALTH & SAFETY CODE FORBIDS ACTIVITIES
THAT OCCUR IN CLOSE PROXIMITY TO HIGH VOLTAGE LINES, SPECIFICALLY:
ANY ACTIVITY WHERE PERSON OR THINGS MAY COME WITHIN SIX(6) FEET OF LIVE OVERHEAD HIGH
VOLTAGE LINES; AND
OPERATING A CRANE, DERRICK, POWER SHOVEL, DRILLING RIG, PILE DRIVER, HOISTING EQUIPMENT, OR
SIMILAR APPARATUS WITHIN 10 FEET OF LIVE OVERHEAD HIGH VOLTAGE LINES.
PARTIES RESPONSIBLE FOR THE WORK, INCLUDING CONTRACTORS ARE LEGALLY RESPONSIBLE FOR THE SAFETY OF CONSTRUCTION WORKERS UNDER THIS LAW. THIS LAW CARRIES BOTH CRIMINAL AND CIVIL LIABILITY. TO ARRANGE FOR LINES TO BE TURNED OFF OR REMOVED CALL CENTERPOINT ENERGY AT (713) 207-2222.
UTILITY NOTES
HCFCD GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
FENCES AND/OR OTHER ENCROACHMENTS IN THE HCFCD RIGHT-OF-WAY ARE NOT TO BE REMOVED UNLESS OTHERWISE STATED ON THE PLANS. IN CASES WHERE FENCE REMOVAL IS INDICATED ON THE PLANS, THE FENCE SHALL BE REMOVED AND PLACED NEATLY ON THE ADJACENT PROPERTY AT THE START OF CONSTRUCTION. WHERE THERE IS NOT A SEPARATE ITEM LISTED ON THE UNIT PRICE SCHEDULE, THE ENCROACHMENT REMOVAL IS INCIDENTAL TO SITE
PREPARATION AND RESTORATION.
DO NOT ENTER PRIVATE PROPERTY WITHOUT PROPER WRITTEN AUTHORIZATION FROM THE OWNER. PROVIDE COPY OF
WRITTEN PERMISSION TO HCFCD.
STRIP VEGETATION AND TOPSOIL AND STOCKPILE FOR REUSE ONSITE. MATERIAL FOUND UNACCEPTABLE BY THE ENGINEER WILL BE REMOVED AND PAID AS EXCAVATION AND OFFSITE DISPOSAL. NO SEPARATE MEASUREMENT AND PAYMENT WILL BE MADE FOR STRIPPING, STOCKPILING AND PLACING ON-SITE TOPSOIL. THE COST FOR THIS WORK WILL BE INCIDENTAL TO RELATED PAY ITEMS UNDER SPECIFICATION SECTION NUMBER 02315 LISTED ON THE UNIT PRICE
SCHEDULE.
RIPRAP AND GRANULAR FILL MATERIAL REMOVED DURING EXCAVATION, MEETING SPECIFICATION SECTION NUMBER 02378, SHALL BE REUSED AS DIRECTED BY THE ENGINEER. REUSED MATERIAL WILL BE MEASURED AND PAID FOR AS EXCAVATION AND ON-SITE FILL UNDER SPECIFICATION NUMBER 02315. NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR PROCESSING, HANDLING, STOCKPILING, AND PLACING MATERIAL FOUND TO BE ACCEPTABLE FOR REUSE.
UPON APPROVAL OF THE ENGINEER, DISPOSAL OF NONCONFORMING RIPRAP AND GRANULAR FILL MATERIAL WILL BE MEASURED AND PAID FOR AS REMOVE AND DISPOSE OF CONCRETE RUBBLE UNDER SPECIFICATION SECTION NUMBER
02120, MATERIAL DISPOSAL.
THE LOCATION AND GRADE OF THE BACKSLOPE INTERCEPTOR STRUCTURES AND SWALES MAY BE ADJUSTED IN THE FIELD BY THE ENGINEER AT THE TIME OF CONSTRUCTION. UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER, THE BACKSLOPE INTERCEPTOR STRUCTURE SHALL BE SET AT A MAXIMUM DEPTH OF 2.5 FEET AND THE MINIMUM GRADE FOR
BACKSLOPE SWALES SHALL BE 0.2%.
ADJUST AND/OR EXTEND YARD DRAINS TO OUTFALL AT TOE OF CHANNEL PER STANDARD OUTFALL DETAILS. PAYMENT
WILL BE INCIDENTAL TO SITE PREPARATION AND RESTORATION.
COMPLETED SECTIONS OF THE CHANNEL WILL BE TURNED OVER FOR VEGETATION ESTABLISHMENT IN MAXIMUM 1500 LINEAR FOOT SEGMENTS. CONTRACTOR MAY NOT DISTURB GREATER THAN 1500 LF OF CHANNEL AT A TIME.
CLEAR AND REMOVE ALL SILT FROM CULVERTS, PIPES AND UNDER BRIDGES TO THE PROPOSED DESIGN GRADES TO
PROVIDE POSITIVE FLOW.
LENGTHS AND DIAMETERS REPRESENTED ON PLANS ARE APPROXIMATE. CONTRACTOR WILL BE RESPONSIBLE FOR FIELD
VERIFICATION PRIOR TO ORDERING MATERIALS.
ACTIVITIES THAT DISTURB BIRD HABITAT, INCLUDING BUT NOT LIMITED TO CLEARING, GRUBBING, AND IMPACTS TO STRUCTURES WHERE MIGRATORY BIRDS AND BALD EAGLES MIGHT NEST, REQUIRE A NEST HABITAT SURVEY. DO NOT PROCEED UNTIL HARRIS COUNTY FLOOD CONTROL DISTRICT HAS CONDUCTED A NEST HABITAT SURVEY TO VERIFY ACTIVE MIGRATORY BIRD NESTS AND BALD EAGLE NESTS ARE NOT PRESENT. THE HARRIS COUNTY FLOOD CONTROL
DISTRICT MUST PROVIDE WRITTEN AUTHORIZATION TO PROCEED.
WHEN BANK EROSION REPAIRS CALL FOR THE PLACEMENT OF 3"x5" GRANULAR FILL IN THE CHANNEL BOTTOM TO ESTABLISH A BASE FOR REBUILDING THE SLOPE. THE 3"x5" GRANULAR FILL SHALL BE LIMITED TO AN ELEVATION 6-INCHES
ABOVE THE NORMAL WATER SURFACE ELEVATION LEVEL.
THE CONTRACT CONTAINS UNIT ITEMS FOR THE ESTABLISHMENT OF BEST MANAGEMENT PRACTICES FOR STORM WATER QUALITY PURPOSES. WHEN NOT CALLED FOR IN THE PROJECT PLANS, COORDINATE THE NEED AND LOCATION OF THESE UNIT ITEMS WITH THE DISTRICT REPRESENTATIVE ON SITE PRIOR TO PLACEMENT. THESE UNIT ITEMS INCLUDE, BUT ARE NOT LIMITED TO, REINFORCED SILT FENCE FOR MATERIAL STOCKPILES, ANCHORED SODDING FOR DISTURBED EARTHEN AREAS OR AROUND CONCRETE AND CONCRETE INTERCEPTOR, AND STABILIZED CONSTRUCTION ACCESS FOR PROJECT
SITE INGRESS/EGRESS.
WHEN INCLUDED IN THE SCOPE OF WORK, THE PURPOSE OF DEEP PLOWING THE SLOPE OR BERM OF A CHANNEL IS TO BREAK UP THE DESICCATED SOILS AND TO ELIMINATE ANY VOIDS, OR RILLING CLOSE TO THE SURFACE OF THE SLOPE OR BERM. THE CONTRACTOR WILL DEEP PLOW THE SLOPE OR BERM TO A MINIMUM DEPTH OF 2 FEET IN AREAS CONTAINING VOIDS AND/OR RILLING. IN AREAS OF VOIDS ONLY, THE SURFACE FROM WHICH THE 2 FEET DEPTH IS MEASURED WILL BE THE LEVEL OF THE SURROUNDING UNDISTURBED SOIL. IN AREAS OF RILLING, THE RILLS WILL FIRST BE KNOCKED DOWN AND LEVELED OFF. THE 2 FEET DEPTH WILL THEN BE MEASURED FROM THIS NEW SURFACE. THE CONTRACTOR WILL
DETERMINE THE MEANS AND METHODS FOR DEEP PLOWING.)
TREES AND PLANTS LOCATED WITHIN A DESIGNATED TREE PROTECTION ZONE (TPZ) SHALL BE PRESERVED. REFER TO SPECIFICATION SECTION 01566 - TREE AND PLANT PROTECTION, FOR DETAILED INFORMATION ON TREE AND PLANT PRESERVATION PRACTICES AND PROCEDURES INCLUDING, BUT NOT LIMITED TO, ROOT PRUNING, VEGETATION TRIMMING, FENCING AND OTHER PRESERVATION OPERATIONS.
IF APPLICABLE, CONTRACTOR SHALL AVOID ANY WETLAND AREAS BEYOND THE LIMITS OF EXCAVATION AND CLEARING.
AS THE FIRST WORK ITEM CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLING FENCING OR OTHER MATERIAL TO IDENTIFY AND PROTECT THE IDENTIFIED WETLAND AREAS, UNLESS WETLANDS HAVE BEEN IDENTIFIED AND FENCED BY
HCFCD PRIOR TO CONSTRUCTION AND CONTRACTOR HAS WRITTEN EVIDENCE OF SUCH.
12.
13.
14.
15.
SUNOCO
1. THE 6" SUNOCO PIPELINE HAS BEEN FULLY ABANDONED. THE LINE HAS
BEEN PURGED AND EMPTIED. IT HAS BEEN FULLY ABANDONED
"IN-PLACE."
2. HCFCD HAS BEEN AUTHORIZED TO CUT, REMOVE, RECYCLE OR DO
WHATEVER TO ANY PORTIONS OF THE LINE AS DESIRED. ENERGY
TRANSFER WILL NOT BE RESPONSIBLE FOR REMOVAL.
3. ENERGY TRANSFER HAS NO CONCERNS REGARDING HEAVY EQUIPMENT
TRAVERSING THE PIPELINE (IT HAS BEEN COMPLETELY PURGED,
EMPTIED, AND ABANDONED).
4. NO REPRESENTATIVE FROM ENERGY TRANSFER NEEDS TO BE
CONTACTED OR PRESENT DURING NEARBY OPERATIONS, INCLUDING
EXCAVATIONS AND PIPELINE REMOVAL. IF NEEDED, ENERGY TRANSFER
IS AVAILABLE TO HELP LOCATE THE FACILITY, CONTACT JACOB JANACEK,
EMAIL: JACOB.JANACEK@ENERGYTRANSFER.COM.
1. HERBICIDE APPLICATION IS RESTRICTED TO TARGETED METHODS, SUCH AS HACK-AND-SQUIRT, BASAL BARK, INJECTIONS, CUT-STUMP, OR SPOT SPRAYING (FOLIAR SPRAYING ON INDIVIDUAL HERBACEOUS PLANTS WITH NO FOLIAR SPRAYING OF
DECIDUOUS TREE LEAVES OR SPANISH MOSS).
2. ADDITION OF ARTIFICIAL LIGHTING MUST BE DOWNWARD FACING AND DOES NOT INCREASE AMBIENT LIGHTING CONDITIONS
WITHIN NLEB AND/OR TCB SUITABLE SUMMER HABITAT.
3. PRESCRIBED FIRE MUST HAVE AVERAGE FLAME LENGTH ≤4 FEET IN COLORADO, KANSAS, MONTANA, NEBRASKA, NORTH DAKOTA, NEW MEXICO, OKLAHOMA, SOUTH DAKOTA, AND WYOMING OR ≤8 FEET FOR OTHER STATES, AND MAY ONLY BE CONDUCTED WHEN TEMPERATURES ARE ≥40 DEGREES FAHRENHEIT , AND FIRE WILL OCCUR OUTSIDE THE PUP SEASON.
4. TREE REMOVAL IS CONDUCTED:
a. OUTSIDE SUMMER OCCUPANCY PERIOD FOR NLEB
b. OUTSIDE THE PUP SEASON FOR TCB
c. OUTSIDE THE WINTER TORPOR PERIOD IN YEAR-ROUND ACTIVE ZONE 1
d. OUTSIDE SPRING STAGING AND FALL SWARMING PERIODS WITHIN KNOWN NLEB AND/OR TCB SPRING STAGING/FALL
SWARMING AREAS (I.E., 5.0 MILES OR 3.0 MILES FROM NELB OR TCB HIBERNACULUM ENTRANCES, RESPECTFULLY) IN THE
HIBERNATING RANGE.
e. THE EXTENT OF TREE REMOVAL DOES NOT EXCEED 0.5, 5, 40, OR 100 ACRES FOR 5X5KM GRID CELLS WITH PERCENT FOREST
COVER MEASURING 0-9.9%, 10-19.9%, 20.0-29.9% AND 30.0-100%, RESPECTIVELY
UNITED STATES FISH & WILDLIFE SERVICE REQUIREMENTS:
GRADING
1. IN AREAS WHERE THE PROJECT DESIGN INCORPORATES FILL ADJACENT
TO NEIGHBORING LANDOWNERS, THE CONTRACTOR SHALL IMPLEMENT
GRADING AND/OR PERIMETER RUNOFF CATCHMENT DEVICES
(E.G.-PERIMETER DITCHES) DURING CONSTRUCTION TO ENSURE THAT
ADJACENT PARCELS BORDERING THE PROJECT SITE DO NOT
EXPERIENCE INTERIM DRAINAGE FLOWS THAT EXCEED
PRE-DEVELOPMENT CONDITIONS FOR STORM EVENTS UP TO AND
INCLUDING THE CURRENT STORM DRAINAGE DESIGN CRITERIA AT THE
TIME OF THE PERMIT OR CARRY SEDIMENT GENERATED AS PART OF
CONSTRUCTION ACTIVITIES. WHERE APPLICABLE, THESE PRACTICES
ARE IN ADDITION TO THE STANDARD STORM WATER POLLUTION
PREVENTION PLAN DESIGN AND SHALL INLCUDE ADDITIONAL DITCHES
REDIRECTION SITE DRAINAGE OR TEMPORARY PIPING. THIS NOTE IS NOT
INTENDED TO ADDRESS ANY LIABILITY OR RESPONSIBILITY UNDER
TEXAS WATER CODE 11.086
WARNING: UNDERGROUND ELECTRICAL FACILITIES
THE CONTRACTOR SHALL CONTACT THE UTILITY COORDINATING COMMITTEE AT
1-800-545-6005 OR 811 A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION TO HAVE
MAIN AND SERVICE LINES FIELD LOCATED.
ALL INFORMATION CONCERNING TYPE AND LOCATION OF UNDERGROUND
UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE
CONTRACTORS ARE RESPONSIBLE MAKING THEIR OWN DETERMINATIONS AS TO
TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO
AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF
UNDERGROUND PIPELINES, CONDUITS, AND STRUCTURES BY CONTACTING
OWNERS OF UNDERGROUND UTILITIES OR BY EXCAVATING IN ADVANCE OF
CONSTRUCTION.
THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF
ALL UTILITIES WHEN AND WHERE THEY FALL IN THE PATH OF CONSTRUCTION.
THE CONTRACTOR IS ALSO RESPONSIBLE FOR CONTACTING THE UTILITY
COORDINATING COMMITTEE AT (713) 223-4567 AND TEXAS ONE CALL AT
1-800-245-4545, FORTY-EIGHT (48) HOURS PRIOR TO ANY CONSTRUCTION.
THE LOCATION OF ANY CENTERPOINT ENERGY UTILITIES ARE SHOWN IN
APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION BEFORE COMMENCING WORK. THEY AGREE TO BE FULLY RESPONSIBLE
FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THIS FAILURE TO
EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND UTILITIES.
ALL PROPOSED FACILITIES SHALL MAINTAIN 12" CLEAR FROM ALL EXISTING
UTILITIES.
05/27/2025
05/29/25
05/29/25
CORPORATION
GUNDA
Houston, Texas 77092 9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
- G
EN
ER
AL
N
OT
ES
.D W
G
J
GO
TT
LI
EB
S
AV
ED
: W ed ne sd ay
, M ay
1, :1 8:
A
M
GC
-B W
-F
UL
L.
LO
TT
ED
: Tu es da y, M ay
7, :0
3:
A M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q
4-
-0 0-
E0
FO
RE
ST
G
RE
EN
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
ES
TI
M
AT
E
O F
Q U
AN
TI
TY
C T
D K
R O
05/27/2025
05 62
N/A
Q534-01-00-E002 ESTIMATE OF QUANTITY
# PAY ITEM # PAY ITEM DESCRIPTION UNIT QUANTITY
1 1562-01 CONSTRUCTION FENCE LF 5,154
2 2120-02 DEBRIS AND TRASH REMOVAL AND DISPOSAL IN A LANDFILL CY 50
3 2120-03 REMOVE & DISPOSE OF CONCRETE RUBBLE AND CONCRETE STRUCTURES CY 51
4 2120-04 REMOVE & DISPOSE OF ALL PIPE LF 2,212
5 2120-06 REMOVE & DISPOSE OF STEEL RESTRICTOR PLATES SF 60
6 2120-09 REMOVE & DISPOSE OF TIRES <= 16" EA 25
7 2120-10 REMOVE & DISPOSE OF TIRES >= 16" EA 25
8 2120-33 DISMOUNT RIMS (IF ATTACHED TO TIRE), ALL DIAMETERS EA 50
9 2200-06 SITE PREPARATION & RESTORATION, INCLUDING CLEARING & GRUBBING, CARE AND CONTROL OF WATER , ACCESS
ROADS AND FACILITY FOR ENGINEER EA 1
10 2233-01 CLEARING & GRUBBING AC 5
11 2269-01 TRENCH SHORING SYSTEM, 5 TO 20 FEET LF 815
12 2315-02 EXCAVATION & OFF-SITE DISPOSAL CY 414,504
13 2315-03 EXCAVATION & FILL (ON-SITE MATERIAL) CY 103,817
14 2361-02 REINFORCED SILT FENCE LF 9,676
15 2364-02 FILTER DAM - TYPE 2 LF 100
16 2365-01 STABILIZED CONSTRUCTION ACCESS SY 348
17 2376-03 CONCRETE CHANNEL LINING, 6" NOMINAL THICKNESS SY 1,946
18 2376-06 CONCRETE INTERCEPTOR STRUCTURE SY 125
19 2378-06 GRANULAR FILL, 3-5 INCHES TON 250
20 2378-01 RIPRAP, GRADATION NO. 1 SY 706
21 2378-23 RIPRAP, GRADATION NO. 2 TON 585
22 2379-01 GEOTEXTILE FILTER MATERIAL FOR RIPRAP SY 222
23 2379-05 GEOTEXTILE FILTER MATERIAL, NON-WOVEN SY 12,538
24 2379-20 GEOGRID SY 12,538
25 2464-01 HCFCD TIMBER BENT FOR OUTFALLS EA 4
26 2505-02 24-INCH HDPE PIPE LF 335
27 2612-61 8' x 4' REINFORCED CONCRETE BOX (TxDOT:Item 462) LF 480
28 2632-70 HEADWALLS AND WINGWALLS (TxDOT:Item 400;Item 466) CY 9
29 2635-71 SAFETY END TREATMENT EA 2
30 2642-02 24-INCH CORRUGATED METAL PIPE LF 468
31 2642-06 48-INCH CORRUGATED METAL PIPE LF 112
32 2711-03 CRUSHED LIMESTONE FLEXIBLE BASE COURSE,10" THICKNESS SY 12,538
33 2825-01 STEEL PIPE GATE EA 1
34 2921-16 ANCHORED SODDING SY 5,000
35 2930-01 TREE PLANTING, INCLUDING ALL MATERIAL AND INSTALLATION LS 1
EXIST FL
EXIST SLOPE
FENCE (CHAIN LINK)
BUILDING
BUILDING OVERHANG
TREE LINE/BRUSH LINE
CURB LINE
GUARD RAIL/HAND RAIL
EDGE OF ASPHALT
UTILITY MARKER
CITY OF HOUSTON MONU.
DESCRIPTIONSYMBOL
GRATE INLET
C-INLET
STREET LIGHT, GAS LIGHT
MAIL BOX
SPRINKLER
SPRINKLER VALVE
BRICK COLUMN
SIGN
TREE
SIGNAL POLE
ELECTRIC BOX
METER POLE
GUY WIRE
POWER POLE
MH-ELECTRIC
CLEANOUT
GRATE INLET
E-INLET
B-INLET/BB-INLET
STM./SAN./WTR./ MANHOLE
PEDESTAL BOX
MH-TELEPHONE
GAS VALVE
GAS METER
WATER METER
FIRE HYDRANT
WATER VALVE
CHANNEL BASELINE
PROP SLOPE
5+00
EXISTING SYMBOLS
DESCRIPTIONSYMBOL
EXISTING PLAN PROPOSED PLAN
DESCRIPTIONSYMBOL
REINFORCED SILT FENCE
PROP RIPRAP
FLOW
BASELINE
CENTER LINE
CONC CONCRETE
DESC DESCRIPTION
DIA Ø DIAMETER
D/S DOWNSTREAM
E EAST
EOP EDGE OF PAVEMENT
EL ELEVATION
FLOW LINE
FH FIRE HYDRANT
FM FORCE MAIN OR FLOW METER
GALV GALVANIZED
HOUSTON LIGHTING & POWERHL&P
HOT MIX ASPHALTIC CONCRETEHMAC
HIGH POINTHP
INVERT ELEVATIONINV EL
INFLECTION POINTIP
LINEAR FEETLF
LEFTLT
MAXIMUMMAX
MANHOLEMH
MINIMUMMIN
NATURAL GROUNDNG
NORTHN
POINT OF CURVATUREPC
POINT ON CURVEPOC
POINT OF REVERSE CURVEPRC
PROPOSEDPROP
POINT OF TANGENCYPT
RADIUSR
REINFORCED CONCRETE PIPERCP
RIGHT OF WAYROW
RADIUS POINTRP
RAILROADRR
SANITARY SEWERSAN
SOIL BORING / BORE HOLESB/BH
SAFETY END TREATMENTSET
SANITARY SEWER EASEMENTSSE
STATIONSTA
STORM SEWERSTM
SOUTHWESTERN BELL
TELEPHONE
SWBT
AT@
SCHEDULESCH
REQUIREDREQ
POINT OF COMPOUND CURVATUREPCC
D DELTA
POINT OF INTERSECTIONPI
LENGTHL
COL COLUMN
HORIZONTALHORT
HCFCD HARRIS COUNTY FLOOD
CONTROL DISTRICT
C-C CENTER TO CENTER
DIP DUCTILE IRON PIPE
IRON RODIR
BOTTOMBOT
BEGINBEG
CLR CLEAR DISTANCE
CJ CONSTRUCTION JOINT
NOT TO SCALENTS
ON CENTER EACH WAYOCEW
PREPARATIONPREP
PROP CONCRETE LINING
FILTER FABRIC/SILT FENCE
ABBREVIATIONS
SET/FOUND IRON ROD
OR P.K. NAIL
TOP OF CURBTC
WITHW/
WESTW
WATERLINEWL
WATERLINE EASEMENTWLE
UTILITY EASEMENTUE
TYPICALTYP
UPSTREAMU/S
TANGENTT
VERTICALVERT
TYPETY
ABBREVIATIONS
X 5.9
SLOPE LABELING
EXIST CONTOURS
EXIST ELEVATION
RIGHTRT
HIGH DENSITY POLYETHYLENE PIPEHDPE
RETAININGRET
STEELSTL
POINT OF VERTICAL INTERSECTIONPVI
BEGINNING VERTICAL CURVE STATIONBVCS
EVCS END VERTICAL CURVE STATION
BEGINNING VERTICAL CURVE ELEVATIONBVCE
EVCE END VERTICAL CURVE ELEVATION
RSF
CMP CORRUGATED METAL PIPE
EW EACH WAY
EXIST EXISTING
EXP EXPANSION
FG FINISH GRADE
L FL
POWER POLEPP
REINFORCED CONCRETE BOXRCB
SOUTHS
VERTICAL CURBVC
BL BL
CL CL
F
ADDITIONAL ABBREVIATIONS
B/S BACKSLOPE
BW BOTTOM WIDTH
BWF BARBED WIRE FENCE
CHAN CHANNEL
CLF CHAIN LINK FENCE
COMB COMBINED
ESMT EASEMENT
FNC FENCE
HDWL HEADWALL
INT INTERCEPTOR
RECT RECTANGULAR
SS SIDE SLOPE
SWR SEWER
TOW TOP OF WALL
SHRUB/BUSH
HCFCD ROW
STREET ROW (EXIST)
EASEMENTS (EXIST)
FENCE (WOODEN)
LOT LINE (EXIST)
W WATER LINE
E ELECTRICAL
FM FORCEMAIN
T TELEPHONE
PROP CUT AREA
FD-TYPE FILTER DAM W/TYPE NOTED
SOD
STABILIZED CONSTRUCTION ACCESS
MAX 3
70 PROP CONTOURS
SS SANITARY SEWER (GRAVITY)
GAS GAS LINE
STORM SEWER
Houston, Texas 77092 9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
- S
YM
BO
LS
-A
BB
RE
VI
AT
IO
N.
DW
G
R
OZ
UN
A | S
AV
ED
: F rid ay , F eb ru ar y 1
4, 3:
:1
PM |
GC
-B
W -F
UL
L.
LO
TT
ED
: Tu es da y, M ay
7, :0
3:
A M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q
4-
-0 0-
E0
FO
R
ES
T
G R
EE
N
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
SY
M
BO
LS
A
BB
R
EV
IA
TI
O
N S
C T
D K
R O
05/27/2025
06 62
N/A
HB HIGH BANK
SCALE: 1:1
VIEW TITLE1
XX
XX
XX
PROPOSED SYMBOLS
DETAIL/SECTION TITLE
SECTION CALLOUT
DETAIL CALLOUT
PROP BASIN SHELF AREA
PROTECTED WETLANDS
COH CITY OF HOUSTON
HCED HARRIS COUNTY ENGINEERING
DEPARTMENT
INLET PROTECTION
VEGETATEDVEG
TOP OF BANKTOB
EG EXISTING GRADE
PROP FILL AREA
IP
STATIC WSEL
WATER SURFACE ELEVATIONWSEL
CLEARING & GRUBBING LIMITS
WETLANDS AREA
TREE PROTECTION ZONE
24"RCP FL=63.45'
24"RCP FL=65.87'
24"RCP FL=65.01'
24"RCP FL=64.99'
24"RCP FL=64.83'
24"RCP FL=64.80'
24"RCP FL=65.92'
24"RCP FL=64.96'
24"RCP FL=65.14'
24"RCP FL=64.80'
24"RCP FL=64.79'
36"RCP FL=64.43'
36"RCP FL=64.65'
36"RCP FL=64.08'
36"RCP FL=64.55'
24"RCP FL=64.18'
36"RCP FL=64.80'
36"RCP FL=64.55'
24"RCP FL=64.01'
24"RCP FL=64.03'
24"RCP FL=63.93'
24"RCP FL=63.85'
36"RCP FL=63.72' 36"RCP FL=63.51'
36"RCP FL=63.63'
36"RCP FL=63.04'
36"RCP FL=63.00'
36"RCP FL=62.79'
24"RCP FL=64.19'
24"RCP FL=62.21'
36"RCP FL=62.65'
36"RCP FL=62.68'
36"RCP FL=62.90'
36"RCP FL=62.99'
48"RCP FL=60.23'
48"RCP FL=60.37'
48"RCP FL=60.45'
36"RCP FL=61.85'
36"RCP FL=62.02'
48"RCP FL=60.25'
48"RCP FL=60.06'
48"RCP FL=59.86'
48" RCP FL=58.42'
48" RCP FL=58.04'
48" RCP FL=57.97'
48" RCP FL=57.71'
48"RCP FL=56.99'
48"RCP FL=57.06'
48"RCP FL=57.07'
48"RCP FL=57.16'
CMP+24" FL=59.43'
CMP+24" FL=60.02'
24" STEEL PIPE FL=62.24'
24" STEEL PIPE FL=61.49'
CMP CRUSHED
TOP OF PIPE = 62.37'
42"RCP FL=59.74'
42"RCP FL=59.92'
66.58
66.1067.37
66.1866.96
67.29
67.64
70.89 67.41
18" RCP SW FL=66.25'
18" RCP SW FL=66.66'
30" RCP NE FL=64.87'
30" RCP SW FL=65.06'
30" RCP NE FL=64.93'
30" RCP SW FL=64.80'
30" RCP NE FL=64.92'
30" RCP SW FL=65.06'
STOP
(PRIVATE RR-CROSSINGS
MP (UTILITY MARKER
24" RCP NE FL=64.78'
24" RCP SW FL=64.96'
18" RCP NE FL=64.78'
18" RCP SW FL=64.69'
24" STEEL PIPE NE FL=64.60'
24" STEEL PIPE SW FL=64.31'
STOP
STOP
GAS GAS
GAS
GAS
GAS
E
E
PROP. SIDE-WEIR STRUCTURE 2
SEE SHEET 44
PROP. INFLOW STRUCTURE 1
SEE SHEET 41
PROP.
BASIN
BOTTOM
PROP.
BASIN
BOTTOM
PROP 30' ALL WEATHER
ACCESS ROAD
PROP 30'
MAINTENANCE
BERM
PROP 30'
MAINTENANCE
BERM
PROP 30'
MAINTENANCE
BERM
PROP. BASIN
TOP BANK
PROP. BASIN
TOP BANK
PROP. BASIN
TOP BANK
PROP 30'
MAINTENANCE
BERM
PROP.
BACKSLOPE
SWALE PROP.
INTERCEPTOR
PROP. INTERCEPTOR
PROP. BACKSLOPE SWALE
PROP. OUTFALL STRUCTURE
(4-8'X4' RCBs WITH WINGWALLS)
SEE SHEET 45
PROP. INFLOW STRUCTURE 2
SEE SHEET 42
PROP. INFLOW STRUCTURE 1
SEE NOTE 41
PROP. WSEL
59.54
PROP. WSEL
59.54
STATIC WSEL
59.54
PROP.
INTERCEPTOR
PROP.
INTERCEPTOR
FLOW
BORING 2 BORING 3
BORING 4
BORING 5
BORING 6
BORING 9
BORING 17
BORING 10
BORING 11
BORING 12
BORING 1
0+00 5+00 10+00 15+00 20+00 25+00 30+00
35+00
40+00
45+00
50+00
55+00
56+73
PHASE 1
REGIONAL
STORMWATER
DETENTION
BASIN
STATIC WSEL
59.54
BORING 8
BORING 7
PROP. BASIN
TOP BANK
PROP.
INTERCEPTOR PROP.
INT.PROP.
INT.
DESIGN
BASELINE
PROP GATE
60.0060.00
60.00 60.00
62.0062.00
62.00
62.00
64.00 64.00
64.0064.00
64.00 64.00
64.0064.00
64.00 64.00
64.00 64.00
64.0064.00
64.00 64.00
64.0064.00
64.0064.00
64.0064 .00
64.00 64.00
64.0064 .0
64.00
64.00
64.00
64.00
64.00
64.00
.0
64.0064.00 64.00
64.00
64.0064 .0
0 64 .0
64.00
64.00
64.00
64.00
64.0064.00
64.00
64.00
WILLIAM KEYSER SURVEY A-500
JOHN MERRY SURVEY A-49 APPROX. SURVEY LINE
E
E
EXISTING TxDOT
DETENTION POND.
(PER REFERENCE)
F.
M
. 2
(T xD O
T R
O W
FLOW
SCALE IN FEET
0 400200
NOTES
1. CAUTION EXISTING GAS FACILITIES IN AREA.
2. REFER TO SHEET 48 FOR PIPELINE REMOVAL.
3. REFER TO SHEET 31 FOR POND TYPICAL
SECTIONS AND SHEET 32 THROUGH 40 FOR
POND CROSS SECTIONS.
4. REFER TO SHEET 50 FOR CONSTRUCTION &
LOW-USE ACCESS.
BAYOU BEND, LLC.
360 AC.
H.C.C.F. #Y056225
6"Ø SUNOCO
CRUDE OIL
PIPELINE
BENCHMARK:
FLOODPLAIN REFERENCE MARK NO. 070515 IS A HCFCD
DATUM ROD IN SLEEVE W/ AC STAMPED HGCSD 8 1986,
LOCATED FROM THE INTERSECTION FM 1960 AND FM
2100 TRAVEL SOUTH ON FM 2100 FOR 1.24 MILES TO
ATASCOCITA ROAD GO WEST FOR 0.2 MILE TO FIRST
PENTECOSTAL CHURCH OF GOD ON THE SOUTH SIDE OF
THE ROAD.
ELEV. = 67.79' (NAVD 1988, 2001 ADJ TSARP)
HCFCD UNIT NO.
Q134-01-00
HCFCD UNIT NO. Q134-00-00
FLOW
PROP 30'
MAINTENANCE
BERM
PROP 30' ALL WEATHER
ACCESS ROAD
M
AT
CH
LI
NE
M
AT
CH
LI
NE
F.M. 1960
PROP. EMERGENCY OVERFLOW STRUCTURE
SEE SHEET 47
30' HCFCD ESMT
D19200542
VOL 1920 PG 542 HCDR
EXISTING 30' HCFCD ESMT UNIT Q134-00-00
VOL 1920, PG 540 HCDR
EXISTING 30' HCFCD ESMT
VOL 187, PG 1 HCMR
EXISTING 16' U.E.
VOL 187, PG 1 HCMR Houston, Texas 77092
9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
-O
A- Q5
.D
W G
J
GO
TT
LI
EB
S
AV
ED
: F rid ay , M ay
, 2
:2 0:
A
M |
GC
-B
W -F
UL
L.
LO
TT
ED
: Tu es da y, M ay
7, :0
4:
A M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q
4-
-0 0-
E0
FO
RE
ST
G
RE
EN
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
O
VE
R
AL
L
LA
YO
U T
C T
D K
R O
05/27/2025
07 62
1" = 400'
HCFCD PROPERTY LINE
H C
FC
D
P R
O
PE
R
TY
L
IN
E
SEE SHEET 25
SEE SHEET 26
SEE SHEET 27SEE SHEET 28
SEE SHEET 29
BORE HOLE POINT TABLE
DESCRIPTION ELEVATION NORTHING EASTING
BORING 1 64.40 13941780.48 3210352.38
BORING 2 63.90 13941255.37 3210332.86
BORING 3 63.71 13941172.46 3210868.46
BORING 4 63.73 13940631.45 3210964.46
BORING 5 63.68 13940545.44 3211448.94
BORING 6 63.41 13940069.13 3211830.06
BORING 7 63.54 13939795.49 3211219.86
BORING 8 63.37 13940044.57 3210850.31
BORING 9 63.00 13940006.61 3210147.91
BORING 10 63.36 13939784.23 3209815.29
BORING 11 63.52 13939963.11 3209410.14
BORING 12 63.82 13939702.93 3209109.21
BORING 13* 64.36 13938852.94 3208709.89
BORING 14* 64.37 13938159.32 3208763.58
BORING 15* 65.44 13937685.83 3208808.70
BORING 16* 65.54 13937472.33 3208834.12
BORING 17 63.57 13940310.37 3210067.83
HCFCD UNIT NO. Q134-00-00
286.41 ACRES
HARRIS COUNTY FLOOD
CONTROL DISTRICT
H.C.C.F. NO. RP 2019-280247
O.P.R.R.P.H.C.T.
COVE MATRIX INVESTMENTS LTD
TR 4E
ABST 49 J MERRY
TxDOT PARCEL
TR 4E-1 (NM)
ABST 49 J MERRY
TxDOT PARCEL 345
TR 4D-1 (NM) ABST 49
J MERRY
286.41 ACRES
HARRIS COUNTY FLOOD
CONTROL DISTRICT
H.C.C.F. NO. RP 2019-280247
O.P.R.R.P.H.C.T.
70.93 ACRES
BAYOU BEND, LLC
F.C. NO. 20130012706
P.R.R.P.H.C.T.
tree line tree line
EXISTING 30' HCFCD ESMT UNIT Q134-00-00
VOL 1920, PG 540 HCDR
REMOVE & DISPOSE OF
ABANDONED PIPELINE,
SEE NOTE 2
dirt trail dirt trail irrigation ditch
* THESE BORINGS ARE OUTSIDE THE EXTENTS OF THIS
LAYOUT AND NOT VISIBLE. YOU WILL FIND THESE
BORINGS IN THE PROJECT'S GEOTECHNICAL REPORT.
HCFCD PROPERTY LINE
20' HCFCD ESMT (TRACT2) VOL.
1866 PG. 642 HCDR
100' IRRIGATION ESMT 1
(VOL 1362 PG 449 &
VOL 1405 PG 610 HCDR)
HCFCD ROW
(VARIES)
HCFCD ROW (VARIES)
20' HCFCD ESMT (TRACT2) VOL.
1866 PG. 642 HCDR
64.90
65.50 61.35
61.15 58.65
54.0052.00
VARIES
54.00
52.00VARIES
58.65 61.1561.35
65.50
64.90
64.9065.50
61.35 61.15
58.65
54.00
52.00
VARIES
VARIES
58.65
61.1565.5064.90
52.0054.00
61.35
HCFCD PROPERTY LINE
H C
FC
D
P R
O
PE
R
TY
L
IN
E
RAILROAD
tree line tree line tree line tree line dirt trail
PROP. CONSTRUCTION
ACCESS, SEE NOTE 4
48" RCP FL=57.97'
48" RCP FL=57.71'
48"RCP FL=56.99'
48"RCP FL=57.06'
48"RCP FL=57.07'
48"RCP FL=57.16'
CMP+24" FL=59.43'
CMP+24" FL=60.02'
24" STEEL PIPE FL=62.24'
24" STEEL PIPE FL=61.49'
CMP CRUSHEDTOP OF PIPE = 62.37'
42"RCP FL=59.74'
42"RCP FL=59.92'
64.97
66.7765.24
64.16GAS GAS
GAS
GAS
GAS
7" W
N G
H D
W W
N G
WILLIAM KEYSER SURVEY A-500
JOHN MERRY SURVEY A-49 APPROX. SURVEY LINE
SCALE IN FEET
0 400'200'
NOTES
BENCHMARK:
FLOODPLAIN REFERENCE MARK NO. 070515 IS A HCFCD
DATUM ROD IN SLEEVE W/ AC STAMPED HGCSD 8 1986,
LOCATED FROM THE INTERSECTION FM 1960 AND FM
2100 TRAVEL SOUTH ON FM 2100 FOR 1.24 MILES TO
ATASCOCITA ROAD GO WEST FOR 0.2 MILE TO FIRST
PENTECOSTAL CHURCH OF GOD ON THE SOUTH SIDE OF
THE ROAD.
ELEV. = 67.79' (NAVD 1988, 2001 ADJ TSARP)
Houston, Texas 77092 9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
-P
P- Q1
-0
0-
-P
ON
D_
DA
M _P
R.
DW
G
J
GO
TT
LI
EB
S
AV
ED
: F rid ay
, M ay
, 2
:2
2:
A M |
GC
-B
W -F
UL
L.
LO
TT
ED
: Tu es da y, M ay
7, :0
7:
A M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q
4-
-0 0-
E0
FO
RE
ST
G
RE
EN
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
D
R
AI
N
AG
E
AR
EA
M
AP
C T
D K
R O
05/27/2025
08 62
1" = 400'
LEGEND
DRAINAGE AREA BOUNDARY
DA1
14.87
DA2
10.08 DA3
5.24
DA4
2.16
H C
FC
D
P R
O
JE
C T
ID
Q
4-
-0 0-
E0
DA5
0.94
DA7
14.44
DA8
17.85
DA6
6.30
PROP 30' ALL WEATHER
ACCESS ROAD
PROP 30'
MAINTENANCE
BERM
PROP 30'
MAINTENANCE
BERM
PROP. BASIN
TOP BANK
PROP. BACKSLOPE
SWALE
PROP. INTERCEPTOR
PROP. BACKSLOPE SWALE
EXISTING 30' HCFCD ESMT UNIT Q134-00-00
VOL 1920, PG 540 HCDR
EXISTING 30' HCFCD ESMT
VOL 187, PG 1 HCMR
STATIC WSEL
59.54
PROP.
INTERCEPTOR
PROP. BASIN
TOP BANK
PROP.
INTERCEPTOR
20' HCFCD ESMT (TRACT2) VOL.
1866 PG. 642 HCDR
100' IRRIGATION ESMT 1
(VOL 1362 PG 449 &
VOL 1405 PG 610 HCDR)
HCFCD ROW (VARIES)
HCFCD ROW (VARIES)
20' HCFCD ESMT (TRACT2) VOL.
1866 PG. 642 HCDR
PROP. INT.
PROP.
INT.
PROP. INT.
PROP. INT.
HCFCD UNIT NO.
Q134-01-00
HCFCD UNIT NO. Q134-00-00
FLOW
PROP.
BASIN
BOTTOM
30' HCFCD ESMT
D19200542
VOL 1920 PG 542 HCDR
HCFCD PROPERTY LINE
H C
FC
D
P R
O
PE
R
TY
L
IN
E
HCFCD PROPERTY LINE
286.41 ACRES
HARRIS COUNTY FLOOD
CONTROL DISTRICT
H.C.C.F. NO. RP 2019-280247
O.P.R.R.P.H.C.T.
tree line tree line dirt trail dirt trail irrigation ditch tree line tree line dirt trail
FLOW
PROP. INT.
1. ACCORDING TO FEDERAL EMERGENCY
MANAGEMENT AGENCY'S F.I.R.M.
COMMUNITY PANEL NO. 48201C0340L
EFFECTIVE DATE JUNE 18, 2007. THE
SURVEYED AREA APPEARS TO BE LOCATED
IN THE FOLLOWING ZONES:
1.1. ZONE AE - DEFINED AS SPECIAL FLOOD
HAZARD AREAS SUBJECT TO
INUNDATION BY THE 1% ANNUAL
CHANCE FLOOD EVENT.
2. ALL-WEATHER ACCESS ROAD IS DESIGNED
TO DRAIN BY OVERLAND SHEET FLOW TO
THE IDENTIFIED EXISTING DRAINAGE PATHS
THE FLOW INTO HCFCD UNIT Q134-00-00.
OVERLAND FLOW DIRECTION
DRAINAGE AREA IDDA
X.X DRAINAGE AREA (AC)
PHASE 1
REGIONAL
STORMWATER
DETENTION
BASIN
64.90
65.50 61.35
61.15 58.65
54.0052.00
VARIES
54.00
52.00VARIES
58.65 61.1561.35
65.50
64.90
64.9065.50
61.35 61.15
58.65
54.00
52.00
VARIES
VARIES
58.65
61.1565.5064.90
52.0054.00
61.35
PROP 30' ALL WEATHER
ACCESS ROAD
M
AT
CH
LI
NE
HCFCD UNIT NO. Q134-00-00
HCFCD PROPERTY LINE
H C
FC
D
PR
O
PE
R
TY
LI
N E
SEE NOTE 2
SEE NOTE 2
SEE NOTE 2
FLOW
M
AT
CH
LI
NE
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
CR
OS
S
SE
CT
IO
NS
.D
W G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 7:
A
M
PL
OT
TE
D:
Fr ida y, Fe br ua ry
, 2
:4
7:
A M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
CR
OS
S
SE
CT
IO
NS
.D
W G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 7:
A
M
OT
TE
D:
Fr ida y, Fe br ua ry
, 2
:4
7:
A M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
TY
PI
C
AL
S
EC
TI
O N
APPROX. 80'
EX. GROUND
EX. GROUND
30'
2% 2%
VARIES
NOTES:
1. BASED ON GEOTECHNICAL REPORT ALL-TERRA
PROJECT NO: AE20-972 BY ALL TERRA
ENGINEERING, INC. IN NOVEMBER 2, 2021, IT IS
ASSUMED THAT EXISTING SUBGRADE CONSISTS
OF 2 SOIL LAYERS CONSISTING OF HARD CLAY
LAYERS AND LEAN CLAY LAYERS.
2. CRUSHED AGGREGATE BASE TO BE COMPACTED
TO 95% STD PROCTOR PER HARRIS COUNTY SPEC
ITEM 230 WITH A MOISTURE CONTENT CONTENT
RANGING FROM OPTIMUM TO 3% ABOVE OPTIMUM.
3. ENSURE POSITIVE DRAINAGE AWAY FROM
PAVEMENT SO THERE IS NO PONDING ALONG THE
ACCESS ROAD
ALL WEATHER ACCESS ROAD TYPICAL SECTION
SCALE = N.T.S.
10" CRUSHED AGGREGATE
BASE COURSE (SEE NOTE 2)
N.T.S.
(N O
R
TH
) C O
N
ST
R U
C
TI
O N
L
IM
IT
S
(S O
U
TH
) T R
EE
L
IN
E
VARIES
35'
SEE INSET 1
UNDERLYING GEOTEXTILE.
TERRA TEX #8 OR EQUAL
10"
GEOGRID (BX1100 OR EQUAL)
INSET 1
SCALE: N.T.S.
10" CRUSHED AGGREGATE
BASE COURSE (SEE NOTE 2)
UNDERLYING GEOTEXTILE.
TERRA TEX #8 OR EQUAL
GEOGRID (BX1100 OR EQUAL)
2.5
TO 95% OF MODIFIED PROCTOR (ASTM D-1557)
LO
T 152
LO
T 151
BLO
CK 8
LO
T 150
BLO
CK 8
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
OV
ER
AL
L.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 7:
A
M
OT
TE
D:
Fr ida y, Fe br ua ry
, 2
:4
7:
A M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
OV
ER
AL
L.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 7:
A
M
OT
TE
D:
Fr ida y, Fe br ua ry
, 2
:4
7:
A M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
O
VE
R
AL
L
LA
YO
U
T
1" = 250'
SCALE IN FEET
0 125 250
START TO STA.15+00 PROFILE
9+22 10+00 11+00 12+00 13+00 14+00 15+00
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 7:
A
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 7:
A
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
P
LA
N
PR
O
FI
LE
BE
G
IN
N
IN
G T
O S
TA
.1
5+
EXIST. N.G.
SCALE IN FEET
0 25 50
1" = 50'
EXISTING DRIVEWAY
SYMBOL
LEGEND
DESCRIPTION
CLEARING GRUBBING
EXISTING GROUND
PROPOSED GROUND
ALL WEATHER ACCESS ROAD
EX. TREES
EX. TREES
1" = 50'
STA.15+00 TO STA.20+00 PROFILE
15+00 16+00 17+00 18+00 19+00 20+00
SYMBOL
LEGEND
DESCRIPTION
CLEARING GRUBBING
EXISTING GROUND
PROPOSED GROUND
ALL WEATHER ACCESS ROAD
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
P
LA
N
PR
O
FI
LE
ST
A.
+0
TO
S
TA
.2
0+
SCALE IN FEET
0 25 50
1" = 50'
EX. TREES
EX. TREES
STA.20+00 TO STA.25+00 PROFILE
20+00 21+00 22+00 23+00 24+00 25+00
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
P
LA
N
PR
O
FI
LE
ST
A.
+0
TO
S
TA
.2
5+
SCALE IN FEET
0 25 50
1" = 50'
SYMBOL
LEGEND
DESCRIPTION
CLEARING GRUBBING
EXISTING GROUND
PROPOSED GROUND
ALL WEATHER ACCESS ROAD
EX. TREES
STA.25+00 TO STA.30+00 PROFILE
25+00 26+00 27+00 28+00 29+00 30+00
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
P
LA
N
PR
O
FI
LE
ST
A.
+0
TO
S
TA
.3
0+
SCALE IN FEET
0 25 50
1" = 50'
SYMBOL
LEGEND
DESCRIPTION
CLEARING GRUBBING
EXISTING GROUND
PROPOSED GROUND
ALL WEATHER ACCESS ROAD
EX. TREES
STA.30+00 TO STA.35+00 PROFILE
30+00 31+00 32+00 33+00 34+00 35+00
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 7:
A
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 7:
A
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
P
LA
N
PR
O
FI
LE
ST
A.
+0
TO
S
TA
.3
5+
SCALE IN FEET
0 25 50
1" = 50'
SYMBOL
LEGEND
DESCRIPTION
CLEARING GRUBBING
EXISTING GROUND
PROPOSED GROUND
ALL WEATHER ACCESS ROAD
EX. TREES
STA.35+00 TO STA 38+50 PROFILE
35+00 36+00 37+00 38+00 38+50
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:4 3:
A
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
P
LA
N
PR
O
FI
LE
ST
A.
+0
TO
S
TA
.3
8+
SCALE IN FEET
0 25 50
1" = 50'
SYMBOL
LEGEND
DESCRIPTION
CLEARING GRUBBING
EXISTING GROUND
PROPOSED GROUND
ALL WEATHER ACCESS ROAD
EX. TREES
EX. TREES
1" = 50'
PROPOSED SWING GATE
2.5'
2.5'
STA.38+50 TO ALIGNMENT END PROFILE
38+50 39+00 40+00 41+00 42+00
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:5 7:
P
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:5 7:
P
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
PL
AN
P
RO
FI
LE
S.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay , F eb ru ar y 7
, 2
:5 7:
P
M
P
LO
TT
ED
: Fr ida y, Fe br ua ry
, 2
:5 7:
P
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
P
LA
N
PR
O
FI
LE
ST
A.
+5
TO
E
N D
SCALE IN FEET
0 25 50
1" = 50'
SYMBOL
LEGEND
DESCRIPTION
CLEARING GRUBBING
EXISTING GROUND
PROPOSED GROUND
ALL WEATHER ACCESS ROAD
EX. TREES
LOT 122
BLOCK 7
LOT 123
BLOCK 7
LOT 163
BLOCK 8
LOT 162
BLOCK 8
LOT 161
BLOCK 8
LOT 152
BLOCK 8
LOT 151
BLOCK 8
LOT 150
BLOCK 8
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
SW
PP
P.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay
, F eb ru ar y 7 , 2
:4
1:
A M
OT
TE
D:
Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
PR
EP
AR
ED
C H
EC
KE
D
AP
PR
O
VE
D
SCALE:
H C
FC
D
P R
O
JE
C T
ID
DRAWING NUMBER
OF 59
R
EV
IS
IO
N S
D
AT
E
AP
P N
O
Q
4-
-0 0-
E0
D
JY
TRE FIRM F-15291
3151 BRIARPARK DRIVE,
SUITE 225
HOUSTON, TX 77042
832.779.5700
GRADIENT
02/07/2025
FO
R
ES
T
G R
EE
N
R
EG
IO
N
AL
S
TO
R
M W
AT
ER
D
ET
EN
SI
O N
B
AS
IN
PH
AS
E
SA SA
Houston, Texas 77092 9900 Northwest Freeway
S:
\2
CO
UN
TY
\2
HA
RR
IS
\2
HC
FC
D\
Q
4- E0
A
CC
ES
S
RD
\2
CA
D\
- D
W G\
SW
PP
P.
DW
G
E
GO
NZ
AL
EZ
S
AV
ED
: F rid ay
, F eb ru ar y 7 , 2
:4
1:
A M
OT
TE
D:
Fr ida y, Fe br ua ry
, 2
:4 8:
A
M
DATE:
SCALE:
DRAWING NUMBER
OF
02/07/2025
1" = 250'
AL
L
W
EA
TH
ER
A C
C
ES
S R
O
AD
S
TO
R M
W
AT
ER
PO
LL
U
TI
O
N P
R
EV
EN
TI
O N
P
LA
N
SCALE IN FEET
0 125 250
48" RCP FL=57.97'
48" RCP FL=57.71'
64.4064.16
63.9063.77
63.7163.23
63.54
58.3363.4163.39
63.84 63.86
59.36 58.1058.55
67.33
67.37
63.07 62.36
59.32 57.80
58.62
63.98 63.98
63.86 63.69
58.63 57.89
58.78
63.52 63.53
64.99 64.87
59.24 57.87
58.67
63.92 63.73
63.76
63.78
58.83 57.89
58.93
65.30 66.16
67.51 67.18
59.19 57.66
58.67
64.21 63.66
63.54 63.72
58.61 57.84 59.02
65.58
66.32
66.65 66.57
59.3057.90 58.61
63.51 63.45
63.59 63.49
58.9058.2358.75
66.26 66.63
67.10 66.73
59.3358.1158.76
63.44 63.25
63.56 63.34
59.0357.9158.54
66.44
63.54
63.42
64.1963.95
63.6963.56
63.5063.02
60.00
60.00
62.00
62.00
.00
64.00
.00
64.00
64.00
64.00
64.00
64.00
64.00
.00
64.00
64.00
64.00
66.00
66.00 68.00
68.00
R600'
R100'
52.00
61.15
61.35
65.50
64.90
58.65
52.00
58.65 61.15
61.35 65.50
64.90
52.00
58.65 61.15
61.3565.50
64.90
52.00
58.65 61.15
61.35 65.50
64.90
56+73
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
55+00
56+00
PROP BACKSLOPE INTERCEPTOR
STRUCTURE WITH 24" CMP
STA 53+86.38, 179.78' LT
STA 50+99.51, 248.76' LT
SWALE HP
STA 55+74.17, 92.22' LT
SWALE HP
PROP BACKSLOPE INTERCEPTOR
STRUCTURE WITH 24" CMP
STA 47+75.62, 216.88' LT R655'
STA 53+75.44, 132.71' LT
24" FL = 61.35'
STA 47+67.76, 163.03' LT
24" FL = 61.35'
54.00
54.00
54.00
54.00
R69' R22.39'
R34.8'
144 145
R100'
R100'
R100'
R100'
PROP. TOB
PROP. STATIC
WSEL = 59.54'
PROP 30'
MAINTENANCE
BERM
PROP. TOB
PROP 30'
MAINTENANCE
BERM
END CONSTRUCTION
STA 56+73.11, 0.00'
N: 13941945.2946 E: 3210093.2312
N31° 28' 17.85"W 281.55'
L=24.828 Δ=14.2255 R=100.000
N45° 41' 49.70"W
261.92'
L=13.153 Δ=7.5360
R=100.000
N53° 13' 59.39"W
447.67'
L=25.756 Δ=14.7569 R=100.000
N38° 28' 34.59"W 240.93'
L=21.070 Δ=12.0721 R=100.000
N26° 24' 15.19"W 173.90'
PROP 20'
MAINTENANCE
BERM 2%
2%
2%
2%
2%
2%
R108'
SCALE IN FEET
0 50 100
NOTES
1. REFER TO SHEETS 31 TO 40 FOR DETENTION
BASIN TYPICAL SECTIONS & CROSS
SECTIONS.
2. REFER TO SHEET 30 FOR GEOMETRY POINT
TABLES.
3. REFER TO SHEET 55 FOR HCFCD
INTERCEPTOR STRUCTURE AND CONCRETE
PILOT CHANNEL DETAILS.
4. REFER TO SHEET 48 FOR DEMOLITION
LAYOUT INCLUDING THE PIPELINE REMOVAL
BY CONTRACTOR.
5. REFER TO SHEET 49 FOR PROTECTED
WETLANDS AND PROPOSED LIMITS OF
CLEARING & GRUBBING.
BENCHMARK:
FLOODPLAIN REFERENCE MARK NO. 070515 IS A HCFCD
DATUM ROD IN SLEEVE W/ AC STAMPED HGCSD 8 1986,
LOCATED FROM THE INTERSECTION FM 1960 AND FM
2100 TRAVEL SOUTH ON FM 2100 FOR 1.24 MILES TO
ATASCOCITA ROAD GO WEST FOR 0.2 MILE TO FIRST
PENTECOSTAL CHURCH OF GOD ON THE SOUTH SIDE OF
THE ROAD.
ELEV. = 67.79' (NAVD 1988, 2001 ADJ TSARP)
HCFCD UNIT
NO. Q134-01-00
MATCHLINE A-A
SEE SHEET 26
Houston, Texas 77092 9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
-P
P- Q1
-0
0-
-P
ON
D_
0.
DW
G
D
KE
HR
ER
S
AV
ED
: F rid ay , M ay
, 2
4:
:5
PM |
GC
-B W
-F
UL
L.
LO
TT
ED
: Tu es da y, M ay
7, :0
9:
A M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q
4-
-0 0-
E0
FO
RE
ST
G
RE
EN
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
D
ET
EN
TI
O
N B
AS
IN
L
AY
O U
T
O F
C T
D K
R O
05/27/2025
25 62
1" = 100'
10' SHELF
10' SHELF
VEGETATED SHELF
(WIDTH VARIES 10'
MIN TO 25' MAX)
PROP. SIDE-WEIR STRUCTURE 1
SEE SHEET 43
FLOW
D
IR
T
TR
AI
L
DIRT TRAIL
286.41 ACRES
HARRIS COUNTY FLOOD
CONTROL DISTRICT
H.C.C.F. NO. RP 2019-280247
286.41 ACRES
HARRIS COUNTY FLOOD
CONTROL DISTRICT
H.C.C.F. NO. RP 2019-280247
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
VEGETATED SHELF
(WIDTH VARIES 10'
MIN TO 25' MAX)
PROP. 20' BASIN
BOTTOM (SEE NOTE 1)
D
D
F
F
A
A
30' WIDE HCFCD
EASEMENT NO. Q134-01-00
D19200542
VOL 1926, PG 218 HCDR
LEGEND
PROP. BASIN SHELF
PROP. RIPRAP
PROP. CONCRETE
PROP. SIDE SLOPES
POINT NUMBERS##
WETLANDS
HCFCD PROPERTY LINE
PROPOSED WETLAND PROTECTION
MIN 25' BUFFER OF CONSTRUCTION FENCING
tree line tree line tree line
PROP. INFLOW STRUCTURE 1
SEE SHEET 41
FLO
W
FLOW
FLOW
FLOW
FLO
W
FLOW
FLOW
48"R C
P FL=56.99' 48"R
C
P FL=57.06'
48"R C
P FL=57.07'
48"R C
P FL=57.16'
63.73 63.44
63.68 63.37
63.56 63.34
59.03 57.91
58.54 66.44
66.54 65.83
58.33 57.49
58.41 63.54
63.42
57.07 56.99
57.06 57.16
64.13 64.07
58.78 57.77
58.53 65.89
66.22
66.43 66.2158.89
58.19 58.61
65.28 64.99
64.61 64.58
59.17 57.98
58.14 66.10
65.82
65.81 66.00
59.01 57.67
58.29 64.81
64.12
63.91
64.97 58.69
57.76 58.04
65.88 65.91
65.79 65.32
58.93 57.54
58.25 65.26
64.58
63.67 64.27
58.45 57.54
58.09 65.30 65.69
66.01 65.75
58.11 57.68
58.32 64.42
64.12
63.52 63.23
63.47 63.16
GAS
.0
.0
.0
.0
.0
.0
.00
.0
.0
R1050'
+0
+0
+0
+0
+0
+0
+0
+0
+0
STA 43+17.73, 239.18' LT
SWALE HP
PROP BACKSLOPE INTERCEPTOR
STRUCTURE WITH 24" CMP
STA 40+19.39, 300.93' LT
STA 37+11.37, 291.59' LT
SWALE HP
STA 23+61.33, 230.23' LT
SWALE HP
PROP BACKSLOPE INTERCEPTOR
STRUCTURE WITH 24" CMP
STA 20+50.98, 245.65' LT
STA 40+03.72, 248.63' LT
24" FL = 61.35'
R500'
R100'
R100'
R100'
R655'
PROP. STATIC
WSEL = 59.54'
30' WIDE HCFCD
EASEMENT NO. Q134-01-00
D19200542
VOL 1926, PG 218 HCDR
PROP 30'
MAINTENANCE
BERM
PROP 30'
MAINTENANCE
BERM
PROP. BACKSLOPE SWALE
L=21.070 Δ=12.0721 R=100.000
N2 6°
4'
.1
9" W
3.
L=17.985 Δ=10.3049 R=100.000
N3 6°
2'
.7
9" W
6.
L=17.253 Δ=9.8854
R=100.000
N4 6°
5'
.3
5" W
0.
2%
2%
2%
2%
2%
H C
FC
D
U N
IT
N
O . Q
134-01-00
MATCHLINE A-A
SEE SHEET 25
MATCHLINE B-B
SEE SHEET 27
Houston, Texas 77092 9900 Northwest Freeway
C:
\U
SE
RS
\JG
OT
TL
IE
B\
DC
\A
CC
DO
CS
\A
RD
UR
RA
, I
NC
\2
-0
2\
PR
OJ
EC
T
FI
LE
S\
-P
RO
D\
-D
W
GS
\2
-P
P- Q1
-0
0-
-P
ON
D_
0.
DW
G
D
KE
HR
ER
S
AV
ED
: F rid ay , M ay
, 2
4:
:5
PM |
GC
-B W
-F
UL
L.
LO
TT
ED
: Tu es da y, M ay
7, :0
9:
A M
DATE:
PR
EP
AR
ED
SCALE:
H C
FC
D
P R
O
JE
C T
ID
C H
EC
KE
D
AP
PR
O
VE
D
DRAWING NUMBER
OF
N O
R
EV
IS
IO
N
S D
AT
E
AP
P
CORPORATION
GUNDA
Q
4-
-0 0-
E0
FO
RE
ST
G
RE
EN
RE
GI
ON
AL
S
TO
RM
W
AT
ER
D
ET
EN
TI
ON
B
AS
IN
PH
AS
E
D
ET
EN
TI
O
N B
AS
IN
L
AY
O U
T
O F
C T
D K
R O
05/27/2025
26 62
1" = 100'
.0
.6
.1
.3
.5
.9
52.00
58.65
61.15 61.35
65.5064.90
58.65 61.15 61.35 65.50
64.90
58.65 61.15
61.35
65.50
64.90
VEGETATED SHELF
(WIDTH VARIES
10' MIN TO 25' MAX)
10' SHELF
286.41 ACRES
HARRIS COUNTY FLOOD
CONTROL DISTRICT
H.C.C.F. NO. RP 2019-280247
286.41 ACRES
HARRIS COUNTY FLOOD
CONTROL DISTRICT
H.C.C.F. NO. RP 2019-280247
FLO
W
.0
.0
.0
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
54.00
54.00
52.00
PROP. 20'
BASIN BOTTOM
(SEE NOTE 1)
VEGETATED SHELF
(WIDTH VARIES
10' MIN TO 25' MAX)
10' SHELF
PROP. TOB
PROP. TOB
PROP. BACKSLOPE SWALE
@ MIN 0.2% SLOPE
30' WIDE HCFCD
EASEMENT NO. Q134-01-00
D19200542
VOL 1926, PG 218 HCDR
SCALE IN FEET
0 50 100
BENCHMARK:
FLOODPLAIN REFERENCE MARK NO. 070515 IS A HCFCD
DATUM ROD IN SLEEVE W/ AC STAMPED HGCSD 8 1986,
LOCATED FROM THE INTERSECTION FM 1960 AND FM
2100 TRAVEL SOUTH ON FM 2100 FOR 1.24 MILES TO
ATASCOCITA ROAD GO WEST FOR 0.2 MILE TO FIRST
PENTECOSTAL CHURCH OF GOD ON THE SOUTH SIDE OF
THE ROAD.
ELEV. = 67.79' (NAVD 1988, 2001 ADJ TSARP)
NOTES
1. REFER TO SHEETS 31 TO 40 FOR DETENTION
BASIN TYPICAL SECTIONS & CROSS
SECTIONS.
2. REFER TO SHEET 30 FOR GEOMETRY POINT
TABLES.
3. REFER TO SHEET 55 FOR HCFCD
INTERCEPTOR STRUCTURE AND CONCRETE
PILOT CHANNEL DETAILS.
4. REFER TO SHEET 48 FOR DEMOLITION
LAYOUT INCLUDING THE PIPELINE REMOVAL
BY CONTRACTOR.
5. REFER TO SHEET 49 FOR PROTECTED
WETLANDS AND PROPOSED LIMITS OF
CLEARING & GRUBBING.
LEGEND
PROP. BASIN SHELF
PROP. RIPRAP
PROP. CONCRETE
PROP. SIDE SLOPES
POINT NUMBERS##
WETLANDS
tree line tree line
64.00
FL
O
W
FL
O
W
FL
O
W
FL
O
W
FL
O W
FLO
W
CMP+24" FL=59.43'
CMP+24" FL=60.02'
24" STEEL PIPE FL=62.24'
24" STEEL PIPE FL=61.49'
61.67 62.04
66.43
63.4163.49
63.5463.18
66.6666.29
58.5257.9458.52
64.49 63.88
63.61 63.11
58.6857.4858.43
66.1666.34
60.46 60.38
65.0164.70
58.7157.8858.46
66.41 66.68
66.27 66.33
58.4457.8058.67
64.81 64.37
65.14 64.44
59.33 58.03
58.43
63.48 63.32
65.33
59.12 57.6158.27
64.75
66.4565.09 59.0257.6158.81 65.4965.35
65.6658.8957.3858.60 63.4864.77
65.20 63.80 58.5757.5658.71 65.54
65.15 64.48 58.5756.8857.94 65.2365.48
64.2263.45 58.60
57.1758.35 65.4065.43
65.16
65.36
58.04 56.90 58.45
64.16 64.32
59.4361.46
62.28
60.02 62.14
63.23
62.24
61.49
63.0762.27
61.81
61.62 61.91
63.22
64.85 64.31
58.32 56.97
58.12 60.91
61.17 58.25
56.46
58.17
65.31 64.8164.70
65.07
58.28 57.18 58.60
67.04 66.92
67.58 67.69
58.41
57.77 58.42
65.39 64.84
64.82
65.13
58.62 58.20 58.54
67.28 66.95
66.36 66.08
58.65 58.28 58.69
65.66 65.32
65.11 65.14
58.65 58.43 58.58
67.41 67.26
64.81
65.68
58.79 57.63…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .