15-Attachment C - Algonquin-Goethe Park - Bid Form (BT-39BP).xlsx

XLSX spreadsheet 55 KB Posted

Attached to
Algonquin Goethe Park Improvement
Solicitation number
543599
Issued by
Wayne County, Michigan

About this file

This is a bid form for the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department for the Algonquin-Goethe Park Improvement project in Michigan. The project encompasses installation and replacement of playground equipment and site furnishings at the park over a two-year contract period. The bid form is structured in multiple sections: a Planning section (#1-1) for a Soil Erosion and Sedimentation Plan (1 LS); a Demolition section (#2-1 through #2-5) including removal of existing playground equipment, borders, engineered wood fiber, furnishings, and concrete totaling 234 linear feet of borders, 3,168 square feet of fiber, and 56 square feet of concrete; a Construction section (#3-1 through #3-9) with items such as perforated drainage pipe (170 LF), concrete curb (234 LF), engineered wood fiber (3,168 SF), benches (3 EA), swing configurations, spring riders, and signage; and a Soft Cost section (#4-1 through #4-7) covering site restoration, mobilization, layout and field survey, bonds and insurance, general conditions, miscellaneous work, and additional services capped at $10,000. The form also includes an Alternates section (#5-1 through #5-3) with additional drainage pipe, engineered wood fiber, and swing configuration options.

The bid form requires respondents to indicate either "Bid" or "No Bid" for each line item, with all editable cells requiring valid values if bidding on an item or remaining blank if declining to bid. Bidders may submit additional responses for items on a separate worksheet by referencing the unique item numbers. The form prohibits the use of Excel formulas, special characters, and file format changes, and requires all content to be submitted as text without formatting. The current submission status shows all items defaulted to "No Bid" with a grand total of $0.00. Bidders are directed to submit completed forms to Euna Procurement and may contact support.bonfire@eunasolutions.com for technical issues or the appropriate purchaser for content questions.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Algonquin-Goethe Park - Bid Form (BT-39BP)
Instructions
- When pasting content, please use Paste Special as Text without any formatting.

- You can only submit text based responses, please do not use special characters like emojis.

- Please do not change the structure of any of the worksheets. Changing the structure will invalidate your submission.

- Any additional information outside of the given structure of the worksheets will not be visible to the purchaser.

- Please do not save this file in a different format. Saving this file in a different format will invalidate your submission.

- Please follow the instructions provided along with this file to submit it back to Euna Procurement.

- By default, every item has `No Bid` selected for the `Bid/No Bid Decision` column.

- If you decide to bid on an item, then you must select `Bid` in the `Bid/No Bid Decision` column and all of the other editable cells for the item must contain a valid value.

- If you decide not to bid on an item, then you must select `No Bid` in the `Bid/No Bid Decision` column and all of the other editable cells for the item must be blank.

- To submit additional bids for an item, you must go to the Additional Responses tab.

- If you decide to submit an additional response for an item, then you must also complete a primary response bid for that item.

- Every item has a unique item number found in column D. To submit an additional bid for an item, enter the item number from the Primary Responses sheet into the blank item number cell on the Additional Responses sheet (column D).

- Entering the item number on the Additional responses sheet will cause the line to populate with item-specific info. An additional response can now be completed by filling in the blank cells with the bid information you wish to submit.

- You can submit as many additional bids for each item as you would like

- Please do not use Excel formulas in your responses.

- If you have any questions regarding the content of this file, please contact the appropriate purchaser.

- If you have any technical problems, please contact Euna Procurement at support.bonfire@eunasolutions.com.

3c3104b85bb9e73a245bc16d5f5e9b8c44cdc21cf651992ef7b1d8e6f2b96f01f42a68db22b80470bba743ca71bf186749a37450236edd64e9941b7711289f45HkDh5U2kDWz5KctbdaFazs7LVVMa/N1oMgO0GYASO/jEymslhk6BCncxuxaWldc9

Primary Responses

Primary Responses
Success: All data is valid!
Numeric
StatusBid/No Bid Decision#ItemsCostQuantity RequiredUnitTotal CostTotal Cost
Helper:ResponseStatusBidTableItem:BidTableItemIDBidTableItemResponse:IsBiddingHelper:BidTableBasketOrderWithItemOrderBidTableItem:ItemNameBidTableItem:376186BidTableItem:375866BidTableItem:375867BidTableItemResponse:324301BidTableFormula:161556
Plan
Not Bidding3725500No Bid#1-1

Soil Erosion and Sedimentation Plan

1LS-
Basket Total[$$ ]0.00
Demolition
Not Bidding3730220No Bid#2-1

Remove existing playground

1EA-
Not Bidding3730241No Bid#2-2

Remove playground border

234LF-
Not Bidding3730246No Bid#2-3

Remove engineered wood fiber

3168SF-
Not Bidding3730449No Bid#2-4

Remove furnishings

1LS-
Not Bidding3730464No Bid#2-5

Remove concrete

56SF-
Basket Total[$$ ]0.00
Construction
Not Bidding3730466No Bid#3-1

Perforated Drainage pipe w/ sock

N/A170LF-
Not Bidding3730471No Bid#3-2

Concrete playground curb

N/A234LF-
Not Bidding3730494No Bid#3-3

Engineered Wood Fiber

N/A3168SF-
Not Bidding3730497No Bid#3-4

Bench

N/A3EA-
Not Bidding3730509No Bid#3-5

Custom Swing Configuration (2 bays)

N/A1EA-
Not Bidding3730542No Bid#3-6

Deco Double Spring Rider

N/A1EA-
Not Bidding3730567No Bid#3-7

Stargazer

N/A1EA-
Not Bidding3730568No Bid#3-8

Custom Swing Configuration (2 bays)

N/A1EA-
Not Bidding3730569No Bid#3-9

Welcome Sign

N/A1EA-
Basket Total[$$ ]0.00
Soft Cost
Not Bidding3730694No Bid#4-1

Site Restoration

Fixed1EA-
Not Bidding3730697No Bid#4-2

Mobilization

Fixed1EA-
Not Bidding3730698No Bid#4-3

Layout and Field Survey

Fixed1EA-
Not Bidding3730699No Bid#4-4

Bonds and Insurance

Fixed1EA-
Not Bidding3730700No Bid#4-5

General Conditions

Fixed1EA-
Not Bidding3730802No Bid#4-6

Miscellaneous and Close-out Work

Fixed1EA-
Not Bidding3730869No Bid#4-7

Additional Services

$10,000.001LS-
Basket Total[$$ ]0.00
Alternates
Not Bidding3730870No Bid#5-1

Perforated drainage pipe w/ sock (3a)

N/A228LF-
Not Bidding3730871No Bid#5-2

Engineered wood fiber (3c)

N/A3803SF-
Not Bidding3730872No Bid#5-3

Custom Swing configuration (3 bays) (3h)

N/A1EA-
Basket Total[$$ ]0.00
Grand Total[$$ ]0.00

Additional Responses

Additional Responses
Success: All data is valid!
Numeric
StatusBid/No Bid Decision#ItemsCostQuantity RequiredUnitTotal CostTotal Cost
Helper:ResponseStatusBidTableItem:BidTableItemIDBidTableItemResponse:IsBiddingHelper:BidTableBasketOrderWithItemOrderBidTableItem:ItemNameBidTableItem:376186BidTableItem:375866BidTableItem:375867BidTableItemResponse:324301BidTableFormula:161556
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-
-N/AN/A-

image1.png

File details come from the government source that posted it. Updated .