CF - Canyon Ferry Vault Toilet and Sewage Pumping
Solicitation number
140R6025Q0011
Issued by

About this file

This is a Questions and Answers document for Canyon Ferry Sewage Toilet/Vault Pumping Service. The document reveals that the incumbent contractor is City County Sanitation, Inc., who was awarded contract 140R6020P0050 on July 8, 2020, with a total contract value of $75,500.00.

The service requirements include annual pumping of 70 vaults/tanks plus 10 additional pumps as needed, with a standard response time of 2 days and emergency response time of 24 hours. The contractor is responsible for selecting an approved disposal facility and paying associated disposal fees. The work locations are accessible via gravel roads with no restrictions on pumping truck sizes or special vehicle permits required. Work will be performed during summer months after load limits are lifted, and the locations are in public areas with no security clearance requirements. This project is managed by the Department of the Interior Bureau of Reclamation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Title: Canyon Ferry Sewage Toilet/Vault Pumping Service Questions and Answers

Amendment 0002

Question: Incumbent Contract Information – Is there a current or previous contractor performing this service? If so, could you provide details on the incumbent contractor, including contract value and performance history?

Answer: Contract Award Date: Jul 08, 2020 Contract Award Number: 140R6020P0050 Contractor Awarded Name: CITY COUNTY SANITATION, INC Base and All Options Value (Total Contract Value): $75,500.00

Question: Pump Frequency and Emergency Services – The PWS mentions an annual pumping of 70 vaults/tanks, with an additional 10 pumps as needed. Is there a defined schedule for these additional services, or will they be requested on an as-needed basis? Additionally, are there emergency response time requirements in case of unexpected overflows?

Answer: We will call for service on an as needed basis with a response time of 2 days.

For emergency situations we will need a 24-hour response time.

Question: Waste Disposal Site and Fees – Are there specific waste disposal facilities designated for this contract, or is the contractor responsible for selecting an approved site? If so, will the government cover any disposal fees, or should these costs be included in the bid?

Answer: We did not specify a facility. "Sewage and waste materials will be disposed of at an approved facility in compliance with State Sanitation Regulations. It is the Contractor’s responsibility to make arrangements and pay any charges for using disposal sites."

Question: Site Accessibility and Road Conditions – Since the locations are accessible via gravel roads, are there any restrictions regarding the size of pumping trucks or other equipment? Will special vehicle access permits be required?

Answer: There are no restrictions regarding the size of pumping trucks or other equipment, no special vehicle access permits are required. All work will happen during the summer months after load limits have been lifted.

Question: Security and Compliance Requirements – What are the security clearance or background check requirements, if any, for contractor personnel working on-site? Are there any specific federal or state compliance requirements that we should be aware of regarding personnel qualifications and safety protocols?

Answer: Work will not take place in secure locations. Areas of work are open to the public.