140R6018B0001.pdf

PDF 11 MB Posted

Attached to
z--NK-TRENTON DAM OUTLET WORKS PIPE REPAIR
Solicitation number
140R6018B0001
Issued by

About this file

Solicitation for: TRENTON DAM OUTLET PIPE REPAIR FrenchmanCambridge Division Pick Sloan Missouri River Basin Program, Nebraska. Principal components of work include removal and control of water, removing and disposing of coatings containing hazardous materials, removing and disposing of damaged portions of steel outlet works pipe, installing new portions of steel outlet works pipe, recoating interior and exterior portions of steel outlet works pipe, and coating exterior areas of steel outlet works pipe.

View the file

Other files

File Type Posted
140R6018B0001_Amendment_0003.pdf PDF
140R6018B0001_SF_30_Amend_0002.pdf PDF
140R6018B0001_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Bureau of Reclamation November 2017

Invitation for Bid (IFB) Solicitation No. 140R6018B0001

Trenton Dam Outlet Pipe Repair

Frenchman–Cambridge Division Pick–Sloan Missouri River Basin Program, Nebraska

U.S. Department of the Interior Bureau of Reclamation November 2017

This page intentionally left blank

TRENTON DAM OUTLET PIPE REPAIR

Frenchman–Cambridge Division Pick– Sloan Missouri River Basin Program, Nebraska

FOREWORD

Work is located at Trenton Dam, approximately 3 miles west of Trenton, Nebraska in Hitchcock County.

Principal components of work include removal and control of water, removing and disposing of coatings containing hazardous materials, removing and disposing of damaged portions of steel outlet works pipe, installing new portions of steel outlet works pipe, recoating interior and exterior portions of steel outlet works pipe, and coating exterior areas of steel outlet works pipe for spot repairs.

EMAIL INQUIRIES REGARDING THIS SOLICITATION SHOULD BE MADE TO:

Contractual Matters: Michael Birkland, Contracts Specialist Billings, Montana Email: mbirkland@usbr.gov

PRE-BID SITE VISIT: A Pre-bid site visit will be held on Thursday December 14th, 2017 at the Trenton Dam shop, 71378 Road 44B, Trenton NE, 69044, beginning at 8:00 am CST. Prospective bidders should make arrangements by contacting John Foreman at 870-962-4527. Attendees are to provide and wear safety boots, hard hats, and safety vests.

BID DUE DATE AND TIME: For date and place bids are due, see “SOLICITATION, OFFER, AND AWARD,” Standard Form 1442, immediately following the Table of Contents.

ORAL INFORMATION: In accordance to provision 52.214-06 of the Federal Acquisition Regulation, oral explanations, information, or instruction given before the award of the contract will not be binding.

SAFETY AND HEALTH MANUAL: For information regarding Bureau of Reclamation's publication "Reclamation Safety and Health Standards" (RSHS) November 2009 Edition, which is applicable to work under this contract, see clause WBR 1452.223- 81 (Safety and Health) of the solicitation. The electronic version of the publication can be found at: https://www.usbr.gov/safety/rshs/index.html

SAM: Effective July 29, 2012, any contractor interested in doing business with the federal government must register in the System for Award Management (SAM) database prior to award of a contract or agreement. SAM is a federal government owned and operated free website, which consolidates the central contractor registration (CCR), the online mailto:mbirkland@usbr.gov https://www.usbr.gov/safety/rshs/index.html representations and certifications application (ORCA), and the excluded parties list system

(EPLS).

DUNS: The vendor's DUN & Bradstreet number and banking information are required for registration. Contractors may obtain information on registration and annual confirmation requirements via the SAM website accessed through https://www.sam.gov/portal/public/sam/ or by the federal service desk at 1-866- 606-8220.

IPP: Payment requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury’s Internet Payment Platform system (IPP).

The IPP website address is: https://www.ipp.gov. The contractor must use the IPP website to register access and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the ipp production helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the contractor is unable to comply with the requirement to use ipp for submitting invoices for payment, the contractor must submit a waiver request in writing to the contracting officer with its proposal or quotation.

METHOD OF PROCUREMENT: This procurement is set-aside for Total Small Business Concerns and is a construction acquisition, pursuant to Federal Acquisition Regulations (FAR) Part 14.

https://www.sam.gov/portal/public/sam/ https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

Table of Contents - 1

TABLE OF CONTENTS

PART 1 – THE SCHEDULE

SECTION A – Solicitation, Offer, and Award Form (SF 1442)

SECTION B – Supplies or Services and Prices

SECTION C – Specification/Drawings/Maps

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s On-site Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 74 00 Cleaning and Waste Management

01 78 30 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS

02 70 10 Removal and Control of Water 02 89 10 Removal and Disposal of Materials Containing Coal Tar Products

DIVISION 09 - FINISHES

09 96 20 Coatings

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 21 95 Steel Pipe Repair

Table of Contents - 2

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 00 10 Analytical Results 51 00 20 Photographs

DIVISION 52 - DRAWINGS

52 00 00 Drawings

DIVISION 53

Not Used

SECTION D – Not Used

SECTION E – Inspection and Acceptance E.1 Material and Workmanship E.2 Inspection of Construction

SECTION F – Deliveries or Performance F.1 Commencement, Prosecution, and Completion of Work F.2 Variation in Estimated Quantity F.3 Suspension of Work

SECTION G – Contract Administration Data G.1 Authorities and Delegations G.2 Electronic Invoicing and Payment Requirements

SECTION H – Special Contract Requirements H.1 Site Security

PART II – CONTRACT CLAUSES

SECTION I – Contract Clauses I.1 Clauses By Reference I.2 Prohibition on Contracting with Entities that Require Certain Internal

Confidentiality Agreements I.3 Commercial and Government Entity Code Maintenance I.4 Order of Precedence – Sealed Bidding I.5 Minimum Wages Under Executive Order 13658 I.6 Buy American Act – Construction Materials I.7 Bid Guarantee I.8 Additional Bonding I.9 Performance and Payment Bonds - Construction

Table of Contents - 3

I.10 Payments under Fixed-Price Construction Contracts I.11 Prompt Payment for Construction Contracts I.12 Differing Site Conditions I.13 Accident Prevention I.14 Schedules For Construction Contracts I.15 Specification and Drawings for Construction I.16 Changes I.17 Authorized Deviations in Clauses I.18 Restriction on Endorsements I.19 Release of Claims I.20 Liability Insurance I.21 Employment Verification I.22 Safety and Health I.23 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke I.24 Certification of Representations I.25 Equipment Ownership I.26 Payment for Mobilization and Preparatory Work I.27 Other Contracts I.28 Preservation of Cultural Resources I.29 Security Requirements – Bureau of Reclamation Alt III I.30 Modification Proposals

PART III – DOCUMENTS, EXHIBITS, AND OTHER

SECTION J – List of Documents, Exhibits, and Other Attachments Wage Determination Standard Form 24 – Bid Guarantee Construction Payment Forms Department of Interior Limitations on Subcontracting Worksheet

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K – Representations, Certifications and Other Statements of Offerors K.1 Prohibition on Contracting with Entities That Require Certain Internal

Confidentiality Agreements K.2 Annual Representations and Certifications

SECTION L – Instructions, Conditions and Notices to Bidders L.1 System for Award Management L.2 Commercial and Government Entity Code Reporting L.3 Alternative Line Item Proposal L.4 Availability of Specifications Listed in the GSA Index of Federal Specifications L.5 Availability of Specifications Listed in the Acquisition Streamlining and

Standardization Information System (ASSIST)

Table of Contents - 4

L.6 Amendments to Invitations for Bids L.7 False Statements in Bids L.8 Submission of Bids L.9 Explanation to Prospective Bidders L.10 Late Submissions, Modifications, and Withdrawals of Bids L.11 Preparation of Bids – Construction L.12 Submission of Offers in the English Language L.13 Submission of Offers in U.S. Currency L.14 Type of Contract L.15 Construction Wage Rate Requirements L.16 Notice of Requirement for Affirmative Action to Ensure Equal Employment

Opportunity for Construction L.17 Notice of Buy American Requirement – Construction Materials L.18 Site Visit (Construction) L.19 Authorized Deviations in Proposals L.20 Service of Protest – Department of the Interior L.21 Instruction for Mobilization and Preparatory Work

SECTION M – Evaluation Factors for Award M.1 Evaluation Factors for Award M.2 Notice of World Trade Organization Government Procurement Agreement

Evaluations

PART I – THE SCHEDULE

THIS PAGE INTENTIONALY LEFT BLANK

SECTION A

SOLICITATION, OFFER, AND AWARD

(STANDARD FORM 1442)

This Page Intentionally Left Blank

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040329210

Bureau of Reclamation

Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Bureau of Reclamation

2021 4th Ave North Billings MT 59101

Michael Birkland 406-247-7646 x

11/22/2017

140R6018B0001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Trenton Dam Outlet Pipe Repair, Frenchman-Cambridge Division, Pick-Sloan Missouri

Basin Project, Nebraska

The estimated price range for this project is $250,000 to $500,000

This procurement is set-aside as Total Small Business

The North American Industrial Classification Code (NAICS) is 238320 Painting & Wall

Covering Contractors, which has an associated Small Business size standard of $15 million. Bids are required to be submitted by Hard Copy. Bids will be accepted by hand carried delivery or by express mail bids, and must be in a sealed package/envelope. Bids will be received at the Bureau of Reclamation, Great Plains

Regional Office, at the address identified in Block 8(above). Individuals delivering bids in person shall allow sufficient time to pass and depart through security. Bids will not be accepted by facsimile or email.

Taxpayer Identification Number: ________________________________________

Data Universal Numbering System:______________________________________

Commercial and Government Entity Code:________________________________

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 240 calendar days and complete it within ________________ ________________ calendar days after receiving

See Paragraph F.1

01/04/2018

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Gerri Voto-Braun

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R6018B0001

00010

SECTION B Supplies or Services and Prices

Trenton Dam Outlet Works Pipe Repair

(Price Schedule CLINS 1 through 10

See Following Continuation Pages

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1 AU $______________

SECTION B

THE SCHEDULE

Price Schedule B - 1

Trenton Dam Outlet Pipe Repair Frenchman–Cambridge Division Pick-Sloan Missouri River Basin Program, Nebraska Solicitation No. 140R6018B0001

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

TRENTON DAM OUTLET PIPE REPAIR FRENCHMAN–

CAMBRIDGE DIVISION

PICK–SLOAN MISSOURI RIVER BASIN PROGRAM, NEBRASKA

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump-sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory

Work, for CLIN 1.

(e) Definitions:

(1) CLIN – Contract Line Item Number

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 WBR

1452.232 -81

Mobilization and Preparatory Work

For the lump sum of $

2 02 70 10 Removal and Control of Water

For the lump sum of $

Price Schedule B - 2

Trenton Dam Outlet Pipe Repair Frenchman–Cambridge Division Pick-Sloan Missouri River Basin Program, Nebraska Solicitation No. 140R6018B0001

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

3 02 89 10 Removal and Disposal of Existing Hazardous Coatings on Interior and Exterior of Steel Outlet Pipe Repair Flat Spot Locations

98 ft2 $ $

4 02 89 10 Removal and Disposal of Existing Hazardous Coatings on Interior and Exterior of Steel Outlet Pipe Flat Spot Repair Location Perimeters

40 ft2 $ $

5 02 89 10 Removal and Disposal of Existing Hazardous Coatings on Exterior Spot Repair Areas of Steel Outlet Pipe

201 ft2 $ $

6 09 96 20 Coating Interior and Exterior of New Steel Outlet Pipe Flat Spot Repairs

195 ft2 $ $

7 09 96 20 Coating Repair of Interior and Exterior of Steel Outlet Pipe Flat Spot Repairs due to Cutting and Welding

50 ft2 $ $

8 09 96 20 Coating of Existing Exterior Spot Repair Areas

201 ft2 $ $

9 35 21 95 Removing Existing Damaged Steel Pipe

978 lb $ $

10 35 21 95 Steel Pipe Replacement 978 lb $ $

TOTAL FOR PRICE SCHEDULE $ _______________

END OF SUPPLIES OR SERVICES AND PRICES

SECTION C

THE SPECIFICATIONS

Trenton Dam Outlet Pipe Repair

Pick–Sloan Missouri River Basin Program, Nebraska Solicitation No.140R6018B0001

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located approximately 3 miles west of Trenton, NE in Hitchcock County.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Removal and control of water.

B. Removing and disposing of coatings containing hazardous materials.

C. Removing and disposing of existing damaged portions of steel outlet works pipe.

D. Installing new portions of steel outlet works pipe.

E. Recoating interior and exterior portions of steel outlet works pipe.

F. Coating exterior areas of steel outlet works pipe for spot repairs.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.

1.04 DEFINITIONS

A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer.

2. COR: Contracting Officer’s Representative.

Pick–Sloan Missouri River Basin Program, Nebraska Solicitation No.140R6018B0001

Summary of Work 01 11 00 - 2

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Pick–Sloan Missouri River Basin Program, Nebraska Solicitation No.140R6018B0001

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. Cleaning Manual-2012 Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2012 Edition Available online at: http://www.usbr.gov/mussels/prevention

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

1. For each Contractor use site on Government land.

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas, temporary roads, and haul routes.

3) Utilities including air, power, and water lines; fire hydrants; and compressor station.

4) First-aid and medical facilities.

5) Areas for processing, storing, and disposing of waste materials from construction operations.

6) Temporary fences.

b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work http://www.usbr.gov/mussels/prevention

Pick–Sloan Missouri River Basin Program, Nebraska Solicitation No.140R6018B0001

Use of Site 01 14 10 - 2 required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

1.04 PROJECT CONDITIONS

A. Government land as shown on drawings may be used for required construction facilities.

B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of COR.

D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

E. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 RESTORATION

A. Restore Contractor use areas to pre-construction condition.

Work Restrictions

01 14 12 - 1

SECTION 01 14 12

WORK RESTRICTIONS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 WORK RESTRICTIONS

A. Bureau of Reclamation operates and maintains Trenton Dam.

B. Maintain Bureau of Reclamation access to Trenton Dam facilities at all times.

C. All onsite work shall be performed between September 15 and April 30.

D. Allowable Work Hours:

1. Monday through Friday: 7:00 a.m. to 4:30 p.m. unless authorized by COR.

E. No work is allowed during Federal holidays unless authorized by COR.

F. Contractor will not be allowed unescorted access to the outlet works site area.

Government will provide Contractor escorted access into the work site areas during allowable work hours.

G. Photographs of the dam and other facilities are not allowed.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Work Restrictions

01 14 12 - 2

This page intentionally left blank.

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.

1.03 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and Format

B. National Institute of Building Sciences (NIBS)

1. NIBS NCS-14 United States National CAD Standards, Version 6

1.04 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

2. Label with contract number and title and RSN.

3. Measurement Units: US Customary Units.

C. Drawings:

1. Minimum Identification in Title Block:

01 33 00 - 2

a. Contract number and title.

b. Contractor’s or supplier’s title and drawing number.

c. Date.

2. Reserve 3- by 3-inch space next to title block for review stamps.

3. Print Size: D size (22 inches by 34 inches).

4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.

a. Computer drafted drawings:

1) In accordance with NIBS NCS.

2) Electronic file format: Compatible with AUTOCAD, Version 2013 or later.

3) Compile using “eTransmit” utility in AUTOCAD.

b. Drawing prepared with drafting equipment, when allowed: Lettering shall be neat.

5. Drawings Designated as “Government Format” in Specifications:

a. Computer drafted.

b. Government will provide electronic AutoCAD format template.

c. Title block and sheet format:

1) As shown on Standard Drawing 40-D-7102.

2) Government will supply template.

3) Government will supply specific title block information to be used.

6. Final Drawings:

a. Computer drafted.

b. Government will supply electronic AutoCAD format template.

c. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

7. Electronic Files: On CD or DVD discs.

D. Samples Submittals:

1. Label with complete manufacturer's product and color identification.

2. Include type and quantity of materials specified in the referenced section in each “set” of samples.

3. Samples: Representative of product to be installed.

4. Label each sample, sample kit with contract number and title.

01 33 00 - 3

E. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets:

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy (no highlighter).

d. Strike through items that do not apply.

F. Certifications:

1. Certifications by a registered professional: Signed and sealed by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

1.05 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.

1. Electronic Submittals:

a. In Portable Document Format (.pdf).

b. Include RSN transmittal letter.

c. Do not include Personally Identifiable Information (PII) in electronic submittals.

d. Submittal method (size based):

1) Government can receive e-mails up to 25 MB. Receipt of e-mails exceeding 25 MB (extra-large) is not possible. E-mailing of extra-large electronic submittals may occur only after size limit for transmittal of extra-large e-mail has been verified.

2) Electronic media for submittals too large to e-mail: CD or DVD.

D. Include the following information in transmittal letters:

1. Contract number and title.

01 33 00 - 4

2. RSN for each attached submittal.

3. Responsible code.

4. Number of sets for each RSN.

5. Identify submittal as initial or resubmittal.

E. Resubmittal of submittals not approved:

1. Mark changes such that they are readily identifiable and show revision date.

2. Describe reasons for significant changes in transmittal letter.

3. Resubmit returned submittals within 14 days after receiving comments, unless otherwise directed.

4. Requirements for initial submittals apply to resubmittals.

F. Submit each RSN under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned for resubmittal.

1.06 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.

2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.

B. Time in Excess of Specified:

1. CO may extend contract completion date to allow additional time for completing work affected by excess review time.

a. Time extension will be to extent that excess review time caused delay to contract completion date.

b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.

c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending contract completion date.

2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to extent that:

a. Approval was required under contract.

01 33 00 - 5

b. Requests for approval were properly and timely submitted and were approved.

4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.

C. Submittal Response:

1. Response letter will indicate whether submittal is approved, approved subject to identified changes, not approved, acceptable, not acceptable, or acknowledged receipt.

a. Revise and resubmit submittals not approved.

b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.

1.07 TRANSMITTAL

A. Addresses for codes receiving paper copy submittals listed in Table 01 33 00A - List of Submittals:

1. CO: Bureau of Reclamation, Attention: GP-5000, P.O. Box 36900, Billings, MT 59107-6900. Physical address: 2021 4th Avenue North, Billings, MT 59101.

2. COR: Bureau of Reclamation, Attention: GP-2600, P.O. Box 36900, Billings, MT 59107-6900. Physical address: 2021 4th Avenue North, Billings, MT 59101.

B. E-mail address for electronic submittals listed in Table 01 33 00A - List of Submittals: sha-GPR-CONSTSVCS@usbr.gov.

1. Submit electronic submittals that are too large for e-mail along with paper copy.

C. Submittals required by specifications, but not listed in Table 01 33 00A - List of Submittals:

1. Submit in accordance with this section.

2. Submit to COR unless otherwise specified.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

mailto:sha-GPR-CONSTSVCS@usbr.gov

01 33 00 - 6

Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

1 Performance and Payment Bonds - Construction 52.228-15

Performance and Payment Bonds

Within 10 calendar days after award

CO 1 paper 0

2 Additional Bond Security 52.228-02

Evidence of Increase in Bond Security

Within 10 calendar days after modifications increasing contract value

CO 1 paper 0

3 Insurance-Work on a Government Installation 1452.228-70

1) Written certification that the required insurance has been obtained

2) Current certification of insurance for each subcontractor

Before commencing onsite work

CO 1 paper

1 paper

4 Liability Insurance 1452.228-70

Acceptable Certificate of Liability Insurance

Prior to commencement of work under the contract

CO 1 paper 0

5 Equal Opportunity 52.222-26

Information required by Executive Order

112246 (SF-100)

Within 30 days following award

CO 1 paper 0

6 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10

Certification that executive compensation and subcontract awards were reported

Within 10 days of each report being submitted

CO 1 paper 0

7 Release of Claims 1452.204-70

Release of Claims (DI-137) against the Government

After completion of the work and prior to final payment

CO 1 paper 0

8 Personal Identity Verification 52.204-09

SF-85 and OF-306 for each employee and subcontractor employee working onsite

Within 10 days after preconstruction meeting

CO 1 paper 0

9 Labor Standards Data 52.222-11

1) List of subcontractors

2) Statement and acknowledgement Form (SF-1413) for each subcontract

Within 14 days after preconstruction meeting

COR 1 paper

1 paper

1 paper + 1 electronic

1 paper + 1

01 33 00 - 7

Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

10 Payrolls and Basic Records 52.222-08

Copies of all payrolls Weekly for each week of contract performance

CO 1 paper 2 paper

11 Schedules for Construction Contracts (52.236-15)

Practicable Schedule Within 7 days after work commences on the contract or another period of time as determined by the CO

COR 1 paper 1 paper + 1 electronic

12 Schedules for Construction Contracts (52.236-15)

Annotated Schedule Showing Actual Progress

As directed by the

CO

COR 1 paper 1 paper + 1 electronic

13 Schedules for Construction Contracts (52.236-15)

Supplementary Schedule Or Schedules

As deemed necessary by the CO

COR 1 paper 1 paper + 1 electronic

14 Site Security

WBR 1452.237-80

List of contractor and subcontractor employees

At least 10 days prior to arriving at worksite

COR 0 2 paper

15 Site Security

WBR 1452.237-80

List of vehicles and equipment to be brought onsite

At least 10 days prior to arriving at worksite

COR 0 2 paper

01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan

At least 21 days before use of Government land

COR 0 1 paper + 1

01 35 10-1 Safety Data Sheets Complete LHM and

SDS

At least 28 days before jobsite delivery of hazardous material

01 35 10-2 Safety Data Sheets Updated LHM and

SDS

At least 28 days before jobsite delivery of hazardous material not previously listed

01 35 20-1 Safety and Health Safety Program Submitted and accepted before commencing onsite work. See Section 3 of RSHS

01 35 20-2 Safety and Health Monthly Accident Summary Report

Monthly COR 0 1 paper + 1

01 35 20-3 Safety and Health Respirator User

Documentation At least 28 days before beginning

COR 0 2 paper

01 33 00 - 8

Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

01 35 20-4 Safety and Health Crane Operation Certificates

At least 28 days before beginning onsite work

COR 0 2 paper

01 35 20-5 Safety and Health Exposure Assessment Form

At least 28 days before beginning onsite work

COR 0 2 paper

01 35 20-6 Safety and Health Other Training Certificates

At least 28 days before beginning

COR 0 2 paper

01 35 30-1 Contractor’s On-Site Safety Personnel

Qualifications At least 28 days before beginning onsite work

COR 0 2 paper

01 35 30-2 Contractor’s On-Site Safety Personnel

CIH Inspection Reports

Within 7 days of each inspection

01 35 30-3 Contractor’s On-Site

Safety Personnel Safety Inspection Reports

Weekly COR 0 1 paper + 1 electronic

01 46 00-1 Quality Procedures Contractor Quality Control Program

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

01 46 00-2 Quality Procedures Contractor’s Daily Reports

Weekly COR 0 1 paper + 1 electronic

01 46 00-3 Quality Procedures Quality Control Supervisor Resume

At least 28 days before beginning onsite work

COR 0 2 paper

01 46 00-4 Quality Procedures Contractor’s Quality Testing Plan

At least 28 days before beginning onsite work

COR 0 1 paper + 1 electronic

01 46 00-5 Quality Procedures Summary Monthly Test Results

Monthly COR 0 1 paper + 1 electronic

01 55 20-1 Traffic Control Traffic Control Plan At least 28 days before affecting public traffic

01 56 10-1 Protection of

Existing Installations Plan for Protecting Existing Installations

At least 28 days before starting onsite work

01 57 20-1 Environmental

Controls Copy of Applicable Air Quality Permit

At least 28 days before starting onsite work

01 57 30-1 Water Pollution

Control Water Management Plan

At least 28 days before start of onsite construction work

01 33 00 - 9

Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

01 57 30-2 Water Pollution Control

Spill Prevention, Control, and Countermeasure (SPCC) Plan

At least 28 days before delivery or storage of oil

01 74 00-1 Cleaning and Waste Management

Waste Production and Disposal Plan

At least 28 days before starting onsite work

01 74 00-2 Cleaning and Waste

Waste Production and Disposal Records

Within 7 days of waste disposal

01 74 00-3 Cleaning and Waste

Environmental Consultant Resume

At least 28 days before beginning environmental assessment

COR 0 2 paper

01 74 00-4 Cleaning and Waste Management

Environmental Site Assessment

Within 14 days of completion of work

01 78 30-1 Project Record

Documents Final As-built Drawings

Within 14 days of completion of work

COR 0 1 paper + 1 electronic

02 70 10-1 Removal and Control of Water

Removal and Control of Water Plan

At least 28 days before beginning removal and control of water work

COR 0 1 paper + 1 electronic

02 89 10-1 Removal and Disposal of Materials Containing Coal Tar Products

Written Compliance Program for Worker Protection from Coal Tar Coatings and Linings

At least 28 days before beginning removal and disposal of materials containing coal tar products

COR 0 1 paper + 1 electronic

02 89 10-2 Removal and Disposal of Materials Containing Coal Tar Products

Containment System and Ventilation Plan

At least 28 days before beginning removal and disposal of materials containing coal tar products

COR 0 1 paper + 1 electronic

02 89 10-3 Removal and Disposal of Materials Containing Coal Tar Products

Emissions and Exposure Monitoring Plan for Coal Tar Dust

At least 28 days before beginning removal and disposal of materials containing coal tar products

01 33 00 - 10

Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

02 89 10-4 Removal and Disposal of Materials Containing Coal Tar Products

Waste Characterization, Handling, and Disposal Plan

At least 28 days before beginning removal and disposal of materials containing coal tar porducts

COR 0 1 paper + 1 electronic

02 89 10-5 Removal and Disposal of Materials Containing Coal Tar Products

Preconstruction Test Results

Within 2 days of completing test results

COR 0 1 paper + 1 electronic

02 89 10-6 Removal and Disposal of Materials Containing Coal Tar Products

Test Results During Work Activities

Within 2 days of completing test results

COR 0 1 paper + 1 electronic

02 89 10-7 Removal and Disposal of Materials Containing Coal Tar Products

Post-Construction Test Results

Within 2 days of completing test results

COR 0 1 paper + 1 electronic

02 89 10-8 Removal and Disposal of Materials Containing Coal Tar Products

Certificate of Disposal

Within 14 days after disposal

COR 0 1 paper + 1 electronic

09 96 20-1 Coatings Approval Data At least 28 days before beginning application

COR 0 1 paper + 1 electronic

09 96 20-2 Coatings Final Approval Data At least 28 days before beginning application

COR 0 1 paper + 1 electronic

09 96 20-3 Coatings Qualifications At least 28 days before beginning application

COR 0 2 paper

09 96 20-4 Coatings Quality Control Plan At least 28 days before beginning application

COR 0 1 paper + 1 electronic

09 96 20-5 Coatings Contractor Quality Testing Report

Weekly COR 0 1 paper + 1 electronic

35 21 95-1 Steel Pipe Repair Qualifications At least 28 days before beginning steel pipe repair

COR 0 2 paper

35 21 95-2 Steel Pipe Repair Field Inspection Plan At least 28 days before beginning steel pipe repair

01 33 00 - 11

Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required Due date or delivery time

Respon-sible code

Sets to be sent: **

CO COR

35 21 95-3 Steel Pipe Repair Field Inspection Report and Removal Procedure

At least 28 days before beginning removal of existing damaged steel pipe

COR 0 1 paper + 1 electronic

35 21 95-4 Steel Pipe Repair Approval Drawings and Data

At least 28 days before beginning steel pipe repair

COR 0 1 paper + 1 electronic

35 21 95-5 Steel Pipe Repair Final Drawings and Data

Within 14 days of completing field quality test reports

COR 0 1 paper + 1

01 33 00 - 12

Safety Data Sheets

01 35 10 - 1

SECTION 01 35 10

SAFETY DATA SHEETS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 DEFINITIONS

A. LHM: List of Hazardous Materials.

B. SDS: Safety Data Sheet.

1. Referred to as Material Safety Data Sheets in the clause at 52.223-3, Hazardous Material Identifications and Material Safety Data - Alternate 1.

1.03 APPLICATION

A. For the purposes of this contract, “delivered under this contract” in paragraph (b) of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1, includes:

1. Materials delivered to Government.

2. Materials incorporated into work.

3. Materials used by the Contractor during contract performance at the jobsite.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 10-1, Complete LHM and SDS.

C. RSN 01 35 10-2, Updated LHM and SDS:

1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1.

1.05 DELIVERY

A. Do not deliver hazardous materials to jobsite which are not included on original or previously updated LHM and SDS before receipt of updated LHM and SDS by COR.

Safety Data Sheets

01 35 10 - 2

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Safety and Health

01 35 20 - 1

SECTION 01 35 20

SAFETY AND HEALTH

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include the cost of complying with this section in the prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS- Reclamation Safety and Health Standards including revisions posted.

a. Available on the internet at:

http://www.usbr.gov/ssle/safety/RSHS/rshs.html.

2. FIST 1-1 (2012) Hazardous Energy Control Program

a. Available on the internet at: www.usbr.gov/power/data/fist_pub.html.

B. Occupational Safety and Health Administration (OSHA)

1. 29 CFR Part 1910 Occupational Safety and Health Standards.

2. 29 CFR Part 1926 Safety and Health Regulations for Construction.

3. Available on the Internet at www.osha.gov.

C. American Conference of Governmental Industrial Hygienists (ACGIH), Threshold Limit Values (TLVs):

1. Available at www.acgih.org.

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 20-1, Safety Program:

1. Submit a comprehensive, job-specific safety and health program in accordance with Section 01 33 00 – Submittals and in accordance with the requirements of Section 3.3 of the Reclamation Safety and Health Standards (RSHS) and these specifications.

2. Cover aspects of onsite and applicable off-site operations and activities associated with this contract.

01 35 20 - 2

3. Follow the outline in Appendix B of the RSHS.

4. The Safety Program will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B of the RSHS, a comprehensive narrative for each applicable item in the outline and program elements contained in these specifications.

5. Generic company safety programs are not acceptable. The Safety Program must be site specific for this contract.

6. The Contractor’s Safety Program must be submitted and accepted by Reclamation prior to commencing onsite work, including mobilization.

7. The Safety Program Statement of Responsibility must state that “the contractor is responsible for ensuring that all work will be in compliance with Reclamation Safety and Health Standards and these specifications.”

8. The Safety and Health Program shall include, but not be limited to, the following program elements:

a. Safety and Health Program Guidance - General Requirements (in accordance with Appendix B as per these specifications, Section 01 35 20 1.03.B.4.). Comply with RSHS, local safety programs, and any other referenced safety and health standards. Perform work in accordance with the specific safety program elements and referenced standards. In the site specific safety and health program, address sections that do not apply to this project as ‘not applicable’.

1) Statement of Policy:

a) Contractor’s Safety and Health Policy.

2) Statement of Safety and Health Responsibilities:

a) As per this specification RSN 01 35 20-1 listed above.

3) Statement of Compliance with Regulations, Standards, and Codes:

a) The contractor shall specifically state the intention to comply with the RSHS, OSHA, and any other regulatory standard. The most stringent shall apply.

4) Statement of Subcontractor Compliance:

a) The contractor shall state that they will ensure compliance of their employees and subcontractors.

5) Safety Inspection Procedures:

a) Specify in accordance with this specification and Chapter 3 of the RSHS.

6) Accident Investigation and Reporting Procedures:

a) Specify in accordance with this specification and Chapter 3 of the RSHS.

01 35 20 - 3

7) Applicable Emergency Plans:

a) Detail coordination plan for outside emergency services including response time and a site visit where a rescue requires special capabilities or equipment.

b) This plan shall address detailed emergency contacts and procedures to be used during an onsite emergency.

c) Additional emergency plans and procedures as applicable to the location and potential hazards such as but not limited to the remoteness of worksite, potential hazards of worksite, and limitations outside assistance.

d) Plan shall include procedures for weather related emergencies.

8) Confined Space Procedures:

a) Include a detailed confined space entry plan for operations that require employees to enter confined spaces.

b) The confined space entry program must be site specific and in accordance with OSHA 29 CFR 1926.1200 thru 1926.1213.

c) Include engineering controls, detailed ventilation plans (if applicable), personal protective equipment and air monitoring procedures for each confined space.

d) Include non-entry and entry rescue plan.

e) Include the Contractor’s Confined Space Program.

f) If permit required spaces will be entered, a rescue team/service will be required. If outside emergency services are to be relied upon for rescue and/or transporting of injured personnel, the employer must first secure an agreement with the outside personnel to include what role they will have, response time, GPS coordinates if helicopter will be used, etc. Rescue team must be immediately available during all entries into a permit-required confined space.

g) The rescue team must be trained in all potential types of rescue that might be necessary on the specific permit required confined space and in accordance with 29 CFR 1926.1200-1213.

h) The confined space rescue team will be required to perform a practice rescue in each permit required confined space prior to the start of work in the permit-required confined

01 35 20 - 4 space. The practice rescue(s) must be documented and include the space, names of rescuers and methods used.

i) The contractor must ensure that rescue team members practice making permit space rescues before attempting an actual rescue, and at least once every 12 months, by means of simulated rescue operations in which they remove dummies, manikins, or actual persons from the actual permit spaces or from representative permit spaces.

j) If the Contractor is to provide rescue services through trained employees, the contractor must maintain training records for the rescue team that include the employee’s names, the name of the trainers and the dates of the training. These records must be available to the COR for review.

9) Lockout/Tagout Procedures:

a) Include the contractor’s written Hazardous Energy Control Program (HECP).

b) The Contractor will not be allowed to place locks on Reclamation equipment. Include the Contractor’s ‘group lockout’ procedures for coordination with the facility and its equipment.

c) Comply with facility Hazardous Energy Control Program (HECP) procedures and coordinate activities with Reclamation staff.

10) Electrical Safety:

a) Include safe work procedures at the site, electrically qualified persons, grounding techniques, use of mobile generators, construction lighting, power tool safety, and use of personal protective equipment.

b) Include the use of intrinsically safe equipment or classified hazardous electrical for hazardous atmospheres as needed.

c) Include controls for hazards such as static electricity as needed.

11) Fire Protection Plans - Hot Work and Fire Prevention:

a) Include a plan to address hazards associated with coating application, hot work, etc.

b) Include list of workplace fire hazards, potential ignition sources, safe work procedures, engineering controls and equipment to be used to prevent fires during any coating application, hot work or applicable process.

01 35 20 - 5

c) Type and location of suppression equipment or systems.

d) Offsite assistance agreement.

e) When working in areas with the potential for a hazardous atmosphere from gases or vapors, include a plan to control all potential ignition sources such as but not limited to lighting, motors, heating devices, fans, static electricity (clothing, abrasive blasting, coating spray application, etc.)

and small tools.

b. Medical:

1) Facilities:

a) List medical facilities and services, emergency contacts, phone numbers, GPS coordinates, etc. as pertains to worksite and location.

2) Training:

a) All Contractor/Subcontractor employees onsite shall have current First Aid/CPR certifications.