140R3026Q0079_Amendment_0002_Key_Inventory_Questions_0002.pdf
PDF 83 KB Posted
- Attached to
- Key Inventory at Davis, Hoover & Parker Dams
- Solicitation number
- 140R3026Q0079
About this file
This is a Questions and Answers document for federal contract opportunity 140R3026Q0079 Amendment 0002, addressing vendor inquiries regarding a door opening inventory requirement at Hoover Dam.
The Government will not disclose the Independent Government Cost Estimate (IGCE) or internal budget information; vendors must develop their own pricing based on solicitation requirements. This is a new requirement with no prior contract performance or incumbent. The scope requires Openings Studio to be connected to SimpleK using native connectivity only, with no custom development or API integration work. Hardware identification and verification will be conducted independently during on-site inventory work, rather than relying on existing SimpleK records. At Hoover Dam, which contains approximately 921 door openings, contractor personnel will move between locations primarily on foot as vehicle transportation needs are minimal within the dam structure. Field teams must be limited to 3 to 5 personnel per site per day due to location complexity, with additional escorts available upon advance notice. The inventory and data input into Openings Studio will be independent of SimpleK, allowing the Government to verify hardware information as part of the effort.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 - 140R3026Q0079 Amendment 0002 - Key Inventory Questions & Answers
1. Budget/Estimate - Is there an estimated budget or Independent Government Cost Estimate (IGCE) range available for this requirement?
Answer: The Government does not disclose the Independent Government Cost Estimate (IGCE) or internal budget information. Vendors must propose pricing based on their own assessment of the solicitation requirements.
2. Prior Performance/Recompete Status - Has this inventory requirement been performed previously under a prior contract, or is this a new requirement?
Answer: This is a new requirement.
3. Openings Studio / SimpleK Integration Scope - The SOW describes Openings Studio as needing to be “connected/attached” and “linked” to SimpleK. Can the Government confirm this refers to using the vendor’s existing native connectivity between the two platforms, rather than requiring custom development or API integration work?
Answer: Yes, the Government is looking for native connections versus any API or custom development.
4. Hardware Documentation - Does the Government have existing records identifying the manufacturer and model of hardware currently installed at each opening (e.g., from prior maintenance records or the current SimpleK system), which would be provided to the Contractor for verification? Or is the Contractor expected to identify hardware manufacturer/model information independently during the on-site inventory?
Answer: The inventory and input into Openings Studio will be independent of SimpleK as the Government is looking for verification as well during this effort.
5. Site Mobility - Hoover Dam Given the scale of Hoover Dam (approximately 921 door openings), will the Government provide any mode of transportation (e.g., UTV, golf cart, vehicle access) between openings, or should the Contractor plan for personnel to move between all locations on foot?
Answer: The need for a vehicle is minimal due to the openings being within the Dam which is accessed mostly by foot.
6. Escort Availability and Team Size - The SOW notes that additional escorts can be arranged with advance notice. To help us plan field team size and scheduling, can the Government advise on a practical maximum number of simultaneous escorts, and maximum Contractor personnel, typically available per site, per day?
Answer: Limit team size to 3 to 5, given the complexity of location.
7. Is there any incumbent/recompete or is this a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
Answer: This is a new project.