140R3026Q0074-Attachment_2-Price_Schedule_and_Schedule_of_Rates.pdf
PDF 125 KB Posted
- Attached to
- SONTEK/YSI IDIQ
- Solicitation number
- 140R3026Q0074
About this file
This document is a Price Schedule attachment for a Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract for SonTek/YSI water quality and acoustic Doppler flow measurement equipment and related services, contract number 140R3026Q0074.
The contract establishes pricing for water quality meters, conductivity meters, and acoustic Doppler current profilers and flow meters from YSI and SonTek manufacturers. Price Schedule Year One lists ten Contract Line Item Numbers (CLINs 0010–0090) for individual equipment units priced at one each, including YSI Pro Swap models, YSI Pro DSS, YSI Pro30 handheld conductivity meter, SonTek M9 and S5 acoustic Doppler current profilers, SonTek Flow Tracker 2 acoustic Doppler velocimeter, SonTek SL500 and SL15003G acoustic Doppler flow meters. CLIN 0070 and 0071, consisting of five SonTek IQPlus acoustic Doppler flow meters and five SonTek-IQ power and communications cables, are designated for award under Task Order No. 1. CLIN 0100 provides for repairs and maintenance services on an actual unit basis with rates to be determined by contractor proposal. The Schedule of Rates for Year One requires contractors to propose appropriate labor categories for maintenance and repairs with fully burdened hourly rates, plus actual materials and equipment costs for pre-authorized work. Specific unit prices are not populated in this template; future RFQs will be issued annually based on need, with contractors required to submit quotes for maintenance or repairs to the Contract Specialist and Contracting Officer for approval before commencing work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2-Price Schedule 1 140R3026Q0074- SonTek/YSI
SonTek/YSI-Multiple Award IDIQ
Price Schedule Year One Price Schedule to be included with future RFQ’s for Delivery/Task Orders
Each year, an RFQ will be issued based on need.
1 Following the need for maintenance or repairs, the contractor shall submit an initial quote detailing the required work to the Contract Specialist (CS) and CO for review. The contractor shall not commence any work until approval is issued by the CO.
*NOTE: 0070 and 0071 will be awarded under Task Order No. 1
*Price Schedules
Price Schedule – Year One
CLIN Manufacturer Model Part
Number
Description QTY Unit Price
0010 YSI Pro Swap 610152-30 Water Quality Meter
1 EA $
0011 YSI Pro Swap (non-battery variant)
610155-30
Water Quality Meter
1 EA $
0020 YSI Pro DSS 626902 Water Quality Meter
1 EA $
0030 YSI Pro30 handheld
6050030 Conductivity Meter
1 EA $
0040 SonTek M9 M9 Acoustic Doppler Current Profiler
1 EA $
0050 SonTek S5 S5 Acoustic Doppler Current Profiler
1 EA $
0060 SonTek Flow Tracker
FT2-2D Acoustic Doppler Velocimeter
1 EA $
0070* SonTek IQPlus SON-IQP Acoustic Doppler Flow Meter
5 EA $
0071* SonTek SonTek-IQ
36-0040-020 Power & Communications Cables
5 EA $
0080 SonTek SL500 SL500-232 Acoustic Doppler Flow Meter
1 EA $
0090 SonTek SL15003G SL1500-3G Acoustic Doppler Flow Meter
1 EA $
01001 TBD TBD TBD Repairs and Maintenance
AU $
Attachment 2-Price Schedule 2
IDIQ Delivery Order No. 1
CLIN Manufacturer Model Part
Number
Description QTY Unit Unit
Price
Total Price
0070 SonTek IQPlus SON-IQP Acoustic Doppler Flow Meter
5 EA $ $
0071 SonTek SonTek-IQ
36-0040-
Power & Communications Cables
5 EA $ $
TOTAL $
Attachment 2-Price Schedule 3
SonTek/YSI-Multiple Award IDIQ
Schedule of Rates- Year One
Schedule of Rates – Year One
Labor Category1 Unit of Measure Straight Time per Hour
Hour $
Hour $
Hour $
Hour $
Materials Unit of Measure
Materials and Equipment2 Actual TBD 1 Propose appropriate labor categories for repairs and maintenance 2 Materials and Equipment- For pre-authorized repairs and maintenance only
Note: The contractor shall bill strictly at these rates for work performed for maintenance/repairs. All labor rates shall be fully burdened (including wages, overhead, G&A, and profit).
File details come from the government source that posted it. Updated .