C06_Q_A_on_solicitiation_0001.pdf

PDF 102 KB Posted

Attached to
PARKER SERVICE STATION ROOF REHAB
Solicitation number
140R3025R0011
Issued by

About this file

This document is a Request for Information (RFI) for the Parker Dam Service Station Roof Rehabilitation project, Solicitation No. 140R3025R0011. The RFI addresses three key technical questions about the project specifications. Regarding the roof panels, the government requires a metal roof with a minimum 1-inch double lock seam and concealed fasteners, with material selection based on the local climate of Parker Dam. The drywall ceiling should have a standard tape and spray texture with knock down and light sanding. For the attic access, no permanent ladder is required due to the low roof pitch; instead, a 2' x 2' access point will be centered under the peak, and a portable ladder will be used for access.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKER DAM – SERVICE STATION ROOF REHAB

Solicitation No: 140R3025R0011

RFI’s

1. What is the Basis of Design for the standing seam roof panels?

Government has no preference for manufacture, as long as the product meets the requirements in the SOW, Government requires a metal roof with a minimum 1-inch double lock seam and concealed fasteners. Material selection should be appropriate for the local climate of Parker Dam.

2. What texture is expected on the drywall ceiling?

Standard tape and spray texture with knock down and light sanding.

3. What is the Basis of Design for the attic access ladder?

This can be omitted, the low pitch of the roof will require the 2’ x 2’ access to be centered under the peak, no access ladder is required. A portable ladder will be used for access.

File details come from the government source that posted it. Updated .