140R3024Q0139_Combined_Synopsis_Solicitation.pdf
PDF 1 MB Posted
- Attached to
- 2300 Volt Switchgear for Hoover Dam Federal contract opportunity
- Solicitation number
- 140R3024Q0139
About this file
This document is a combined synopsis/solicitation for the procurement of 2300 Volt Switchgear for the Bureau of Reclamation's Hoover Dam. The government is seeking commercial equipment that meets the specified technical requirements, including dimensions, electrical ratings, and construction details. Award will be made to the responsible offeror whose quote is most advantageous to the government, considering technical specifications, delivery time, past performance, and price. Quotes are due by September 13, 2024. The North American Industry Classification System (NAICS) code is 335313, Switchgear and Switchboard Apparatus Manufacturing. The Bureau of Reclamation will install and configure the equipment at the Hoover Dam Central Warehouse in Nevada. Key requirements include providing detailed technical submittals, meeting NEMA and ISO 9001/9002 standards, and providing operations and maintenance manuals. Offerors must complete the required representations and certifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R3024Q0139_Specs_2300_Volt_Switchgear_for_Hoover_Dam_0002.pdf | ||
| Sol_140R3024Q0139_Amd_0002.pdf | ||
| 140R3024Q0139_2300V_Cabinet_Starter_Photos_0002.pdf | ||
| 140R3024Q0139_Questions_and_Answers_0002.pdf | ||
| 140R3024Q0139__45-301-7416-R0_0001.pdf | ||
| 140R3024Q0139__45-301-60896-RD-1_22_x_34_Drawing_0001.pdf | ||
| 140R3024Q0139_Photos_0001.pdf | ||
| Sol_140R3024Q0139_Amd_0001.pdf | ||
| Sol_140R3024Q0139.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supply purchase for 2300 Volt Switchgear for Hoover Dam
General introduction:
This is a supply 2300 Volt Switchgear for Hoover Dam. The goal is to be open to all US manufacturers who meet the following requirements. The full voltage non reversing starters are rated at 2300 volts, with (two) 400-amp (minimum) vacuum contactors and one piece for the incoming power. The full voltage none reversing FVNR starters will be used to start government furnished 2300 Volt 150 HP sump pump motors with built in winding temperature RTD’s. The goal is for standard commercial equipment being made with a few modifications for the switches.
Dimension for the Switchgear equipment specifications as follows:
Note: The arrangement may vary depending upon the manufacturer. The total area footprint allowed is
60 inches for the front (front is considered where the breakers rack out and access to the full voltage starters is allowed for wiring and maintenance) with a depth of 38 inches maximum, and with a height from 92 to 96 inches. Floor space is a premium for Hoover Dam, with the addition of two new sump pumps not furnished here in this purchase request. The desired overall floor layout for one full piece of switchgear is 60 inches wide x 38 inches deep per unit switchgear. The Switchgear has the draw out for two 400 amp vacuum contactors, control switches, and relay protection for two full voltage starters with one stacked on top of the other or side by side space permitting, full voltage starter (30 inches deep x 36 inches wide for example). The height isn’t a critical dimension, but 92 to 96 inches is acceptable. One piece of the switchgear is 24 x 30 inches for example for the incoming line power for example. The two sections bolted together as one complete unit is 30 inches deep x 60 inches wide for example. A total of three full sectional piece sections fitting will fit in an area of 60 inches for the front with a depth of 38 inches.
Enclosures:
1. The enclosures for the two medium voltage contactors FVNR shall meet NEMA ICS 6 standards.
The enclosure shall be NEMA 1 type, free standing, and completely front accessible (36 wide x
30 inch deep section for example).
2. The other enclosure which is connected to the above enclosure is (24 inches wide x 30 inches deep for example). The feeder incoming section is used for the incoming line feeder from the customer/government power cable and this section feeds the power via the bus bar to the two
FVNR contactors section.
Submittals – for Review/Approval
1. Master drawing index
2. Front view elevation with dimensions
3. Floor plan with dimensions (60 inches wide x 38 inches deep maximum)
4. Top view dimensions
5. Schematic diagram
6. Nameplate schedule
7. Component list
8. Conduit entry/exit locations
9. Assembly ratings including:
140R3024Q0139 Combined Synopsis Solicitation
a. Short-circuit rating
b. Voltage
c. Continuous current
d. Basic impulse level: 60kV minimum rating
10. Major component ratings including:
a. Voltage
b. Continuous current
c. Interrupting ratings
11. Cables terminal sizes
12. Descriptive bulletins
13. Product data sheets
14. The government has included a special sheet for the control switch which has four positions.
Extra contact blocks for the switch positions shall be included also. The four positions are as follows: Hand, OFF, PLC AB-SLC 504, and CSB1 SE PLC
Qualifications for Manufacturer:
1. The manufacturer of the assembly shall be the manufacturer of the major components within the assembly.
2. For the equipment specified herein, the manufacturer shall be ISO 9001 or 9002 certified.
3. The manufacturer of this equipment shall have produced similar electrical equipment for a minimum period of five (5) years. The equipment shall be of the latest production not a legacy product that is out of production or one that is in its last year of production. The product must be in the active life cycle.
Operation and Maintenance Manuals.
Equipment operation and maintenance manuals shall be provided with each assembly shipped and shall include instruction leaflets and instruction bulletins for the complete assembly and each major component.
Ratings of the full voltage starters as follows:
1. Starters shall have an integrated interrupting rating with current limiting fuses of 50ka.
2. The entire assembly shall be suitable for application on a power system having a short-circuit capacity of 50kA.
3. The vacuum contactor shall have the following ratings:
7200V Max. 400 Amperes
Max. Interrupting 8500 Amperes
Rated Current – Enclosed 400 Amps
Rated Current – Open 400 Amps
Short Time Current
30 seconds 2400 Amps
1 second 6000 Amps
8.7 ms (.5 cycle) 63dA Peak
Mechanical Life 2.5 million
Electrical Life at rated current 300,000
Impulse Withstand 60kV (1.2 x 50 Micro Sec.)
Construction
1. Isolating switch and contactor assemblies, including current limiting fuses shall be of the component-to-component design with a minimum number of interconnecting cables. The isolating switch shall be easily removed from the enclosure by removing the pin securing the operating rod to the switch and then removing two bolts securing the removal portion of the switch. Line and load cable terminations shall be completely accessible from the front. The isolating switch shall be capable of being locked out by a padlock for lockout tag out purposes.
2. Current limiting power fuses shall be provided with special fatigue proof elements that allow the elements to absorb the expansions and contractions created by the heating and cooling associate with severe cycling as is typical with motor starting. The fuses will include visible fuse condition indicators. The fuses shall incorporate special time/current characteristics for motor service allowing proper coordination with the contractor and overload relay for maximum motor protection. The power fuses shall be Bolt-in and rated for 50 symmetrical kA rating. The fuses shall be sized for the 150 HP sump pump motor provided by the government.
3. The vacuum contactor shall be of the roll-out, stab connection and latched design, rated at 400 amperes with single-break high pressure type main contacts with weld-resistant alloy contact faces. The vacuum contactor contact wear shall be easily checked with the use of a go/go-go feeler gauge.
4. A built-in-test circuit shall be included to permit checking of the starter control and pilot circuit, with high voltage de-energized and isolated, and the contactor in its normal position or in the draw out position. The control circuit shall be capable of being energized through a polarized plug connector from an external 115-volt supply while in the test mode.
5. The low voltage control compartment shall be isolated and barriered from the high voltage area and located behind a separate low voltage access door. The low voltage compartment shall be painted white to increase visibility of components mounted inside the compartment.
6. Each starter cell shall contain a vertical and horizontal low voltage wireway.
Bus works
1. The two FVNR Starters shall be connected by an insulated vertical bus.
2. All bus bars shall be copper tin or silver plated. Bus shall be rated for a minimum of 1000 amps continuous current.
3. A ¼ x 2-inch ground bus shall be provided throughout the entire lineup.
4. The bus bar will feed the other section containing the two FVNR (Full Voltage Non-Reversing) starters.
Wiring/Terminations
1. Control wire shall be UL/CSA approved.
2. Standard control wire shall be 16 or 14 Gauge stranded, tin-plated, dual-rated SIS 90 degrees C.
3. Current transformer circuits shall utilize 12 Gauge wire, with the same characteristics as above.
4. Provide “lug-in” terminal blocks, rated at 600V, 50 amps with “clamping collar.”
5. Wire markers shall be “sleeve” type or equal not handwritten.
6. “Clamping collar” type terminal shall be used to terminate the control wiring. Control transformer circuits shall be provided with ring type terminals where applicable.
7. Ground wire color shall be green yellow stripe.
8. Customer Terminal blocks with wires going to the control switches (status position 24VDC customer power) for the two extra positions shall be provided. The positions are as follows:
Hand, Off, PLC AB-SLC 504, and RTU Cab SE PLC.
9. Customer Terminal blocks for external wiring shall be provided for the customer relays to use for remote starting via the PLC relay contacts. The relays are provided by the customer. If possible room permitting, two inches of din rail, which is unused shall be used by the customer to install the PLC interface relays for remote start devices.
10. One dry contact for breaker tripped via the motor starter relay.
11. Two dry contracts for motor running indication
12. One 4/20milliamp output for the current of the motor.
13. All of the above contacts must be provided on a terminal block for external wiring to the government.
FVNR Starters to be used to start the existing government furnished 150 HP 2300-volt motors:
1. The starters shall be designed to accommodate the existing 150HP vertical sump pump motors of the size and type as follows:
2. The starters shall be non-reversing.
3. Three phase 2300 volts rated at 35 amps.
4. Service Factor is 40 amps.
5. The motor is rated at 150 HP with a RPM of 1780, and 60 Hertz.
6. The service factor is 1.15.
7. The duty of the motor is continuous, and the insulation class is type F.
The following equipment shall be provided for each of the starter type as follows:
1. One-Fixed portion isolating switch with shutter mechanism.
2. One-Removable portion isolating switch (with blown fuse indication).
3. Three clips in Current-limiting power fuses.
4. One-Stab-in three pole main vacuum contactor assembly.
5. One- Control circuit transformer (750 VA @ 2.4KV)
6. Two- Control circuit primary current limiting fuses.
7. One- Control circuit secondary fuse.
8. One- Run test circuit, which an external 120VAC power source can be applied.
9. Four- Electrical interlocks
10. One – three phase current transformer suitable for use with motor protection relay and or electronic meter.
Low Voltage Compartment and Door
1. One- Motor protection Relay
2. One- Interposing control relay
3. One- Set of control circuit terminal blocks.
4. Two-PT’s (potential transformers), open delta
5. Isolation switch viewing window to verify switch position.
6. One – CT (current transformer) shorting block
Motor Protection Relay (Six Total are Provided)
1. One Motor protection relay per starter shall be furnished.
2. An optional URTD (Resistance Temperature Detector) card shall be mounted on the backside of each Motor Protection relay. Or the motor protection relay may have the URTD build into the Motor Protection relay. A total of six one per starter.
3. Trip circuit monitoring. Relay shall display the reason for tripping.
4. Current readout of the phases shall be available.
5. Current unbalance
6. THD monitoring (Total Hamonic Distortion) of the current
7. Temperature monitoring with the motor protection relay with the URTD card on the back side or built in.
8. TBS (Time between Starts or called Anti-backspin time): Timer counts down preventing the motor starting for a certain time. Our motors require a minimum of 2 minutes between starts.
9. Small digital display
10. A minimum of one analog output (4 to 20ma). The 4/20ma signal shall be capable of outputting the current being used by the sump pump motor.
11. The Eaton EMR-3MP0 protection relay with options can meet the above criteria. Note this is only an example a manufacturer with a relay equal to this one will suffice.
12. If any software which is required to program the relay, the software must be provided with any special cables, or etc. All software must be free of malicious code or any virus.
Attached documentation with relay shall be provided which goes into details on further instructions.
Enclosure
1. Enclosures for the medium voltage starters shall meet NEMA ICS 6 standards. The enclosure shall be NEMA 1 type, free standing, completely front accessible.
Government Furnished Drawings
1. The sheet on the switch arrangement is attached, which must be used for the new switchgear.
2. The floor plan is attached which shows the tentative switchgear installation on the 2nd floor of
Hoover Dam, which is done by government forces. This drawing shows the real estate the government is working with, for the floor space allowed to install the switchgear. Note the existing switchgear was installed when the NEMA codes were less stringent therefore the existing equipment is smaller.
After receiving the equipment
1. After receiving the equipment, the government has the option to call the technical representative of the manufacturer out for the equipment checkout within one year of the receiving date. The vender/supplier is responsible for this cost. The cost is a separate line item on the billing. Note: Most likely all of the new switchgear will not be installed, therefore at minimum the 120VAC external power supply can be used for testing the switchgear which isn’t wired up to the government 2300 incoming line feeder. The government will install one piece of switchgear for two starters for example within one year of the equipment arriving at the warehouse and call out the technician for installation verification for example. Note the other two arrangements will only be tested with the 120VAC test plug at this time granted they are still in the warehouse storage.
Clauses
52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2023)
---Addendum to 52.212-4---
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar
(End of clause)
DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING
PLATFORM (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
None
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause) http://www.acquisition.gov/far http://www.acquisition.gov/diar http://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015)
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The
Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.
Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
http://www.cpars.gov/ http://www.cpars.gov/
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
DOI-AAAP-0055 INTERNET PROTOCOL VERSION 6 (JUN 2012)
1. Any system hardware, software, firmware and/or networked component (voice, video or data) developed, procured, or acquired in support and/or performance of this contract shall be capable of transmitting, receiving, processing, forwarding and storing digital information across system boundaries utilizing system packets that are formatted in accordance with commercial standards of Internet Protocol (IP) version 6 (IPv6) as set forth in the USGv6 Profile (NIST Special Publication 500-267) and corresponding declarations of conformance defined in the USGv6 Test Program. In addition, this system shall maintain interoperability with IPv4 systems and provide at least the same level of performance and reliability capabilities of IPv4 products.
2. Specifically, any new IP product or system developed, acquired, or produced must:
a. Interoperate with both IPv6 and IPv4 systems and products, and
b. Have available contractor/vendor IPv6 technical support for development and implementation and fielded product management.
3. As IPv6 evolves, the Contractor commits to upgrading or providing an appropriate migration path for each item developed, delivered or utilized at no additional cost to the Government. The Contractor shall retrofit all non-IPv6 capable equipment, as defined above, that is fielded under this contract with IPv6 capable equipment, at no additional cost to the Government.
4. The contractor shall provide technical support for both IPv4 and IPv6.
5. Any system or software must be able to operate on networks supporting IPv4, IPv6 or one that supports both.
6. Any product whose non-compliance is discovered and made known to the Contractor within one year after acceptance shall be upgraded, modified or replaced to bring it into compliance at no additional cost to the Government.
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
(a) Definitions. As used in this clause– Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
WBR 1452.237-80 SECURITY REQUIREMENTS -- BUREAU OF RECLAMATION (MAR 2022)
(a) General Security Requirements:
(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements. Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.
(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the contracting officer. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the contracting officer will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.
(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.
(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.
(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI Access Card.) During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.
(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the electronic background investigation forms have been received and the investigation is initiated.
(7) All Contractor employees shall access the facility via the facility’s entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the Government-issued identification card at all times they are on Government facilities.
Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site. Cards that have been lost, damaged, or stolen must be reported to the COR and DOI Access Sponsor immediately, but not later than within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more. The Contractor may be required to turn in access control cards or identification cards on a daily basis.
(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government. The Contractor may be charged up to $500 for each occurrence for any required replacement of Government-issued access control or identification cards due to loss or misuse. At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor shall ensure that all access control and identification cards are returned to the COR.
(9) All Contractor personnel, including subcontractor personnel, with access to the work site shall be U.S. citizens or foreign individuals legally residing in, or legally admitted to, the U.S.
For all non-U.S. citizens working under this contract, irrespective of length of time working on the contract, the Contractor shall provide to the COR, legible and valid copies of the individual’s passport and visa (unless individual is on the Visa Waiver Program) a minimum of 14 calendar days prior to beginning work or arriving at the facility. A driver’s license is not acceptable identification. In addition, a completed form I-94 shall be submitted to the COR upon the individual’s arrival at the work facility and prior to beginning work.
(10) The Contractor shall report all contacts with entities, individuals, and counsel/representatives (including foreign entities and foreign nationals) who seek in any way to obtain unauthorized access to sensitive information or areas. The Contractor shall report any violations of contract provisions, laws, executive orders, regulations, and guidance to the contracting officer. The Contractor shall report any information raising a doubt as to whether an individual’s eligibility for continued employment or access to sensitive information is consistent with the interests of National Security and the Public Trust.
(11) Unsanctioned, negligent, or willful inappropriate action on the part of the Contractor (or its employees) may result in termination of the contract or removal of some Contractor employees from Reclamation facilities at no cost to the Government. These actions include, but are not limited to, exploration of a sensitive system and/or information, introduction of unauthorized and/or malicious software, inappropriate release of sensitive information, or failure to follow prescribed access control policies and/or security procedures. Failure to comply with Reclamation policies, procedures, or other published security requirements may result in termination of the contract or removal of some contracted employees from Reclamation buildings and/or facilities at no cost to the Government.
(12) All provisions of this clause shall equally apply to all subcontractors. The Contractor shall incorporate the substance of this clause in all subcontracts.
(13) These security requirements apply to all sections of this Contract including Contract Drawings and other Contract Specifications as applicable. Related documents include other general provisions of Construction or Operations and Maintenance type Contracts, including FAR clauses by reference or as amended by related documents.
(b) Information Security Requirements.
(1) Sensitive Information. The term “sensitive information” means any information which warrants a degree of protection and administrative control as defined by Reclamation or that meets the criteria for exemption from public disclosure set forth under Sections 552 and 552a of Title 5, United States Code: the Freedom of Information Act and the Privacy Act.
Sensitive information is generally categorized as CONTROLLED UNCLASSIFIED INFORMATION (CUI), but in some cases may include other unclassified information. (The protection of National Security information is beyond the scope of this clause. If any work on National Security information is required under this contract, it is addressed under other contract clauses.) The Contractor shall protect this type of information from unauthorized release into public domain, or to unauthorized persons, organizations, or subcontractors. Information which, either alone or in aggregate, is deemed sensitive by Reclamation shall be handled and protected in accordance with Reclamation Directives and Standards SLE 02-01 Identifying and Safeguarding Controlled Unclassified Information (CUI), which is available from the COR or at http://www.usbr.gov/recman/DandS.html#sle.
(i) Any Government-furnished information or material does not become the property of the Contractor and may be withdrawn at any time. Upon expiration or termination of the contract, all documents released to the Contractor and any material created using data from such documents shall be returned to the COR for final disposition. Government-furnished information residing on any electronic systems (laptops, servers, desktops, media) shall be deleted from those systems using a COR-approved data erasure solution. Only with prior authorization from the contracting officer may the Contractor retain the material. The Contractor or subcontractor shall not disclose or release the materials provided to the Contractor to any individuals of the Contractor's organization not directly engaged in providing services under the contract or that do not have a valid need-to-know. All technical data provided to the Contractor by the Government shall be protected from public or private disclosure in accordance with the markings printed on them. All other information relating to the items to be delivered or the services to be performed under this contract shall not be disclosed by any means without prior approval of the contracting officer.
Prohibited dissemination or disclosure includes, but is not limited to: permitting http://www.usbr.gov/recman/DandS.html#sle access to such information by foreign nationals or by immigrant aliens who may be employed by the Contractor, publication of technical or scientific papers, advertising, disclosure to Contractor staff not investigated and deemed acceptable at the appropriate information sensitivity level, and any other public release. The Contractor shall maintain, and furnish upon request of the contracting officer, records of the names of individuals who have access to sensitive material in its custody and the sensitive material to which the individuals had access. All questions regarding information security, access, and control shall be referred to the COR.
(ii) The Contractor shall not release to anyone outside the Contractor’s organization any sensitive, or otherwise protected information, regardless of medium in which it is contained (for example, film, tape, document, electronic), pertaining to any part of this contract or any Reclamation program or activity, unless the contracting officer has given prior written approval. This includes, but is not limited to, news releases, marketing promotions, articles, interviews, reports, social media posts, and any other media releases. Requests for approval shall identify the specific information to be released, the medium to be used, the purpose for the release, and a description of the need-to-know. The Contractor shall submit its request to the contracting officer ten business days before the proposed date for release.
Subcontractors shall submit requests for authorization to release through the prime Contractor to the contracting officer.
(iii) The Contractor shall notify the COR immediately when known or suspected loss/compromise of sensitive information or other documents, notes, drawings, sketches, reports, photographs, exposed film or similar information which may affect the security interests of Government has occurred. This requirement extends to employees and other personnel working on behalf of the Contractor, and expands responsibility to include prompt reporting of security issues, including observed or subsequently discovered efforts by unauthorized persons to gain unauthorized access to sensitive information.
(2) Classified Information.
(i) The disclosure of U.S. Government documents by third parties can result in damage to our national security. While this contract may not deal directly with classified information, each contractor is obligated to protect classified information pursuant to all applicable laws and to use Government information technology systems in accordance with agency procedures so that the integrity of such systems is not compromised.
(ii) Unauthorized disclosures of classified documents (whether in print, on a blog, or on websites, or other electronic or non-electronic media) do not alter the documents' classified status or automatically result in declassification of the documents. To the contrary, classified information, whether or not already posted on public websites or disclosed to the media, remains classified, and must be treated as such by Federal employees and contractors, until it is declassified by an appropriate U.S. Government authority. Executive Order 13526, Classified National Security Information (December 29, 2009), Section 1.1.(c) states, "Classified Information shall not be declassified automatically as a result of any unauthorized disclosure of identical or similar information." Although the Department has taken steps to prevent access to publicly disclosed classified materials from Departmental computers, it is important to understand our continuing duties and responsibilities in this regard.
(iii) Contractors (which include all employees of the contractor, as well as subcontractors and its employees performing work for the contractor) are reminded of the following obligations with respect to the treatment of classified information and the use of unclassified government information technology systems:
(iv) The contractor shall not, while using unclassified Government computers or other devices (such as phones or tablets) access documents that are marked classified (including classified documents made publicly available by a third party), as doing so risks that material still classified will be placed onto unclassified systems. This requirement does not restrict contractor access to unclassified, publicly available news reports (and other unclassified material) that may in turn discuss classified material, as distinguished from access to underlying documents that themselves are marked classified (including if the underlying classified documents are available on public web sites or otherwise in the public domain).
(v) For contracts that require access to classified information, the contractor is responsible for obtaining the required national security clearance through the Department of the Defense National Industrial Security Program Operating Manual (NISPOM). Any classified contracts will be coordinated through the Reclamation Chief Security Officer, or for IT requirements, the Bureau Chief Information Security Officer. No contractor shall access classified information unless proper clearances have been obtained and transmitted to Reclamation. For further information, refer to 443 DM 1 or DOD NISPOM 5220.22-M dated February 28, 2006 (incorporating change 2 dated May 18, 2016).
(vi) Classified information shall not be removed from official premises.
(vii) Classified information shall not be disclosed without proper authorization.
(c) Reserved
(d) Reserved
(e) Reserved
(f) Reserved
--- End of Addendum to 52.212-4---
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan
2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C.
3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19
U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C.
3509)).
[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
(4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900 (a).
[X] (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards
140R3024Q0139 Combined Synopsis Solicitation https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/3.900#FAR_3_900
(Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
[ ] (6) [Reserved].
[ ] (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
[ ] (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
[X] (9) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023)
(10) 52.204–28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).
[X] (11)(i) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition.
(Dec 2023) ( Pub.
L. 115–390, title II).
(ii) Alternate[ ] I (Dec 2023) of 52.204–30.
[X] (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).
[ ] (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
[ ] (14) [Reserved] [ ] (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C.
657a).
[ ] (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
(17)[Reserve[ ]d]
[X] (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644). [ ]
(ii) Alternate I (Mar 2020) of 52.219-6.
[ ] (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644). [ ]
(ii) Alternate I (Mar 2020) of 52.219-7.
[X](20) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C. 637(d)(2) and (3)). [ ] (21) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C.
637(d)(4)).
[ ] (ii) Alternate I (Nov 2016) of 52.219-9. [ ] (iii) Alternate II (Nov 2016) of 52.219-9. [ ] (iv) Alternate III (Jun 2020) of 52.219-9. [ ] (v) Alternate IV (Sep 2023) of 52.219-9 [ ] (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)). [ ] (ii) Alternate I (Mar 2020) of 52.219-13.
[X](23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 637(a)(14))(Deviation
OCT 2022).
[ ] (24) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C.
637(d)(4)(F)(i)).
[ ] (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).
[X] (26) (i) 52.219-28, Post Award Small Business Program Representation (Feb 2024) (15 U.S.C. 632(a)(2)). [ ] (ii) Alternate I (MAR 2020) of 52.219-28.
[ ] (27) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
https://www.govinfo.gov/link/plaw/115/public/390
[ ] (28) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).
[ ] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)). [ ] (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15U.S.C. 637(a)(17)).
[X] (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
[X] (32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB 2024) (E.O.13126).
[X] (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
[X] (34) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
[ ] (ii) Alternate I (Feb 1999) of 52.222-26.
[X] (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212). [ ] (ii) Alternate I (Jul 2014) of 52.222-35.
[X] (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C.
793). [ ] (ii) Alternate I (Jul 2014) of 52.222-36.
[X] (37) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
[X] (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
[X] (39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627).
[ ] (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[X] (40) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in 22.1803.)
[ ] (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off- the-shelf items.)
[ ] (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).
[ ] (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
[ ] (44) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
[ ] (ii) Alternate I (Oct 2015) of 52.223-13.
[ ] (45) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514). [ ] (ii) Alternate I (Jun 2014) of 52.223-14.
[ ] (46) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .