140R3024Q0139_Questions_and_Answers_0002.pdf
PDF 161 KB Posted
- Attached to
- 2300 Volt Switchgear for Hoover Dam
- Solicitation number
- 140R3024Q0139
About this file
This document is a set of Questions and Answers related to Solicitation Number 140R3024Q0139 for 2300 Volt Switchgear for Hoover Dam. The key details are:
The solicitation is for 2300 Volt Switchgear for the Hoover Dam. It is a combined synopsis/solicitation for commercial supplies, with a NAICS code of 335313 Switchgear and Switchboard Apparatus Manufacturing. Delivery is required approximately 60 days after award to the Hoover Dam Central Warehouse in Boulder City, NV. Offers must include a completed SF 1449, pricing, representations and certifications, technical information, delivery date, and past performance. Award will be made to the responsible offeror whose quote is most advantageous to the government, based on technical, delivery, past performance, and price factors. Offers are due by September 13, 2024.
The Questions and Answers clarify details around the quantity of equipment required, the potential for phased delivery, and the relationship to existing switchgear equipment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R3024Q0139
Questions and Answers
Question 1:
Please clarify/verify: question on quantity of starters in this quote. It looks like they want quantity 3 of the same layout.
Answer 1:
We have a total of 2 complete units, therefore there are 2 starters per unit, thus we have 6 motor protection relays and 6 RTD devices.
Question 2:
SWO After receiving the equipment. “Note the other two arrangements”
Answer 2:
Depending upon how fast the government installs the switchgear only one complete unit might be installed in the first year. Other units could be tested with the 120VAC test plug leads with no 2300 volt
AC present.
Question 3:
This section is where it became unclear as it looks like a 3 structure assembly and a 2 structure assembly.
Answer 3:
The section in yellow is the existing 2300 volt soft start switchgear to the 400HP air compressors. This equipment is not in the statement of work. A previous version I thought about matching the motor protection relays here only for the operators.
File details come from the government source that posted it. Updated .