June_2023_reports_0003.pdf
PDF 421 KB Posted
- Attached to
- Fire suppression systems maintenance, monitoring
- Solicitation number
- 140R3023Q0057
About this file
This solicitation seeks maintenance, monitoring, and inspection services for fire suppression systems. The Bureau of Reclamation is seeking these services for buildings located at 500 Fir Street in Boulder City, Nevada. Key requirements include maintenance and testing of fire alarm panels, devices, batteries and ancillary equipment in accordance with NFPA 72 standards. The contractor must also provide monitoring and inspection reports documenting performance measurements and identifying any deficiencies. The response deadline is July 29, 2023 and the period of performance is one year from award with four optional one-year extensions. Pricing shall be fixed for the initial one-year base period and optional extensions. This represents an opportunity for firms providing fire protection system installation, maintenance and monitoring services to federal customers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 140R3023Q0057_Q_A_2-7_0004.pdf | ||
| Sol_140R3023Q0057_Amd_0004.pdf | ||
| Attachment_4_LCB_Maps_0004.pdf | ||
| Sol_140R3023Q0057_Amd_0003.pdf | ||
| 140R3023Q0057_Q_A_2-6_0003.pdf | ||
| Attachment_4_LCB_Maps_0002.pdf | ||
| Fire_Suppression_System_0002.pptx | PPTX presentation | |
| 140R3023Q0057_Q_A_2-5_0002.pdf | ||
| Attachment_2_Price_Schedule_0002.xlsx | XLSX spreadsheet | |
| Sol_140R3023Q0057_Amd_0002.pdf | ||
| Sol_140R3023Q0057_Amd_0001.pdf | ||
| Attachment_2_Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140R3023Q0057.pdf | ||
| Attachment_1_Fire_Suppression_System_PWS.docx | DOCX document | |
| Attachment_3_Wage_Determination.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire Alarm and Life Safety System Inspection Certificate
For
BOR - 200 Building 500 Fir Street
Boulder City, NV 89005
Tested to NFPA 72 Standards
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Inspection Date Jun 29, 2023
Building: BOR - 200 Building Company: Sting Alarm Inc.
Contact: Pete Gonzales Contact: Christian Pinto
Title: Foreman I Building Repairman Title: Inspector Fire Alarm Testing Report
Page of 2 12 Executive Summary
Sting Alarm Inc. Download Date: 07/19/2023
Executive Summary Generated by: BuildingReports.com
Building Information Building: BOR - 200 Building Contact: Pete Gonzales Address: 500 Fir Street Phone: 702-293-8024 Address: Fax:
City/State/ZIP Code: Boulder City, NV 89005 Mobile:
Country: United States of America Email: pgonzales@usbr.gov
Inspection Performed By Company: Sting Alarm Inc. Inspector: Christian Pinto Address: 7120 Rafael Ridge Way Phone: 7026267560 Address: Fax:
City/State/ZIP Code: Las Vegas, NV 89119 Mobile:
Country: United States of America Email: christian@signalfireinc.com
System Control Unit Manufacturer: Viking Inspection Date: 01/27/2023 IDC Style: B Model Number: VFR-400 Install Date: 07/29/2016 SLC Style:
Software Version: Version Date: 12/31/1969 NAC Style: Y Location: 1st Near Riser FACP Current Protection: Breaker
Page of 3 12
Sting Alarm Inc. Download Date: 07/19/2023
Inspection Summary
Category:
Total Items Serviced Passed Failed/Other
Qty % Qty % Qty % Qty % Control 6 37.50% 6 100.00% 6 100.00% 0 0.00%
Initiating 6 37.50% 6 100.00% 6 100.00% 0 0.00%
Monitor 1 6.25% 1 100.00% 1 100.00% 0 0.00%
Supervisory 3 18.75% 3 100.00% 2 66.67% 1 33.33%
Totals 16 100% 16 100.00% 15 93.75% 1 6.25%
Certification
Company: Sting Alarm Inc. Building: BOR - 200 Building
Inspector: Christian Pinto Contact: Pete Gonzales
Page of 4 12 Discrepancy Report
Sting Alarm Inc. Download Date: 07/19/2023
Discrepancy Report Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.
Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer's replacement/upgrade program is included.
Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade
No items found during this inspection.
ScanID Location Problem Address Reference
Supervisory Supervisory Device
3 58259131 1st West Riser Hi/Lo Air Switch Failed Test 1 NFPA72 14.2.2.2.2
Code References NFPA72 14.2.2.2.2 System deficiencies shall be corrected.
javascript:editViewDevice('58259131');
Page of 5 12 Proposed Solutions Report
Sting Alarm Inc. Download Date: 07/19/2023
Proposed Solutions Report Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.
ScanID Location Solution Model # Cost Fix
Supervisory Supervisory Device
58259131 1st West Riser Hi/Lo Air Switch See notes /recommendations
PS40-2 T/M
PO #: (none) T/M
Page of 6 12 Notes & Recommendations
Sting Alarm Inc. Download Date: 07/19/2023
Notes & Recommendations Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by Category.
Note Device Type Location Comment ScanID Supervisory
1 Supervisory Device 1st West Riser Hi/Lo Air Switch Failed Test 58259131 Low air pressure, supervisory in fire alarm panel in bldg 200 L3M123, sprinkler company will need to service it.
Page of 7 12 Inspection & Testing
Sting Alarm Inc. Download Date: 07/19/2023
Inspection & Testing Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Control
Battery 1st Near Riser Pre-Action Panel Battery 1 Tested 11:53:42 AM 06/29/2023
Battery 1st Near Riser Pre-Action Panel Battery 2 Tested 11:53:47 AM 06/29/2023
Battery 1st West Near Riser Power Supply Battery
Tested 11:54:17 AM 06/29/2023
Battery 1st West Near Riser Power Supply Battery
Tested 11:54:39 AM 06/29/2023
Control Panel 1st Near Riser FACP Tested 9:04:24 AM 01/27/2023
Power Supply 1st West Near Riser NAC Power Supply Tested 11:35:05 AM 06/29/2023
Initiating
Pull Station main entrance Tested 8:56:59 AM 01/27/2023
Pull Station rear entrance Tested 9:01:54 AM 01/27/2023
Pull Station security Tested 8:58:51 AM 01/27/2023
Smoke Detector 2nd electrical room S/D Pre-action Tested/Cleaned 11:35:11 AM 06/29/2023
Waterflow Switch 1st West Riser Water-flow Tested 9:24:17 AM 01/26/2023
Waterflow Switch 1st West Riser Water-flow Tested 9:24:20 AM 01/26/2023
Monitor
Module 1st West Near Riser Power Supply NAC Trip
Tested 11:55:32 AM 06/29/2023
Supervisory
Tamper Switch 1st West Riser Tamper Tested 9:24:10 AM 01/26/2023
Tamper Switch 1st West Riser Tamper Tested 9:24:14 AM 01/26/2023
Device Type Location Service Time Date
Failed/Other Supervisory
3 Supervisory Device
1st West Riser Hi/Lo Air Switch Tested 12:19:51 PM 06/29/2023 javascript:editViewDevice('58259129');
javascript:editViewDevice('58259128');
javascript:editViewDevice('35478757');
javascript:editViewDevice('35478758');
javascript:editViewDevice('58259130');
javascript:editViewDevice('35478756');
javascript:editViewDevice('35478759');
javascript:editViewDevice('35478761');
javascript:editViewDevice('35478760');
javascript:editViewDevice('58844255');
javascript:editViewDevice('51475400');
javascript:editViewDevice('51475402');
javascript:editViewDevice('76249265');
javascript:editViewDevice('51475399');
javascript:editViewDevice('51475401');
Page of 8 12 Service Summary
Sting Alarm Inc. Download Date: 07/19/2023
Service Summary Generated by: BuildingReports.com
Building: BOR - 200 Building The Service Summary section provides an overview of the services performed in this report.
Device Type Service Quantity
Failed/Other Supervisory Device Tested 1
Total 1
Passed Battery Tested 4 Control Panel Tested 1 Module Tested 1 Power Supply Tested 1 Pull Station Tested 3 Smoke Detector Tested/Cleaned 1 Tamper Switch Tested 2 Waterflow Switch Tested 2
Total 15 Grand Total 16
Page of 9 12 Auxiliary Functions Testing
Sting Alarm Inc. Download Date: 07/19/2023
Auxiliary Functions Testing Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Auxiliary Functions Testing section lists each of the ancillary items, systems, and emergency equipment that are controlled by the system control unit. Items are grouped by Passed or Failed/Other. The items are listed by device type, and a check box is provided to indicate if the test conducted was simulated.
Type Location Comment ScanID Simulated
Passed Smoke Detector
Pre-Action System 2nd electrical room S/D Pre-action Passed 58844255 javascript:editViewDevice('58844255');
Page of 10 12 Battery & Power Supply Testing
Sting Alarm Inc. Download Date: 07/19/2023
Battery & Power Supply Testing Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Battery & Power Supply Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
Type Location Rated Ah
Rated Volts Pre Test
Post Test Min Ah Tested Ah
Battery
Passed Sealed Lead Acid 1st Near Riser Pre-Action
Panel Battery 1 12 12 13.75 7.80 8.25
Sealed Lead Acid 1st Near Riser Pre-Action Panel Battery 2
12 12 13.77 7.80 8.63
Sealed Lead Acid 1st West Near Riser Power Supply Battery 1
7 12 13.75 4.30 4.85
Sealed Lead Acid 1st West Near Riser Power Supply Battery 2
7 12 13.65 4.30 4.35
Protection Type Location Rated Ah Rated Volts Charging Voltage Power Supply
Passed Breaker 1st West Near Riser NAC
Power Supply 20 120
Page of 11 12 Inventory & Warranty Report
Sting Alarm Inc. Download Date: 07/19/2023
Inventory & Warranty Report Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Battery Control 25.00% 4
Control Panel Control 6.25% 1
Module Monitor 6.25% 1
Power Supply Control 6.25% 1
Pull Station Initiating 18.75% 3
Smoke Detector Initiating 6.25% 1
Supervisory Device Supervisory 6.25% 1
Tamper Switch Supervisory 12.50% 2
Waterflow Switch Initiating 12.50% 2
Type Qty Model # Description Install Date
In Service - 3 Years to 5 Years Interstate Battery
Battery 2 SLA 1104 Sealed Lead Acid 07/11/2019
Sigmas Tek Battery 2 SP12-7.5 Sealed Lead Acid 05/21/2019
In Service - 5 Years to 10 Years Smoke Detector 1 Photoelectric 07/29/2016
Fire-Lite Power Supply 1 FCPS-24FS6 07/29/2016
Mircom Module 1 MIX-M500S 07/29/2016 Pull Station 3 MS-710ADU Dual Action 07/29/2016
Nibco Tamper Switch 2 GD-4765-8N 07/29/2016
Potter Supervisory Device 1 PS40-2 Hi/Lo Air Switch 07/29/2016 Waterflow Switch 1 PS10-2 07/29/2016 Waterflow Switch 1 VSR 07/29/2016
Viking Control Panel 1 VFR-400 Conventional 07/29/2016
Page of 12 12 Zone Address Report
Sting Alarm Inc. Download Date: 07/19/2023
Zone Address Report Generated by: BuildingReports.com
Building: BOR - 200 Building Control Panel: 1 - Viking VFR-400 The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.
Address Device Type Location Type ScanID L3M140 Pull Station main entrance Dual Action 35478759 L3M141 Pull Station rear entrance Dual Action 35478761 L3M142 Pull Station security Dual Action 35478760 javascript:editViewDevice('35478759');
javascript:editViewDevice('35478761');
javascript:editViewDevice('35478760');
For
BOR - 1400 Building 500 Fir Street
Boulder City, NV 89005
Tested to NFPA 72 Standards
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Inspection Date Jun 29, 2023
Building: BOR - 1400 Building Company: Sting Alarm Inc.
Contact: Pete Gonzales Contact: Christian Pinto
Page of 2 12
Sting Alarm Inc. Download Date: 07/19/2023
Executive Summary Generated by: BuildingReports.com
Building Information Building: BOR - 1400 Building Contact: Pete Gonzales Address: 500 Fir Street Phone: 702-293-8024 Address: Fax:
City/State/ZIP Code: Boulder City, NV 89005 Mobile:
Country: United States of America Email: pgonzales@usbr.gov
Inspection Performed By Company: Sting Alarm Inc. Inspector: Christian Pinto Address: 7120 Rafael Ridge Way Phone: 7026267560 Address: Fax:
City/State/ZIP Code: Las Vegas, NV 89119 Mobile:
Country: United States of America Email: christian@signalfireinc.com
System Control Unit Manufacturer: GE Security Inspection Date: 01/27/2023 IDC Style: B Model Number: quick start Install Date: 02/05/2015 SLC Style: Addr Software Version: Version Date: 08/03/2016 NAC Style: Y Location: 1st Inside Electrical Room Current Protection: Breaker
Page of 3 12
Sting Alarm Inc. Download Date: 07/19/2023
Inspection Summary
Category:
Total Items Serviced Passed Failed/Other
Qty % Qty % Qty % Qty % Auxiliary 3 8.82% 0 0.00% 0 0.00% 0 0.00%
Control 10 29.41% 4 40.00% 4 100.00% 0 0.00%
Indicating 1 2.94% 1 100.00% 1 100.00% 0 0.00%
Initiating 15 44.12% 4 26.67% 4 100.00% 0 0.00%
Supervisory 5 14.71% 5 100.00% 5 100.00% 0 0.00%
Totals 34 100% 14 41.18% 14 100.00% 0 0.00%
Certification
Company: Sting Alarm Inc. Building: BOR - 1400 Building
Page of 4 12
Sting Alarm Inc. Download Date: 07/19/2023
Inspection & Testing Generated by: BuildingReports.com
Building: BOR - 1400 Building Control Panel: 1 - GE Security quick start The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Control
Control Panel 1st Inside Electrical Room Tested 8:03:40 AM 01/27/2023
Device Type Location Service Time Date
Untested Control
Battery 1st Inside Electrical Room battery 1
Battery 1st Inside Electrical Room battery 2 javascript:editViewDevice('33046392');
javascript:editViewDevice('51475381');
javascript:editViewDevice('51475382');
Page of 5 12
Sting Alarm Inc. Download Date: 07/19/2023
Building: BOR - 1400 Building Control Panel: 2 The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Control
Annunciator 1st Front Main Entrance Tested 7:58:15 AM 01/27/2023
Power Supply 1st Inside Electrical Room 130 A Tested 11:34:32 AM 06/29/2023
Power Supply 2nd Center Electrical Room 231 Tested 11:34:35 AM 06/29/2023
Indicating
Horn/Strobe Throughout Building Tested 11:34:26 AM 06/29/2023
Initiating
Pull Station 1st Front Main Entrance Tested 7:55:30 AM 01/27/2023
Waterflow Switch 1st Inside Fire Riser Room Tested 8:42:54 AM 01/26/2023
Waterflow Switch 1st Inside Fire Riser Room Tested 8:42:58 AM 01/26/2023
Waterflow Switch 1st Inside Fire Riser Room Tested 8:43:02 AM 01/26/2023
Supervisory
Tamper Switch 1st Inside Fire Riser Room Tested 8:29:42 AM 01/26/2023
Tamper Switch 1st Inside Fire Riser Room Tested 8:29:44 AM 01/26/2023
Tamper Switch 1st Inside Fire Riser Room Tested 8:29:48 AM 01/26/2023
Tamper Switch 1st Inside Fire Riser Room Tested 8:30:21 AM 01/26/2023
Tamper Switch 1st Inside elevator tamper Tested 8:42:51 AM 01/26/2023
Device Type Location Service Time Date
Untested Auxiliary
Elevator 1st Elevator Equipment Room control relay
Elevator 1st Elevator Equipment Room control relay
Elevator 1st Elevator Equipment Room control relay
Control
Battery 1st East Electrical Room 130 A FACP Battery 1
Battery 1st East Electrical Room 130 A FACP Battery 2
Battery 2nd Inside Electrical Room battery 1
Battery 2nd Inside Electrical Room battery 2
Initiating
Duct Detector Roof air handler 1 Return duct detector
Duct Detector Roof air handler 1 supply duct detector
Duct Detector Roof air handler 2 Return duct detector
Duct Detector Roof air handler 2 Supply duct detector javascript:editViewDevice('51474786');
javascript:editViewDevice('33046393');
javascript:editViewDevice('51473920');
javascript:editViewDevice('51475384');
javascript:editViewDevice('51475386');
javascript:editViewDevice('33046400');
javascript:editViewDevice('33046401');
javascript:editViewDevice('33046402');
javascript:editViewDevice('33046396');
javascript:editViewDevice('33046397');
javascript:editViewDevice('33046398');
javascript:editViewDevice('33046399');
javascript:editViewDevice('58845688');
javascript:editViewDevice('51474743');
javascript:editViewDevice('51474744');
javascript:editViewDevice('51474745');
javascript:editViewDevice('51475385');
javascript:editViewDevice('33046394');
javascript:editViewDevice('51473941');
javascript:editViewDevice('51473942');
javascript:editViewDevice('51474781');
javascript:editViewDevice('51474782');
javascript:editViewDevice('51474746');
javascript:editViewDevice('51474625');
Page of 6 12
Sting Alarm Inc. Download Date: 07/19/2023
Device Type Location Service Time Date
Untested Smoke Detector 1st Elevator Equipment Room smoke detector
Smoke Detector 1st East S/D Electrical Rm above FACP
Smoke Detector 1st East S/D Main Electrical Rm
Smoke Detector 1st Front Elevator Lobby smoke detector
Smoke Detector 2nd Center S/D Electrical Room 231
Smoke Detector 2nd Center S/D Telecom/IDF Rm 229
Smoke Detector 2nd Front Elevator Lobby smoke detector javascript:editViewDevice('51474742');
javascript:editViewDevice('58845753');
javascript:editViewDevice('58845754');
javascript:editViewDevice('51474740');
javascript:editViewDevice('58845756');
javascript:editViewDevice('58845755');
javascript:editViewDevice('51474741');
Page of 7 12
Sting Alarm Inc. Download Date: 07/19/2023
Service Summary Generated by: BuildingReports.com
Building: BOR - 1400 Building The Service Summary section provides an overview of the services performed in this report.
Device Type Service Quantity
Passed Annunciator Tested 1 Control Panel Tested 1 Horn/Strobe Tested 1 Power Supply Tested 2 Pull Station Tested 1 Tamper Switch Tested 5 Waterflow Switch Tested 3
Total 14
Untested Battery 6 Duct Detector 4 Elevator 3 Smoke Detector 7
Total 20 Grand Total 34
Page of 8 12
Sting Alarm Inc. Download Date: 07/19/2023
Auxiliary Functions Testing Generated by: BuildingReports.com
Building: BOR - 1400 Building Control Panel: 2 The Auxiliary Functions Testing section lists each of the ancillary items, systems, and emergency equipment that are controlled by the system control unit. Items are grouped by Passed or Failed/Other. The items are listed by device type, and a check box is provided to indicate if the test conducted was simulated.
Type Location Comment ScanID Simulated
Untested Elevator
Recall Primary 1st Elevator Equipment Room control relay 51474743 Recall Alternate 1st Elevator Equipment Room control relay 51474744 Fireman's Hat 1st Elevator Equipment Room control relay 51474745
Duct Detector AHU Shutdown Roof air handler 1 Return duct detector 51474781 AHU Shutdown Roof air handler 1 supply duct detector 51474782 AHU Shutdown Roof air handler 2 Return duct detector 51474746 AHU Shutdown Roof air handler 2 Supply duct detector 51474625
Smoke Detector Elevator Recall 1st Elevator Equipment Room smoke detector 51474742 Smoke Compartment 1st East S/D Electrical Rm above FACP 58845753 Smoke Compartment 1st East S/D Main Electrical Rm 58845754 Elevator Recall 1st Front Elevator Lobby smoke detector 51474740 Smoke Compartment 2nd Center S/D Electrical Room 231 58845756 Smoke Compartment 2nd Center S/D Telecom/IDF Rm 229 58845755 Elevator Recall 2nd Front Elevator Lobby smoke detector 51474741 javascript:editViewDevice('51474743');
javascript:editViewDevice('51474744');
javascript:editViewDevice('51474745');
javascript:editViewDevice('51474781');
javascript:editViewDevice('51474782');
javascript:editViewDevice('51474746');
javascript:editViewDevice('51474625');
javascript:editViewDevice('51474742');
javascript:editViewDevice('58845753');
javascript:editViewDevice('58845754');
javascript:editViewDevice('51474740');
javascript:editViewDevice('58845756');
javascript:editViewDevice('58845755');
javascript:editViewDevice('51474741');
Page of 9 12
Sting Alarm Inc. Download Date: 07/19/2023
Battery & Power Supply Testing Generated by: BuildingReports.com
Building: BOR - 1400 Building Control Panel: 1 - GE Security quick start
The Battery & Power Supply Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
Type Location Rated Ah
Rated Volts Pre Test
Post Test Min Ah Tested Ah
Battery
Untested Sealed Lead Acid 1st Inside Electrical Room battery 1 7 12
Sealed Lead Acid 1st Inside Electrical Room battery 2
7 12
Building: BOR - 1400 Building Control Panel: 2 The Battery & Power Supply Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
Type Location Rated Ah
Rated Volts Pre Test
Post Test Min Ah Tested Ah
Battery
Untested Sealed Lead Acid 1st East Electrical Room 130 A
FACP Battery 1 12 12
Sealed Lead Acid 1st East Electrical Room 130 A FACP Battery 2
12 12
Sealed Lead Acid 2nd Inside Electrical Room battery 1
7 12
Sealed Lead Acid 2nd Inside Electrical Room battery 2
8 12
Protection Type Location Rated Ah Rated Volts Charging Voltage Power Supply
Passed Breaker 1st Inside Electrical Room 130
A 20 120
Breaker 2nd Center Electrical Room
Page of 10 12
Sting Alarm Inc. Download Date: 07/19/2023
Inventory & Warranty Report Generated by: BuildingReports.com
Building: BOR - 1400 Building Control Panel: 1 - GE Security quick start The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Annunciator Control 2.94% 1
Battery Control 17.65% 6
Control Panel Control 2.94% 1
Duct Detector Initiating 11.76% 4
Elevator Auxiliary 8.82% 3
Horn/Strobe Indicating 2.94% 1
Power Supply Control 5.88% 2
Pull Station Initiating 2.94% 1
Smoke Detector Initiating 20.59% 7
Tamper Switch Supervisory 14.71% 5
Waterflow Switch Initiating 8.82% 3
Type Qty Model # Description Install Date
In Service - 1 Year to 2 Years power sonic
Battery 2 ps-1270-f1 Sealed Lead Acid 09/27/2021
In Service - 5 Years to 10 Years GE Security
Control Panel 1 quick start 02/05/2015
Building: BOR - 1400 Building Control Panel: 2 The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Type Qty Model # Description Install Date
In Service - 5 Years to 10 Years Duracell
Battery 2 DURA12-8A Sealed Lead Acid 09/11/2017
Mk Power Battery 2 ES12-12SA Sealed Lead Acid 07/21/2017
Fire-Lite Power Supply 2 FCPS-24FS8 02/05/2015
GE
Smoke Detector 4 Photoelectric 02/05/2015
GE Security Annunciator 1 LCD Display 02/05/2015
Page of 11 12
Sting Alarm Inc. Download Date: 07/19/2023
Duct Detector 4 GSA-SD Photoelectric 02/05/2015 Elevator 1 Fireman's Hat 02/05/2015 Elevator 1 Recall Alternate 02/05/2015 Elevator 1 Recall Primary 02/05/2015 Horn/Strobe 1 Quick Start 02/05/2015 Pull Station 1 Dual Action 02/05/2015 Smoke Detector 3 Photoelectric 02/05/2015
NIBCO
Tamper Switch 5 GD-4765-8N 02/05/2015
Potter Waterflow Switch 1 PS10-2 02/05/2015 Waterflow Switch 2 VSR 02/05/2015
Page of 12 12
Sting Alarm Inc. Download Date: 07/19/2023
Zone Address Report Generated by: BuildingReports.com
Building: BOR - 1400 Building Control Panel: 2 The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.
Address Device Type Location Type ScanID D001 Smoke Detector 1st East S/D Electrical Rm above FACP Photoelectric 58845753 D002 Smoke Detector 1st Elevator Equipment Room smoke detector Photoelectric 51474742
D003 Smoke Detector 1st East S/D Main Electrical Rm Photoelectric 58845754 D004 Smoke Detector 1st Front Elevator Lobby smoke detector Photoelectric 51474740 D005 Smoke Detector 2nd Center S/D Electrical Room 231 Photoelectric 58845756 D006 Smoke Detector 2nd Center S/D Telecom/IDF Rm 229 Photoelectric 58845755 D007 Smoke Detector 2nd Front Elevator Lobby smoke detector Photoelectric 51474741 D128 Elevator 1st Elevator Equipment Room control relay Recall Primary 51474743
D129 Elevator 1st Elevator Equipment Room control relay
Recall Alternate 51474744
D130 Elevator 1st Elevator Equipment Room control relay
Fireman's Hat 51474745
L1D008 Duct Detector Roof air handler 1 supply duct detector Photoelectric 51474782 L1D009 Duct Detector Roof air handler 1 Return duct detector Photoelectric 51474781 L1D010 Duct Detector Roof air handler 2 Supply duct detector Photoelectric 51474625 L1D011 Duct Detector Roof air handler 2 Return duct detector Photoelectric 51474746
P1C1D136 /L2M105
Pull Station 1st Front Main Entrance Dual Action 51475386 javascript:editViewDevice('58845753');
javascript:editViewDevice('51474742');
javascript:editViewDevice('58845754');
javascript:editViewDevice('51474740');
javascript:editViewDevice('58845756');
javascript:editViewDevice('58845755');
javascript:editViewDevice('51474741');
javascript:editViewDevice('51474743');
javascript:editViewDevice('51474744');
javascript:editViewDevice('51474745');
javascript:editViewDevice('51474782');
javascript:editViewDevice('51474781');
javascript:editViewDevice('51474625');
javascript:editViewDevice('51474746');
javascript:editViewDevice('51475386');
For
BOR - Admin Building 500 Fir Street
Boulder City, NV 89005
Tested to NFPA 72 Standards
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Inspection Date Jun 29, 2023
Building: BOR - Admin Building Company: Sting Alarm Inc.
Contact: Pete Gonzales Contact: Christian Pinto
Page of 2 14
Sting Alarm Inc. Download Date: 07/19/2023
Executive Summary Generated by: BuildingReports.com
Building Information Building: BOR - Admin Building Contact: Pete Gonzales Address: 500 Fir Street Phone: 702-293-8024 Address: Fax:
City/State/ZIP Code: Boulder City, NV 89005 Mobile:
Country: United States of America Email: pgonzales@usbr.gov
Inspection Performed By Company: Sting Alarm Inc. Inspector: Christian Pinto Address: 7120 Rafael Ridge Way Phone: 7026267560 Address: Fax:
City/State/ZIP Code: Las Vegas, NV 89119 Mobile:
Country: United States of America Email: christian@signalfireinc.com
System Control Unit Manufacturer: Mircom Inspection Date: 06/29/2023 IDC Style: B Model Number: Flexnet Install Date: 02/05/2015 SLC Style: 2 Software Version: Version Date: 08/03/2016 NAC Style: Y Location: Basement Server Room Current Protection: Breaker
Central Station Signal Verification Type: Digital Radio Mfg: AES Model #: 7788
Test Time/Date: Restore Time: Note:
Page of 3 14
Sting Alarm Inc. Download Date: 07/19/2023
Inspection Summary
Category:
Total Items Serviced Passed Failed/Other
Qty % Qty % Qty % Qty % Control 8 28.57% 7 87.50% 5 71.43% 2 28.57%
Indicating 1 3.57% 1 100.00% 1 100.00% 0 0.00%
Initiating 17 60.71% 4 23.53% 4 100.00% 0 0.00%
Supervisory 2 7.14% 2 100.00% 2 100.00% 0 0.00%
Totals 28 100% 14 50.00% 12 85.71% 2 14.29%
Certification
Company: Sting Alarm Inc. Building: BOR - Admin Building
Page of 4 14
Sting Alarm Inc. Download Date: 07/19/2023
Discrepancy Report Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.
Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer's replacement/upgrade program is included.
Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade
No items found during this inspection.
ScanID Location Problem Address Reference
Control Battery
1 51473913 1st Storage Room 108 Power Supply Battery 1
Failed Test 1 NFPA72 Table
14.4.3.2 (9a)(1)
1 51473914 1st Storage Room 108 Power Supply Battery 2
Failed Test 1 NFPA72 Table
14.4.3.2 (9a)(1)
Code References NFPA72 Table 14.4.3.2 (9a)(1)
Batteries shall be replaced in accordance with the recommendations of the alarm equipment manufacturer or when the recharged battery voltage or current falls below the manufacturer's recommendations javascript:editViewDevice('51473913');
javascript:editViewDevice('51473914');
Page of 5 14
Sting Alarm Inc. Download Date: 07/19/2023
Proposed Solutions Report Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.
ScanID Location Solution Model # Cost Fix
Control Battery
51473913 1st Storage Room 108 Power Supply Battery 1 Replace Battery ES7-12A T/M 51473914 1st Storage Room 108 Power Supply Battery 2 Replace Battery ES7-12A T/M
Page of 6 14 Notes & Recommendations
Sting Alarm Inc. Download Date: 07/19/2023
Notes & Recommendations Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by Category.
Note Device Type Location Comment ScanID Control
1 Battery 1st Storage Room 108 Power Supply Battery
Failed Test 51473913
6/29/2023 - batteries failed in previous inspection 2 Battery 1st Storage Room 108 Power Supply Battery
Failed Test 51473914
6/29/2023 - batteries failed in previous inspection javascript:editViewDevice('51473913');
javascript:editViewDevice('51473914');
Page of 7 14
Sting Alarm Inc. Download Date: 07/19/2023
Inspection & Testing Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Control
Battery Basement Server Room FACP Battery 1 Tested 10:06:08 AM 06/29/2023
Battery Basement Servers Room Tested 1:27:41 PM 01/26/2023
Battery Basement Servers Room FACP Battery 2 Tested 10:05:33 AM 06/29/2023
Control Panel Basement Server Room Tested 10:59:27 AM 06/29/2023
Power Supply 1st Storage Room 108 S NAC Power Supply
Tested 10:47:38 AM 06/29/2023
Indicating
Horn/Strobe Tested Audibles throughout building Tested 10:51:36 AM 06/29/2023
Initiating
Pull Station Bunker near FACP Tested 9:17:00 AM 01/27/2023
Smoke Detector Basement above FACP Tested/Cleaned 10:52:05 AM 06/29/2023
Smoke Detector 1st storage room 108 S/D Tested/Cleaned 10:49:31 AM 06/29/2023
Waterflow Switch 1st Mechanical room Tested 9:52:09 AM 01/26/2023
Supervisory
Tamper Switch 1st Mechanical room Tested 9:52:02 AM 01/26/2023
Tamper Switch 3rd corridor Tested 9:52:06 AM 01/26/2023
Device Type Location Service Time Date
Failed/Other Control
1 Battery 1st Storage Room 108 Power Supply Battery 1
Tested 10:47:15 AM 06/29/2023
1 Battery 1st Storage Room 108 Power Supply Battery 2
Tested 10:47:27 AM 06/29/2023
Device Type Location Service Time Date
Untested Control
Communicator Basement Server Room
Initiating
Duct Detector 1st Room 110 MER #2
Duct Detector 1st Room 115 MER #3
Duct Detector 1st Room C-112 javascript:editViewDevice('45751140');
javascript:editViewDevice('33046385');
javascript:editViewDevice('45751141');
javascript:editViewDevice('33046381');
javascript:editViewDevice('51473932');
javascript:editViewDevice('54612339');
javascript:editViewDevice('45751143');
javascript:editViewDevice('45751142');
javascript:editViewDevice('51473936');
javascript:editViewDevice('51473939');
javascript:editViewDevice('51473940');
javascript:editViewDevice('51473912');
javascript:editViewDevice('51473913');
javascript:editViewDevice('51473914');
javascript:editViewDevice('33046384');
javascript:editViewDevice('45751153');
javascript:editViewDevice('58845690');
javascript:editViewDevice('58845689');
Page of 8 14
Sting Alarm Inc. Download Date: 07/19/2023
Device Type Location Service Time Date
Untested Duct Detector 3rd Room 316 MER #5 AHU 5
Heat Detector Bunker electrical room
Heat Detector Bunker elevator equipment room
Smoke Detector Basement IT Room
Smoke Detector Basement IT Room
Smoke Detector 1st elevator lobby
Smoke Detector 2nd elevator lobby
Smoke Detector 3rd elevator lobby
Smoke Detector Bunker electrical room
Smoke Detector Bunker elevator equipment room javascript:editViewDevice('58845692');
javascript:editViewDevice('45751156');
javascript:editViewDevice('51473937');
javascript:editViewDevice('63392168');
javascript:editViewDevice('63392170');
javascript:editViewDevice('51473935');
javascript:editViewDevice('51473934');
javascript:editViewDevice('51473933');
javascript:editViewDevice('45751155');
javascript:editViewDevice('51473938');
Page of 9 14
Sting Alarm Inc. Download Date: 07/19/2023
Service Summary Generated by: BuildingReports.com
Building: BOR - Admin Building The Service Summary section provides an overview of the services performed in this report.
Device Type Service Quantity
Failed/Other Battery Tested 2
Total 2
Passed Battery Tested 3 Control Panel Tested 1 Horn/Strobe Tested 1 Power Supply Tested 1 Pull Station Tested 1 Smoke Detector Tested/Cleaned 2 Tamper Switch Tested 2 Waterflow Switch Tested 1
Total 12
Untested Communicator 1 Duct Detector 4 Heat Detector 2 Smoke Detector 7
Total 14 Grand Total 28
Page of 10 14
Sting Alarm Inc. Download Date: 07/19/2023
Auxiliary Functions Testing Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Auxiliary Functions Testing section lists each of the ancillary items, systems, and emergency equipment that are controlled by the system control unit. Items are grouped by Passed or Failed/Other. The items are listed by device type, and a check box is provided to indicate if the test conducted was simulated.
Type Location Comment ScanID Simulated
Passed Smoke Detector
Smoke Compartment Basement above FACP Passed 45751142 Smoke Compartment 1st storage room 108 S/D Passed 51473936
Untested Duct Detector
AHU Shutdown 1st Room 110 MER #2 45751153 AHU Shutdown 1st Room 115 MER #3 58845690 AHU Shutdown 1st Room C-112 58845689 AHU Shutdown 3rd Room 316 MER #5 AHU 5 58845692
Heat Detector Smoke Compartment Bunker electrical room 45751156 Smoke Compartment Bunker elevator equipment room 51473937
Smoke Detector Smoke Compartment Basement IT Room 63392168 Smoke Compartment Basement IT Room 63392170 Smoke Compartment 1st elevator lobby 51473935 Smoke Compartment 2nd elevator lobby 51473934 Smoke Compartment 3rd elevator lobby 51473933 Smoke Compartment Bunker electrical room 45751155 Smoke Compartment Bunker elevator equipment room 51473938 javascript:editViewDevice('45751142');
javascript:editViewDevice('51473936');
javascript:editViewDevice('45751153');
javascript:editViewDevice('58845690');
javascript:editViewDevice('58845689');
javascript:editViewDevice('58845692');
javascript:editViewDevice('45751156');
javascript:editViewDevice('51473937');
javascript:editViewDevice('63392168');
javascript:editViewDevice('63392170');
javascript:editViewDevice('51473935');
javascript:editViewDevice('51473934');
javascript:editViewDevice('51473933');
javascript:editViewDevice('45751155');
javascript:editViewDevice('51473938');
Page of 11 14
Sting Alarm Inc. Download Date: 07/19/2023
Battery & Power Supply Testing Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Battery & Power Supply Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
Type Location Rated Ah
Rated Volts Pre Test
Post Test Min Ah Tested Ah
Battery
Passed Sealed Lead Acid Basement Server Room FACP
Battery 1 18 12 13.80 11.70 15.30
Sealed Lead Acid Basement Servers Room 7 12 13.99 4.3 6.07 Sealed Lead Acid Basement Servers Room
FACP Battery 2 18 12 13.56 11.70 13.65
Failed/Other Sealed Lead Acid 1st Storage Room 108 Power
Supply Battery 1 7 12
Sealed Lead Acid 1st Storage Room 108 Power Supply Battery 2
7 12
Protection Type Location Rated Ah Rated Volts Charging Voltage Power Supply
Passed Breaker 1st Storage Room 108 S NAC
Page of 12 14
Sting Alarm Inc. Download Date: 07/19/2023
Inventory & Warranty Report Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Battery Control 17.86% 5
Communicator Control 3.57% 1
Control Panel Control 3.57% 1
Duct Detector Initiating 14.29% 4
Heat Detector Initiating 7.14% 2
Horn/Strobe Indicating 3.57% 1
Power Supply Control 3.57% 1
Pull Station Initiating 3.57% 1
Smoke Detector Initiating 32.14% 9
Tamper Switch Supervisory 7.14% 2
Waterflow Switch Initiating 3.57% 1
Type Qty Model # Description Install Date
In Service - 1 Year to 2 Years power sonic
Battery 1 PS 12180 NB Sealed Lead Acid 09/25/2021 Battery 1 PS-12180 NB Sealed Lead Acid 09/25/2021
In Service - 2 Years to 3 Years Power Sonic
Battery 1 PS-1270 F1 Sealed Lead Acid 07/19/2021
In Service - 3 Years to 5 Years System Sensor
Horn/Strobe 1 P2W, Mini Horns, P 10/30/2019
In Service - 5 Years to 10 Years Mk Power
Battery 2 ES7-12A Sealed Lead Acid 04/04/2018
Mircom Control Panel 1 Flexnet Addressable 02/05/2015 Heat Detector 2 MX-2251AP Rate-of-Rise 02/05/2015 Pull Station 1 MS-710 APU Dual Action 02/05/2015 Smoke Detector 9 MX-2251AP Photoelectric 02/05/2015
Potter Power Supply 1 PSN - 106 02/05/2015
In Service - 15 Years to 25 Years
Page of 13 14
Sting Alarm Inc. Download Date: 07/19/2023
AES
Communicator 1 7788 Digital Radio 10/05/2007
Mircom Duct Detector 4 MIX2251 Photoelectric 10/05/2007
Potter Electric Waterflow Switch 1 VSR-F 10/05/2007
Victaulic Tamper Switch 2 705W 10/05/2007
Page of 14 14
Sting Alarm Inc. Download Date: 07/19/2023
Zone Address Report Generated by: BuildingReports.com
Building: BOR - Admin Building Control Panel: 1 - Mircom Flexnet The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.
Address Device Type Location Type ScanID Zone/Circuit: 2
005 Smoke Detector Basement IT Room Photoelectric 63392168 005 Smoke Detector Basement IT Room Photoelectric 63392170 005 Smoke Detector Basement above FACP Photoelectric 45751142 008 Smoke Detector Bunker elevator equipment room Photoelectric 51473938 009 Smoke Detector Bunker electrical room Photoelectric 45751155 010 Smoke Detector 1st elevator lobby Photoelectric 51473935 011 Smoke Detector 2nd elevator lobby Photoelectric 51473934 012 Power Supply 1st Storage Room 108 S NAC Power
Supply 51473932
012 Smoke Detector 3rd elevator lobby Photoelectric 51473933 013 Heat Detector Bunker elevator equipment room Rate-of-Rise 51473937 014 Heat Detector Bunker electrical room Rate-of-Rise 45751156 015 Smoke Detector 1st storage room 108 S/D Photoelectric 51473936 2,19 Duct Detector 3rd Room 316 MER #5 AHU 5 Photoelectric 58845692
L2M120 Pull Station Bunker near FACP Dual Action 45751143 javascript:editViewDevice('63392168');
javascript:editViewDevice('63392170');
javascript:editViewDevice('45751142');
javascript:editViewDevice('51473938');
javascript:editViewDevice('45751155');
javascript:editViewDevice('51473935');
javascript:editViewDevice('51473934');
javascript:editViewDevice('51473932');
javascript:editViewDevice('51473933');
javascript:editViewDevice('51473937');
javascript:editViewDevice('45751156');
javascript:editViewDevice('51473936');
javascript:editViewDevice('58845692');
javascript:editViewDevice('45751143');
For
BOR - Annex Building 500 Fir Street
Boulder City, NV 89005
Tested to NFPA 72 Standards
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Inspection Date Jun 29, 2023
Building: BOR - Annex Building Company: Sting Alarm Inc.
Contact: Pete Gonzales Contact: Christian Pinto
Page of 2 11
Sting Alarm Inc. Download Date: 07/19/2023
Executive Summary Generated by: BuildingReports.com
Building Information Building: BOR - Annex Building Contact: Pete Gonzales Address: 500 Fir Street Phone: 702-293-8024 Address: Fax:
City/State/ZIP Code: Boulder City, NV 89005 Mobile:
Country: United States of America Email: pgonzales@usbr.gov
Inspection Performed By Company: Sting Alarm Inc. Inspector: Christian Pinto Address: 7120 Rafael Ridge Way Phone: 7026267560 Address: Fax:
City/State/ZIP Code: Las Vegas, NV 89119 Mobile:
Country: United States of America Email: christian@signalfireinc.com
Page of 3 11
Sting Alarm Inc. Download Date: 07/19/2023
Inspection Summary
Category:
Total Items Serviced Passed Failed/Other
Qty % Qty % Qty % Qty % Auxiliary 4 16.67% 4 100.00% 4 100.00% 0 0.00%
Control 5 20.83% 5 100.00% 5 100.00% 0 0.00%
Indicating 1 4.17% 1 100.00% 1 100.00% 0 0.00%
Initiating 12 50.00% 12 100.00% 12 100.00% 0 0.00%
Supervisory 2 8.33% 2 100.00% 2 100.00% 0 0.00%
Totals 24 100% 24 100.00% 24 100.00% 0 0.00%
Certification
Company: Sting Alarm Inc. Building: BOR - Annex Building
Page of 4 11
Sting Alarm Inc. Download Date: 07/19/2023
Inspection & Testing Generated by: BuildingReports.com
Building: BOR - Annex Building Control Panel: 1 The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Auxiliary
Programmable Relay
AC shut down the unit 7 Tested 10:40:19 AM 06/29/2023
Programmable Relay
AC shutdown unit 5 Tested 10:37:03 AM 06/29/2023
Programmable Relay
AC shutdown unit 6 Tested 10:39:51 AM 06/29/2023
Programmable Relay attic Power supply one relay module Tested 10:34:47 AM 06/29/2023
Control
Annunciator 1st main lobby Tested 1:37:31 PM 01/26/2023
Battery upstairs attic battery 1 Tested 10:33:22 AM 06/29/2023
Battery upstairs attic battery 2 Tested 10:33:56 AM 06/29/2023
Power Supply upstairs attic Power Supply Tested 10:36:25 AM 06/29/2023
Special Control Tested all Door Holders Tested/Cleaned 10:36:16 AM 06/29/2023
Indicating
Horn/Strobe Tested Horn Strobes throughout building Tested 10:41:21 AM 06/29/2023
Initiating
Duct Detector Attic D/D @ AC - 5 Tested 10:36:58 AM 06/29/2023
Duct Detector Attic D/D @ AC - 6 Tested 10:39:44 AM 06/29/2023
Duct Detector Attic D/D @ AC - 7 Tested 10:40:13 AM 06/29/2023
Pull Station 1st by aa-127 Tested 9:24:21 AM 01/27/2023
Pull Station 1st by aa-132 Tested 9:25:15 AM 01/27/2023
Pull Station 1st main entry Tested 9:19:54 AM 01/27/2023
Pull Station AA-118 Tested 9:23:34 AM 01/27/2023
Pull Station break room Tested 9:21:15 AM 01/27/2023
Pull Station break room Tested 9:21:41 AM 01/27/2023
Pull Station by aa-109 Tested 9:22:41 AM 01/27/2023
Smoke Detector S/D upstairs attic above Power Supply Tested/Cleaned 10:35:54 AM 06/29/2023
Waterflow Switch 1st Riser in janitors room Tested 10:09:44 AM 01/26/2023
Supervisory javascript:editViewDevice('45751139');
javascript:editViewDevice('45751139');
javascript:editViewDevice('45751134');
javascript:editViewDevice('45751134');
javascript:editViewDevice('45751137');
javascript:editViewDevice('45751137');
javascript:editViewDevice('63393762');
javascript:editViewDevice('63393762');
javascript:editViewDevice('33046389');
javascript:editViewDevice('45751131');
javascript:editViewDevice('45751132');
javascript:editViewDevice('51473931');
javascript:editViewDevice('54612322');
javascript:editViewDevice('54612323');
javascript:editViewDevice('45751133');
javascript:editViewDevice('45751136');
javascript:editViewDevice('45751138');
javascript:editViewDevice('35477502');
javascript:editViewDevice('35477501');
javascript:editViewDevice('35477500');
javascript:editViewDevice('35477503');
javascript:editViewDevice('35477504');
javascript:editViewDevice('35477505');
javascript:editViewDevice('35477506');
javascript:editViewDevice('45751129');
javascript:editViewDevice('33046390');
Page of 5 11
Sting Alarm Inc. Download Date: 07/19/2023
Device Type Location Service Time Date
Passed Tamper Switch 1st Corridor by AA132 Antifreeze Tested 10:05:01 AM 01/26/2023
Tamper Switch 1st Riser Room in Janitors room Tested 10:04:58 AM 01/26/2023 javascript:editViewDevice('58845691');
javascript:editViewDevice('33046391');
Page of 6 11
Sting Alarm Inc. Download Date: 07/19/2023
Service Summary Generated by: BuildingReports.com
Building: BOR - Annex Building The Service Summary section provides an overview of the services performed in this report.
Device Type Service Quantity
Passed Annunciator Tested 1 Battery Tested 2 Duct Detector Tested 3 Horn/Strobe Tested 1 Power Supply Tested 1 Programmable Relay Tested 4 Pull Station Tested 7 Smoke Detector Tested/Cleaned 1 Special Control Tested/Cleaned 1 Tamper Switch Tested 2 Waterflow Switch Tested 1
Total 24 Grand Total 24
Page of 7 11
Sting Alarm Inc. Download Date: 07/19/2023
Auxiliary Functions Testing Generated by: BuildingReports.com
Building: BOR - Annex Building Control Panel: 1 The Auxiliary Functions Testing section lists each of the ancillary items, systems, and emergency equipment that are controlled by the system control unit. Items are grouped by Passed or Failed/Other. The items are listed by device type, and a check box is provided to indicate if the test conducted was simulated.
Type Location Comment ScanID Simulated
Passed Programmable Relay
Relay Control AC shut down the unit 7 Passed 45751139 AC shutdown unit 5 Passed 45751134 AC shutdown unit 6 Passed 45751137 Monitor Model attic Power supply one relay module Passed 63393762
Duct Detector AHU Shutdown Attic D/D @ AC - 5 Passed 45751133 AHU Shutdown Attic D/D @ AC - 6 Passed 45751136 AHU Shutdown Attic D/D @ AC - 7 Passed 45751138
Smoke Detector Smoke Compartment S/D upstairs attic above Power Supply Passed 45751129 javascript:editViewDevice('45751139');
javascript:editViewDevice('45751134');
javascript:editViewDevice('45751137');
javascript:editViewDevice('63393762');
javascript:editViewDevice('45751133');
javascript:editViewDevice('45751136');
javascript:editViewDevice('45751138');
javascript:editViewDevice('45751129');
Page of 8 11
Sting Alarm Inc. Download Date: 07/19/2023
Battery & Power Supply Testing Generated by: BuildingReports.com
Building: BOR - Annex Building Control Panel: 1 The Battery & Power Supply Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
Type Location Rated Ah
Rated Volts Pre Test
Post Test Min Ah Tested Ah
Battery
Passed Sealed Lead Acid upstairs attic battery 1 7 12 13.71 4.55 6.52 Sealed Lead Acid upstairs attic battery 2 7 12 13.60 4.55 6.76 Protection Type Location Rated Ah Rated Volts Charging Voltage Power Supply
Passed Breaker upstairs attic Power Supply 5.1 120VAC 24VDC
Page of 9 11
Sting Alarm Inc. Download Date: 07/19/2023
Inventory & Warranty Report Generated by: BuildingReports.com
Building: BOR - Annex Building Control Panel: 1 The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Annunciator Control 4.17% 1
Battery Control 8.33% 2
Duct Detector Initiating 12.50% 3
Horn/Strobe Indicating 4.17% 1
Power Supply Control 4.17% 1
Programmable Relay Auxiliary 16.67% 4
Pull Station Initiating 29.17% 7
Smoke Detector Initiating 4.17% 1
Special Control Control 4.17% 1
Tamper Switch Supervisory 8.33% 2
Waterflow Switch Initiating 4.17% 1
Type Qty Model # Description Install Date
In Service - 3 Years to 5 Years Potter
Power Supply 1 PSN-106 08/10/2018
Power Patrol Battery 2 FAS 1075 Sealed Lead Acid 08/10/2018
In Service - 5 Years to 10 Years Mircom
Programmable Relay 2 MIX-M500R 07/23/2015 Programmable Relay 1 MIX-M500R Relay Control 07/23/2015 Programmable Relay 1 MIX-M500S Monitor Model 07/23/2015 Pull Station 7 MS-710ADU Dual Action 07/23/2015 Smoke Detector 1 Photoelectric 07/23/2015
System sensor Duct Detector 3 DNR Photoelectric 07/23/2015
Mircom Annunciator 1 LCD Display 02/05/2015 Horn/Strobe 1 02/05/2015
Potter Waterflow Switch 1 VSR 02/05/2015
Victaulic Tamper Switch 2 705W 02/05/2015
Watchman
Page of 10 11
Sting Alarm Inc.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .