140R3022R0022_Q_A_060822_0001.pdf

PDF 148 KB Posted

Attached to
D2 F9 Southwestern Willow Flycatcher Monitoring
Solicitation number
140R3022R0022
Issued by

About this file

This document contains questions and answers regarding a request for proposals for Southwestern Willow Flycatcher monitoring services. The key details are as follows:

The performance work statement outlines requirements to conduct surveys of Southwestern Willow Flycatcher at sites within Palo Verde Ecological Reserve, Cibola Valley Conservation Area, Cibola National Wildlife Refuge Unit #1, and Yuma East Wetlands every three years, with a third of each site surveyed each year. The contractor will provide raw survey data by September 15th, quality assured/quality controlled data by November 15th, and final data including statistical analysis by January 31st of each year. The solicitation was issued by the Department of the Interior Bureau of Reclamation and originally had a proposal due date of June 15th, 2022, which was extended to June 29th, 2022 by an amendment. The document clarifies that burned areas will not be fully surveyed but some suitable habitat sites within burned areas are included. It also confirms that nest monitoring is not required.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 140R3022R0022 - QUESTIONS AND ANSWERS

June 6, 2022

Q1: Kindly ask for a two‐week due date extension. Would this be possible?

A1: The proposal due date has been changed from Wednesday June 15, 2022, at 10:00 a.m. to Wednesday June 29, 2022, at 10:00 a.m.

June 7, 2022

Q2: For Task 1, the PWS states that sites at Palo Verde Ecological Reserve, Cibola Valley Conservation Area, Cibola National Wildlife Refuge Unit #1, and Yuma East Wetlands will be surveyed every 3 years.

Can you clarify how that effort will be distributed? For example, would a third of the sites in PVER (and the other LCR MSCP areas) be surveyed each year, or would all of PVER be surveyed in a single year every 3 years (i.e., once during the contract period)?

A2: For larger sites like PVER, and CVCA a third of each site will be surveyed in one year. For smaller sites like Yuma East Wetlands the entire site will be surveyed just once in one year.

Q3: For Task 3, it is stated that “None of the areas that were burned will be surveyed for this contract”.

However, several sites within the burned area (The Wallows, PC6‐1, 800M) are in the list of survey sites (Table 3). Please clarify whether these sites will be included in surveys.

A3: Those sites will be surveyed, as they may contain some suitable habitat. The PWS will be revised to reflect that most of the burned areas will not be surveyed.

Q4: Please clarify whether intensive nest monitoring (locating nests, determining success and productivity for each nest, identifying causes of nest failure) is being requested for Tasks 3 and 4.

A4: No, no nest monitoring will take place for Tasks 3 and 4.

Q5: In section 3.9.5, January and February due dates for the reports are listed as 2023, 2024, and 2025.

Should these be 2024, 2025, and 2026?

A5: Yes they should be 2024, 2025 and 2026. The PWS will be revised to correct this inadvertent error.

Q6: The Price Schedule lists Optional Line Item FAR 52.217‐8 Price Schedule – CLIN 040: March 1, 2026 to September 30, 2026. This Optional Line Item is also mentioned in Combined Synopsis/Solicitation: “d. Optional Line Item, IAW FAR 52.217-8 Option to Extend Services, Line item 0040, Southwestern Willow Flycatcher Monitoring in accordance with Attachment 1 – Performance Work Statement. The Performance Work Statement provides more detailed information about the requirement and is attached to the RFP at SAM.gov (opportunity reference number 140R3022R0022).”

However, there is no mention in the Performance Work Statement of extending services. Please explain what services would be covered under this line item.

A6: In accordance with FAR 52.217-8 Option to Extend Services, it would be equivalent to the cost of six months of work from the last option year.

Q7: Section 3.10 of the PWS states that we must provide resumes for all key personnel proposed to work on the project and Section 4.10 Delivery Schedule states that we must provide resumes prior to any field work. Does this mean that resumes are not required as part of our proposal? Related to that, the Synopsis/Solicitation document has no mention of resumes or any staff qualifications in the evaluation factors. Are we required to provide any staff qualifications or resumes with our proposal? If so, under which Factor should they be provided? If they should be provided under Factor 1 Technical Approach, will they count toward the page limit?

A7: It is at the offerors discretion to identify and submit resumes for key personnel proposed to work on the requirement. Resumes are not an evaluation factor. If resumes are so decided to be submitted, they would not count toward the page limit and would be considered a supplement to Factor 1 Technical Approach.

Q8: Part II – Technical Submission on pages 3‐4 of the Synopsis/Solicitation states that we must provide relevant projects with detailed descriptions, contract numbers, etc. It also states that we must provide past performance references with the same detail. However, Technical Evaluation Criteria Factor 3 – Past Performance on page 7 of the Synopsis/Solicitation states that no additional information is requested at the time of submission. Does this mean that no information in addition to the list of projects and references is required? Or does it mean that you will review our information in the CPARS system and contact the individual references we list for each project in Factor 2 – Experience and that no information is needed under Factor 3? Please confirm how many projects with references you require and under which factor (Experience or Past Performance) they should be presented.

A8: No information is needed under Factor 3. The Government will review CPARS, any other information available, and any information provided under Factor 2 as necessary. Factor 2 requires no less than two (2) projects but no more than five (5). Factor 3 requires no additional information to be submitted.

Q9: In section 3.9.3 of the PWS, the delivery date for final data (including statistical analyses) is listed as November 15. This is the same as the delivery date for corrected data. Should the delivery date for final data be later than November 15? Should this delivery date be January 31?

A9: It should read September 15 for raw data delivery, Nov 15 for QA/QC data, and January 31 for Final Data. The PWS will be revised to correct this error.

File details come from the government source that posted it. Updated .