Questions_and_Answers___2_0003.pdf

PDF 50 KB Posted

Attached to
Carbon dust collection system Federal contract opportunity
Solicitation number
140R3021Q0037
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to Carbon dust collection system, newest first.
File Type Posted
Sol_140R3021Q0037_Amd_0003.pdf PDF
Site_Visit_Questions_0002.pdf PDF
Sol_140R3021Q0037_Amd_0002.pdf PDF
Drawings_and_Photos_0001.pdf PDF
Sol_140R3021Q0037.pdf PDF
140R3021Q0037_-__Combined_Synopsis.pdf PDF
Attachment_A_-_Carbon_Dust_Collection_SOW_2021_02_23.pdf PDF
Attachment_B_-_Past_Performance.pdf PDF
Attachment_C_-_PRICE_SCHEDULE_TW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1 - Page 5 – C(a). Would we need to provide the New Carbon Brush holders equipped with “Dust Suction Shoes”? If so do you have more information on this.

Answer 1 - Yes, contractor will provide the new carbon brush holder equipped with dust suction. The dimensions of the carbon brush and holders are located in page 7 of the statement of work (SOW).

Question 2 - We have researched “Helwig” Mentioned on Page 7 but have not been able to get much information on the Dust Suction Shoes. Can you assist.

Answer 2 - The dust suction shoes are carbon brush holders designed collect the carbon debris or dust produced the generators' excitation system.

Question 3 - Also how much Airflow volume is required at each of the 20 x per system at the suction shoe?

Answer 3 - We do not have an airflow volume requirement. In the SOW Section 2.01(B)(b), the system is required to have a 90% collection rate of the carbon dust/debris produced from the carbon brushes during generator operation.

Question 4 - Do all 20 (Dust Suction Shoes) on each system operate at the same time?

Answer 4 - Yes, when a system is in operation, all 20 dust suction shoes are to operate.

Question 5 - Can you provide more information on what is required for “SCADA”. We are not familiar with this and want to make sure it is something we can provide prior to job walk.

Answer 5 - The designed system is to be capable of being monitoring and controlled (start/stop) via low voltage contacts.

Question 6 - Last – would it be possible to know how many bidders you have for this project and what other equipment brands are being offered.

Answer 6 – I cannot disclose that information at this time.

Question 7 - For the purpose of the Supervisor role for the installation, would this be considered a prevailing wage rate project.

Answer 7 – Yes, the wage rates are attached.